CE-345 water supply and waste water Management
Lecture# 01
(6th semester civil)
By: Engr. Hayat Hussain
Lecturer Saidu polytechnic institute saidu sharif Swat
Contents
Water supply
Components of water work scheme
Design period
Factors affecting design period
Water supply
THE PROCESS OF SUPPLYING WATER TO A COMMUNITY IN ADEQUATE
QUANTITY AND QUALITY.
Components of water work scheme
• Collection works
• Treatment works
• Transmission works
• Distribution works
• Collection works
In collection works, water is collected from the source. There are two
major source of water. Surface water and ground water. In order to
collect surface water, dams and barrages are constructed whereas to
collect ground water, tube wells are used.
• Treatment works
In treatment works, water obtained through the source is treated. Most
of the surface water need treatment as it is contaminated by suspended
particles. Ground water may or may not need treatment. One of the
problems with ground water is high salt concentration. It is more
expensive to treat this. In such case surface water is used, when ground
water contains high salt concentration. Ground water may also contain
elements like iron, magnesium.
• Transmission works
If source of water is away from the community, transmission work is
required to transport water the treatment plant and then the treated water
from treatment plant to the community. In some cases, transmission
work may be eliminated
• Distribution works
In Distribution works, treated water is supplied to the consumers at the
point of use from overhead tanks.
Following two requirements should be fulfilled while distribute water to
the community
1. Quantity of water must be sufficient according to demand.
2. Pressure should be sufficient.
Design period
It is the number of years in future for which the proposed facility would
meet the demand of the community.
OR
The number of years in future for which supply will be more than
demand.
Factors affecting Design period
• Useful Life of the structure
• Rate of population growth
• Ease or difficulty in extension
• Lead time
• Economy of scale
• Performance time
• Useful Life of the structure
Life of structure is the number of years in future for which the design
period is physically suitable to provide the intended facility. So it
should be less than life of structure.
• Rate of population growth
If the rate of population growth is higher, then for that region shorter
design period is required.
• Ease or difficulty in extension
For the projects whose extension is easily possible, it is kept low. For
example we can install new tube wells at any time, so we do not need to
install all tube wells which would be required after 20 years. But for the
projects whose extension is difficult, their design period is kept greater.
For example dams and reservoirs cannot be extended easily.
• Lead time
it is the time from the commencement of a project to its completion.
Design period should be greater than lead time.
• Economy of scale
The decrease in average cost as the size of facility increase is known as
economy of scale. If the economy of scale is small, smaller design
period will be used. It is economical to build a large structure, for longer
design period.
• Performance time
Structures are checked under working condition for sometime, which
should not be considered in design period. During this time it is not
providing facility to community.
Questions & Answers
THANKS

More Related Content

What's hot

Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestFairfax County
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2Ismael Vazquez, LSIT
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
 
Upper Laguna Creek Eva Butler
Upper Laguna Creek Eva ButlerUpper Laguna Creek Eva Butler
Upper Laguna Creek Eva ButlerGreg Gearheart
 
Schuylerville Storm Water 2
Schuylerville Storm Water 2Schuylerville Storm Water 2
Schuylerville Storm Water 2sulljame
 
Morgan's Run - Schuylerville's Infrastructure Problems
Morgan's Run - Schuylerville's Infrastructure ProblemsMorgan's Run - Schuylerville's Infrastructure Problems
Morgan's Run - Schuylerville's Infrastructure Problemswlukas
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Fairfax County
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity of San Angelo Texas
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04HartTWI
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Fairfax County
 
Peyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream RestorationPeyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream RestorationFairfax County
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 
Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectFairfax County
 
Franklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFranklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFairfax County
 
Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Fairfax County
 

What's hot (20)

Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 
Upper Laguna Creek Eva Butler
Upper Laguna Creek Eva ButlerUpper Laguna Creek Eva Butler
Upper Laguna Creek Eva Butler
 
Schuylerville Storm Water 2
Schuylerville Storm Water 2Schuylerville Storm Water 2
Schuylerville Storm Water 2
 
Morgan's Run - Schuylerville's Infrastructure Problems
Morgan's Run - Schuylerville's Infrastructure ProblemsMorgan's Run - Schuylerville's Infrastructure Problems
Morgan's Run - Schuylerville's Infrastructure Problems
 
Dwyer Sess3 101309
Dwyer Sess3 101309Dwyer Sess3 101309
Dwyer Sess3 101309
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
Pimmit Run Tributary at George Marshall High School Stream Restoration 9/29/2020
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
City Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project UpdateCity Council April 3, 2012 Hickory Aquifer Project Update
City Council April 3, 2012 Hickory Aquifer Project Update
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04
 
Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015Huntsman Lake Dredging January 2015
Huntsman Lake Dredging January 2015
 
Peyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream RestorationPeyton Run at Longwood Knolls Stream Restoration
Peyton Run at Longwood Knolls Stream Restoration
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
City council 7 16-13 river project
City council 7 16-13 river projectCity council 7 16-13 river project
City council 7 16-13 river project
 
Dolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag ProjectDolphin Lane Sewer Sag Project
Dolphin Lane Sewer Sag Project
 
Franklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project HighlightsFranklin Park Chesterbrook Neighborhood Project Highlights
Franklin Park Chesterbrook Neighborhood Project Highlights
 
Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021Snakeden Branch at Lake Audubon January 2021
Snakeden Branch at Lake Audubon January 2021
 

Similar to Lecture# 01 ce 345 water supply - 6th

Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacYashna Garg
 
Chapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdfChapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdftameneaDemissie
 
Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013India Water Portal
 
Power plant engineering unit-iii.pptx
Power plant engineering unit-iii.pptxPower plant engineering unit-iii.pptx
Power plant engineering unit-iii.pptxSyedMujeeb22
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownBrian Sipes
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Well Unloading Solution - Winning Poster
Well Unloading Solution - Winning PosterWell Unloading Solution - Winning Poster
Well Unloading Solution - Winning PosterHasan Siddiqui
 
The 2011 thailand flood
The 2011 thailand floodThe 2011 thailand flood
The 2011 thailand floodHo Wei Haw
 
Some Maintenance Issues in Civil Engineering Works
Some Maintenance Issues in Civil Engineering WorksSome Maintenance Issues in Civil Engineering Works
Some Maintenance Issues in Civil Engineering WorksDr K M SONI
 
Water supply & waste water management ce345
Water supply & waste water management   ce345Water supply & waste water management   ce345
Water supply & waste water management ce345Saqib Imran
 
Delay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping StationDelay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping Stationchetlapally balakrishna
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)gn022010sem1
 

Similar to Lecture# 01 ce 345 water supply - 6th (20)

Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
 
Chapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdfChapter 4 design of hydropower plants.pdf
Chapter 4 design of hydropower plants.pdf
 
Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013Storm water harvestin_Anamrita khan_2013
Storm water harvestin_Anamrita khan_2013
 
Lecture 0 design of spilways an overview
Lecture 0 design of spilways an overviewLecture 0 design of spilways an overview
Lecture 0 design of spilways an overview
 
Power plant engineering unit-iii.pptx
Power plant engineering unit-iii.pptxPower plant engineering unit-iii.pptx
Power plant engineering unit-iii.pptx
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
 
Area 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panelsArea 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panels
 
ROOFTOP RAIN WATER HARVESTING
ROOFTOP RAIN WATER HARVESTINGROOFTOP RAIN WATER HARVESTING
ROOFTOP RAIN WATER HARVESTING
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Well Unloading Solution - Winning Poster
Well Unloading Solution - Winning PosterWell Unloading Solution - Winning Poster
Well Unloading Solution - Winning Poster
 
Bs1 3
Bs1   3Bs1   3
Bs1 3
 
The 2011 thailand flood
The 2011 thailand floodThe 2011 thailand flood
The 2011 thailand flood
 
UNIT I 1.pptx
UNIT I 1.pptxUNIT I 1.pptx
UNIT I 1.pptx
 
Some Maintenance Issues in Civil Engineering Works
Some Maintenance Issues in Civil Engineering WorksSome Maintenance Issues in Civil Engineering Works
Some Maintenance Issues in Civil Engineering Works
 
Water supply & waste water management ce345
Water supply & waste water management   ce345Water supply & waste water management   ce345
Water supply & waste water management ce345
 
Delay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping StationDelay analysis of raw water reservoir and pumping Station
Delay analysis of raw water reservoir and pumping Station
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
ENTRANCE PP
ENTRANCE PPENTRANCE PP
ENTRANCE PP
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 

More from EngrHayatHussain

Lecture # 02, 03 316 geology and earth quake engineering 5th
Lecture # 02, 03  316 geology and earth quake engineering  5thLecture # 02, 03  316 geology and earth quake engineering  5th
Lecture # 02, 03 316 geology and earth quake engineering 5thEngrHayatHussain
 
Lecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management convertedLecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management convertedEngrHayatHussain
 
Lecture # 03 ce 355 environmental mangement-converted
Lecture # 03  ce 355 environmental mangement-convertedLecture # 03  ce 355 environmental mangement-converted
Lecture # 03 ce 355 environmental mangement-convertedEngrHayatHussain
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thEngrHayatHussain
 
Ce 355 environmental management 7th
Ce 355 environmental management 7thCe 355 environmental management 7th
Ce 355 environmental management 7thEngrHayatHussain
 
