SlideShare a Scribd company logo
1 of 1
Download to read offline
I
y, molar
x, molar
T1
T2
T3
T4
Operating Line Equilibrium Line
y1
x1
x*1,y*1
Isothermal Gas Absorption
If usedfor non-isothermal case, the number of stages
estimatedwill be less than needed. Here, T3 is chosen
as the average temperature. Only two stages are needed,
according to this approach.
x, molar
T1
T2
T3
T4
Operating Line
Equilibrium Line
y1
x1
x*1,y*1
Non-Isothermal Gas Absorption
Either the temperatures must be known for each stage or
estimated.
y, molar
y, molar
x, molar
T1
T2
T3
T4
Operating Line 1
Equilibrium Line 1
Non-Isothermal Gas Absorption with Rinse Stream
Adding a secondstream, usually one containing a strong concentration of acid
andat an elevatedtemperature complicates the calculation by requiring two
operating lines anda "broken" equilibrium line. Additional stages are probably
required.
Operating Line 2 Equilibrium Line 2
L G
L
GL

More Related Content

More from Dirk Willard

CCl4 process bioreactors
CCl4 process bioreactorsCCl4 process bioreactors
CCl4 process bioreactorsDirk Willard
 
Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)Dirk Willard
 
Explanation of pressure relief valve increase
Explanation of pressure relief valve increaseExplanation of pressure relief valve increase
Explanation of pressure relief valve increaseDirk Willard
 
Frag tk skid, r0b, dw
Frag tk skid, r0b, dwFrag tk skid, r0b, dw
Frag tk skid, r0b, dwDirk Willard
 
Contact Condenser Sizing
Contact Condenser SizingContact Condenser Sizing
Contact Condenser SizingDirk Willard
 
Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007Dirk Willard
 
Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006Dirk Willard
 
MIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJCMIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJCDirk Willard
 
151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skidDirk Willard
 
Option 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansionOption 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansionDirk Willard
 
Cooling tower soln
Cooling tower solnCooling tower soln
Cooling tower solnDirk Willard
 
Cooling tower problem
Cooling tower problemCooling tower problem
Cooling tower problemDirk Willard
 

More from Dirk Willard (14)

CCl4 process bioreactors
CCl4 process bioreactorsCCl4 process bioreactors
CCl4 process bioreactors
 
De ethanizer
De ethanizerDe ethanizer
De ethanizer
 
Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)Figure 2 ko pot, problem, fixes 2 2000 model (1)
Figure 2 ko pot, problem, fixes 2 2000 model (1)
 
Explanation of pressure relief valve increase
Explanation of pressure relief valve increaseExplanation of pressure relief valve increase
Explanation of pressure relief valve increase
 
Frag tk skid, r0b, dw
Frag tk skid, r0b, dwFrag tk skid, r0b, dw
Frag tk skid, r0b, dw
 
Contact Condenser Sizing
Contact Condenser SizingContact Condenser Sizing
Contact Condenser Sizing
 
Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007Cat bed heat-up, GTP, 7 2007
Cat bed heat-up, GTP, 7 2007
 
Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006Liq soap vessel, AJC, 93006
Liq soap vessel, AJC, 93006
 
MIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJCMIXING-Color-making agitation, AJC
MIXING-Color-making agitation, AJC
 
151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid151058-supply, skid -MODEL-flow to skid
151058-supply, skid -MODEL-flow to skid
 
EAC logic tree
EAC logic treeEAC logic tree
EAC logic tree
 
Option 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansionOption 1 - N2 skid location, Citgo expansion
Option 1 - N2 skid location, Citgo expansion
 
Cooling tower soln
Cooling tower solnCooling tower soln
Cooling tower soln
 
Cooling tower problem
Cooling tower problemCooling tower problem
Cooling tower problem
 

McCabe Thiele

  • 1. I y, molar x, molar T1 T2 T3 T4 Operating Line Equilibrium Line y1 x1 x*1,y*1 Isothermal Gas Absorption If usedfor non-isothermal case, the number of stages estimatedwill be less than needed. Here, T3 is chosen as the average temperature. Only two stages are needed, according to this approach. x, molar T1 T2 T3 T4 Operating Line Equilibrium Line y1 x1 x*1,y*1 Non-Isothermal Gas Absorption Either the temperatures must be known for each stage or estimated. y, molar y, molar x, molar T1 T2 T3 T4 Operating Line 1 Equilibrium Line 1 Non-Isothermal Gas Absorption with Rinse Stream Adding a secondstream, usually one containing a strong concentration of acid andat an elevatedtemperature complicates the calculation by requiring two operating lines anda "broken" equilibrium line. Additional stages are probably required. Operating Line 2 Equilibrium Line 2 L G L GL