SlideShare a Scribd company logo
1 of 2
Farrukh Sajjad
D.O.B ---27-August 1986
House # E-62 Engro fertilizers employees colony Daharki dist Ghotki, Pakistan
Cell: +92-3346787409
Farrukhsajjad14@yahoo.com
Experience 7 Year3
Objective
Work with a progressive organization where, I can utilize my skills for improving operational
performance and contributing substantially towards the growth of the organization.
Technical Qualifications
Two Years Apprenticeship (2006-2008) as a Chemical AMMONIA Plant Operator From Technical
Training Centre, Engro fertilizers Ltd Daharki..
Professional Affiliation
Engro Fertilizer Company Ltd from 2009 to Date.
Currently I am working in Engro as ammonia DCS plant Operator (Experian PKS-3000).Designed
by (Holder TOPSO) (Saipem). This is the world largest single train Ammonia Urea complex.
Capacity 3835 MT/Day production.
PRE-COMMISSIONING, COMMISSIONING & STARTUP ACTIVITIES
• Developed Pre-commissioning & Commissioning procedures for startup
• Steam blowing of all steam network at ammonia plant
• Lube oil flushing of all compressor lube oil headers.
• Over Speed Test of all turbines
• Successfully commissioned Steam turbines, Recycle gas compressor,CO2 absorber ,Stripper and steam
drum.
• Successfully commissioned & safely startup of Ammonia Plant.
Technical Skill’s & Safety courses
• Problem Solving & Decision Making.
• Communication & Interpersonal Relationships
• Self-motivated.
• Energetic to work in challenging environments.
• Fire Fighting & Confined Space Rescue Training (Emergency Response Team Member)
• First aid and cardiopulmonary resuscitation training. (AED Trained)
• Permit to work System
• Process Safety Management (PSM)
• Inergen System
Personal Information
• Father’s Name Sajjad Hussain
• Marital Status Married
• N.I.C. Number 32103-2395344-9
• Passport DF5571441
MAJOR WORK EXPRIENCE
Hydro-Carbons Reforming: *(Induced Draft Furnace)
• Hydrogenator.
• Desulpherizor.
• Primary reformer.
• Secondary Reformer.
• Waste Heat Boiler.
Amine Gas Sweetening Section (Using MDEA) Consists of,
• Amine Absorber is equipped with IMTP to absorb CO2.
• Amine HP Flash vessel to flash out inert gases.
• LP Flash vessel for Flashing of CO2
• Stripper to strip out CO2 having Kettle type Reboiler
Hydro desulphurization
Natural Gas is purified from organic and inorganic sulfur in two rectors.
• NiMO Reactor (Nickel molybdenum)
• ZnO Reactor (Zinc Oxide)
Reforming and CO Conversion
• Primary Reformer
• Secondary Reformer
• Waste Heat Boiler
• HTS & LTS Converters
• Steam system KS/HS letdown station.
CDR (CO2 Recovery From Flue Gases)
• KS 1 solution for CO2 absorption
• Flue gases quencher.
• Amine solution regenerator
• Amine solution re-boiler
Reciprocating PD Compressor
This section consists of Electric motor driven, P.D compressor to handle recycle gas generated during
flashing of Process gas for again transfer to CO2 absorber for absorption..
Piston type positive displacement compressor. Motor driven PD compressor.
Computer Skills
• Proficient in Microsoft Office suite (Word, Excel, PowerPoint,)
• SAP, (system applications and products)
• Maximo, IMS.
Hobbies & Games
• Cricket, volleyball
Educational qualifications
Course Title Institute Grade/Div
Matric B.I.S.E Dera Ghazi Khan 1st
3 year DAE (Pertro-chemical) TEVTA Lahore 1st

More Related Content

What's hot

Petroleum Refining
Petroleum Refining Petroleum Refining
Petroleum Refining Ajay Sharma
 
Ongc drilling services introduction
Ongc drilling services introductionOngc drilling services introduction
Ongc drilling services introductionDeepak Chandak
 
Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016Muhammad Rashid Usman
 
petroleum refinery and its product
petroleum refinery and its productpetroleum refinery and its product
petroleum refinery and its productYOGESH THORIYA
 
Chapter 2 crude_oil_processing2
Chapter 2 crude_oil_processing2Chapter 2 crude_oil_processing2
Chapter 2 crude_oil_processing2Helena Francis
 
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)kentchih
 
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLAnkit Devatwal
 
Refining Process
Refining ProcessRefining Process
Refining ProcessMubarik Rao
 
1.2 mtpa iron ore pellet plant
1.2 mtpa iron ore pellet plant1.2 mtpa iron ore pellet plant
1.2 mtpa iron ore pellet plantDEEPAK GORAI
 
