OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
1
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
2
Mission Statement- P&P
Processing of Hydrocarbons to maintain
uninterrupted supply of on spec Products, with
best operation and maintenance practices
observing high standards of HSE, creating
team spirit and learning environment.
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
The finished petroleum products namely
natural gas, crude, LPG and sulphur
undergo multiple processing stages to get
separated from undesired constituents and
impurities of throughput coming from
producing wells before these can be
marketed to clients in downstream
petroleum sector. In OGDCL this
indispensable role is performed by
Process and Plants Department. 3
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
4
P&P Plant Processing Facilities
GAS
SULPHUR
LPG
WHITE PRODUCTS
STBILIZED OIL
WELL HEAD
PRODUCTION DEPARTMENT PROCESS & PLANTS DEPARTMENT
WELL& GATHERING OPERATIONS PLANT OPERATION
GATHERING
SYSTEM
SEPARATION
SWEETENING DEHYDARATION
LPG
RECOCVERY
REFINARY
SULPHUR
RECOVERY
CONDENSATE
STABILIZATION
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
5
Work Arrangement – P&P
EXECUTIVE DIRECTOR
G. M
PLANT OPERATIONS
MANAGER(P&P)-N/C
DAKHNI
DHODAK
CHANDA/MELA
NANDPUR
NASHPA
SADQAL,UCH,PK/LOTI
MANAGER(P&P)-S-A/B
QADIRPUR
DARU
SINJHORO,BOBI,KUNNER,/KPD
H/SARI
MANAGER(MAINT)-P&P
OVERALL SUPERVISION OF
NORTH,CENTRE AND SOUTH
ZONE
M (SS)-P&P
SUPPORT SERVICES
MANPOWER,CHEMICALS,
TRAINING,COORDINATION
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
6
Man Power
P&P DEPARTMENT MANPOWER SUMMARY
Sr. No. Category Sanctioned
Held
Excess / Deficient
Regular Daily Wages Total
1 Officers 696 454 20 474 -222
2 Staff 1566 646 881 1527 -39
Grand Total 2262 1100 901 2001
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
7
Man Power
OFFICERS / STAFF ON THE STRENGTH OF P&P DEPARTMENT
S. No. Name of Post Groups Sanctioned
Held
Excess /
Deficiency
Regular
Daily
Wagers
Total
1 General Manager EG-VIII 1 1 0 1 0
2 Manager EG-VII 21 19 0 19 -2
3 Chief Engineer EG-VI 24 12 0 12 -12
4 Dy Chief/CTO EG-V 101 37 0 37 -64
5 Sr. Engineer/PTO EG-IV 134 75 0 75 -59
6 Jr. Engineer/STO EG-III 187 109 0 109 -78
7
Asstt
Engineer/TO
EG-II-I 228 201 20 221 -7
Officers Total 696 454 20 474 -222
8 Staff 1566 646 881 1527 -39
GRAND TOTAL 2262 1100 901 2001 -261
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Type of Plants
Plant / Location Dehydration H2S/CO2 Removal LPG Recovery Sulphur Recovery
Dakhni √ √ √ √
Dhodak √ - - -
Chanda √ √ √ -
Mela √ - - -
Sadqal √ - - -
Nashpa √ - - -
Nandpur √ - - -
Uch-I √ √ - -
Uch-II √ - - -
Pirkoh √ - - -
Loti √ - - -
Reti/Maru √ - - -
Noor Bagla - √ - -
Pakhro+Dpur - √ - -
Kunnar √ - √ -
KPD √ - - -
Sinjhoro+JKH √ - - -
BOBI √ - √ -
8
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Plant capacities
Plant / Location Design capacity Raw gas /
Oil
Current input
Qadirpur Gas Processing Plant –Ghotiki Sindh: 650 MMSCFD 540
Gas sweetening through Membrane technology. 1300 BPD 950 BPD
Uch Gas Processing Plant-Bugti Agencies
Balochistan:
300 MMSCFD 280 winter
Gas Sweetening though MDEA process having low
heating value gas
260 Summer
Dhodak Dehydration, unit 20 MMSCFD 1.5
Dakhni Gas / Condensate/Oil Processing Plant–
(Jand)-Punjab:
40 MMSCFD 22
Gas sweetening through Amine process, LPG and
Sulphur Recovery Unit
1760 BPD 1000
LPG 26 MT/D 11
SRU 155 MT/D 100
Gas Dehydration unit – train II 50 MMSCFD 10
Bobi Gas / Condensate/Oil Processing Plant-
(Sanghar)-Sindh: Gas dehydration, LPG recovery
