JSC „LITHUANIAN
RAILWAYS” -
IMPLEMENTER OF THE
PROJECTS
STRUCTURE OF THE COMPANY
Head office
Freight transportation directorate
Passenger transportation directorate
Railway infrastructure directorate
Rail Baltic project directorate
JSC Railway environmental center
Information technologies center
Representative offices in:
China
Russia
Belarus
Subsidiaries:
JSC Center of railway construction
JSC Vilnius locomotive repair depot
JSC Railway security
JSC Railway designing
JSC “Rail Baltic” construction
Kazakhstan
ABOUT THE COMPANY
• JSC ,,Lithuanian Railways” – the largest transport and logistics company in
the Lithuania.
36
Freight Carrier
2015 year
48,1 mill. t
2015 year
4,2 mill. pass.
Passenger Carrier Railway network
1767 km
ABOUT THE COMPANY
• Experience – 150 years.
• 100% of the company's shares belong to the State.
• 10th place in EU by railways freight transportation volume (million ton-kilometers).
• Overall investment during last 10 years – 1.5 billion EUR.
2015 year
437 mill. EUR
2015 year
2,1 billion EUR
Employees
10,2 K
2015 year
Revenues Property
VILNIUS
Šiauliai
Tauragė
Panevėžys
Kaunas
Alytus
Utena
Turmantas
Pabradė
Kena
Stasylos
Senovė
Kybartai
Kazlų Rūda
Lentvaris
Kaišiadorys
GaižiūnaiPagėgiai
Radviliškis
Obeliai
JoniškisSkuodas
Kužiai
Mažeikiai
Bugeniai
Baltic sea
VaidotaiMarijampolė
Modernization of Kaunas station, bypass Palemonas
– Rokai – Jiesia and section Kaunas - Kybartai
signaling and power supply equipment
Road equipment modernization of Kaunas station,
bypass Palemonas – Rokai – Jiesia and section
Kaunas –Kybartai road equipment (stage I)
Installation of Traffic Control
Centre
Construction of the second track of
Vilnius bypass Kyviškės – Valčiūnai,
corridor IXB
Infrastructure restoration and modernization
(stage I) of the corridor IA section
Radviliškis – Pagėgiai – State border
Reconstruction of existing railway
section Kaunas (Palemonas) –
Gaižiūnai
Installation and modernization of Infrastructure
diagnostic systems
Reconstruction of road structures of
connecting railway line Klaipėda –
Pagėgiai
Modernization of the infrastructure of
connecting railway line Klaipėda –
Pagėgiai
Technical assistance (design) for track
modernization of section Vilnius – Kaunas
(speed up to 160 km/h) and for construction of
second track in the sections Kyviškės –
Valčiūnai and Pušynas – Paneriai
Technical assistance (design) for construction of
second tracks
Design and construction of an
intermodal terminal at the Vilnius
Public Logistics Centre
Design and construction of an
intermodal terminal at the Kaunas
Public Logistics Centre
Traffic safety program (upgrade of railway
emergency and crisis situations management
system )
Electrification of the Corridor IX, stage I. Design
Klaipėda
Construction of the second
track in the section Telšiai –
Dūseikiai
Construction of the second
track in the section
Kūlupėnai – Kretinga
Accomplished projects
Construction of the second
track in the section Pavenčiai
– Raudėnai
Construction of a new EU (1435 mm)
gauge railway line and modernization of
existing broad (1520 mm) gauge railway
line Šeštokai - Marijampolė;
Marijampolė - Kazlų Rūda – Kaunas
Modernization of existing EU (1435 mm) gauge
and dual (1435/1520 mm) gauge railway line
Polish/Lithuanian state border - Mockava;
Mockava – Šeštokai
ACCOMPLISHED INFRASTRUCTURE PROJECTS FOR FINANCIAL PERIOD
2007-2013
Reconstruction of the stations:
Draugystė;
Rimkai.
FREIGHT TRANSPORTATION BY RAIL PERSPECTIVES – 2030
East-West transit
North-South transit
Freight of local companies
50 mill. t
12 mill. t
60 mill. t
10 mill. t
The main freight flows
10 mill. t
Necessary capacities + 30 %
ES NVS
KENA
Boundary station
KLAIPĖDA
Sea Port
LITHUANIA – TRANSIT COUNTRY
EU
CIS
Kena – unique gates between EU and CIS
Border crossing formalities according to all
necessary EU rules takes only 30 min.
KENA
KLAIPĖDA
ŠEŠTOKAI
PASSENGERS CARRIAGE PERSPECTIVES - 2030
1. Servicing of transit passenger trains
2. Convenient connection by
international routes:
 Minsk direction;
 In 2016: Vilnius-Minsk in 2 hours.
 Warsaw / Berlin direction;
 In 2015: „Rail Baltica“ European
gauge to Kaunas.
 Riga / Tallinn direction.
3. Carriage of passengers on domestic
routes depends on the State policy
dealing with the public transport
organization and financing issues
 Most promising railway routes:
 Vilnius-Kaunas
 Vilnius-Šiauliai-Klaipėda
1. „Rail Baltica“ project construction.
2. Electrification of the IXB (Kena – Klaipėda) transport
corridor in the section Kena – Radviliškis.
3. Construction of the second track and extension of the
main stations of the IXB transport corridor.
THE MAIN STRATEGIC INFRASTRUCTURE DEVELOPMENT
AIMS IN 2014 - 2020 YEAR
I stage
Construction works
have been started
II stage
Date of public procurement for
electrification works – 06/2016
III stage (FIDIC yellow
book)
Date of public
procurement – 02/2017
After 2014 – 2020 years till 2030 years.
Klaipėda
Radviliškis
Kaunas Kaišiadorys
Kena
Vilnius
DEVELOPMENT
OF THE IXB
CORRIDOR,
2014 – 2020 YEAR
Electrification of the line Radviliškis –
Klaipėda till 2030.
Planned electrification of the IXB transport
corridor (from Kena – N. Vilnia, Vilnius railway
junction, Kaišiadorys – Radviliškis, Šiauliai -
Radviliškis (Radviliškis yard) till 2020.
Existing electrified line N. Vilnia – Kaunas
IV stage (FIDIC
yellow book)
Date of public
procurement –
02/2017
Section Telšiai – Lieplaukė
Construction works have been
started
Vilnius bypass section
Pušynas – Paneriai
Procurement procedures
for construction works
almost completed
Pauostis yard
Date of public procurement
for construction works –
04/2016
Construction of the second
tracks
Reconstruction of the station
To design electrification of the line PL/LT border-
Kaunas
Construction of the railways in section Jiesia-
Rokai-Palemonas
Expropriation of the land in section Palemonas -
LT/LV border
To design the railway line in section Palemonas -
LT/LV border
Construction of the railways (I stage, Palemonas-
LT/LV border)
Construction of the railways in section Kaunas-
Palemonas
"RAIL BALTICA" PROJECT IMPLEMENTATION PLAN IN LITHUANIA BY 2020
Construction of the embankment (55 km) and
related infrastructure
- operating line
- designed line
- expropriated land
- constructed embankment
Construction of the maintenance and repair
facility with relevant infrastructure (depo)
Implementation of the ERTMS (Level 2 base line 3
or higher) and related systems in the line PL/LT-
Kaunas
To prepare the technical documentation for the
upgrade of speed on the line PL/LT-Kaunas
To prepare the studies (archaeological,
maintenance depot)
12
„RAIL BALTICA“
PROJECT DEVELOPMENT IN LITHUANIA. STAGE 1
THE SUCCESS STORY
13
PROBLEM:
VIA BALTICA overcrowded.
Heavy accidents almost everyday.
Press calls VIA BALTICA – „Death
Road“
SOLUTION:
Start to use „Rail Baltica“ ASAP:
- For container transportation;
- For semitrailers transportation
Kaunas
LV
PL/LT
Panevėžys
Rail Baltica project
development in Lithuania
Šiauliai
Rail Baltica -1
AECOM study
Vilnius
Construction
Stage 1
Max speed
120-160-240 km/h
16