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Khalid Nawaz
 
Manoj Das ONGC project
Manoj Das ONGC projectManoj Das ONGC project
Manoj Das ONGC projectManoj Das
 
Summer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation LimitedSummer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation LimitedAbhishek Anand Thakur
 
Visakhapatnam Steel Plant - Success Story - Project Sales Corp
Visakhapatnam Steel Plant - Success Story - Project Sales CorpVisakhapatnam Steel Plant - Success Story - Project Sales Corp
Visakhapatnam Steel Plant - Success Story - Project Sales CorpProject Sales Corp
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbUpal Jb
 
Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10Salah Tantawy
 

What's hot (20)

Petroleum Refining
Petroleum Refining Petroleum Refining
Petroleum Refining
 
Ongc drilling services introduction
Ongc drilling services introductionOngc drilling services introduction
Ongc drilling services introduction
 
AMCO_Christian-Pfeiffer
AMCO_Christian-PfeifferAMCO_Christian-Pfeiffer
AMCO_Christian-Pfeiffer
 
Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016
 
CEMNAT MANUFACTRING
CEMNAT MANUFACTRINGCEMNAT MANUFACTRING
CEMNAT MANUFACTRING
 
petroleum refinery and its product
petroleum refinery and its productpetroleum refinery and its product
petroleum refinery and its product
 
Petroleum Intro-Rev 4
Petroleum Intro-Rev 4Petroleum Intro-Rev 4
Petroleum Intro-Rev 4
 
Chapter 2 crude_oil_processing2
Chapter 2 crude_oil_processing2Chapter 2 crude_oil_processing2
Chapter 2 crude_oil_processing2
 
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)
Tyre Recycle Machine by GLOBALTECH ENERGY RESOURCES ( MALAYSIA)
 
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPL
 
Refining Process
Refining ProcessRefining Process
Refining Process
 
Oil Refineries in Karachi Sanjrani
Oil Refineries  in Karachi    SanjraniOil Refineries  in Karachi    Sanjrani
Oil Refineries in Karachi Sanjrani
 
Refinery process
Refinery process Refinery process
Refinery process
 
1.2 mtpa iron ore pellet plant
1.2 mtpa iron ore pellet plant1.2 mtpa iron ore pellet plant
1.2 mtpa iron ore pellet plant
 
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
 
Manoj Das ONGC project
Manoj Das ONGC projectManoj Das ONGC project
Manoj Das ONGC project
 
Summer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation LimitedSummer Internship on Indian Oil Corporation Limited
Summer Internship on Indian Oil Corporation Limited
 
Visakhapatnam Steel Plant - Success Story - Project Sales Corp
Visakhapatnam Steel Plant - Success Story - Project Sales CorpVisakhapatnam Steel Plant - Success Story - Project Sales Corp
Visakhapatnam Steel Plant - Success Story - Project Sales Corp
 
Training report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jbTraining report Oil India Limited LPG, Duliajan by upal jb
Training report Oil India Limited LPG, Duliajan by upal jb
 
Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10
 

Similar to farrukh sajjad

AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAjith Kumar
 
Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)iftikhar anjum
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resumeMayur Amin
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New ResumeManoj Patel
 
oil_refinery_processes
oil_refinery_processesoil_refinery_processes
oil_refinery_processesSatej Colaco
 
Hg remove HZL DEBARI
Hg remove HZL DEBARIHg remove HZL DEBARI
Hg remove HZL DEBARImahesh meena
 
Presentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptPresentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptshakeelabbas23
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant informationsantoshadd82
 
AHSAN RAZA CHEMICAL ENGR CV
AHSAN RAZA CHEMICAL ENGR CVAHSAN RAZA CHEMICAL ENGR CV
AHSAN RAZA CHEMICAL ENGR CVAhsan Raza
 
Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)LMM GROUP CO., LTD.
 
Shareef.Mahar CV (1) 3
Shareef.Mahar CV (1) 3Shareef.Mahar CV (1) 3
Shareef.Mahar CV (1) 3sharif mahar
 
Inplant training report
Inplant training reportInplant training report
Inplant training reportapplesam8
 

Similar to farrukh sajjad (20)

AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production Operator
 
Rama-Resume
Rama-ResumeRama-Resume
Rama-Resume
 
RANJEET PRAJAPATI-RESUME
RANJEET PRAJAPATI-RESUMERANJEET PRAJAPATI-RESUME
RANJEET PRAJAPATI-RESUME
 
Ghulam Farid cv
Ghulam Farid cvGhulam Farid cv
Ghulam Farid cv
 
Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)
 
Resume - Kundan Trivedi
Resume - Kundan TrivediResume - Kundan Trivedi
Resume - Kundan Trivedi
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
oil_refinery_processes
oil_refinery_processesoil_refinery_processes
oil_refinery_processes
 
