6/2015-2/2016
Designer
Plant Engineering Services
Marathon Petroleum Corporation (MPC), Texas City
 Revise “As-Built” drawings based upon the Inspector’s redlines of pipe that is existing in the plant or new piping
installed in the field.
 Develop Inspection ISO’s using construction drawings and field sketches.
 Pick up red line updates and modifications on existing drawings using markups from inspectors using MPC’s Inspection
AutoCAD and P&ID software.
4/2015-6/2015
CADWORX Piping Designer
Project Consulting Services (PCS), Houston, TX
Short term contract position for the Birmingham, AL office
 Design and model piping using CADWORX Plant Professional 2014 and Navisworks Software.
 Modeling and layout of pipeline piping, facilities and stations.
 Use piping background and design standards for various piping configurations.
 Layout of piping and equipment according to Plot Plan.
7/2014-1/2015
CADWORX Piping Designer
Holloman Engineering Houston, TX
 Design and model piping using CADWORX Plant Professional 2014 and Navisworks Software.
 Modeling and layout of pipe racks and underground piping.
 Use piping background and design standards for various piping configurations.
 Layout of piping and equipment according to Plot Plan.
2/2014-7/2014
CADWORX Piping Designer
Ref-Chem, L.-P. Pearland, TX
 CADWORX Piping Designer proficient in use of CADWORX Plant Design software in designing, routing pipe,
creating isometrics using ISOGEN software and producing stress isometrics for use with CAESER II software.
3/2012-2/2014
CADWORX Piping Designer
Ventech Engineers Pasadena, TX
 Design and model piping using CADWORX Plant Professional and Navisworks Software.
 Obtain Certificates in CADWORX Plant Professional for Piping Level One and Two.
 Design and route piping with little or no supervision.
 Use piping background and design standards for various piping configurations.
 Layout of piping and equipment according to Plot Plan.
9/2011-7/2012
Experis
Kinder Morgan Houston, TX
Designer - Material Verification Project
 Data research to positively identify pipeline materials and test records for integrity
 Assembled packages positively verifying the pipeline records for permanent retention.
 Use advanced MS Excel techniques to create and manipulate various spreadsheets and records.
 Analyze GIS data and current alignment sheets as well as historical records to verify materials.
9/2010-9/2011
Plant Engineering Services
BP, Texas City
P&ID and ISO Designer/Corrosion and Material Diagram Lead
PES won the contract at BP previously held by Taylor and Hill Engineering
 Field verification, review, and update ISO’s/P&ID’s. Create and maintain Master Line List. Revise “As-Built” drawings
based upon the actual pipe existing in the plant or new piping installed in the field.
 Develop Inspection ISO’s using construction drawings and field sketches.
 Pick up red line updates and modifications on existing drawings using markups from inspectors using BP’s Inspection
AutoCAD and P&ID software.
 Recently I have completed creating CMD’s for all the units at BP on my own utilizing information from the unit
corrosion engineers and information from existing PFD’s, P&ID’s, ISO’s and Equipment files. All lines and equipment
are color coded by material and coatings to help identify where corrosion problems exist in the process, I also created
the toolbar and all the blocks used in these drawings. I have overseen the project working one on one with BP’s
Materials & Corrosion Superintendent, Misha Williamson, with minimal involvement from supervision since October
2007.
 Currently, I am continuing the CMD Program by creating Unit CMD’s for each unit showing the entire unit on one
drawing and highlighting areas where corrosion problems are present. The order of the units is determined by priority
and risk assessment as decided by the Asset Integrity Department.
8/2007-9/2010
Taylor & Hill, Inc.
BP, Texas City
Inspection CAD Designer/Project Cad Draftsman/Corrosion and Material Diagram Lead
 Field verification, review, and update ISO’s/P&ID’s. Create and maintain Master Line List. Revise “As-Built” drawings
