Certification for installation of SF6 Gas Insulated Switchgear
updated CV Yacoub
1. Mahmoud Yacoub
E- MAIL: mah_0086@hotmail.com, mahmoud.yacoub@sa.abb.com
Mobile No. +966-544810661
Objective
To seek a career in an Organization which provides an environment conductive continuous learning and
provides exposure to new technologies and innovative ideas, where my skills would be utilized to the
fullest potential, there by achieving personal and professional growth along with the organization.
Summary of Experience
Successfully completed 3 Major Projects with ABB Saudi Arabia in capacity of Lead Supervisor
Electrical Engineer having more than 6 years of rich experience in High Voltage Projects including
planning, scheduling, Excecution,pre-commissioning & testing support, High Voltage testing support
up to 380KV Substation
Details of Professional Experience
M/S ABB Electrical Industries Company LTD. (Saudi Arabia) as a Technical Advisor cum Lead
Installation Supervisor- Electrical–from October 2012 to till date:
Area under present responsibility:
Full responsibility for GIS HV substation (from A to Z)
Supervising installation and partially testing of GIS HV substation
Time management - scheduling, planning, logistics (also local)
Reporting - to Project Manager as well as to the Client, Site meetings, Progress meetings
(also with clients)
Feedback for improvements, Non-conformance reports, Coordination on site - client and
subcontractor, Daily/Weekly/Monthly reporting to P.M.
Testing - Primary resistance, SF6 gas quality tests, Density monitor operating points test,
Gas compartment tightness (leak) test. All testing with end client
Supervision, Quality control and monitoring Erection and Installation activity
Leading & monitoring the performance of team members to ensure efficiency in process
operations and meeting of project targets
Preparation for onsite HV test & Cooperation and support to Commissioning engineer and
HV Test Engineer
HV test set operator in HV test trailer as per IEC standards in cooperation with HV test
Engineer
SF6 gas recovery plant handling
Working experience on GIS Installations from Egypt, Kuwait and Saudi Arabia
2. Hand over GIS after all tests including HV test to end client - Final completion certificate/s
Experience from new installations, extensions, service, troubleshooting
Supervising installation and maintenance work independently
Taking responsibility for ensuring compliance with the installation requirements and
Instructions & ensuring that the necessary accident prevention measures are observed,
specifically abiding by the guidelines for work on live system components
Responsible to red-mark drawings/documents with any changes or modification that
became necessary during the installation
Advice the sub-suppliers installation superintendent in planning and coordination of the
work force necessary to comply with the schedule
Cooperation with ABB Project Manager on establishing status of completed and non-
completed work
Inspection of arriving material for completeness and possible damage and coordination of
material handling in cooperation with sub-suppliers Material Control within sub-suppliers
procedures
Issue of non-conformance reports for damage or missing equipment within ABB scope of
supply in cooperation with ABB Project Manager
Supervise final installation tests and ABB installation completion documentation
Supervise and coordinate the loop check activities.& Participation at site meetings as
requested by the ABB-CH Project Manager
Successfully Completed Projects in voltage level of 420KV and 550KV
Project: 1: Al-Mashaar project ELK03-GIS 6 diameters, 18 bays, 2HCB
Client:Al Gihaz
Consultant: Palace Consulting
Responsibilities:
Planning of day to day works with respect to schedule.
Bus C/C line marking, placing and alignment of circuit breakers.
Installation of bus bars, bus ducts, CT, VT, LA, bushings and Cable end links.
Installation of Steel support for GIS bus duct.
Arrangement of man power and other special tools required for installation in time.
SF-6 gas handling –Dilo operation, Evacuation, Gas filling and Recovery process.
Density monitor testing, contact resistance measurements and Gas Analyzer test for all
compartments.
Installation of GIS to Transformer connection and GIS to cable end link fixing work.
Coordination for Commissioning and High voltage Test of GIS.
Preparation of all standard protocols of GIS completion.
Site hand over to client
3. Project: 2: Al-Khaldiyah project ELK03-GIS 5 Diameters, 15 bays.
Client:Al Toukhi
Consultant: Palace Consulting
Responsibilities:
Marking (X,Y) , placing and alignment of circuit breaker
Installation of 380/220/132/33kv one and half breaker scheme-GIS bays for Fedeers, Bus
Section, Bus Couplers, including Bus Bars, Circuit Breakers, Bus Bar Insolators,Line
Insolators,Bus Bars earth Switches, Line Earth Switches, Gas Insulated Bus
Ducts,CT’s,VT's,including LCC panels for GIS with all accessories
Perform GIS gas processing by the sequence of, vacuuming, nitrogen filling for Drying,and
Sf6 gas filling until normalization
Perform site acceptance tests as in SF6 moisture & gas content, bus bars contact resistance,
density switches calibration
To install HV testing bushing for HV testing of GIS, replace o rings and gaskets for GIS
verification and repair of 380/220/132KV GIS problems
Perform cable glanding supervision, cable dressing, cable laying as per cable schedule, cable
termination, wiring modification for all GIS primary components up to LCC panels
Project: 3: Tabuk ELK03-GIS 11 Diameters consisting of 33 bays, 2HCB
Client:Al Gihaz
Consultant: Palace Consulting
Responsibilities:
Activity preparation & follow :sub-assembly preparation / erection / adjustement / cable
pulling / wiring connection schedule (up to 60 persons)
Self-supervision Installation & Commissioning for full GIS substation worldwide
Progress report & coordination meeting with contractor / customer
Quality management – Non conformity & failure reporting => corrective actions
Preparation: Method statement / Planning / Equipment & Resources estimation
M/S Hussein Thermal Power Station (HTPS)-CEGCO (3x33MW & 4X66MW) (Jordan) as an
Electrician cum Maintenance Supervisor- Electrical–from July 2006 to September 2012
Area under present responsibility:
13.8KV SWG T&C.
LV SDB&DCDB T&C.
Working on different kind of testing kits.
Install MCC cabinet, maintenance & assembly
Maintenance and testing of (48,125,250 DCV) batteries, its efficiency and maintenance of
battery chargers system
Electrical power transformers Erection and testing
Ac motor (416-3.3kv) & Dc motor check, test & maintenance.
Switch gear, substation, power electronic cabinet &cable system.
Building electrical installation.
Working as an associated with MV/LV/HV panel and line check of interface signal etc.
Follow-up electric drawings
4. Competency Preview
ABB Certified GIS Lead Supervisor having solid “Hands-on experience” in GIS HV Substation project
erection, Installation, partial testing, with safety, Quality and environment.
Computer Knowledge
● Well versed with Microsoft Office,Exchange,Lotus Notes,CAD etc
Education
B.S Electrical Power engineering Al-Balqa Applied University Amman City , Jordan in
2010
Certified GIS Supervisor from ABB Switzerland
Personal Details
Date of Birth : 1st November 1986
Communication Address : ABB Services Co Ltd,Street No.144,Cross 39,Dammam KSA-31281
Nationallity : Jordanian
Marital Status : Married
Languages : Arabic(Native),English(Excellent)