OUR MAIN CHALLENGES
1. „Rail Baltica“ is the bigest infrastructure project of Lithuania;
2. Extremely short time for implementation;
3. Necessity to split implementation in to the parts, to coordinate separate
Contractors;
4. Works to be done on acting railway line during the traffic breaks;
5. Necessity to coordinate technical parameters, time table, take in to account the
needs and wishes and find common solutions with Neighbour countries,
Municipalities, Private People, Companies, State institutions.
17
OUR ACHIEVEMENTS 2010-2015 (1)
Following completion of international public procurement tenders, contracts were signed with
Consultants and Designers, who:
-Completed and presented feasibility studies, which examined the possibility of splitting the
entire line into separate railway sections;
-Completed technical designs;
-Obtained separated construction permits for each of the railway sections, which were based
on the territory of one or few municipalities.
Lithuanian Railways, through the Ministry of Transport and Communication of the Lithuanian
Republic, coordinated the approval of technical solutions and planned work schedules with
municipalities and other public institutions. If there was a necessity, the tripartite agreements
were signed between the Ministry of Transport and Communication, individual municipalities
and Lithuanian Railways for the implementation of the Rail Baltica project in the territory of the
specific municipality.
18
OUR ACHIEVEMENTS 2010-2015 (2)
The procurement of the construction works was executed through the
international tenders.
For some specific railway sections, in spite of an extremely important time
factor, due to the excessive prices, which were included in the tender
proposals, public procurement procedures were terminated and repeated
(in some cases – up to 3 times).
Proposals were evaluated based on the method of economic efficiency,
combining the proposed shortest timeframe for the construction
completion and the lowest price.
19
OUR ACHIEVEMENTS (3)
After the completion of technical design and obtainment of the construction permits,
between April and July, 2013, 11 construction contracts were signed with 5 main
contractors (tender winners), who made use of over 30 subcontractors. Moreover, 6
additional contracts were signed to provide Technical supervision and supervision of
technical design implementation.
Lithuanian Railways (specifically "Rail Baltica" project directorate) conducted the
function as the daily coordinator:
- Construction works had to be carried out simultaneously in all the railway sections
and only during the railway traffic breaks without the stopping the regular train traffic,
construction work schedules were thoroughly coordinated with each of the contractors,
Contractors capacity was verified on weekly basis (special films where produced to fix
changes in construction works and discussed and improvement possibilities discussed
with Contractors).
1. FEASIBILITY STUDIES AND TECHNICAL DESIGN WERE FINANCED
TEN-T program – 50%, remaining 50% by State budget and Lithuanian Railways (LG)
2. CONSTRUCTION WORKS:
2.1 For section from PL/LT border to Marijampolė
TEN-T – 27%, remaining 73% by State budget and Lithuanian Railways (LG)
2.2 For section from Marijampolė to Kaunas
Cohesion Fund – 85%, remaining 15% by State budget and Lithuanian Railways (LG)
Overall, “Rail Baltica” Stage 1 was financed from (in mln. EUR/ percent):
TEN-T – 21,4mln.EUR (7,1%) STATE BUDGET – 5,1mln. EUR (1,7%)
Cohesion Fund – 144,7mln. EUR (48, 1%) LG – 129,9mln.EUR (43,1%)
3. 2014-2020 EU financing period activities are financed 85% from Connecting Europe Facility (CEF) program and
remaining 15% by State budget and Lithuanian Railways (LG)
„RAIL BALTICA“ PROJECT FINANCING:
1. Contractors for feasibility studies and technical design of pre-assigned railways sections
were selected as the result of OPEN (INTERNATIONAL) PUBLIC TENDERS.
FEASIBILITY STUDIES
For section Šeštokai-Marijampolė was prepared by company Ernst & Young (GREAT
BRITAIN branch in Lithuania)
for section Marijampolė to Kaunas was prepared by company SYSTRA from FRANCE
SPECIAL PLAN for section from Palemonas to LT/LV border currently in prepartion by
AECOM (USA& GREAT BRITAIN branch in Lithuania)
2. TECHNICAL DESIGN
For section from Polish-Lithuanian state border to Mockava, technical design was prepared by a company
EPG (GERMAN branch in Lithuania)
For section from Šeštokai to Marijampolė was prepared by company SWECO (originated
from SWEDEN)
For section from Marijampolė to Kaunas, technical design was prepared by Kelprojektas
(LT,LV, EE investment company).
For section Palemonas – LT/LV border was prepared by ARDANUY Ingeniería (SPANISH
branch in Lithuania)
SECTION PL/LT STATE BORDER – KAUNAS CONTRACTORS FOR FEASIBILITY STUDIES
AND TECHNICAL DESIGN :
1. Contractors for construction works of pre-assigned railways sections were selected
as the result of OPENED (INTERNATIONAL) PUBL IC TENDERS.
2. These Contractors were selected:
2.1 Sections Lithuanian-Polish border- Mockava and
Mockava-Šeštokai (incl. Šeštokai Railway station)
UAB GELEŽINKELIO TIESIMO CENTRAS;
2.2 Section Šeštokai-Marijampolė (incl. Marijampolė Railway station)
AB KAUNO TILTAI (JSC with Polish) AND UAB MITNIJA (JAP*)
2.3 Section Marijampolė-Kazlų Rūda and Mauručiai- Jiesia
AB PANEVĖŽIO KELIAI
2.4. Section Kazlų Rūda-Mauručiai AB EUROVIA LIETUVAAND EUROVIA C.S. a.s. (JAP*) (shareholders from Czech Republic
and France)
2.5. Section Jiesia-Kaunas UAB HIDROSTATYBA AND UAB Šilutės automobilių keliai (JAP*)
*JAP- joint activity partners
SECTION PL/LT STATE BORDER – KAUNAS CONSTRUCTION WORKS
CONTRACTORS:
1. Total value of contracts signed is more than € 300 Million;
2. Implementation of the project in numbers:
2.1. Executors : 5 Contractors, more than 30 subcontractors;
1.000 staff employed;
700 units of different mashines;
2.2 trackbed, tracks: eguipped 229 km of trackbed;
built abt. 127 km of European gauge track (1435 mm width);
reconstructed abt. 106 km of existing 1520 mm width gauge;
2.3. reconstructed, equiped or built : 19 bridges;
108 switches;
40 crossings;
95 culverts;
6 railway stations;
20 platforms;
4 viaducts;
24 232 m noise fences;
115 263 m protective fences;
85 909 m water drenage system;
2.4. Other important numbers: during implementation used
30.000 tons of different type of metals;
800.000 tons of crushed rock;
1.500.000 tons of earthwork (abt. 20.000 vagons = train lenght abt. 260 km)
SECTION PL/LT STATE BORDER – KAUNAS IN NUMBERS:
All tenders were announced through electronic information system of Public Procurement Office.
An access to the tender documents through:
http://ted.europa.eu; https://pirkimai.eviesiejipirkimai.lt,
Www.litrail.lt
Opened tenders were performed in TWO stages:
STAGE 1: During the first stage Contractors were verified how they meet qualification requirements
set in tender documents (no debts to Social security office and tax office, provided guarantees and insurance
required by tender, declaration about company’s CEO&Accountant, certificate about company‘s management