based upon the actual pipe existing in the plant or new piping installed in the field.
 Develop Inspection ISO’s using construction drawings and field sketches.
 Pick up red line updates and modifications on existing drawings using markups from inspectors using BP’s Inspection
AutoCAD and P&ID software.
 Recently I have completed creating CMD’s for all the units at BP on my own utilizing information from the unit
corrosion engineers and information from existing PFD’s, P&ID’s, ISO’s and Equipment files. All lines and equipment
are color coded by material and coatings to help identify where corrosion problems exist in the process, I also created
the toolbar and all the blocks used in these drawings. I have overseen the project working one on one with BP’s
Materials & Corrosion Superintendent, Misha Williamson, with minimal involvement from supervision since October
2007.
 Currently, I am continuing the CMD Program by creating Unit CMD’s for each unit showing the entire unit on one
drawing and highlighting areas where corrosion problems are present. The order of the units is determined by priority
and risk assessment as decided by the Asset Integrity Department.
5/2000- 8/2007
Alpha-Flo Systems
Baytown, TX
Fabricator/Designer/Lead
 Install equipment and fabricate piping systems from field measurements in a food and beverage setting.
 Field sketch and design piping applications using existing equipment, set pump and tanks.
 Write purchase orders and expedite materials from various vendors by reviewing quotes.
 Fabricate, weld and install piping and equipment from start to finish from a one man crew to a multiple man crew.
2/1999-5/2000
Becon Construction.
Chevron Baytown, TX
Pipe Fabricator/Lead Man
 Worked several years in various chemical plants in the pipe department.
 Have experience reading and fabricating from P&ID’s, Rack Drawings, ISO’s and cut sheets.
 Use ISO’s and other drawings to verify tie in points, locate lines and walk down punch lists to ensure the work has been
correctly with the right materials for the application.
 Main duties at Chevron consisted of filling the racks with the appropriate piping on each level to save time and money,
then I began running a 36” flare header from the new unit through the existing units to a new flare stack located in the
back of the plant. Completed the truck loading area once the flare header was finished.
Education & Certifications
Robert E. Lee High School (Baytown, TX) - Graduating class of 1993
Lee College (Baytown, TX) — 2005-2007 - Certificate of Computer Aided Drafting and Design
Obtained Certificate in CADWORX Plant Professional (Piping Design Online) - Piping Level One and Piping Level Two
Obtained a Certificate Computer Aided Drafting and Design while maintaining a 3.863 GPA
 Advanced AutoCAD -
Advanced techniques, including the use of a customized system. Presentation of advanced drawing
applications, such as three-dimensional solids
modeling and linking graphic entities to external non-graphic data.
 Intermediate AutoCAD -
A continuation of practices and techniques used in basic computer-aided drafting emphasizing advanced
dimensioning techniques, the development and use of
prototype drawings, construction of pictorial drawings,
construction of 3 dimensional drawings, interfacing
2d and 3d environments and extracting data.
 Basic AutoCAD -
An introduction to computer-aided drafting. Emphasis is placed on setup; creating and modifying
geometry; storing and retrieving predefined
shapes; placing, rotating, and scaling objects,
adding text and dimensions, using layers, coordinate
systems, and plot/print to scale.
 Mechanical Drafting-
Introduction to the principles of drafting to include terminology and fundamentals, including size and
shape descriptions, projection methods, geometric construction, sections, auxiliary views, and reproduction processes.
References
Charles Brown (Senior Piping Design Lead) Holloman – Ph# 713-838-5003
Matt Gillespie (Senior Piping Design Lead) Ventech – Ph# 713-456-9533
Will Whiteley (Friend/ Controls Designer) Belcan - Bayer - Ph# 713-751-9737
Kenny Wycoff (Senior Piping Designer/Checker) Ventech/Holloman - Ph# 832-766-0737

