OFFSITEOFFSITE
MANUFACTUREMANUFACTURE
PRECAST FRAMESPRECAST FRAMES
helpdesk@construction-productivity.co.ukhelpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.ukhtt://www.construction-productivity.co.uk
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
Categorisation of OSMCategorisation of OSM
Volumetric systemsVolumetric systems
Majority of factory-based form ofMajority of factory-based form of
production, volumetric systemsproduction, volumetric systems
involve three dimensional modulesinvolve three dimensional modules
that can be used in isolation or inthat can be used in isolation or in
multiples to form the structure of themultiples to form the structure of the
building.building.
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
These modules can be pre-These modules can be pre-
finished in the factory.finished in the factory.
They include all fixtures andThey include all fixtures and
fittings, requiring a very limitedfittings, requiring a very limited
amount of installation work onamount of installation work on
site.site.
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
Open panel systemsOpen panel systems
Open panel systems are typicallyOpen panel systems are typically
delivered to the site purely as adelivered to the site purely as a
structural element with services,structural element with services,
insulation, cladding and internalinsulation, cladding and internal
finishes installed in situ.finishes installed in situ.
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
Closed panel systemsClosed panel systems
 These are similar to open panel systemsThese are similar to open panel systems
in that the structural elements of thein that the structural elements of the
building are delivered to the site in flatbuilding are delivered to the site in flat
panels.panels.
 Closed panel systems include moreClosed panel systems include more
factory based fabrication such as liningfactory based fabrication such as lining
materials and insulation.materials and insulation.
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
 It may also even include:It may also even include:
 CladdingCladding
 internal finishesinternal finishes
 ServicesServices
 doors and windowsdoors and windows
OFFSITEOFFSITE
MANUFACTURE(OSM)MANUFACTURE(OSM)
Hybrid systemsHybrid systems
 A combination of volumetric and panelisedA combination of volumetric and panelised
systems.systems.
 The high value areas such as kitchen andThe high value areas such as kitchen and
bathroom are typically formed frombathroom are typically formed from
volumetric units.volumetric units.
 The rest of the structure formed fromThe rest of the structure formed from
some form of framing system.some form of framing system.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 UK’s off-site manufacturing (OSM)UK’s off-site manufacturing (OSM)
industry in relation to the supply of OSMindustry in relation to the supply of OSM
components for housing.components for housing.
 Almost any component can beAlmost any component can be
manufactured off site.manufactured off site.
 Reinforced concrete columns (circular orReinforced concrete columns (circular or
square) with a smooth even surface readysquare) with a smooth even surface ready
for direct decoration.for direct decoration.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
Beams and floorBeams and floor
 Like the other structural elements beamsLike the other structural elements beams
and floors.and floors.
 Units can be designed to meet client’sUnits can be designed to meet client’s
requirements making provision forrequirements making provision for
services or features that will beservices or features that will be
incorporated during manufacture.incorporated during manufacture.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Parapets are often a very visible elementParapets are often a very visible element
of the structure making their aestheticof the structure making their aesthetic
appeal as important as their structuralappeal as important as their structural
integrity.integrity.
 Barriers can be supplied with a variety ofBarriers can be supplied with a variety of
attractive concrete finishes or designed toattractive concrete finishes or designed to
allow materials used elsewhere in theallow materials used elsewhere in the
structure, such as brick or stone to bestructure, such as brick or stone to be
incorporated.incorporated.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
Double Tee BeamsDouble Tee Beams
 Providing a lightweight solution for longProviding a lightweight solution for long
spans;spans;
 Double tee beams can reduce the numberDouble tee beams can reduce the number
of columns needed which is ideal for carof columns needed which is ideal for car
parks and offices.parks and offices.
 Using steel moulds for a smooth, evenUsing steel moulds for a smooth, even
finish Double Tee Beams arefinish Double Tee Beams are
manufactured to BS8110.manufactured to BS8110.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
Using concrete structuralUsing concrete structural
elements offers:elements offers:
fast track, off-sitefast track, off-site
construction, even for largeconstruction, even for large
structures.structures.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
Coffered Flooring UnitCoffered Flooring Unit
 These carefully detailed units provide aThese carefully detailed units provide a
flooring slab incorporating a finishedflooring slab incorporating a finished
ceiling.ceiling.
 The units can be manufactured to theThe units can be manufactured to the
designer’s specification incorporatingdesigner’s specification incorporating
whatever details are required.whatever details are required.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
Ground BeamsGround Beams
concrete beamsconcrete beams