Hg remove HZL DEBARI
Hg remove HZL DEBARIHg remove HZL DEBARI
Hg remove HZL DEBARI
 
ammoniautility operator
ammoniautility operatorammoniautility operator
ammoniautility operator
 
ammonia&utility operator
ammonia&utility operatorammonia&utility operator
ammonia&utility operator
 
Presentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).pptPresentation P&P Dept edited (1).ppt
Presentation P&P Dept edited (1).ppt
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant information
 
AHSAN RAZA CHEMICAL ENGR CV
AHSAN RAZA CHEMICAL ENGR CVAHSAN RAZA CHEMICAL ENGR CV
AHSAN RAZA CHEMICAL ENGR CV
 
Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)
 
PACT Carbon Capture Plant - talk by Kris Milkowski, PACT/University of Leeds,...
PACT Carbon Capture Plant - talk by Kris Milkowski, PACT/University of Leeds,...PACT Carbon Capture Plant - talk by Kris Milkowski, PACT/University of Leeds,...
PACT Carbon Capture Plant - talk by Kris Milkowski, PACT/University of Leeds,...
 
Shareef.Mahar CV (1) 3
Shareef.Mahar CV (1) 3Shareef.Mahar CV (1) 3
Shareef.Mahar CV (1) 3
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 

farrukh sajjad

  • 1. Farrukh Sajjad D.O.B ---27-August 1986 House # E-62 Engro fertilizers employees colony Daharki dist Ghotki, Pakistan Cell: +92-3346787409 Farrukhsajjad14@yahoo.com Experience 7 Year3 Objective Work with a progressive organization where, I can utilize my skills for improving operational performance and contributing substantially towards the growth of the organization. Technical Qualifications Two Years Apprenticeship (2006-2008) as a Chemical AMMONIA Plant Operator From Technical Training Centre, Engro fertilizers Ltd Daharki.. Professional Affiliation Engro Fertilizer Company Ltd from 2009 to Date. Currently I am working in Engro as ammonia DCS plant Operator (Experian PKS-3000).Designed by (Holder TOPSO) (Saipem). This is the world largest single train Ammonia Urea complex. Capacity 3835 MT/Day production. PRE-COMMISSIONING, COMMISSIONING & STARTUP ACTIVITIES • Developed Pre-commissioning & Commissioning procedures for startup • Steam blowing of all steam network at ammonia plant • Lube oil flushing of all compressor lube oil headers. • Over Speed Test of all turbines • Successfully commissioned Steam turbines, Recycle gas compressor,CO2 absorber ,Stripper and steam drum. • Successfully commissioned & safely startup of Ammonia Plant. Technical Skill’s & Safety courses • Problem Solving & Decision Making. • Communication & Interpersonal Relationships • Self-motivated. • Energetic to work in challenging environments. • Fire Fighting & Confined Space Rescue Training (Emergency Response Team Member) • First aid and cardiopulmonary resuscitation training. (AED Trained) • Permit to work System • Process Safety Management (PSM) • Inergen System Personal Information • Father’s Name Sajjad Hussain • Marital Status Married • N.I.C. Number 32103-2395344-9 • Passport DF5571441
  • 2. MAJOR WORK EXPRIENCE Hydro-Carbons Reforming: *(Induced Draft Furnace) • Hydrogenator. • Desulpherizor. • Primary reformer. • Secondary Reformer. • Waste Heat Boiler. Amine Gas Sweetening Section (Using MDEA) Consists of, • Amine Absorber is equipped with IMTP to absorb CO2. • Amine HP Flash vessel to flash out inert gases. • LP Flash vessel for Flashing of CO2 • Stripper to strip out CO2 having Kettle type Reboiler Hydro desulphurization Natural Gas is purified from organic and inorganic sulfur in two rectors. • NiMO Reactor (Nickel molybdenum) • ZnO Reactor (Zinc Oxide) Reforming and CO Conversion • Primary Reformer • Secondary Reformer • Waste Heat Boiler • HTS & LTS Converters • Steam system KS/HS letdown station. CDR (CO2 Recovery From Flue Gases) • KS 1 solution for CO2 absorption • Flue gases quencher. • Amine solution regenerator • Amine solution re-boiler Reciprocating PD Compressor This section consists of Electric motor driven, P.D compressor to handle recycle gas generated during flashing of Process gas for again transfer to CO2 absorber for absorption.. Piston type positive displacement compressor. Motor driven PD compressor. Computer Skills • Proficient in Microsoft Office suite (Word, Excel, PowerPoint,) • SAP, (system applications and products) • Maximo, IMS. Hobbies & Games • Cricket, volleyball Educational qualifications Course Title Institute Grade/Div Matric B.I.S.E Dera Ghazi Khan 1st 3 year DAE (Pertro-chemical) TEVTA Lahore 1st