and environmental management quality systems, etc. )
There were requirements to the Contractors companies as well their staff:
- Contractor had to have permit for construction works within Lithuania,
- To obtain local registration of Value Added Tax account;
- Contractors , attending the tender were qualified only those holding valid qualification
- Certificate to construct exceptional significance constructions (issued by Lithuanian Construction Products
Certification Center) and had a proof that succesfully constructed at least 1 structure of exceptional significance.
- Company’s average construction works turnover in last 5 years had to be equal or exceeding value required in tender
documents;
SECTION PL/LT STATE BORDER – KAUNAS MAIN
QUALIFICATION FOR TENDERS` PARTICIPANTS (1):
Not only , Contractors, but Subcontractors attending these tenders also had to
meet criteria set by Lithuanian Public Procurement Law and tender documents,
particulary for those whoes share in construction works offered for tender exceeded
10 % of total Construction works.
Also, there are specific requirements to both Contractors and Subcontractors
to their leading specialists in terms of certification and experience.
For each group of works there are obligation for Contractors to pre-assign specialists
those who should meet certain tender criteria. These were:
1. Exceptional significance construction manager, main requirements to hold valid
exceptional significance certificate, at least 3 years experience (from at least 10 years
overall experience in construction field) in heading construction of works of exceptional significance
in railway and heading for at least 1 construction of exceptional significance structure.
2. Exceptional significance specialized construction managers, main requirements to hold valid exceptional
significance certificate, at least 2 years experience (from at least 10 years overall
experience in specialized ) in heading works of exceptional significance in that specialized field ( signaling, electrification,
environment protection, etc.)
In this stage also duration of construction works announced.
SECTION PL/LT STATE BORDER – KAUNAS MAIN
QUALIFICATION FOR TENDERS` PARTICIPANTS (2):
STAGE 2. After investigation of qualification is completed and then total price offered
for tender by Contractor is announced and detailed works quantities sheets are
provided for verification.
For construction works tenders:
90 were given for the contract TOTAL PRICE offered and
10 for the TIME CRITERIA Contractor took responsibility to complete entire works
(For technical design tenders 80 and 20 accordingly)
EVALUATION OF TENDER RESULTS
Based on results of offers provided by Contractors in STAGES 1 AND 2 calculations
are produced and winner of tender announced, based on the Contractor’s offer which
generated highest number of scores.
FOR 2014-2020 TENDERS FINANACED FROM CEF QUITE A SIMILAR
CRITERIA EXPECTED TO BE IN USE!
SECTION PL/LT STATE BORDER – KAUNAS
COMPLETION OF TENDER (3)
CONTRACTORS FOR WORKS FOUND
HISTORICAL REMAINS
2013-10
2014-05
2015-05
AFTER COMPLETION IN 2015
“RAIL BALTICA”. STAGE 1: IN 2015 100 % OF WORKS WERE COMPLETED!
LITHUANIA
MADE IT ON
SCHEDULE!
FUTURE OF RAILWAY
INFRASTRUCTURE
PROJECTS
 Embankment construction ~ 55 km
(including bridges, viaducts, culverts,
passings)
Preliminary start date for construction –
07/2018
PL/LT – Kaunas (completed)
Palemonas
0 km
~ 55 km
 Construction of 1435 mm
3 km railway line and a
partial 1435 mm yard
construction
Preliminary start date for
construction – 04/2018
~ 3 km
CONSTRUCTION OF THE SECTION KAUNAS (RRT)-PANEVĖŽYS-LT/LV BORDER
2007 - 2013
 Expropriation of the land
in section Palemonas -
LT/LV border
Preliminary start date of public
procurement – 08/2016
 To design the railway line
in section Palemonas -
LT/LV border (FIDIC
yellow book) (168 km)
Preliminary start date of public
procurement – 12/2016
 Technical designing and
construction of the 1435 mm gauge
railway infrastructure maintenance
depot in Kaunas railway node
Preliminary start date of public
procurement for technical design –
09/2016
 To prepare the studies:
- Archaeological - preliminary start date
of public procurement – 07/2016
- Maintenance depot - preliminary start
date of public procurement – 01/2018
KAUNAS NODE
Kaunas Public
Logistic Center
Kaunas
Kaunas
bypass
Kaunas – Palemonas construction (10 km)
Preliminary start date of public
procurement for construction works –
04/2016 (upon receipt of the construction
permit)
Jiesia – Rokai construction (5 km)
Public procurement procedures almost
completed, works will start – 07/2016
Rokai – Palemonas construction (8 km)
Preliminary start date of public
procurement for construction works –
04/2016 (upon receipt of the construction
permit)
ALTERNATIVES
LT/PL state border
Alternative # 1 (2011, AECOM) – P2/F1 new electrified
double track with ERTMS.
Alternative # 2 – Upgrade of the existing line up to P2/F1
electrified double track with ERTMS.
Indicators
Alternative #1
(AECOM)
Alternative
#2
Difference
(#1 - #2)
Investment cost, EUR 875,2 mill. 666,8 mill. 208,4 mill.
Total length (passenger) in section PL/LT –
Kaunas, km
88,5 km 99,7 km - 11,2 km
Average theoretical travel time, min 26,9 min 34,9 min - 8,0* min**
Total value of passenger travel time
savings during the project reference
period (value of time saving forecasted
volume for 30 year), discounted, EUR
17,2 mill. - 17,2 mill.
(-) Loss, which is generated for each of the
travel time minute saved (evaluating only
initial investment and travel time savings),
EUR
- 191,6 mill. -
- 191,6 mill.
(208,4 - 17,2)
Operating costs (for 30 year),
undiscounted, EUR
254,1 mill. (with
existing line)
169,7 mill. 84,4 mill.
* investment amount to shorten the travel time per one travel minute - 26,1 mill. EUR
** Average theoretical travel time in route Warsaw (Bialystok) – Kaunas - 165 min, so 8 min. is just ~ 4,8 proc. time of
this route.
Jiesia
Mockava
Šeštokai
Mauručiai
Jiesia
Vinčai
Rokai
Marijampolė
Kazlų Rūda
Jiesia
Rokai
KaunasRailway infrastructure adaptation in the line PL/LT-Kaunas for
train traffic code P2, F1
Kalvarija
2014-2020
Speed increase activities in the line PL/LT-Kaunas for train traffic code
P2, F1 (intermediate phase traffic code P4, F1):
ERTMS (Level 2 base line 3 or higher) and related systems.
Preliminary start date of public procurement – 03/2017.
 Feasibility study for the line PL/LT-Kaunas speed upgrade (current
line upgrade and analysis of a new line alternative).
Preliminary start date of public procurement – 05/2016.
 Spatial plan preparing for section PL/LT – Kaunas (according to
feasibility study analysis).
Preliminary start date of public procurement – 03/2017.
 Preparation of technical design for electrification.
Preliminary start date of public procurement – 10/2016.
2021-2025
Railway infrastructure adaptation in the line PL/LT-Kaunas for train
traffic code P2, F1 (stage 2)
After preparation of the feasibility study, works will be detailed.
THANK YOU FOR YOUR ATTENTION