and condensate stabilization
20 MMSCFD 17
125 MT/D 50
2800 BPD 1500
9
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Plant capacities-Cont
Plant / Location Design capacity Raw gas /
Oil
Current input
Kunnar Gas / Condensate/oil
Processing Plant –(Hyderabad)-Sindh: 10 MMSCFD 7.5
Gas dehydration, LPG recovery and condensate
stabilization
41 MT/D 23
3880 BPD 4400
Chanda Gas / Condensate/Oil Processing Plant–
(Shakardara)-KPK:
24 MMSCFD 3.5
Gas dehydration, LPG recovery and condensate
stabilization
54 MT/D 11
5300 BPD 2200
Pirkoh/Loti Gas Compression & Dehydration
Plants-(DeraBugti)-Balochistan:
100 MMSCFD 12
Compression of low pressure gas and GAS
dehydration
50 MMscfd 35
NandPur Gas Dehydration Plant-(Kabirwala)-
Punjab
50 MMSCFD 29
Sadqal Gas Dehydration Plant-(Fateh Jang)-
Punjab
10 MMSCFD 1
10
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Plant capacities-Cont
11
Plant / Location Design capacity Raw gas / Oil Current input
Pakhro Membrane Plant- (Hyderabad)-Sindh (Daru
Central Facilities)
10 MMSCFD 0.5
Hundi Sari Gas Dehydration/ Compression Plant-
(Dado)-Sindh
20 MMSCFD 2.5
Mela Gas Dehydration Plant-(Kohat)-KPK 30 MMSCFD 10
14500 BPD 1900
Nashpa Gas Dehydration Plant (Karak)-KPK 50 MMSCFD-Tr-I 40
40 MMSCFD-Tr-II 30
15000 BPD 19500
Nur / Bagla (Badin-Sindh) 12 MMSCFD
Membrane Plant
KPD (Hyderabad)-Sindh 140 MMScfd 115
Dehydration by OGDCL’s plant. 1500 BBLs 1500
LPG being extracted at M/s JJVL’s plant
Pakhro Membrane Plant- (Hyderabad)-Sindh (Daru
Central Facilities)
10 MMSCFD 0.5
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Total Number of Plants
Plants Total Number
Dehydration 16
H2S/CO2 Removal 05
LPG Recovery 04
Sulphur Recovery 01
12
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
13
Duties / Key function
 Operations & Maintenance Management
 Assistance in Pre-commissioning and
Commissioning
 Refurbishment & Overhauls
 Technical assistance in material procurement, new
project activities, Joint Ventures & Marketing
 Annual Turn Around (ATAs) of Plants
 Debottlenecking & Revamping
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
14
Priorities
 Integrity & Transparency
 H S E Compliance & reduce risk by operational
practice.
 Improved reliability through proactive
maintenance.
 Cost effectiveness and optimization.
 Maximizing plants efficiency through optimization
of operations & effective planned ATAs.
 Training and professional growth.
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
15
Requirement of Technical Services section with
Software tools for P&P
 Maintenance Management System (MMS) software
purchase to be expedited
 Revamping of old plants to meet future outlooks
 Capacity/Operation Optimization
 Effective planning/Material Management
 Review of Consultant design reports/JV reports
 Timely/valueable input to Project Deptt.
 Annual Turn Around (ATAs) of Plants
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
16
RENTAL, O&M :DEHYDARTION PLANT
OGDCL has entered into a Gas Processing
Agreement (GPA) with Petroleum Exploration
Limited (PEL) and P&P is processing 14 MMscfd
Gas at Dehydration Plant (Ghotki,Sind)
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Achievements
17
Plants Details of Plants Jobs
Qadirpur
Plant
•Trouble shooting to control end of regeneration temp.
of Memguard vessels (Job done successfully). Saving
the life of the M.G. media and membrane elements for
better efficiency.
•Installation of NRV at Qadirpur plant inlet Headers
to safeguard back ward flow of gas in case tripping of
compressors. Saving the membrane
efficiency/performance.
