Picture Project Report
Project : Roll in/out 2 engines for Navigat-MaxPower at PLTMG Teluk
Lembu, Pekanbaru, Riau
Time : 9 – 20 November 2015
1. DESCRIPTION AND SCOPE OF WORK
The main activity for this work is to replace 2 units of engine at PLTMG Teluk Lembu also to transport
the replacement engines from Belawan, North Sumatera and transport the old units to PLC (Pekanbaru
Logistics Center) Rumbai. The work includes the activity of loading/unloading roll out and roll in 2 sets
of engines from enclosure / Power House.
2. TIME IMPLEMENTATION PLAN (Start Date and End) AND THE HOUR START AND FINISH EVERY DAY
Initial Project Time Frame:
The work time will be:
a. Start : 08.00 WIB
b. Finish : 17.30 WIB
c. Over-time : 22.00 WIB
The over-time schedule planned be conducted only when it is absolutely necessary and in accordance to HSE
regulation and standard. In any case, we were focused on the main schedule.
HSE Department
3. ENVIRONMENTAL RISK ASSESSMENT BY SURVEY
4. WORKING METHOD
a. Pre-Work Safety Briefing
To ensure that every workers on the field knows what to do and how to do it safely, every day
we conducted pre-work safety briefing. This briefing include socialization of JSA and Safety
evaluation from yesterday’s work.
b. Assembling heavy equipment (50 Ton Crawler Crane)
For this project we use 50-Ton Crawler Crane, as part of safety measure and to avoid damage to
concrete road we put wooden block as rail for the Crane’s track
c. Clearing the working environment
As per our first survey to Teluk Lembu, we have to move some of Navigat’s container office to
make space for rolling work. As rolling work need a lot of space, not only to secure the engines move
but also to give a lot of space for workers to work or to evacuate in case of emergency.
d. Jacking and Rolling Old Engine out
Lifting the Old Engine using jacking technique
Rolling out the old engine out
e. Unload the New Engine and Load the Old Engine to Truck
To make sure that the engines were lifted properly according to Navigat’s procedure, we use
adjustable spreader bar so that the weight distributed properly when conducting the lifting.
f. Rolling New Engine in
g. Deliver the old Engine to PLC
Prepared by, Approved by
Adhitya Wicaksono Andriyana Saputra
HSE Coordinator Project Manager

More Related Content

What's hot

Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017
Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Crosstown TO
 
ACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORTACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORT
Mohamed Selim
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Crosstown TO
 
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
Crosstown TO
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
Ian Kelly
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Crosstown TO
 

What's hot (20)

Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017Western Works Construction Liaison Committee - November 2017
Western Works Construction Liaison Committee - November 2017
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
 
ACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORTACCEOMPLISHMENTS REPORT
ACCEOMPLISHMENTS REPORT
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
 
CBorgland resume
CBorgland resumeCBorgland resume
CBorgland resume
 
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
 
Hareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- EnglishHareket Magazine 25. issue-2017- English
Hareket Magazine 25. issue-2017- English
 
Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)Amit kala (Hydro Mechanical Professional Engineer)
Amit kala (Hydro Mechanical Professional Engineer)
 
High level cancer institute,
High level cancer institute,High level cancer institute,
High level cancer institute,
 
DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2DATA2015-12-06 Ashghal Presentation 2
DATA2015-12-06 Ashghal Presentation 2
 
Sripadasagar project
Sripadasagar projectSripadasagar project
Sripadasagar project
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Montrose BLP
Montrose BLPMontrose BLP
Montrose BLP
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
 
CV _Rizwan
CV _RizwanCV _Rizwan
CV _Rizwan
 
Site Visits 6.5
Site Visits 6.5Site Visits 6.5
Site Visits 6.5
 

Similar to Gas Engine Photo

vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
vikash kumar
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
Aaron Lian Kian Hoe
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
Norfadzly Nordin
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
Tommy Muldoon
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
Keith Vary
 