More Related Content

What's hot

Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Goutama Bachtiar
 
Crisis management plan
Crisis management planCrisis management plan
Crisis management planarshadlalmoni
 
COVID-19 Rapid Response Crisis Checklist
COVID-19 Rapid Response Crisis ChecklistCOVID-19 Rapid Response Crisis Checklist
COVID-19 Rapid Response Crisis ChecklistBoston Consulting Group
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksInternational Federation of Accountants
 
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...Boston Consulting Group
 
#BainWebinar Commercial Aviation Outlook and Scenarios
#BainWebinar Commercial Aviation Outlook and Scenarios#BainWebinar Commercial Aviation Outlook and Scenarios
#BainWebinar Commercial Aviation Outlook and ScenariosBain & Company Brasil
 
Marketing strategije proizvođaĉa organske hrane
Marketing strategije proizvođaĉa organske hraneMarketing strategije proizvođaĉa organske hrane
Marketing strategije proizvođaĉa organske hraneEko produkt
 
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain times
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain timesPECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain times
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain timesPECB
 
Case study in Enterprise Risk Management
Case study in Enterprise Risk ManagementCase study in Enterprise Risk Management
Case study in Enterprise Risk ManagementChris Teniswood
 
2018 EY-Parthenon Price Perception Airlines
2018 EY-Parthenon Price Perception Airlines2018 EY-Parthenon Price Perception Airlines
2018 EY-Parthenon Price Perception AirlinesWouter Vincken
 
Intuit's - Investor Day 2015 Presentation
Intuit's - Investor Day 2015 PresentationIntuit's - Investor Day 2015 Presentation
Intuit's - Investor Day 2015 Presentationinvestorsintuitinc
 
Win The Fight: Crush and Contain for Safer Reopening
Win The Fight: Crush and Contain for Safer Reopening Win The Fight: Crush and Contain for Safer Reopening
Win The Fight: Crush and Contain for Safer Reopening Boston Consulting Group
 
Introduction To Risk Management PowerPoint Presentation Slides
Introduction To Risk Management PowerPoint Presentation SlidesIntroduction To Risk Management PowerPoint Presentation Slides
Introduction To Risk Management PowerPoint Presentation SlidesSlideTeam
 
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Eric Campbell
 

What's hot (14)

Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009
 
Crisis management plan
Crisis management planCrisis management plan
Crisis management plan
 
COVID-19 Rapid Response Crisis Checklist
COVID-19 Rapid Response Crisis ChecklistCOVID-19 Rapid Response Crisis Checklist
COVID-19 Rapid Response Crisis Checklist
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
 
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...
Chinese Internet Economy White Paper 2.0 - Decoding the Chinese Internet 2.0:...
 
#BainWebinar Commercial Aviation Outlook and Scenarios
#BainWebinar Commercial Aviation Outlook and Scenarios#BainWebinar Commercial Aviation Outlook and Scenarios
#BainWebinar Commercial Aviation Outlook and Scenarios
 
Marketing strategije proizvođaĉa organske hrane
Marketing strategije proizvođaĉa organske hraneMarketing strategije proizvođaĉa organske hrane
Marketing strategije proizvođaĉa organske hrane
 
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain times
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain timesPECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain times
PECB Webinar: ISO 31000 - The Benchmark for Risk Management in uncertain times
 
Case study in Enterprise Risk Management
Case study in Enterprise Risk ManagementCase study in Enterprise Risk Management
Case study in Enterprise Risk Management
 
2018 EY-Parthenon Price Perception Airlines
2018 EY-Parthenon Price Perception Airlines2018 EY-Parthenon Price Perception Airlines
2018 EY-Parthenon Price Perception Airlines
 
Intuit's - Investor Day 2015 Presentation
Intuit's - Investor Day 2015 PresentationIntuit's - Investor Day 2015 Presentation
Intuit's - Investor Day 2015 Presentation
 
Win The Fight: Crush and Contain for Safer Reopening
Win The Fight: Crush and Contain for Safer Reopening Win The Fight: Crush and Contain for Safer Reopening
Win The Fight: Crush and Contain for Safer Reopening
 
Introduction To Risk Management PowerPoint Presentation Slides
Introduction To Risk Management PowerPoint Presentation SlidesIntroduction To Risk Management PowerPoint Presentation Slides
Introduction To Risk Management PowerPoint Presentation Slides
 
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
 

Viewers also liked (19)

Rail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspectiveRail Baltica project - Lithuanian perspective
Rail Baltica project - Lithuanian perspective
 
VR Track Oy
VR Track OyVR Track Oy
VR Track Oy
 
Mitnija
MitnijaMitnija
Mitnija
 
Sweco in Lithuania
Sweco in LithuaniaSweco in Lithuania
Sweco in Lithuania
 
Rail Baltica planning process
Rail Baltica planning processRail Baltica planning process
Rail Baltica planning process
 
Rail Baltica
Rail BalticaRail Baltica
Rail Baltica
 
Global Lithuanian Leaders - presentation
Global Lithuanian Leaders - presentationGlobal Lithuanian Leaders - presentation
Global Lithuanian Leaders - presentation
 
Most popular places in vilnius
Most popular places in vilniusMost popular places in vilnius
Most popular places in vilnius
 
Muslims Degredation / Downfall And Its Remedies PRESENTATION
Muslims Degredation / Downfall And Its Remedies PRESENTATION Muslims Degredation / Downfall And Its Remedies PRESENTATION
Muslims Degredation / Downfall And Its Remedies PRESENTATION
 
Guide For Incoming Students
Guide For Incoming StudentsGuide For Incoming Students
Guide For Incoming Students
 
Eurostars funding
Eurostars fundingEurostars funding
Eurostars funding
 
A-insinoorit
A-insinooritA-insinoorit
A-insinoorit
 
Sipin Infra
Sipin InfraSipin Infra
Sipin Infra
 
Lemminkäinen in the Baltics
Lemminkäinen in the BalticsLemminkäinen in the Baltics
Lemminkäinen in the Baltics
 
Siemens
SiemensSiemens
Siemens
 
Rudus
RudusRudus
Rudus
 
WSP Parsons Brinckerhoff
WSP Parsons BrinckerhoffWSP Parsons Brinckerhoff
WSP Parsons Brinckerhoff
 
Ramboll and Ramboll Finland today rail business update
Ramboll and Ramboll Finland today rail business updateRamboll and Ramboll Finland today rail business update
Ramboll and Ramboll Finland today rail business update
 
Pöyry
PöyryPöyry
Pöyry
 

Similar to JSC, “Lithuanian railways”

South East Europe Rail conference - Franc Zepic
South East Europe Rail conference -  Franc ZepicSouth East Europe Rail conference -  Franc Zepic
South East Europe Rail conference - Franc ZepicRussell Publishing
 
Business Opportunities in Rail Baltica Project
Business Opportunities in Rail Baltica ProjectBusiness Opportunities in Rail Baltica Project
Business Opportunities in Rail Baltica ProjectBusiness Finland
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_fullinvestinlviv
 
North sea baltic corridor c. trautmann
North sea baltic corridor   c. trautmannNorth sea baltic corridor   c. trautmann
North sea baltic corridor c. trautmannEuropean Commission
 
CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018Rezart Arkaxhiu
 
Orient east med corridor m. grosch
Orient east med corridor   m. groschOrient east med corridor   m. grosch
Orient east med corridor m. groschEuropean Commission
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewigEuropean Commission
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Lugaustluga
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilBusiness Finland
 
Master class 12 December 2013 Chokepoints in transport corridors
Master class 12 December 2013 Chokepoints in transport corridorsMaster class 12 December 2013 Chokepoints in transport corridors
Master class 12 December 2013 Chokepoints in transport corridorsMaurice Jansen
 
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0mohamed mohiy el deen
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)EasyBusiness
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.P. Anna Paddon
 
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...Katherine Lozovenko
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014johnrubial
 

Similar to JSC, “Lithuanian railways” (20)