•Relocation and installation of 03 centrifugal trains
from Pirkoh Plant (Job completed in 2014).
Enhancement of raw gas compression
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Achievements
18
Plants Details of Plants Jobs
MELA
Installation of crude oil RVP control equipment was carried
out and after commissioning of this equipment RVP of Mela
crude oil has decreased from 20 to 13 psig. Additionally, to
further reduce RVP of crude oil around 10 Psig, 02 nos. of
pre-heaters have been installed and commissioned at Mela.
NASHPA
Installation and commissioning of MP-Gas comps. was
carried out in Nov. 2013 resulting in injection of additional
06 MMscfd of MP gas into M/s SNGPL’s system.
CHANDA
Installation and commissioning of Membrane tubes was
completed to address the long outstanding issue of off-
specification sale gas discount due to which CO2 contents
from Chanda sales gas are reduced from 3.9 mole % to 2.7
mole % (pipeline quality gas specs.)
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Achievements
19
Plants Details of Plants Jobs
DHODAK
De-hiring of 550 KW rental Diesel Generator and
installation & commissioning of OGDCL procured 565 KW
Diesel Generator was carried out.
Installation and commissioning of OGDCL procured 650 KW
Gas Generator will be carried out after arrival of necessary
spare parts.
UCH
Refurbishment of 03 no. of cooling towers cell A, B & C.
Construction of 01 no. of additional cooling tower (cell D) is
in progress
Commissioning of 4.8 MW of EG Turbine # 4
Laying of new 500 Meter, 10” Dia, sales gas line from
Dehydration train-30 outlet to inlet station
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
Achievements
20
Plants Details of Plants Jobs
Bobi
Installation of 35 MMSCFD TEG De-Hydration unit at
Bobi LPG Plant is in progress to reduce moisture content
in raw gas and enhancement in LPG production is
expected.
KPD
Flare relocation for clearance of project area job is in
progress
KPD additional 100 MMSCFD gas processing for
dehydration installation completed.
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
21
Technical/Administrative Issues faced by Plants
 External/Internal Pressures
 Transfers/Postings
 Locals problem on CSR activities
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
22
Issues
S.NO ISSUES REMEDIES/SUGGESTIONS
1.0 Shortage of Technical
Manpower
Manpower to be inducted on regular basis at
entry level. A case was sent to HR Deptt. for
hiring which is still not advertised. To be
expedited.
2.0 Trainings of Plant
Professionals
To empower HOD to approve trainings upto
Rs. 500,000 per month.
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
23
Issues
S.NO ISSUES REMEDIES/SUGGESTIONS
3.0 Continuous Leaving of
Experienced
Professionals (BRAIN
DRAIN)
Incentives (advanced increments,
accelerated promotions etc) to extra
ordinary professionals.
4.0 Promotion Channel &
pre requisite qualification
Special Promotion cases (<5 years )be
considered for the professionals (having
extra ordinary performance)
5.0 Working Space at Head
Office.
Allocation of one additional floor in any
Tower. Currently our senior officers are
placed in hall due to absence of adequate
offices.
6.0 P&P Officers Manpower deputed in other Departments
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
24
Future Outlook
 Improvement of existing old systems
 Expertise development by advance
professional cources
 O&M Contracts
 Revamping and Up gradation of old facilities
 Maximizing Automation
OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT
25
THANKS