Ce 317 irrigation and hydraulic structures 6th
Ce 317 irrigation and hydraulic structures 6thCe 317 irrigation and hydraulic structures 6th
Ce 317 irrigation and hydraulic structures 6thEngrHayatHussain
 

More from EngrHayatHussain (7)

Lecture # 02, 03 316 geology and earth quake engineering 5th
Lecture # 02, 03  316 geology and earth quake engineering  5thLecture # 02, 03  316 geology and earth quake engineering  5th
Lecture # 02, 03 316 geology and earth quake engineering 5th
 
Lecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management convertedLecture # 03 water supply and waste water management converted
Lecture # 03 water supply and waste water management converted
 
Lecture # 03 ce 355 environmental mangement-converted
Lecture # 03  ce 355 environmental mangement-convertedLecture # 03  ce 355 environmental mangement-converted
Lecture # 03 ce 355 environmental mangement-converted
 
Ct 301 hydrology 5th
Ct 301 hydrology 5thCt 301 hydrology 5th
Ct 301 hydrology 5th
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8th
 
Ce 355 environmental management 7th
Ce 355 environmental management 7thCe 355 environmental management 7th
Ce 355 environmental management 7th
 
Ce 317 irrigation and hydraulic structures 6th
Ce 317 irrigation and hydraulic structures 6thCe 317 irrigation and hydraulic structures 6th
Ce 317 irrigation and hydraulic structures 6th
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Lecture# 01 ce 345 water supply - 6th

  • 1. CE-345 water supply and waste water Management Lecture# 01 (6th semester civil) By: Engr. Hayat Hussain Lecturer Saidu polytechnic institute saidu sharif Swat
  • 2. Contents Water supply Components of water work scheme Design period Factors affecting design period
  • 3. Water supply THE PROCESS OF SUPPLYING WATER TO A COMMUNITY IN ADEQUATE QUANTITY AND QUALITY.
  • 4. Components of water work scheme • Collection works • Treatment works • Transmission works • Distribution works
  • 5. • Collection works In collection works, water is collected from the source. There are two major source of water. Surface water and ground water. In order to collect surface water, dams and barrages are constructed whereas to collect ground water, tube wells are used.
  • 6. • Treatment works In treatment works, water obtained through the source is treated. Most of the surface water need treatment as it is contaminated by suspended particles. Ground water may or may not need treatment. One of the problems with ground water is high salt concentration. It is more expensive to treat this. In such case surface water is used, when ground water contains high salt concentration. Ground water may also contain elements like iron, magnesium.
  • 7. • Transmission works If source of water is away from the community, transmission work is required to transport water the treatment plant and then the treated water from treatment plant to the community. In some cases, transmission work may be eliminated
  • 8. • Distribution works In Distribution works, treated water is supplied to the consumers at the point of use from overhead tanks. Following two requirements should be fulfilled while distribute water to the community 1. Quantity of water must be sufficient according to demand. 2. Pressure should be sufficient.
  • 9. Design period It is the number of years in future for which the proposed facility would meet the demand of the community. OR The number of years in future for which supply will be more than demand.
  • 10. Factors affecting Design period • Useful Life of the structure • Rate of population growth • Ease or difficulty in extension • Lead time • Economy of scale • Performance time
  • 11. • Useful Life of the structure Life of structure is the number of years in future for which the design period is physically suitable to provide the intended facility. So it should be less than life of structure.
  • 12. • Rate of population growth If the rate of population growth is higher, then for that region shorter design period is required.
  • 13. • Ease or difficulty in extension For the projects whose extension is easily possible, it is kept low. For example we can install new tube wells at any time, so we do not need to install all tube wells which would be required after 20 years. But for the projects whose extension is difficult, their design period is kept greater. For example dams and reservoirs cannot be extended easily.
  • 14. • Lead time it is the time from the commencement of a project to its completion. Design period should be greater than lead time.
  • 15. • Economy of scale The decrease in average cost as the size of facility increase is known as economy of scale. If the economy of scale is small, smaller design period will be used. It is economical to build a large structure, for longer design period.
  • 16. • Performance time Structures are checked under working condition for sometime, which should not be considered in design period. During this time it is not providing facility to community.

Editor's Notes

  1. By: Engineer Hayat Hussain Lecturer SPI swat.
  2. By: Engineer Hayat Hussain Lecturer SPI swat.
  3. By: Engineer Hayat Hussain Lecturer SPI swat.
  4. By: Engineer Hayat Hussain Lecturer SPI swat.
  5. By: Engineer Hayat Hussain Lecturer SPI swat.
  6. By: Engineer Hayat Hussain Lecturer SPI swat.
  7. By: Engineer Hayat Hussain Lecturer SPI swat.
  8. By: Engineer Hayat Hussain Lecturer SPI swat.
  9. By: Engineer Hayat Hussain Lecturer SPI swat.