1. INDONESIA - MANADO
SOEKARNO BRIDGE
Cable Stayed
Bridge
Description of the Project:
Location Manado – Sulawesi – Indonesia
Structures Supply and installation of 11 pair of cable stayed on a new seashore road and balanced cantilever
bridge (120 meters total length) connecting to a single-pylon cable stayed bridge (372 meters total
length) over Manado Harbour.
Project value 28,9 billion IDR (2 000 k€)
Position and responsibility :
Project Manager in charge of :
Managing and developing a good relationship with the Main Contractor and the Owner
Representatives.
Coordinating actions with the design manager of the bridge, to make sure design is fitting with
Freyssinet works and reach the quality expected.
Follow-up of Main Contractor target program.
Preparation & negotiation of amendment and extra works.
Identifying potential technical / financial risks and establishing preventive measures to ensure
protection of Freyssinet interests.
Managing site works in accordance with contract requirements and DGP (Major Project Department)
standards regarding HSE.
Management of site team (local staff and expatriate).
Generating and monitoring budget objectives for Freyssinet works, included monthly forecast.
Putting in place a snagging process in order to deliver a high quality works for the satisfaction of the
Main Contractor and the Client.
Client:. Kementrian Pekerjaan Umum
(Public Work Ministry)
Consultant: PT. Partono Fondas
Contractor: PT Hutama Karya
Sub-Contractor: FREYSSINEY
Construction: May 2011 – Mar 2015
Freyssinet H2000 Parallel
Strand System (PSS)
cable stays:
+ 130 Ton of stay cable
+ 88 anchorages
Kementrian
Pekerjaan
Umum
François REMOND
Engineer with specialisation in civil and environmental engineering
francois.remond@centraliens-nantes.net
This document is confidential and may not be used, reproduced or
communicated either in whole or in part, in any form or manner
without the prior written agreement of François REMOND