South East Europe Rail conference - Franc Zepic
South East Europe Rail conference -  Franc ZepicSouth East Europe Rail conference -  Franc Zepic
South East Europe Rail conference - Franc Zepic
 
Business Opportunities in Rail Baltica Project
Business Opportunities in Rail Baltica ProjectBusiness Opportunities in Rail Baltica Project
Business Opportunities in Rail Baltica Project
 
Kari rouhonen
Kari rouhonenKari rouhonen
Kari rouhonen
 
Euro rail eng_full
Euro rail eng_fullEuro rail eng_full
Euro rail eng_full
 
North sea baltic corridor c. trautmann
North sea baltic corridor   c. trautmannNorth sea baltic corridor   c. trautmann
North sea baltic corridor c. trautmann
 
CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018CV Rezart Arkaxhiu_Sep2018
CV Rezart Arkaxhiu_Sep2018
 
Orient east med corridor m. grosch
Orient east med corridor   m. groschOrient east med corridor   m. grosch
Orient east med corridor m. grosch
 
Project list part-2-en
Project list part-2-enProject list part-2-en
Project list part-2-en
 
Baltic adriatique corridor k. bodewig
Baltic adriatique corridor   k. bodewigBaltic adriatique corridor   k. bodewig
Baltic adriatique corridor k. bodewig
 
5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg5) 2015.03.23 presentation october railway_valinskiy oleg
5) 2015.03.23 presentation october railway_valinskiy oleg
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Luga
 
Extended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county councilExtended metro in stockholm, stockholm county council
Extended metro in stockholm, stockholm county council
 
Master class 12 December 2013 Chokepoints in transport corridors
Master class 12 December 2013 Chokepoints in transport corridorsMaster class 12 December 2013 Chokepoints in transport corridors
Master class 12 December 2013 Chokepoints in transport corridors
 
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0Karl GHEYSEN -  Kazakhstan - From Landlocked to LinkedIn 5 0
Karl GHEYSEN - Kazakhstan - From Landlocked to LinkedIn 5 0
 
Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)Current concession projects in sea port sector of Ukraine (by SPILNO)
Current concession projects in sea port sector of Ukraine (by SPILNO)
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
 
Development of the Russian Seaport Infrastructure
Development of the Russian Seaport InfrastructureDevelopment of the Russian Seaport Infrastructure
Development of the Russian Seaport Infrastructure
 
Progress in implementation of the eu ua association agreement on transport is...
Progress in implementation of the eu ua association agreement on transport is...Progress in implementation of the eu ua association agreement on transport is...
Progress in implementation of the eu ua association agreement on transport is...
 
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...
Annex 4 - Presentation “Lviv Electromobility Development Plan” (19 slides) – ...
 
Corridors progrreport version1_2014
Corridors progrreport version1_2014Corridors progrreport version1_2014
Corridors progrreport version1_2014
 

More from Business Finland

Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018
Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018
Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018Business Finland
 
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...Business Finland
 
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...Business Finland
 
Innovative Bioproducts Finland
Innovative Bioproducts FinlandInnovative Bioproducts Finland
Innovative Bioproducts FinlandBusiness Finland
 
Canada_Maritime business opportunities_seminar 2018
Canada_Maritime business opportunities_seminar 2018Canada_Maritime business opportunities_seminar 2018
Canada_Maritime business opportunities_seminar 2018Business Finland
 
United States Coast Guard icebreaker program_seminar 2018
United States Coast Guard icebreaker program_seminar 2018United States Coast Guard icebreaker program_seminar 2018
United States Coast Guard icebreaker program_seminar 2018Business Finland
 
China’s key policies and the impacts on maritime industry
China’s key policies and the impacts on maritime industry China’s key policies and the impacts on maritime industry
China’s key policies and the impacts on maritime industry Business Finland
 
Norway_Maritime and offshore market update 2018
 Norway_Maritime and offshore market update 2018 Norway_Maritime and offshore market update 2018
Norway_Maritime and offshore market update 2018Business Finland
 
France_Shipbuilding market_seminar 2018
France_Shipbuilding market_seminar 2018France_Shipbuilding market_seminar 2018
France_Shipbuilding market_seminar 2018Business Finland
 
Russia_Market business opportunities and events 2018
Russia_Market business opportunities and events 2018 Russia_Market business opportunities and events 2018
Russia_Market business opportunities and events 2018 Business Finland
 
German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...Business Finland
 
Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...Business Finland
 
Innovative Bioproducts Finland
Innovative Bioproducts FinlandInnovative Bioproducts Finland
Innovative Bioproducts FinlandBusiness Finland
 
Invest in Finland Forum 2017
Invest in Finland Forum 2017Invest in Finland Forum 2017
Invest in Finland Forum 2017Business Finland
 
Team Finland Japan Day 15.5.2017
 Team Finland Japan Day 15.5.2017 Team Finland Japan Day 15.5.2017
Team Finland Japan Day 15.5.2017Business Finland
 
Iran_Maritime Market snapshot 2017
Iran_Maritime Market snapshot 2017Iran_Maritime Market snapshot 2017
Iran_Maritime Market snapshot 2017Business Finland
 
Norway_Shipbuilding Market Update, seminar 10.5.2017
Norway_Shipbuilding Market Update, seminar 10.5.2017Norway_Shipbuilding Market Update, seminar 10.5.2017
Norway_Shipbuilding Market Update, seminar 10.5.2017Business Finland
 
Russia_Business opportunities in Russia_seminar 10.5.2017
Russia_Business opportunities in Russia_seminar 10.5.2017Russia_Business opportunities in Russia_seminar 10.5.2017
Russia_Business opportunities in Russia_seminar 10.5.2017Business Finland
 
Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017Business Finland
 
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...Business Finland
 

More from Business Finland (20)

Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018
Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018
Russia_Business opportunities, presentation by Alexey Zak at Navigate fair 2018
 
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...
Norway_Business opportunities, presentation by Jaakko Isotalo at Navigate fai...
 
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...
France_Business opportunities_presentation by Marie-Zoe Belon-Laitinen at Nav...
 
Innovative Bioproducts Finland
Innovative Bioproducts FinlandInnovative Bioproducts Finland
Innovative Bioproducts Finland
 
Canada_Maritime business opportunities_seminar 2018
Canada_Maritime business opportunities_seminar 2018Canada_Maritime business opportunities_seminar 2018
Canada_Maritime business opportunities_seminar 2018
 
United States Coast Guard icebreaker program_seminar 2018
United States Coast Guard icebreaker program_seminar 2018United States Coast Guard icebreaker program_seminar 2018
United States Coast Guard icebreaker program_seminar 2018
 
China’s key policies and the impacts on maritime industry
China’s key policies and the impacts on maritime industry China’s key policies and the impacts on maritime industry
China’s key policies and the impacts on maritime industry
 
Norway_Maritime and offshore market update 2018
 Norway_Maritime and offshore market update 2018 Norway_Maritime and offshore market update 2018
Norway_Maritime and offshore market update 2018
 
France_Shipbuilding market_seminar 2018
France_Shipbuilding market_seminar 2018France_Shipbuilding market_seminar 2018
France_Shipbuilding market_seminar 2018
 
Russia_Market business opportunities and events 2018
Russia_Market business opportunities and events 2018 Russia_Market business opportunities and events 2018
Russia_Market business opportunities and events 2018
 
German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...German-Finnish maritime co-operation, joint development of next-generation te...
German-Finnish maritime co-operation, joint development of next-generation te...
 
Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...Challenges and requirements on modern short sea operations in the Baltic Sea ...
Challenges and requirements on modern short sea operations in the Baltic Sea ...
 