More Related Content

Similar to Presentation P&P Dept edited (1).ppt

PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...Mohit Dhull
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Groupprocess group
 
ONGC HAZIRA PROJECT REPORT
ONGC HAZIRA PROJECT REPORTONGC HAZIRA PROJECT REPORT
ONGC HAZIRA PROJECT REPORTNikhil Chavda
 
Subbiah May 16
Subbiah May 16Subbiah May 16
Subbiah May 16subbiah as
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Nofiar Rachman
 
GAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfGAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfHadiTahmasbi2
 
Industrial Training report at ONGC
Industrial Training report at ONGCIndustrial Training report at ONGC
Industrial Training report at ONGCShouvik Ash
 
METHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case StudyMETHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case StudyGerard B. Hawkins
 
Final internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptxFinal internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptxAdisanu
 
Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedRijumoni Boro
 
Hiren ongc report
Hiren ongc reportHiren ongc report
Hiren ongc reportHiren Patel
 
Proceedings of ASME Turbo Expo 2010 Final
Proceedings of ASME Turbo Expo 2010 FinalProceedings of ASME Turbo Expo 2010 Final
Proceedings of ASME Turbo Expo 2010 FinalGary Williams
 
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013Alpesh Gurjar
 
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...Gerard B. Hawkins
 

Similar to Presentation P&P Dept edited (1).ppt (20)

PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
PROJECT REPORT ON VARIOUS MECHANICAL UNITS INVOLVED IN THE BOTTLING OF LPG CY...
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
 
ONGC HAZIRA PROJECT REPORT
ONGC HAZIRA PROJECT REPORTONGC HAZIRA PROJECT REPORT
ONGC HAZIRA PROJECT REPORT
 
Petroleum Intro-Rev 4
Petroleum Intro-Rev 4Petroleum Intro-Rev 4
Petroleum Intro-Rev 4
 
Subbiah May 16
Subbiah May 16Subbiah May 16
Subbiah May 16
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0
 
GAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdfGAS PROCESSING PRESENTATION.pdf
GAS PROCESSING PRESENTATION.pdf
 
Industrial Training report at ONGC
Industrial Training report at ONGCIndustrial Training report at ONGC
Industrial Training report at ONGC
 
METHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case StudyMETHANOL PLANT ARC RETROFIT Case Study
METHANOL PLANT ARC RETROFIT Case Study
 
UMAR FAROOQ CV
UMAR FAROOQ CVUMAR FAROOQ CV
UMAR FAROOQ CV
 
Final internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptxFinal internship refinery Presentation (1).pptx
Final internship refinery Presentation (1).pptx
 
Summer Training Report,Oil India Limited
Summer Training Report,Oil India LimitedSummer Training Report,Oil India Limited
Summer Training Report,Oil India Limited
 
Hiren ongc report
Hiren ongc reportHiren ongc report
Hiren ongc report
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
6week.pptx
6week.pptx6week.pptx
6week.pptx
 
SENTHIL PANDIAN CV
SENTHIL PANDIAN CVSENTHIL PANDIAN CV
SENTHIL PANDIAN CV
 
Proceedings of ASME Turbo Expo 2010 Final
Proceedings of ASME Turbo Expo 2010 FinalProceedings of ASME Turbo Expo 2010 Final
Proceedings of ASME Turbo Expo 2010 Final
 
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013
UlSD Hydrotreater Challenges Overcome to Improve on Stream Factor - MEPEC 2013
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...
Debottlenecking Claus Sulfur Recovery Units: An Investigation of the applicat...
 

More from shakeelabbas23

Presentation on Foreign Policy.pptx
Presentation on Foreign Policy.pptxPresentation on Foreign Policy.pptx
Presentation on Foreign Policy.pptxshakeelabbas23
 
iMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.pptiMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.pptshakeelabbas23
 
Marketing and advertising presentation.pptx
Marketing and advertising presentation.pptxMarketing and advertising presentation.pptx
Marketing and advertising presentation.pptxshakeelabbas23
 
Capital Valley presentation.pptx
Capital Valley presentation.pptxCapital Valley presentation.pptx
Capital Valley presentation.pptxshakeelabbas23
 

More from shakeelabbas23 (11)

racisim.pptx
racisim.pptxracisim.pptx
racisim.pptx
 
BUSINESS IDEA.pptx
BUSINESS IDEA.pptxBUSINESS IDEA.pptx
BUSINESS IDEA.pptx
 
Presentation on Foreign Policy.pptx
Presentation on Foreign Policy.pptxPresentation on Foreign Policy.pptx
Presentation on Foreign Policy.pptx
 
iMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.pptiMPORTANT pRESENTATION.ppt
iMPORTANT pRESENTATION.ppt
 
Marketing and advertising presentation.pptx
Marketing and advertising presentation.pptxMarketing and advertising presentation.pptx
Marketing and advertising presentation.pptx
 
Finance project.ppt
Finance project.pptFinance project.ppt
Finance project.ppt
 
Capital Valley presentation.pptx
Capital Valley presentation.pptxCapital Valley presentation.pptx
Capital Valley presentation.pptx
 