provide a strong, durable structural element capableprovide a strong, durable structural element capable
of providing many years ofof providing many years of trouble free servicetrouble free service
Wall PanelsWall Panels
Precast wall panels are manufactured to client'sPrecast wall panels are manufactured to client's
specification. They are suitable for use in multi-storeyspecification. They are suitable for use in multi-storey
construction and when combined with precast floorsconstruction and when combined with precast floors
allow a building to be erected very quicklyallow a building to be erected very quickly
Terrace units can be used anywhere wereTerrace units can be used anywhere were
banked seating is required from stadia tobanked seating is required from stadia to
concert halls.concert halls.
Lift ShaftsLift Shafts
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Manufactured off-site in bespoke mouldsManufactured off-site in bespoke moulds
and installed quickly and efficiently by theand installed quickly and efficiently by the
specialist installation teams.specialist installation teams.
 Rigorous quality control will ensure that allRigorous quality control will ensure that all
components are accurate, eliminatingcomponents are accurate, eliminating
problems on site.problems on site.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Every bridge is unique and will require aEvery bridge is unique and will require a
design solution developed to meet all ofdesign solution developed to meet all of
the requirements of the project.the requirements of the project.
 From the ground conditions andFrom the ground conditions and
specification of the bridge to the logisticsspecification of the bridge to the logistics
dictated by the site and the potentialdictated by the site and the potential
disruption of such a major project.disruption of such a major project.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
AdvantagesAdvantages
 Off-site construction allows the buildOff-site construction allows the build
process to run concurrently can equate toprocess to run concurrently can equate to
as much as 60% reduction in programmeas much as 60% reduction in programme
 Off-site construction offers improvedOff-site construction offers improved
building quality due to the controlledbuilding quality due to the controlled
construction environment i.e. factory finishconstruction environment i.e. factory finish
and turn-key solutionand turn-key solution
 Cost certainty for ClientCost certainty for Client
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Reduced waste (off cuts, packaging etc) –Reduced waste (off cuts, packaging etc) –
new legislation in the UK forcesnew legislation in the UK forces
construction clients, designers andconstruction clients, designers and
contractors to adopt a more sustainablecontractors to adopt a more sustainable
approach to waste.approach to waste.
 Off-site construction facilities are enclosedOff-site construction facilities are enclosed
and secure protecting against weatherand secure protecting against weather
damage and delaysdamage and delays
 as well as theft.as well as theft.
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Permanent, long term employment forPermanent, long term employment for
skilled labour both within the factory andskilled labour both within the factory and
engineers on site.engineers on site.
 Improved Fire/Acoustic performanceImproved Fire/Acoustic performance
(effectively two walls between all rooms(effectively two walls between all rooms
with a cavity)with a cavity)
 Improved Thermal EfficiencyImproved Thermal Efficiency
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
SafetySafety
 Reduced number of workers/man hoursReduced number of workers/man hours
on siteon site
 Workers have a reduced number of tasks /Workers have a reduced number of tasks /
hazardshazards
 System building allows detailed analysis ofSystem building allows detailed analysis of
risks at each stagerisks at each stage
 Less noise, dust and general disturbanceLess noise, dust and general disturbance
 Fewer commercial vehicle movementsFewer commercial vehicle movements
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
DisadvantagesDisadvantages
 Economically efficient for repetitive floorEconomically efficient for repetitive floor
plates onlyplates only
 Most off-site modular systems are limitedMost off-site modular systems are limited
to low-rise due to structural stability ofto low-rise due to structural stability of
modulesmodules
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Modules are limited in size by transportModules are limited in size by transport
legislation and width of delivery vehicleslegislation and width of delivery vehicles
 Preferred sizes (but larger sizes /heightsPreferred sizes (but larger sizes /heights
are common)are common)
-Width 4.0m outer face of floor steel-Width 4.0m outer face of floor steel
- Length 10.6m outer face of floor steel- Length 10.6m outer face of floor steel
- Height 2.8m floor to floor- Height 2.8m floor to floor
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Design freeze required early in the project.Design freeze required early in the project.
 VMS System is 18 weeks prior toVMS System is 18 weeks prior to
scheduled delivery on site.scheduled delivery on site.
 Size of crane required to lift modules maySize of crane required to lift modules may
not be cost effective with smallernot be cost effective with smaller
quantities’quantities’
OFFSITE MANUFACTUREOFFSITE MANUFACTURE
 Transportation can be costly if site isTransportation can be costly if site is
remote, significant distance from factoryremote, significant distance from factory
and if loads are wideand if loads are wide
 No flexibility or option for future adaptationNo flexibility or option for future adaptation