Innovative Bioproducts Finland
Innovative Bioproducts FinlandInnovative Bioproducts Finland
Innovative Bioproducts Finland
 
Invest in Finland Forum 2017
Invest in Finland Forum 2017Invest in Finland Forum 2017
Invest in Finland Forum 2017
 
Team Finland Japan Day 15.5.2017
 Team Finland Japan Day 15.5.2017 Team Finland Japan Day 15.5.2017
Team Finland Japan Day 15.5.2017
 
Iran_Maritime Market snapshot 2017
Iran_Maritime Market snapshot 2017Iran_Maritime Market snapshot 2017
Iran_Maritime Market snapshot 2017
 
Norway_Shipbuilding Market Update, seminar 10.5.2017
Norway_Shipbuilding Market Update, seminar 10.5.2017Norway_Shipbuilding Market Update, seminar 10.5.2017
Norway_Shipbuilding Market Update, seminar 10.5.2017
 
Russia_Business opportunities in Russia_seminar 10.5.2017
Russia_Business opportunities in Russia_seminar 10.5.2017Russia_Business opportunities in Russia_seminar 10.5.2017
Russia_Business opportunities in Russia_seminar 10.5.2017
 
Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017Vietnam_maritime market snapshot, Seminar 10.5.2017
Vietnam_maritime market snapshot, Seminar 10.5.2017
 
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
Germany_New Business Opportunities in German Maritime and Offshore Market_Sem...
 

Recently uploaded

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 

Recently uploaded (20)

Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 

JSC, “Lithuanian railways”