Chapter-3.ppt
Chapter-3.pptChapter-3.ppt
Chapter-3.ppt
 
Chapter-4 of OM.ppt
Chapter-4 of OM.pptChapter-4 of OM.ppt
Chapter-4 of OM.ppt
 
Process Strategy.pptx
Process Strategy.pptxProcess Strategy.pptx
Process Strategy.pptx
 
Surf excel ppt.pptx
Surf excel ppt.pptxSurf excel ppt.pptx
Surf excel ppt.pptx
 

Recently uploaded

Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturingssuser0811ec
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxVishalDeshpande27
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamDr. Radhey Shyam
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfAbrahamGadissa
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringDr. Radhey Shyam
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf884710SadaqatAli
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 

Recently uploaded (20)

Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturing
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
shape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptxshape functions of 1D and 2 D rectangular elements.pptx
shape functions of 1D and 2 D rectangular elements.pptx
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
Digital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdfDigital Signal Processing Lecture notes n.pdf
Digital Signal Processing Lecture notes n.pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdfONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
ONLINE CAR SERVICING SYSTEM PROJECT REPORT.pdf
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 

Presentation P&P Dept edited (1).ppt

  • 1. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 1
  • 2. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 2 Mission Statement- P&P Processing of Hydrocarbons to maintain uninterrupted supply of on spec Products, with best operation and maintenance practices observing high standards of HSE, creating team spirit and learning environment.
  • 3. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT The finished petroleum products namely natural gas, crude, LPG and sulphur undergo multiple processing stages to get separated from undesired constituents and impurities of throughput coming from producing wells before these can be marketed to clients in downstream petroleum sector. In OGDCL this indispensable role is performed by Process and Plants Department. 3
  • 4. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 4 P&P Plant Processing Facilities GAS SULPHUR LPG WHITE PRODUCTS STBILIZED OIL WELL HEAD PRODUCTION DEPARTMENT PROCESS & PLANTS DEPARTMENT WELL& GATHERING OPERATIONS PLANT OPERATION GATHERING SYSTEM SEPARATION SWEETENING DEHYDARATION LPG RECOCVERY REFINARY SULPHUR RECOVERY CONDENSATE STABILIZATION
  • 5. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 5 Work Arrangement – P&P EXECUTIVE DIRECTOR G. M PLANT OPERATIONS MANAGER(P&P)-N/C DAKHNI DHODAK CHANDA/MELA NANDPUR NASHPA SADQAL,UCH,PK/LOTI MANAGER(P&P)-S-A/B QADIRPUR DARU SINJHORO,BOBI,KUNNER,/KPD H/SARI MANAGER(MAINT)-P&P OVERALL SUPERVISION OF NORTH,CENTRE AND SOUTH ZONE M (SS)-P&P SUPPORT SERVICES MANPOWER,CHEMICALS, TRAINING,COORDINATION
  • 6. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 6 Man Power P&P DEPARTMENT MANPOWER SUMMARY Sr. No. Category Sanctioned Held Excess / Deficient Regular Daily Wages Total 1 Officers 696 454 20 474 -222 2 Staff 1566 646 881 1527 -39 Grand Total 2262 1100 901 2001
  • 7. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 7 Man Power OFFICERS / STAFF ON THE STRENGTH OF P&P DEPARTMENT S. No. Name of Post Groups Sanctioned Held Excess / Deficiency Regular Daily Wagers Total 1 General Manager EG-VIII 1 1 0 1 0 2 Manager EG-VII 21 19 0 19 -2 3 Chief Engineer EG-VI 24 12 0 12 -12 4 Dy Chief/CTO EG-V 101 37 0 37 -64 5 Sr. Engineer/PTO EG-IV 134 75 0 75 -59 6 Jr. Engineer/STO EG-III 187 109 0 109 -78 7 Asstt Engineer/TO EG-II-I 228 201 20 221 -7 Officers Total 696 454 20 474 -222 8 Staff 1566 646 881 1527 -39 GRAND TOTAL 2262 1100 901 2001 -261