More Related Content

What's hot

Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Islam Ezz El-Arab
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.Teow Beng Hur
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profilebassamnakfour
 

What's hot (8)

Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5Technology of precast concrete structures 12-5-2020-rev.5
Technology of precast concrete structures 12-5-2020-rev.5
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.First Single-storey Bungalow Project after 9 years since 2008.
First Single-storey Bungalow Project after 9 years since 2008.
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profile
 
Ahmed burqan
Ahmed burqanAhmed burqan
Ahmed burqan
 
Scaffolding 101
Scaffolding 101Scaffolding 101
Scaffolding 101
 
Table formwork
Table formwork Table formwork
Table formwork
 
JUMP FORM WORK
JUMP FORM WORKJUMP FORM WORK
JUMP FORM WORK
 

Viewers also liked (12)

Estefania silva
Estefania silvaEstefania silva
Estefania silva
 
1572 mean-a review of statistical principles
1572 mean-a review of statistical principles1572 mean-a review of statistical principles
1572 mean-a review of statistical principles
 
1610 probability review
1610 probability review1610 probability review
1610 probability review
 
Botoneras Blocky Tronic
Botoneras Blocky TronicBotoneras Blocky Tronic
Botoneras Blocky Tronic
 
Pobreza en colombia
Pobreza en colombiaPobreza en colombia
Pobreza en colombia
 
1638 vector quantities
1638 vector quantities1638 vector quantities
1638 vector quantities
 
Why You Should Outsource
Why You Should OutsourceWhy You Should Outsource
Why You Should Outsource
 
ciencias del deporte
ciencias del deporteciencias del deporte
ciencias del deporte
 
Causas de la segunda guerra mundial
Causas de la segunda guerra mundialCausas de la segunda guerra mundial
Causas de la segunda guerra mundial
 
Dyscaculia
DyscaculiaDyscaculia
Dyscaculia
 
1630 the binomial distribution
1630 the binomial distribution1630 the binomial distribution
1630 the binomial distribution
 
t pack
t packt pack
t pack
 

Similar to 081 off site manufacture (2)

036 Innovative Construction Materials
036 Innovative Construction Materials036 Innovative Construction Materials
036 Innovative Construction MaterialsDr Fereidoun Dejahang
 
036 innovative construction materials
036 innovative construction materials036 innovative construction materials
036 innovative construction materialsdrdej19
 
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...Dr Fereidoun Dejahang
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final WebFaris Alwan
 
Tensile structure in noida
Tensile structure in noidaTensile structure in noida
Tensile structure in noidafabnoida
 
CDM Stravitec - High Performance Floating Floors
CDM Stravitec - High Performance Floating FloorsCDM Stravitec - High Performance Floating Floors
CDM Stravitec - High Performance Floating FloorsArchitectura
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machineTeow Beng Hur
 