  • 2. STRUCTURE OF THE COMPANY Head office Freight transportation directorate Passenger transportation directorate Railway infrastructure directorate Rail Baltic project directorate JSC Railway environmental center Information technologies center Representative offices in: China Russia Belarus Subsidiaries: JSC Center of railway construction JSC Vilnius locomotive repair depot JSC Railway security JSC Railway designing JSC “Rail Baltic” construction Kazakhstan
  • 3. ABOUT THE COMPANY • JSC ,,Lithuanian Railways” – the largest transport and logistics company in the Lithuania. 36 Freight Carrier 2015 year 48,1 mill. t 2015 year 4,2 mill. pass. Passenger Carrier Railway network 1767 km
  • 4. ABOUT THE COMPANY • Experience – 150 years. • 100% of the company's shares belong to the State. • 10th place in EU by railways freight transportation volume (million ton-kilometers). • Overall investment during last 10 years – 1.5 billion EUR. 2015 year 437 mill. EUR 2015 year 2,1 billion EUR Employees 10,2 K 2015 year Revenues Property
  • 5. VILNIUS Šiauliai Tauragė Panevėžys Kaunas Alytus Utena Turmantas Pabradė Kena Stasylos Senovė Kybartai Kazlų Rūda Lentvaris Kaišiadorys GaižiūnaiPagėgiai Radviliškis Obeliai JoniškisSkuodas Kužiai Mažeikiai Bugeniai Baltic sea VaidotaiMarijampolė Modernization of Kaunas station, bypass Palemonas – Rokai – Jiesia and section Kaunas - Kybartai signaling and power supply equipment Road equipment modernization of Kaunas station, bypass Palemonas – Rokai – Jiesia and section Kaunas –Kybartai road equipment (stage I) Installation of Traffic Control Centre Construction of the second track of Vilnius bypass Kyviškės – Valčiūnai, corridor IXB Infrastructure restoration and modernization (stage I) of the corridor IA section Radviliškis – Pagėgiai – State border Reconstruction of existing railway section Kaunas (Palemonas) – Gaižiūnai Installation and modernization of Infrastructure diagnostic systems Reconstruction of road structures of connecting railway line Klaipėda – Pagėgiai Modernization of the infrastructure of connecting railway line Klaipėda – Pagėgiai Technical assistance (design) for track modernization of section Vilnius – Kaunas (speed up to 160 km/h) and for construction of second track in the sections Kyviškės – Valčiūnai and Pušynas – Paneriai Technical assistance (design) for construction of second tracks Design and construction of an intermodal terminal at the Vilnius Public Logistics Centre Design and construction of an intermodal terminal at the Kaunas Public Logistics Centre Traffic safety program (upgrade of railway emergency and crisis situations management system ) Electrification of the Corridor IX, stage I. Design Klaipėda Construction of the second track in the section Telšiai – Dūseikiai Construction of the second track in the section Kūlupėnai – Kretinga Accomplished projects Construction of the second track in the section Pavenčiai – Raudėnai Construction of a new EU (1435 mm) gauge railway line and modernization of existing broad (1520 mm) gauge railway line Šeštokai - Marijampolė; Marijampolė - Kazlų Rūda – Kaunas Modernization of existing EU (1435 mm) gauge and dual (1435/1520 mm) gauge railway line Polish/Lithuanian state border - Mockava; Mockava – Šeštokai ACCOMPLISHED INFRASTRUCTURE PROJECTS FOR FINANCIAL PERIOD 2007-2013 Reconstruction of the stations: Draugystė; Rimkai.
  • 6. FREIGHT TRANSPORTATION BY RAIL PERSPECTIVES – 2030 East-West transit North-South transit Freight of local companies 50 mill. t 12 mill. t 60 mill. t 10 mill. t The main freight flows 10 mill. t Necessary capacities + 30 % ES NVS KENA Boundary station KLAIPĖDA Sea Port
  • 7. LITHUANIA – TRANSIT COUNTRY EU CIS Kena – unique gates between EU and CIS Border crossing formalities according to all necessary EU rules takes only 30 min. KENA KLAIPĖDA ŠEŠTOKAI
  • 8. PASSENGERS CARRIAGE PERSPECTIVES - 2030 1. Servicing of transit passenger trains 2. Convenient connection by international routes:  Minsk direction;  In 2016: Vilnius-Minsk in 2 hours.  Warsaw / Berlin direction;  In 2015: „Rail Baltica“ European gauge to Kaunas.  Riga / Tallinn direction. 3. Carriage of passengers on domestic routes depends on the State policy dealing with the public transport organization and financing issues  Most promising railway routes:  Vilnius-Kaunas  Vilnius-Šiauliai-Klaipėda
  • 9. 1. „Rail Baltica“ project construction. 2. Electrification of the IXB (Kena – Klaipėda) transport corridor in the section Kena – Radviliškis. 3. Construction of the second track and extension of the main stations of the IXB transport corridor. THE MAIN STRATEGIC INFRASTRUCTURE DEVELOPMENT AIMS IN 2014 - 2020 YEAR
  • 10. I stage Construction works have been started II stage Date of public procurement for electrification works – 06/2016 III stage (FIDIC yellow book) Date of public procurement – 02/2017 After 2014 – 2020 years till 2030 years. Klaipėda Radviliškis Kaunas Kaišiadorys Kena Vilnius DEVELOPMENT OF THE IXB CORRIDOR, 2014 – 2020 YEAR Electrification of the line Radviliškis – Klaipėda till 2030. Planned electrification of the IXB transport corridor (from Kena – N. Vilnia, Vilnius railway junction, Kaišiadorys – Radviliškis, Šiauliai - Radviliškis (Radviliškis yard) till 2020. Existing electrified line N. Vilnia – Kaunas IV stage (FIDIC yellow book) Date of public procurement – 02/2017 Section Telšiai – Lieplaukė Construction works have been started Vilnius bypass section Pušynas – Paneriai Procurement procedures for construction works almost completed Pauostis yard Date of public procurement for construction works – 04/2016 Construction of the second tracks Reconstruction of the station
  • 11. To design electrification of the line PL/LT border- Kaunas Construction of the railways in section Jiesia- Rokai-Palemonas Expropriation of the land in section Palemonas - LT/LV border To design the railway line in section Palemonas - LT/LV border Construction of the railways (I stage, Palemonas- LT/LV border) Construction of the railways in section Kaunas- Palemonas "RAIL BALTICA" PROJECT IMPLEMENTATION PLAN IN LITHUANIA BY 2020 Construction of the embankment (55 km) and related infrastructure - operating line - designed line - expropriated land - constructed embankment Construction of the maintenance and repair facility with relevant infrastructure (depo) Implementation of the ERTMS (Level 2 base line 3 or higher) and related systems in the line PL/LT- Kaunas To prepare the technical documentation for the upgrade of speed on the line PL/LT-Kaunas To prepare the studies (archaeological, maintenance depot)
  • 12. 12 „RAIL BALTICA“ PROJECT DEVELOPMENT IN LITHUANIA. STAGE 1 THE SUCCESS STORY
  • 13. 13
  • 14. PROBLEM: VIA BALTICA overcrowded. Heavy accidents almost everyday. Press calls VIA BALTICA – „Death Road“ SOLUTION: Start to use „Rail Baltica“ ASAP: - For container transportation; - For semitrailers transportation
  • 15. Kaunas LV PL/LT Panevėžys Rail Baltica project development in Lithuania Šiauliai Rail Baltica -1 AECOM study Vilnius Construction Stage 1 Max speed 120-160-240 km/h
  • 16. 16 OUR MAIN CHALLENGES 1. „Rail Baltica“ is the bigest infrastructure project of Lithuania; 2. Extremely short time for implementation; 3. Necessity to split implementation in to the parts, to coordinate separate Contractors; 4. Works to be done on acting railway line during the traffic breaks; 5. Necessity to coordinate technical parameters, time table, take in to account the needs and wishes and find common solutions with Neighbour countries, Municipalities, Private People, Companies, State institutions.
  • 17. 17 OUR ACHIEVEMENTS 2010-2015 (1) Following completion of international public procurement tenders, contracts were signed with Consultants and Designers, who: -Completed and presented feasibility studies, which examined the possibility of splitting the entire line into separate railway sections; -Completed technical designs; -Obtained separated construction permits for each of the railway sections, which were based on the territory of one or few municipalities. Lithuanian Railways, through the Ministry of Transport and Communication of the Lithuanian Republic, coordinated the approval of technical solutions and planned work schedules with municipalities and other public institutions. If there was a necessity, the tripartite agreements were signed between the Ministry of Transport and Communication, individual municipalities and Lithuanian Railways for the implementation of the Rail Baltica project in the territory of the specific municipality.
  • 18. 18 OUR ACHIEVEMENTS 2010-2015 (2) The procurement of the construction works was executed through the international tenders. For some specific railway sections, in spite of an extremely important time factor, due to the excessive prices, which were included in the tender proposals, public procurement procedures were terminated and repeated (in some cases – up to 3 times). Proposals were evaluated based on the method of economic efficiency, combining the proposed shortest timeframe for the construction completion and the lowest price.
  • 19. 19 OUR ACHIEVEMENTS (3) After the completion of technical design and obtainment of the construction permits, between April and July, 2013, 11 construction contracts were signed with 5 main contractors (tender winners), who made use of over 30 subcontractors. Moreover, 6 additional contracts were signed to provide Technical supervision and supervision of technical design implementation. Lithuanian Railways (specifically "Rail Baltica" project directorate) conducted the function as the daily coordinator: - Construction works had to be carried out simultaneously in all the railway sections and only during the railway traffic breaks without the stopping the regular train traffic, construction work schedules were thoroughly coordinated with each of the contractors, Contractors capacity was verified on weekly basis (special films where produced to fix changes in construction works and discussed and improvement possibilities discussed with Contractors).
  • 20. 1. FEASIBILITY STUDIES AND TECHNICAL DESIGN WERE FINANCED TEN-T program – 50%, remaining 50% by State budget and Lithuanian Railways (LG) 2. CONSTRUCTION WORKS: 2.1 For section from PL/LT border to Marijampolė TEN-T – 27%, remaining 73% by State budget and Lithuanian Railways (LG) 2.2 For section from Marijampolė to Kaunas Cohesion Fund – 85%, remaining 15% by State budget and Lithuanian Railways (LG) Overall, “Rail Baltica” Stage 1 was financed from (in mln. EUR/ percent): TEN-T – 21,4mln.EUR (7,1%) STATE BUDGET – 5,1mln. EUR (1,7%) Cohesion Fund – 144,7mln. EUR (48, 1%) LG – 129,9mln.EUR (43,1%) 3. 2014-2020 EU financing period activities are financed 85% from Connecting Europe Facility (CEF) program and remaining 15% by State budget and Lithuanian Railways (LG) „RAIL BALTICA“ PROJECT FINANCING:
  • 21. 1. Contractors for feasibility studies and technical design of pre-assigned railways sections were selected as the result of OPEN (INTERNATIONAL) PUBLIC TENDERS. FEASIBILITY STUDIES For section Šeštokai-Marijampolė was prepared by company Ernst & Young (GREAT BRITAIN branch in Lithuania) for section Marijampolė to Kaunas was prepared by company SYSTRA from FRANCE SPECIAL PLAN for section from Palemonas to LT/LV border currently in prepartion by AECOM (USA& GREAT BRITAIN branch in Lithuania) 2. TECHNICAL DESIGN For section from Polish-Lithuanian state border to Mockava, technical design was prepared by a company EPG (GERMAN branch in Lithuania) For section from Šeštokai to Marijampolė was prepared by company SWECO (originated from SWEDEN) For section from Marijampolė to Kaunas, technical design was prepared by Kelprojektas (LT,LV, EE investment company). For section Palemonas – LT/LV border was prepared by ARDANUY Ingeniería (SPANISH branch in Lithuania) SECTION PL/LT STATE BORDER – KAUNAS CONTRACTORS FOR FEASIBILITY STUDIES AND TECHNICAL DESIGN :
  • 22. 1. Contractors for construction works of pre-assigned railways sections were selected as the result of OPENED (INTERNATIONAL) PUBL IC TENDERS. 2. These Contractors were selected: 2.1 Sections Lithuanian-Polish border- Mockava and Mockava-Šeštokai (incl. Šeštokai Railway station) UAB GELEŽINKELIO TIESIMO CENTRAS; 2.2 Section Šeštokai-Marijampolė (incl. Marijampolė Railway station) AB KAUNO TILTAI (JSC with Polish) AND UAB MITNIJA (JAP*) 2.3 Section Marijampolė-Kazlų Rūda and Mauručiai- Jiesia AB PANEVĖŽIO KELIAI 2.4. Section Kazlų Rūda-Mauručiai AB EUROVIA LIETUVAAND EUROVIA C.S. a.s. (JAP*) (shareholders from Czech Republic and France) 2.5. Section Jiesia-Kaunas UAB HIDROSTATYBA AND UAB Šilutės automobilių keliai (JAP*) *JAP- joint activity partners SECTION PL/LT STATE BORDER – KAUNAS CONSTRUCTION WORKS CONTRACTORS:
  • 23. 1. Total value of contracts signed is more than € 300 Million; 2. Implementation of the project in numbers: 2.1. Executors : 5 Contractors, more than 30 subcontractors; 1.000 staff employed; 700 units of different mashines; 2.2 trackbed, tracks: eguipped 229 km of trackbed; built abt. 127 km of European gauge track (1435 mm width); reconstructed abt. 106 km of existing 1520 mm width gauge; 2.3. reconstructed, equiped or built : 19 bridges; 108 switches; 40 crossings; 95 culverts; 6 railway stations; 20 platforms; 4 viaducts; 24 232 m noise fences; 115 263 m protective fences; 85 909 m water drenage system; 2.4. Other important numbers: during implementation used 30.000 tons of different type of metals; 800.000 tons of crushed rock; 1.500.000 tons of earthwork (abt. 20.000 vagons = train lenght abt. 260 km) SECTION PL/LT STATE BORDER – KAUNAS IN NUMBERS:
  • 24. All tenders were announced through electronic information system of Public Procurement Office. An access to the tender documents through: http://ted.europa.eu; https://pirkimai.eviesiejipirkimai.lt, Www.litrail.lt Opened tenders were performed in TWO stages: STAGE 1: During the first stage Contractors were verified how they meet qualification requirements set in tender documents (no debts to Social security office and tax office, provided guarantees and insurance required by tender, declaration about company’s CEO&Accountant, certificate about company‘s management and environmental management quality systems, etc. ) There were requirements to the Contractors companies as well their staff: - Contractor had to have permit for construction works within Lithuania, - To obtain local registration of Value Added Tax account; - Contractors , attending the tender were qualified only those holding valid qualification - Certificate to construct exceptional significance constructions (issued by Lithuanian Construction Products Certification Center) and had a proof that succesfully constructed at least 1 structure of exceptional significance. - Company’s average construction works turnover in last 5 years had to be equal or exceeding value required in tender documents; SECTION PL/LT STATE BORDER – KAUNAS MAIN QUALIFICATION FOR TENDERS` PARTICIPANTS (1):
  • 25. Not only , Contractors, but Subcontractors attending these tenders also had to meet criteria set by Lithuanian Public Procurement Law and tender documents, particulary for those whoes share in construction works offered for tender exceeded 10 % of total Construction works. Also, there are specific requirements to both Contractors and Subcontractors to their leading specialists in terms of certification and experience. For each group of works there are obligation for Contractors to pre-assign specialists those who should meet certain tender criteria. These were: 1. Exceptional significance construction manager, main requirements to hold valid exceptional significance certificate, at least 3 years experience (from at least 10 years overall experience in construction field) in heading construction of works of exceptional significance in railway and heading for at least 1 construction of exceptional significance structure. 2. Exceptional significance specialized construction managers, main requirements to hold valid exceptional significance certificate, at least 2 years experience (from at least 10 years overall experience in specialized ) in heading works of exceptional significance in that specialized field ( signaling, electrification, environment protection, etc.) In this stage also duration of construction works announced. SECTION PL/LT STATE BORDER – KAUNAS MAIN QUALIFICATION FOR TENDERS` PARTICIPANTS (2):
  • 26. STAGE 2. After investigation of qualification is completed and then total price offered for tender by Contractor is announced and detailed works quantities sheets are provided for verification. For construction works tenders: 90 were given for the contract TOTAL PRICE offered and 10 for the TIME CRITERIA Contractor took responsibility to complete entire works (For technical design tenders 80 and 20 accordingly) EVALUATION OF TENDER RESULTS Based on results of offers provided by Contractors in STAGES 1 AND 2 calculations are produced and winner of tender announced, based on the Contractor’s offer which generated highest number of scores. FOR 2014-2020 TENDERS FINANACED FROM CEF QUITE A SIMILAR CRITERIA EXPECTED TO BE IN USE! SECTION PL/LT STATE BORDER – KAUNAS COMPLETION OF TENDER (3)
  • 27. CONTRACTORS FOR WORKS FOUND HISTORICAL REMAINS
  • 30. “RAIL BALTICA”. STAGE 1: IN 2015 100 % OF WORKS WERE COMPLETED! LITHUANIA MADE IT ON SCHEDULE!
  • 32.  Embankment construction ~ 55 km (including bridges, viaducts, culverts, passings) Preliminary start date for construction – 07/2018 PL/LT – Kaunas (completed) Palemonas 0 km ~ 55 km  Construction of 1435 mm 3 km railway line and a partial 1435 mm yard construction Preliminary start date for construction – 04/2018 ~ 3 km CONSTRUCTION OF THE SECTION KAUNAS (RRT)-PANEVĖŽYS-LT/LV BORDER 2007 - 2013  Expropriation of the land in section Palemonas - LT/LV border Preliminary start date of public procurement – 08/2016  To design the railway line in section Palemonas - LT/LV border (FIDIC yellow book) (168 km) Preliminary start date of public procurement – 12/2016  Technical designing and construction of the 1435 mm gauge railway infrastructure maintenance depot in Kaunas railway node Preliminary start date of public procurement for technical design – 09/2016  To prepare the studies: - Archaeological - preliminary start date of public procurement – 07/2016 - Maintenance depot - preliminary start date of public procurement – 01/2018
  • 33. KAUNAS NODE Kaunas Public Logistic Center Kaunas Kaunas bypass Kaunas – Palemonas construction (10 km) Preliminary start date of public procurement for construction works – 04/2016 (upon receipt of the construction permit) Jiesia – Rokai construction (5 km) Public procurement procedures almost completed, works will start – 07/2016 Rokai – Palemonas construction (8 km) Preliminary start date of public procurement for construction works – 04/2016 (upon receipt of the construction permit)
  • 34. ALTERNATIVES LT/PL state border Alternative # 1 (2011, AECOM) – P2/F1 new electrified double track with ERTMS. Alternative # 2 – Upgrade of the existing line up to P2/F1 electrified double track with ERTMS. Indicators Alternative #1 (AECOM) Alternative #2 Difference (#1 - #2) Investment cost, EUR 875,2 mill. 666,8 mill. 208,4 mill. Total length (passenger) in section PL/LT – Kaunas, km 88,5 km 99,7 km - 11,2 km Average theoretical travel time, min 26,9 min 34,9 min - 8,0* min** Total value of passenger travel time savings during the project reference period (value of time saving forecasted volume for 30 year), discounted, EUR 17,2 mill. - 17,2 mill. (-) Loss, which is generated for each of the travel time minute saved (evaluating only initial investment and travel time savings), EUR - 191,6 mill. - - 191,6 mill. (208,4 - 17,2) Operating costs (for 30 year), undiscounted, EUR 254,1 mill. (with existing line) 169,7 mill. 84,4 mill. * investment amount to shorten the travel time per one travel minute - 26,1 mill. EUR ** Average theoretical travel time in route Warsaw (Bialystok) – Kaunas - 165 min, so 8 min. is just ~ 4,8 proc. time of this route. Jiesia
  • 35. Mockava Šeštokai Mauručiai Jiesia Vinčai Rokai Marijampolė Kazlų Rūda Jiesia Rokai KaunasRailway infrastructure adaptation in the line PL/LT-Kaunas for train traffic code P2, F1 Kalvarija 2014-2020 Speed increase activities in the line PL/LT-Kaunas for train traffic code P2, F1 (intermediate phase traffic code P4, F1): ERTMS (Level 2 base line 3 or higher) and related systems. Preliminary start date of public procurement – 03/2017.  Feasibility study for the line PL/LT-Kaunas speed upgrade (current line upgrade and analysis of a new line alternative). Preliminary start date of public procurement – 05/2016.  Spatial plan preparing for section PL/LT – Kaunas (according to feasibility study analysis). Preliminary start date of public procurement – 03/2017.  Preparation of technical design for electrification. Preliminary start date of public procurement – 10/2016. 2021-2025 Railway infrastructure adaptation in the line PL/LT-Kaunas for train traffic code P2, F1 (stage 2) After preparation of the feasibility study, works will be detailed.
  • 36. THANK YOU FOR YOUR ATTENTION