  • 8. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Type of Plants Plant / Location Dehydration H2S/CO2 Removal LPG Recovery Sulphur Recovery Dakhni √ √ √ √ Dhodak √ - - - Chanda √ √ √ - Mela √ - - - Sadqal √ - - - Nashpa √ - - - Nandpur √ - - - Uch-I √ √ - - Uch-II √ - - - Pirkoh √ - - - Loti √ - - - Reti/Maru √ - - - Noor Bagla - √ - - Pakhro+Dpur - √ - - Kunnar √ - √ - KPD √ - - - Sinjhoro+JKH √ - - - BOBI √ - √ - 8
  • 9. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Plant capacities Plant / Location Design capacity Raw gas / Oil Current input Qadirpur Gas Processing Plant –Ghotiki Sindh: 650 MMSCFD 540 Gas sweetening through Membrane technology. 1300 BPD 950 BPD Uch Gas Processing Plant-Bugti Agencies Balochistan: 300 MMSCFD 280 winter Gas Sweetening though MDEA process having low heating value gas 260 Summer Dhodak Dehydration, unit 20 MMSCFD 1.5 Dakhni Gas / Condensate/Oil Processing Plant– (Jand)-Punjab: 40 MMSCFD 22 Gas sweetening through Amine process, LPG and Sulphur Recovery Unit 1760 BPD 1000 LPG 26 MT/D 11 SRU 155 MT/D 100 Gas Dehydration unit – train II 50 MMSCFD 10 Bobi Gas / Condensate/Oil Processing Plant- (Sanghar)-Sindh: Gas dehydration, LPG recovery and condensate stabilization 20 MMSCFD 17 125 MT/D 50 2800 BPD 1500 9
  • 10. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Plant capacities-Cont Plant / Location Design capacity Raw gas / Oil Current input Kunnar Gas / Condensate/oil Processing Plant –(Hyderabad)-Sindh: 10 MMSCFD 7.5 Gas dehydration, LPG recovery and condensate stabilization 41 MT/D 23 3880 BPD 4400 Chanda Gas / Condensate/Oil Processing Plant– (Shakardara)-KPK: 24 MMSCFD 3.5 Gas dehydration, LPG recovery and condensate stabilization 54 MT/D 11 5300 BPD 2200 Pirkoh/Loti Gas Compression & Dehydration Plants-(DeraBugti)-Balochistan: 100 MMSCFD 12 Compression of low pressure gas and GAS dehydration 50 MMscfd 35 NandPur Gas Dehydration Plant-(Kabirwala)- Punjab 50 MMSCFD 29 Sadqal Gas Dehydration Plant-(Fateh Jang)- Punjab 10 MMSCFD 1 10
  • 11. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Plant capacities-Cont 11 Plant / Location Design capacity Raw gas / Oil Current input Pakhro Membrane Plant- (Hyderabad)-Sindh (Daru Central Facilities) 10 MMSCFD 0.5 Hundi Sari Gas Dehydration/ Compression Plant- (Dado)-Sindh 20 MMSCFD 2.5 Mela Gas Dehydration Plant-(Kohat)-KPK 30 MMSCFD 10 14500 BPD 1900 Nashpa Gas Dehydration Plant (Karak)-KPK 50 MMSCFD-Tr-I 40 40 MMSCFD-Tr-II 30 15000 BPD 19500 Nur / Bagla (Badin-Sindh) 12 MMSCFD Membrane Plant KPD (Hyderabad)-Sindh 140 MMScfd 115 Dehydration by OGDCL’s plant. 1500 BBLs 1500 LPG being extracted at M/s JJVL’s plant Pakhro Membrane Plant- (Hyderabad)-Sindh (Daru Central Facilities) 10 MMSCFD 0.5
  • 12. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Total Number of Plants Plants Total Number Dehydration 16 H2S/CO2 Removal 05 LPG Recovery 04 Sulphur Recovery 01 12
  • 13. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 13 Duties / Key function  Operations & Maintenance Management  Assistance in Pre-commissioning and Commissioning  Refurbishment & Overhauls  Technical assistance in material procurement, new project activities, Joint Ventures & Marketing  Annual Turn Around (ATAs) of Plants  Debottlenecking & Revamping
  • 14. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 14 Priorities  Integrity & Transparency  H S E Compliance & reduce risk by operational practice.  Improved reliability through proactive maintenance.  Cost effectiveness and optimization.  Maximizing plants efficiency through optimization of operations & effective planned ATAs.  Training and professional growth.
  • 15. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 15 Requirement of Technical Services section with Software tools for P&P  Maintenance Management System (MMS) software purchase to be expedited  Revamping of old plants to meet future outlooks  Capacity/Operation Optimization  Effective planning/Material Management  Review of Consultant design reports/JV reports  Timely/valueable input to Project Deptt.  Annual Turn Around (ATAs) of Plants
  • 16. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 16 RENTAL, O&M :DEHYDARTION PLANT OGDCL has entered into a Gas Processing Agreement (GPA) with Petroleum Exploration Limited (PEL) and P&P is processing 14 MMscfd Gas at Dehydration Plant (Ghotki,Sind)