BW Steel Framing Systems 2014
BW Steel Framing Systems 2014BW Steel Framing Systems 2014
BW Steel Framing Systems 2014bwindustries
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueSandeep Jain
 
All Products
All ProductsAll Products
All Productsdibz10
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)Nicole Foo
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemAlthaf Ahmed
 
Datasheet_EX-01581_(EN).pdf
Datasheet_EX-01581_(EN).pdfDatasheet_EX-01581_(EN).pdf
Datasheet_EX-01581_(EN).pdfJose Silva
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 

Similar to 081 off site manufacture (2) (20)

036 Innovative Construction Materials
036 Innovative Construction Materials036 Innovative Construction Materials
036 Innovative Construction Materials
 
036 innovative construction materials
036 innovative construction materials036 innovative construction materials
036 innovative construction materials
 
Precast Fence Forming Systems
Precast Fence Forming SystemsPrecast Fence Forming Systems
Precast Fence Forming Systems
 
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...073 Modern Method of Construction  https://www.blogger.com/profile/0220990482...
073 Modern Method of Construction https://www.blogger.com/profile/0220990482...
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final Web
 
Tensile structure in noida
Tensile structure in noidaTensile structure in noida
Tensile structure in noida
 
CDM Stravitec - High Performance Floating Floors
CDM Stravitec - High Performance Floating FloorsCDM Stravitec - High Performance Floating Floors
CDM Stravitec - High Performance Floating Floors
 
IBS is a system not a machine
IBS is a system not a machineIBS is a system not a machine
IBS is a system not a machine
 
PEB Presentation
PEB PresentationPEB Presentation
PEB Presentation
 
BW Steel Framing Systems 2014
BW Steel Framing Systems 2014BW Steel Framing Systems 2014
BW Steel Framing Systems 2014
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
All Products
All ProductsAll Products
All Products
 
flyer-2013-2
flyer-2013-2flyer-2013-2
flyer-2013-2
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock System
 
Datasheet_EX-01581_(EN).pdf
Datasheet_EX-01581_(EN).pdfDatasheet_EX-01581_(EN).pdf
Datasheet_EX-01581_(EN).pdf
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
6) UBS AT Home Improvements 2015 PDF
6) UBS  AT Home Improvements 2015 PDF6) UBS  AT Home Improvements 2015 PDF
6) UBS AT Home Improvements 2015 PDF
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

081 off site manufacture (2)