Project Milestones quotes from Project Director
Project Milestones quotes from Project DirectorProject Milestones quotes from Project Director
Project Milestones quotes from Project Director
Fabien Deschamps
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
robinking277
 

Similar to Gas Engine Photo (20)

Power Plant Demobilisation
Power Plant DemobilisationPower Plant Demobilisation
Power Plant Demobilisation
 
Shaktivell Pirmala Perumal
Shaktivell Pirmala PerumalShaktivell Pirmala Perumal
Shaktivell Pirmala Perumal
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
Resume Murali 1
Resume Murali 1 Resume Murali 1
Resume Murali 1
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
MOHD NAZRUL CV
MOHD NAZRUL CVMOHD NAZRUL CV
MOHD NAZRUL CV
 
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
OCS CV Field Engr_Aaron Lian Kian Hoe_April 15
 
NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)NORFADZLY NORDIN ( Construction Manager)
NORFADZLY NORDIN ( Construction Manager)
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 
TAround Present.pdf
TAround Present.pdfTAround Present.pdf
TAround Present.pdf
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
MNC-14
MNC-14MNC-14
MNC-14
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)Planning and scheduling project (psp 275)
Planning and scheduling project (psp 275)
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
78-83-NovDec12
78-83-NovDec1278-83-NovDec12
78-83-NovDec12
 
Project Milestones quotes from Project Director
Project Milestones quotes from Project DirectorProject Milestones quotes from Project Director
Project Milestones quotes from Project Director
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 

Gas Engine Photo

  • 1. Picture Project Report Project : Roll in/out 2 engines for Navigat-MaxPower at PLTMG Teluk Lembu, Pekanbaru, Riau Time : 9 – 20 November 2015 1. DESCRIPTION AND SCOPE OF WORK The main activity for this work is to replace 2 units of engine at PLTMG Teluk Lembu also to transport the replacement engines from Belawan, North Sumatera and transport the old units to PLC (Pekanbaru Logistics Center) Rumbai. The work includes the activity of loading/unloading roll out and roll in 2 sets of engines from enclosure / Power House. 2. TIME IMPLEMENTATION PLAN (Start Date and End) AND THE HOUR START AND FINISH EVERY DAY Initial Project Time Frame: The work time will be: a. Start : 08.00 WIB b. Finish : 17.30 WIB c. Over-time : 22.00 WIB The over-time schedule planned be conducted only when it is absolutely necessary and in accordance to HSE regulation and standard. In any case, we were focused on the main schedule. HSE Department
  • 2. 3. ENVIRONMENTAL RISK ASSESSMENT BY SURVEY 4. WORKING METHOD a. Pre-Work Safety Briefing To ensure that every workers on the field knows what to do and how to do it safely, every day we conducted pre-work safety briefing. This briefing include socialization of JSA and Safety evaluation from yesterday’s work.
  • 3. b. Assembling heavy equipment (50 Ton Crawler Crane) For this project we use 50-Ton Crawler Crane, as part of safety measure and to avoid damage to concrete road we put wooden block as rail for the Crane’s track
  • 4. c. Clearing the working environment As per our first survey to Teluk Lembu, we have to move some of Navigat’s container office to make space for rolling work. As rolling work need a lot of space, not only to secure the engines move but also to give a lot of space for workers to work or to evacuate in case of emergency.
  • 5. d. Jacking and Rolling Old Engine out Lifting the Old Engine using jacking technique Rolling out the old engine out e. Unload the New Engine and Load the Old Engine to Truck To make sure that the engines were lifted properly according to Navigat’s procedure, we use adjustable spreader bar so that the weight distributed properly when conducting the lifting.
  • 6. f. Rolling New Engine in g. Deliver the old Engine to PLC Prepared by, Approved by Adhitya Wicaksono Andriyana Saputra HSE Coordinator Project Manager