  • 17. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Achievements 17 Plants Details of Plants Jobs Qadirpur Plant •Trouble shooting to control end of regeneration temp. of Memguard vessels (Job done successfully). Saving the life of the M.G. media and membrane elements for better efficiency. •Installation of NRV at Qadirpur plant inlet Headers to safeguard back ward flow of gas in case tripping of compressors. Saving the membrane efficiency/performance. •Relocation and installation of 03 centrifugal trains from Pirkoh Plant (Job completed in 2014). Enhancement of raw gas compression
  • 18. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Achievements 18 Plants Details of Plants Jobs MELA Installation of crude oil RVP control equipment was carried out and after commissioning of this equipment RVP of Mela crude oil has decreased from 20 to 13 psig. Additionally, to further reduce RVP of crude oil around 10 Psig, 02 nos. of pre-heaters have been installed and commissioned at Mela. NASHPA Installation and commissioning of MP-Gas comps. was carried out in Nov. 2013 resulting in injection of additional 06 MMscfd of MP gas into M/s SNGPL’s system. CHANDA Installation and commissioning of Membrane tubes was completed to address the long outstanding issue of off- specification sale gas discount due to which CO2 contents from Chanda sales gas are reduced from 3.9 mole % to 2.7 mole % (pipeline quality gas specs.)
  • 19. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Achievements 19 Plants Details of Plants Jobs DHODAK De-hiring of 550 KW rental Diesel Generator and installation & commissioning of OGDCL procured 565 KW Diesel Generator was carried out. Installation and commissioning of OGDCL procured 650 KW Gas Generator will be carried out after arrival of necessary spare parts. UCH Refurbishment of 03 no. of cooling towers cell A, B & C. Construction of 01 no. of additional cooling tower (cell D) is in progress Commissioning of 4.8 MW of EG Turbine # 4 Laying of new 500 Meter, 10” Dia, sales gas line from Dehydration train-30 outlet to inlet station
  • 20. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT Achievements 20 Plants Details of Plants Jobs Bobi Installation of 35 MMSCFD TEG De-Hydration unit at Bobi LPG Plant is in progress to reduce moisture content in raw gas and enhancement in LPG production is expected. KPD Flare relocation for clearance of project area job is in progress KPD additional 100 MMSCFD gas processing for dehydration installation completed.
  • 21. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 21 Technical/Administrative Issues faced by Plants  External/Internal Pressures  Transfers/Postings  Locals problem on CSR activities
  • 22. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 22 Issues S.NO ISSUES REMEDIES/SUGGESTIONS 1.0 Shortage of Technical Manpower Manpower to be inducted on regular basis at entry level. A case was sent to HR Deptt. for hiring which is still not advertised. To be expedited. 2.0 Trainings of Plant Professionals To empower HOD to approve trainings upto Rs. 500,000 per month.
  • 23. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 23 Issues S.NO ISSUES REMEDIES/SUGGESTIONS 3.0 Continuous Leaving of Experienced Professionals (BRAIN DRAIN) Incentives (advanced increments, accelerated promotions etc) to extra ordinary professionals. 4.0 Promotion Channel & pre requisite qualification Special Promotion cases (<5 years )be considered for the professionals (having extra ordinary performance) 5.0 Working Space at Head Office. Allocation of one additional floor in any Tower. Currently our senior officers are placed in hall due to absence of adequate offices. 6.0 P&P Officers Manpower deputed in other Departments
  • 24. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 24 Future Outlook  Improvement of existing old systems  Expertise development by advance professional cources  O&M Contracts  Revamping and Up gradation of old facilities  Maximizing Automation
  • 25. OIL AND GAS COMPANY LIMITED PROCESS & PLANTS DEPARTMENT 25 THANKS