  • 3. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM) Categorisation of OSMCategorisation of OSM Volumetric systemsVolumetric systems Majority of factory-based form ofMajority of factory-based form of production, volumetric systemsproduction, volumetric systems involve three dimensional modulesinvolve three dimensional modules that can be used in isolation or inthat can be used in isolation or in multiples to form the structure of themultiples to form the structure of the building.building.
  • 4. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM) These modules can be pre-These modules can be pre- finished in the factory.finished in the factory. They include all fixtures andThey include all fixtures and fittings, requiring a very limitedfittings, requiring a very limited amount of installation work onamount of installation work on site.site.
  • 5. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM) Open panel systemsOpen panel systems Open panel systems are typicallyOpen panel systems are typically delivered to the site purely as adelivered to the site purely as a structural element with services,structural element with services, insulation, cladding and internalinsulation, cladding and internal finishes installed in situ.finishes installed in situ.
  • 6. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM) Closed panel systemsClosed panel systems  These are similar to open panel systemsThese are similar to open panel systems in that the structural elements of thein that the structural elements of the building are delivered to the site in flatbuilding are delivered to the site in flat panels.panels.  Closed panel systems include moreClosed panel systems include more factory based fabrication such as liningfactory based fabrication such as lining materials and insulation.materials and insulation.
  • 7. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM)  It may also even include:It may also even include:  CladdingCladding  internal finishesinternal finishes  ServicesServices  doors and windowsdoors and windows
  • 8. OFFSITEOFFSITE MANUFACTURE(OSM)MANUFACTURE(OSM) Hybrid systemsHybrid systems  A combination of volumetric and panelisedA combination of volumetric and panelised systems.systems.  The high value areas such as kitchen andThe high value areas such as kitchen and bathroom are typically formed frombathroom are typically formed from volumetric units.volumetric units.  The rest of the structure formed fromThe rest of the structure formed from some form of framing system.some form of framing system.
  • 9. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  UK’s off-site manufacturing (OSM)UK’s off-site manufacturing (OSM) industry in relation to the supply of OSMindustry in relation to the supply of OSM components for housing.components for housing.  Almost any component can beAlmost any component can be manufactured off site.manufactured off site.  Reinforced concrete columns (circular orReinforced concrete columns (circular or square) with a smooth even surface readysquare) with a smooth even surface ready for direct decoration.for direct decoration.
  • 11. OFFSITE MANUFACTUREOFFSITE MANUFACTURE Beams and floorBeams and floor  Like the other structural elements beamsLike the other structural elements beams and floors.and floors.  Units can be designed to meet client’sUnits can be designed to meet client’s requirements making provision forrequirements making provision for services or features that will beservices or features that will be incorporated during manufacture.incorporated during manufacture.
  • 14. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Parapets are often a very visible elementParapets are often a very visible element of the structure making their aestheticof the structure making their aesthetic appeal as important as their structuralappeal as important as their structural integrity.integrity.  Barriers can be supplied with a variety ofBarriers can be supplied with a variety of attractive concrete finishes or designed toattractive concrete finishes or designed to allow materials used elsewhere in theallow materials used elsewhere in the structure, such as brick or stone to bestructure, such as brick or stone to be incorporated.incorporated.
  • 16. OFFSITE MANUFACTUREOFFSITE MANUFACTURE Double Tee BeamsDouble Tee Beams  Providing a lightweight solution for longProviding a lightweight solution for long spans;spans;  Double tee beams can reduce the numberDouble tee beams can reduce the number of columns needed which is ideal for carof columns needed which is ideal for car parks and offices.parks and offices.  Using steel moulds for a smooth, evenUsing steel moulds for a smooth, even finish Double Tee Beams arefinish Double Tee Beams are manufactured to BS8110.manufactured to BS8110.
  • 18. OFFSITE MANUFACTUREOFFSITE MANUFACTURE Using concrete structuralUsing concrete structural elements offers:elements offers: fast track, off-sitefast track, off-site construction, even for largeconstruction, even for large structures.structures.
  • 19. OFFSITE MANUFACTUREOFFSITE MANUFACTURE Coffered Flooring UnitCoffered Flooring Unit  These carefully detailed units provide aThese carefully detailed units provide a flooring slab incorporating a finishedflooring slab incorporating a finished ceiling.ceiling.  The units can be manufactured to theThe units can be manufactured to the designer’s specification incorporatingdesigner’s specification incorporating whatever details are required.whatever details are required.
  • 21. Ground BeamsGround Beams concrete beamsconcrete beams provide a strong, durable structural element capableprovide a strong, durable structural element capable of providing many years ofof providing many years of trouble free servicetrouble free service
