1. EBRAHIM GHORBANI
No.73, Mir street, Esfahan, Iran
Ghorbani_eb@yahoo.com
Cell: +989131048647
ELECTRICAL ENGINEER / COSULTANT
12 Years Experience in Overhead Transmission Line
Design and Up-Rating
PROFILE .Providing tender documents and bill of materials
Providing Terrain of Transmission line route using design program PLS-CADD and
performing technical calculations including design criteria, loading, design telescopic
tower (pole), structure layout, conductor selection, insulator coordination, calculation
of sag and tension and tower load analysis
Knowledge of IEC, ASTM, BS and other Transmission line relative standards
Up-Rating existing transmission lines and replace old conductor with
HTLS (High Temperature Low Sag) conductors
Instruct PLS-CADD program
EXPERIENCE Transmission line project manager, 2009-present
Daneshmand Consultant Engineers company-IRAN
Providing a program for calculating Working and Ultimate loads on tower base on
transmission line specification and weather criteria
Providing a program for determine technical specifications of fittings and insulators
base on weather conditions and electric criteria.
Design 4-circuits Telescopic Tower (2-circuits 63Kv & 2-circuits 230Kv)
Design 6-circuits-63Kv Telescopic Tower
Design 8-circuits Telescopic Tower (6-circuits 63Kv & 2-circuits 230Kv)
Calculating V.T.L loads and Vertical / Horizontal safety clearances due to electrical
and swing terms between cross arms and phase attachments with accurate
dimensions for 3 above mentioned designed poles
Verifying project designs to ensure operational accountability
(Continued)
2. Ebrahim Ghorbani . Page 2
EXPERIENCE
Using PLS-CADD program for below purposes:
- Import survey data to provide terrain and profile of transmission line route
- Spotting and Export stringing chart table
- Sag and clearance control on new overhead line projects
- Up-Rating existing transmission line and conductor replacement with HTLS
conductors including ACSS, ACCC and J-POWER and try to keep safety
clearance to terrain by changing catenary regard to tower ultimate loads
limitation
Inspection of many sample test of tower and relative equipment including fittings ,
insulators and conductors in Tehran laboratory of Amir Kabir and other certified
laboratories based on IEC, ASTM and BS standards.
Providing tender document and bill of materials for 400/230/63 Kv transmission lines
Inspection of composite insulator’s Type and Design tests in XIAN Laboratory in
china-2013
Inspection of cable termination and joints’ Routine test in Pfisterer Ixosil AG in
Switzerland-2011
Instructor of PLS-CADD program
Transmission line project engineer,2003-2009
Daneshmand Consultant Engineers company-IRAN
Providing tender document and bill of materials for 230/63 Kv transmission line
Quality control of transmission line accessories including tower,bolts&nuts,fittings,
conductors and insulators base on IEC, ASTM and BS standards
Providing video file of terrain using Google Earth software
Calculating electrical parameters including Z0, Z1, ZC, B0, B1, SIL with Syscon
program
Inspection of Type test on Acsr-Martin Conductor in KINECTRICS
INTERNATIONAL INC. in Toronto-Canada-2008
Managing the money cost of projects
(Continued)