Contact Condenser Sizing.xls(Cost Chart) ISSI
$-
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000
Scrubber Circulation Rate, Q (GPM)
Figure A3 - Equivalent Uniform Annual Cost (EUC) and Amortized (Annual) Capital
Investment for Contact Condenser (Scrubber)
EUC = 41,499.19 + 24.04905(Q) + 2.43x10-3(Q)2
CI = 6,712.524(Q)0.23961
EUC
CI
Optimal Design
Assumptions: HE is inspected annually, 5% plates replaced, all gaskets; U is not affected by no. plates; frame is 10% of HE price; plates are additive for total area; electricity costs 7 ct/kWh; 90% on-stream factor; plant life is 10 years; interest is 10%; PP packing; new
pump seals annually.
Optimal includes a consideration of reliability and cost
4,000 gpm is 35.4 gpm/ft2, design rate for MMI scrubber. Scrubber has been safely operated down to 68% of design, or 2,280 gpm
for an 11 ft tower. This is 24 gpm/ft2.

More Related Content

Viewers also liked

Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
SHIVAJI CHOUDHURY
 

Viewers also liked (6)

Steam Condensers
Steam CondensersSteam Condensers
Steam Condensers
 
Design of condenser
Design of condenserDesign of condenser
Design of condenser
 
Selection and Design of Condensers
Selection and Design of CondensersSelection and Design of Condensers
Selection and Design of Condensers
 
Presentation on cooling tower
Presentation on cooling towerPresentation on cooling tower
Presentation on cooling tower
 
Steam Condensers
Steam CondensersSteam Condensers
Steam Condensers
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 

Similar to Contact Condenser Sizing

الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
Egyptian Engineers Association
 
Estimating payout from pump efficiency gains
Estimating payout from pump efficiency gainsEstimating payout from pump efficiency gains
Estimating payout from pump efficiency gains
webtec
 
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case StudyWind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
Govindarajan Chittaranjan
 
Wind Solar Hybrid Power Project Investigation For Theme Parks A Case Study
Wind Solar Hybrid Power Project Investigation For Theme Parks   A Case StudyWind Solar Hybrid Power Project Investigation For Theme Parks   A Case Study
Wind Solar Hybrid Power Project Investigation For Theme Parks A Case Study
chittaranjang
 

Similar to Contact Condenser Sizing (20)

CBE480ProjectReport
CBE480ProjectReportCBE480ProjectReport
CBE480ProjectReport
 
Manufacturing cost estimation
Manufacturing cost estimationManufacturing cost estimation
Manufacturing cost estimation
 
Development of Economical Analysis and Technical Solutions for Efficient Dist...
Development of Economical Analysis and Technical Solutions for Efficient Dist...Development of Economical Analysis and Technical Solutions for Efficient Dist...
Development of Economical Analysis and Technical Solutions for Efficient Dist...
 
COSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_JieCOSTMODEL_IDETC_2010_Jie
COSTMODEL_IDETC_2010_Jie
 
DG
DGDG
DG
 
How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...How to unlock productivity savings in mining operations part 2. "Show me the ...
How to unlock productivity savings in mining operations part 2. "Show me the ...
 
Michel Sacotte - Schneider Electric
Michel Sacotte - Schneider ElectricMichel Sacotte - Schneider Electric
Michel Sacotte - Schneider Electric
 
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
 
Estimating payout from pump efficiency gains
Estimating payout from pump efficiency gainsEstimating payout from pump efficiency gains
Estimating payout from pump efficiency gains
 
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...Practically Delivering Energy-ReducingTechnology To Optimise Efficiency On T...
Practically Delivering Energy-Reducing Technology To Optimise Efficiency On T...
 
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case StudyWind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
Wind-Solar Hybrid Power Project Investigation for Theme Parks - A Case Study
 
Wind Solar Hybrid Power Project Investigation For Theme Parks A Case Study
Wind Solar Hybrid Power Project Investigation For Theme Parks   A Case StudyWind Solar Hybrid Power Project Investigation For Theme Parks   A Case Study
Wind Solar Hybrid Power Project Investigation For Theme Parks A Case Study
 
Spe Wellhead Compression
Spe Wellhead CompressionSpe Wellhead Compression
Spe Wellhead Compression
 
EFYP2 Presentation
EFYP2 PresentationEFYP2 Presentation
EFYP2 Presentation
 
9 Replacement problems.pptx .
9 Replacement problems.pptx                        .9 Replacement problems.pptx                        .
9 Replacement problems.pptx .
 
Planning and Procurement in Transformers
Planning and Procurement in TransformersPlanning and Procurement in Transformers
Planning and Procurement in Transformers
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
 
energy audits
energy auditsenergy audits
energy audits
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverter
 

More from Dirk Willard

Cleaning skid op1-automated
Cleaning skid op1-automatedCleaning skid op1-automated
Cleaning skid op1-automated
Dirk Willard
 
Explanation of pressure relief valve increase
Explanation of pressure relief valve increaseExplanation of pressure relief valve increase
Explanation of pressure relief valve increase
Dirk Willard
 
Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007
Dirk Willard
 
Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006
Dirk Willard
 
MIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJCMIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJC
Dirk Willard
 
151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid
Dirk Willard
 
Option 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansionOption 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansion
Dirk Willard
 
Cooling tower soln
Cooling tower solnCooling tower soln
Cooling tower soln
Dirk Willard
 
Cooling tower problem
Cooling tower problemCooling tower problem
Cooling tower problem
Dirk Willard
 

More from Dirk Willard (15)

Cleaning skid op1-automated
Cleaning skid op1-automatedCleaning skid op1-automated
Cleaning skid op1-automated
 
CCl4 process bioreactors
CCl4 process bioreactorsCCl4 process bioreactors
CCl4 process bioreactors
 
De ethanizer
De ethanizerDe ethanizer
De ethanizer
 
Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)
 
Explanation of pressure relief valve increase
Explanation of pressure relief valve increaseExplanation of pressure relief valve increase
Explanation of pressure relief valve increase
 
Frag tk skid, r0b, dw
Frag tk skid, r0b, dwFrag tk skid, r0b, dw
Frag tk skid, r0b, dw
 
McCabe Thiele
McCabe ThieleMcCabe Thiele
McCabe Thiele
 
Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007
 
Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006
 
MIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJCMIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJC
 
151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid
 
EAC logic tree
EAC logic treeEAC logic tree
EAC logic tree
 
Option 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansionOption 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansion
 
Cooling tower soln
Cooling tower solnCooling tower soln
Cooling tower soln
 
Cooling tower problem
Cooling tower problemCooling tower problem
Cooling tower problem
 

Contact Condenser Sizing

  • 1. Contact Condenser Sizing.xls(Cost Chart) ISSI $- $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 Scrubber Circulation Rate, Q (GPM) Figure A3 - Equivalent Uniform Annual Cost (EUC) and Amortized (Annual) Capital Investment for Contact Condenser (Scrubber) EUC = 41,499.19 + 24.04905(Q) + 2.43x10-3(Q)2 CI = 6,712.524(Q)0.23961 EUC CI Optimal Design Assumptions: HE is inspected annually, 5% plates replaced, all gaskets; U is not affected by no. plates; frame is 10% of HE price; plates are additive for total area; electricity costs 7 ct/kWh; 90% on-stream factor; plant life is 10 years; interest is 10%; PP packing; new pump seals annually. Optimal includes a consideration of reliability and cost 4,000 gpm is 35.4 gpm/ft2, design rate for MMI scrubber. Scrubber has been safely operated down to 68% of design, or 2,280 gpm for an 11 ft tower. This is 24 gpm/ft2.