  • 22. Wall PanelsWall Panels Precast wall panels are manufactured to client'sPrecast wall panels are manufactured to client's specification. They are suitable for use in multi-storeyspecification. They are suitable for use in multi-storey construction and when combined with precast floorsconstruction and when combined with precast floors allow a building to be erected very quicklyallow a building to be erected very quickly
  • 23. Terrace units can be used anywhere wereTerrace units can be used anywhere were banked seating is required from stadia tobanked seating is required from stadia to concert halls.concert halls.
  • 25. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Manufactured off-site in bespoke mouldsManufactured off-site in bespoke moulds and installed quickly and efficiently by theand installed quickly and efficiently by the specialist installation teams.specialist installation teams.  Rigorous quality control will ensure that allRigorous quality control will ensure that all components are accurate, eliminatingcomponents are accurate, eliminating problems on site.problems on site.
  • 27. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Every bridge is unique and will require aEvery bridge is unique and will require a design solution developed to meet all ofdesign solution developed to meet all of the requirements of the project.the requirements of the project.  From the ground conditions andFrom the ground conditions and specification of the bridge to the logisticsspecification of the bridge to the logistics dictated by the site and the potentialdictated by the site and the potential disruption of such a major project.disruption of such a major project.
  • 29. OFFSITE MANUFACTUREOFFSITE MANUFACTURE AdvantagesAdvantages  Off-site construction allows the buildOff-site construction allows the build process to run concurrently can equate toprocess to run concurrently can equate to as much as 60% reduction in programmeas much as 60% reduction in programme  Off-site construction offers improvedOff-site construction offers improved building quality due to the controlledbuilding quality due to the controlled construction environment i.e. factory finishconstruction environment i.e. factory finish and turn-key solutionand turn-key solution  Cost certainty for ClientCost certainty for Client
  • 30. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Reduced waste (off cuts, packaging etc) –Reduced waste (off cuts, packaging etc) – new legislation in the UK forcesnew legislation in the UK forces construction clients, designers andconstruction clients, designers and contractors to adopt a more sustainablecontractors to adopt a more sustainable approach to waste.approach to waste.  Off-site construction facilities are enclosedOff-site construction facilities are enclosed and secure protecting against weatherand secure protecting against weather damage and delaysdamage and delays  as well as theft.as well as theft.
  • 31. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Permanent, long term employment forPermanent, long term employment for skilled labour both within the factory andskilled labour both within the factory and engineers on site.engineers on site.  Improved Fire/Acoustic performanceImproved Fire/Acoustic performance (effectively two walls between all rooms(effectively two walls between all rooms with a cavity)with a cavity)  Improved Thermal EfficiencyImproved Thermal Efficiency
  • 32. OFFSITE MANUFACTUREOFFSITE MANUFACTURE SafetySafety  Reduced number of workers/man hoursReduced number of workers/man hours on siteon site  Workers have a reduced number of tasks /Workers have a reduced number of tasks / hazardshazards  System building allows detailed analysis ofSystem building allows detailed analysis of risks at each stagerisks at each stage  Less noise, dust and general disturbanceLess noise, dust and general disturbance  Fewer commercial vehicle movementsFewer commercial vehicle movements
  • 33. OFFSITE MANUFACTUREOFFSITE MANUFACTURE DisadvantagesDisadvantages  Economically efficient for repetitive floorEconomically efficient for repetitive floor plates onlyplates only  Most off-site modular systems are limitedMost off-site modular systems are limited to low-rise due to structural stability ofto low-rise due to structural stability of modulesmodules
  • 34. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Modules are limited in size by transportModules are limited in size by transport legislation and width of delivery vehicleslegislation and width of delivery vehicles  Preferred sizes (but larger sizes /heightsPreferred sizes (but larger sizes /heights are common)are common) -Width 4.0m outer face of floor steel-Width 4.0m outer face of floor steel - Length 10.6m outer face of floor steel- Length 10.6m outer face of floor steel - Height 2.8m floor to floor- Height 2.8m floor to floor
  • 35. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Design freeze required early in the project.Design freeze required early in the project.  VMS System is 18 weeks prior toVMS System is 18 weeks prior to scheduled delivery on site.scheduled delivery on site.  Size of crane required to lift modules maySize of crane required to lift modules may not be cost effective with smallernot be cost effective with smaller quantities’quantities’
  • 36. OFFSITE MANUFACTUREOFFSITE MANUFACTURE  Transportation can be costly if site isTransportation can be costly if site is remote, significant distance from factoryremote, significant distance from factory and if loads are wideand if loads are wide  No flexibility or option for future adaptationNo flexibility or option for future adaptation