1. Sr.Executive
Lafarge Cement,Gopalnagar,Bilaspur(C.G)
Jan 2011 to till date
Asst.Officer
UltraTech Cement, ( GCW, Kovaya ,Gujarat)
2008-2011
Communicate to other department regarding breakdown and stoppagerelated issue.
Operate of plant with optimum SPC.SHC and output.
Plant operation from CCR, Two kiln (Line 1 and 2) each 8000 TPD, Atox raw mill
and coal mills.
Cement mill with roller press. Commissioning of cement mill with KHD roller press
with V-separator.
WCM activity, Continuous kaizen improvement and report prepare in SAP
Chemist
Inspectorate Griffith India Pvt. Ltd
February 2005- September 2007
Working as a third party in
• NABL accredation Laboratory in Bhubaneswar
• Balco captive power plant 270 MW, bulk quantity of coal sampling and its
analysis
• Korba area washery’s coal loading in Railway siding Ratija ,sampling and
its analysis within schedule time before rake arrived to purchager.
• Katni and its nearby area different mines materials like Bauxide,Iron ore ,
Lime stone etc sampling and analysis.
Project Trainee
Central Fuel Research Institute (CMRI) Ranchi unit
Oct 2003- Nov 2004
Complete analysis and sampling of bore hole coal.