More Related Content

What's hot (20)

Cad designer resume
Cad designer resumeCad designer resume
Cad designer resume
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
Resume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping DesignerResume - Wan Sazali, PDMS Piping Designer
Resume - Wan Sazali, PDMS Piping Designer
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
Madian CV_Sr Civil Structural Tech Eng
Madian CV_Sr Civil Structural  Tech EngMadian CV_Sr Civil Structural  Tech Eng
Madian CV_Sr Civil Structural Tech Eng
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
JAF_RESUME_2015a
JAF_RESUME_2015aJAF_RESUME_2015a
JAF_RESUME_2015a
 
CV Darlington
CV DarlingtonCV Darlington
CV Darlington
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Mo'men Yousef - Process Engineer
Mo'men Yousef - Process EngineerMo'men Yousef - Process Engineer
Mo'men Yousef - Process Engineer
 
RAJA K RAJA - RESUME
RAJA K RAJA - RESUMERAJA K RAJA - RESUME
RAJA K RAJA - RESUME
 
CV- Piping Engineer (EPC)
CV- Piping  Engineer (EPC)CV- Piping  Engineer (EPC)
CV- Piping Engineer (EPC)
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 

Similar to Douglas Fisher CADWORX Piping Designer Resume

Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debi Turkovic
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERkeshav rao
 
Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Mark Williams
 
Resume of qualifications (mark williams)
Resume of qualifications (mark williams)Resume of qualifications (mark williams)
Resume of qualifications (mark williams)Mark Williams
 
Patty Carberry_Civil Engineer Resume
Patty Carberry_Civil Engineer Resume Patty Carberry_Civil Engineer Resume
Patty Carberry_Civil Engineer Resume Patty Carberry
 
Anil- PIPING
Anil- PIPINGAnil- PIPING
Anil- PIPINGAnil H V
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumeSharon Haddix
 
Resume -Shakya - SS-DCMA-012817
Resume -Shakya  - SS-DCMA-012817Resume -Shakya  - SS-DCMA-012817
Resume -Shakya - SS-DCMA-012817Suchita Shakya
 
JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015Julie Vonesh
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Gary h resume 111014d
Gary h resume 111014dGary h resume 111014d
Gary h resume 111014dGary Haight
 
Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Ted Sabala
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerRaees j
 

Similar to Douglas Fisher CADWORX Piping Designer Resume (20)

Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015Debra_Turkovic_RESUME May2015
Debra_Turkovic_RESUME May2015
 
MVTatel
MVTatelMVTatel
MVTatel
 
KESHAV CAD ENGINEEER
KESHAV CAD ENGINEEERKESHAV CAD ENGINEEER
KESHAV CAD ENGINEEER
 
Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)Resume of Qualifications (Mark Williams)
Resume of Qualifications (Mark Williams)
 
Resume of qualifications (mark williams)
Resume of qualifications (mark williams)Resume of qualifications (mark williams)
Resume of qualifications (mark williams)
 
Patty Carberry_Civil Engineer Resume
Patty Carberry_Civil Engineer Resume Patty Carberry_Civil Engineer Resume
Patty Carberry_Civil Engineer Resume
 
Anil- PIPING
Anil- PIPINGAnil- PIPING
Anil- PIPING
 
Resume2015
Resume2015Resume2015
Resume2015
 
A. Garcia_CV
A. Garcia_CVA. Garcia_CV
A. Garcia_CV
 
PipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix ResumePipingDesigner Sharon Haddix Resume
PipingDesigner Sharon Haddix Resume
 
ToddClapp
ToddClappToddClapp
ToddClapp
 
Resume -Shakya - SS-DCMA-012817
Resume -Shakya  - SS-DCMA-012817Resume -Shakya  - SS-DCMA-012817
Resume -Shakya - SS-DCMA-012817
 
JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015JULIE's Resume' Oct 2015
JULIE's Resume' Oct 2015
 
Amar Updated CV
Amar Updated CVAmar Updated CV
Amar Updated CV
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Gary h resume 111014d
Gary h resume 111014dGary h resume 111014d
Gary h resume 111014d
 
Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015Sr CAD App Engr - Dec 2015
Sr CAD App Engr - Dec 2015
 
Resume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project EnginerResume For CAD Engineer / Project Coordinator / Project Enginer
Resume For CAD Engineer / Project Coordinator / Project Enginer
 
