The document outlines the steps to install a pile using a sub sea vertical borer (SVB), which includes lowering a guide frame onto the sea bed, inserting a pile into the frame which then self-penetrates the sea bed, lowering the SVB onto the pile to begin drilling and removing spoil with an under-reamer, and finally recovering the SVB and guide frame to complete the pile installation.