M_Wilmot Resume_7
M_Wilmot Resume_7M_Wilmot Resume_7
M_Wilmot Resume_7
 
Mech.Des-DIA 2 pg
Mech.Des-DIA 2 pgMech.Des-DIA 2 pg
Mech.Des-DIA 2 pg
 

Douglas Fisher CADWORX Piping Designer Resume

  • 1. Douglas Fisher 6234 Lovage Avenue Crosby, TX Phone: 832-414-0652 E-Mail: Doug071075@yahoo.com LinkedIn Profile: https://www.linkedin.com/in/douglasfisherpipingdesigner 6/2015-2/2016 Designer Plant Engineering Services Marathon Petroleum Corporation (MPC), Texas City  Revise “As-Built” drawings based upon the Inspector’s redlines of pipe that is existing in the plant or new piping installed in the field.  Develop Inspection ISO’s using construction drawings and field sketches.  Pick up red line updates and modifications on existing drawings using markups from inspectors using MPC’s Inspection AutoCAD and P&ID software. 4/2015-6/2015 CADWORX Piping Designer Project Consulting Services (PCS), Houston, TX Short term contract position for the Birmingham, AL office  Design and model piping using CADWORX Plant Professional 2014 and Navisworks Software.  Modeling and layout of pipeline piping, facilities and stations.  Use piping background and design standards for various piping configurations.  Layout of piping and equipment according to Plot Plan. 7/2014-1/2015 CADWORX Piping Designer Holloman Engineering Houston, TX  Design and model piping using CADWORX Plant Professional 2014 and Navisworks Software.  Modeling and layout of pipe racks and underground piping.  Use piping background and design standards for various piping configurations.  Layout of piping and equipment according to Plot Plan. 2/2014-7/2014 CADWORX Piping Designer Ref-Chem, L.-P. Pearland, TX  CADWORX Piping Designer proficient in use of CADWORX Plant Design software in designing, routing pipe, creating isometrics using ISOGEN software and producing stress isometrics for use with CAESER II software. 3/2012-2/2014 CADWORX Piping Designer Ventech Engineers Pasadena, TX  Design and model piping using CADWORX Plant Professional and Navisworks Software.  Obtain Certificates in CADWORX Plant Professional for Piping Level One and Two.  Design and route piping with little or no supervision.  Use piping background and design standards for various piping configurations.  Layout of piping and equipment according to Plot Plan. 9/2011-7/2012 Experis Kinder Morgan Houston, TX Designer - Material Verification Project  Data research to positively identify pipeline materials and test records for integrity
  • 2.  Assembled packages positively verifying the pipeline records for permanent retention.  Use advanced MS Excel techniques to create and manipulate various spreadsheets and records.  Analyze GIS data and current alignment sheets as well as historical records to verify materials. 9/2010-9/2011 Plant Engineering Services BP, Texas City P&ID and ISO Designer/Corrosion and Material Diagram Lead PES won the contract at BP previously held by Taylor and Hill Engineering  Field verification, review, and update ISO’s/P&ID’s. Create and maintain Master Line List. Revise “As-Built” drawings based upon the actual pipe existing in the plant or new piping installed in the field.  Develop Inspection ISO’s using construction drawings and field sketches.  Pick up red line updates and modifications on existing drawings using markups from inspectors using BP’s Inspection AutoCAD and P&ID software.  Recently I have completed creating CMD’s for all the units at BP on my own utilizing information from the unit corrosion engineers and information from existing PFD’s, P&ID’s, ISO’s and Equipment files. All lines and equipment are color coded by material and coatings to help identify where corrosion problems exist in the process, I also created the toolbar and all the blocks used in these drawings. I have overseen the project working one on one with BP’s Materials & Corrosion Superintendent, Misha Williamson, with minimal involvement from supervision since October 2007.  Currently, I am continuing the CMD Program by creating Unit CMD’s for each unit showing the entire unit on one drawing and highlighting areas where corrosion problems are present. The order of the units is determined by priority and risk assessment as decided by the Asset Integrity Department. 8/2007-9/2010 Taylor & Hill, Inc. BP, Texas City Inspection CAD Designer/Project Cad Draftsman/Corrosion and Material Diagram Lead  Field verification, review, and update ISO’s/P&ID’s. Create and maintain Master Line List. Revise “As-Built” drawings based upon the actual pipe existing in the plant or new piping installed in the field.  Develop Inspection ISO’s using construction drawings and field sketches.  Pick up red line updates and modifications on existing drawings using markups from inspectors using BP’s Inspection AutoCAD and P&ID software.  Recently I have completed creating CMD’s for all the units at BP on my own utilizing information from the unit corrosion engineers and information from existing PFD’s, P&ID’s, ISO’s and Equipment files. All lines and equipment are color coded by material and coatings to help identify where corrosion problems exist in the process, I also created the toolbar and all the blocks used in these drawings. I have overseen the project working one on one with BP’s Materials & Corrosion Superintendent, Misha Williamson, with minimal involvement from supervision since October 2007.  Currently, I am continuing the CMD Program by creating Unit CMD’s for each unit showing the entire unit on one drawing and highlighting areas where corrosion problems are present. The order of the units is determined by priority and risk assessment as decided by the Asset Integrity Department. 5/2000- 8/2007 Alpha-Flo Systems Baytown, TX Fabricator/Designer/Lead  Install equipment and fabricate piping systems from field measurements in a food and beverage setting.  Field sketch and design piping applications using existing equipment, set pump and tanks.  Write purchase orders and expedite materials from various vendors by reviewing quotes.  Fabricate, weld and install piping and equipment from start to finish from a one man crew to a multiple man crew. 2/1999-5/2000 Becon Construction. Chevron Baytown, TX Pipe Fabricator/Lead Man  Worked several years in various chemical plants in the pipe department.  Have experience reading and fabricating from P&ID’s, Rack Drawings, ISO’s and cut sheets.
  • 3.  Use ISO’s and other drawings to verify tie in points, locate lines and walk down punch lists to ensure the work has been correctly with the right materials for the application.  Main duties at Chevron consisted of filling the racks with the appropriate piping on each level to save time and money, then I began running a 36” flare header from the new unit through the existing units to a new flare stack located in the back of the plant. Completed the truck loading area once the flare header was finished. Education & Certifications Robert E. Lee High School (Baytown, TX) - Graduating class of 1993 Lee College (Baytown, TX) — 2005-2007 - Certificate of Computer Aided Drafting and Design Obtained Certificate in CADWORX Plant Professional (Piping Design Online) - Piping Level One and Piping Level Two Obtained a Certificate Computer Aided Drafting and Design while maintaining a 3.863 GPA  Advanced AutoCAD - Advanced techniques, including the use of a customized system. Presentation of advanced drawing applications, such as three-dimensional solids modeling and linking graphic entities to external non-graphic data.  Intermediate AutoCAD - A continuation of practices and techniques used in basic computer-aided drafting emphasizing advanced dimensioning techniques, the development and use of prototype drawings, construction of pictorial drawings, construction of 3 dimensional drawings, interfacing 2d and 3d environments and extracting data.  Basic AutoCAD - An introduction to computer-aided drafting. Emphasis is placed on setup; creating and modifying geometry; storing and retrieving predefined shapes; placing, rotating, and scaling objects, adding text and dimensions, using layers, coordinate systems, and plot/print to scale.  Mechanical Drafting- Introduction to the principles of drafting to include terminology and fundamentals, including size and shape descriptions, projection methods, geometric construction, sections, auxiliary views, and reproduction processes. References Charles Brown (Senior Piping Design Lead) Holloman – Ph# 713-838-5003 Matt Gillespie (Senior Piping Design Lead) Ventech – Ph# 713-456-9533 Will Whiteley (Friend/ Controls Designer) Belcan - Bayer - Ph# 713-751-9737 Kenny Wycoff (Senior Piping Designer/Checker) Ventech/Holloman - Ph# 832-766-0737