SlideShare a Scribd company logo
1 of 22
Manufacturer, Fabricator and Distributor
of Rigid Piping Assemblies and Flexible Metal Hoses
to the Turbine Power , Oil & Gas Exploration and Aerospace.
Aerospace Power Gen/Oil & Gas
Our Products are used Globally
Always Compliant with Local, State, Federal and DEFAR requirements
Aerospace
Flex Hoses Rigid Tubes Machine Parts
Machine Facility AS9100 Certified with High Volume Capacity
Power Generation
ASME/ASTM Fittings ASME 31.1 Power Piping Turbine Flex Hoses
Our Facility and Systems
DataBase Management Inventory Inspection & Control ControlledWork Stations
SegregatedTest Areas IT and Data Base Servers Clean and A/C Facility
6”, 8” & 12” Prepared for
CW I Review,
Pressure testing
Weld Pickling
and
Pipe Passivation.
Followed by final cleaning
FOD , Inspection and capping
B31.1 Power Piping
&
B31.3 Process Piping
Aero-Flex Quality
AS9100 Rev C and PED 97/24/EC
Aero-Flex maintains its PED
Compliance and Certification of
European Union 97/23/EC through
the British Standards Institute.
BSI acts as our Notified Body for all
Cat I and CAT II Assemblies as well
as consultant for all materials and
Required Documentation.
PED TAG
Additional Aero-Flex Quality
CWI’s on Staff and on the Floor EVERYWELD CWI INSPECTED
Crating/Wood Third Party Inspections
DUAL CERTIFICATION OF WELDERS
ASME IX AND AWS D17.1
WELD MAP AND TECHNIQUES
TEST LABORATORY X-RAY TECHNIQUES
Their Way Aero-Flex Way
Why some assemblies fail and ours doesn’t!
The Aero-Flex Way using Independent Third
Party (NADCAP) Analysis and Validation
Thermocouple and Cold Argon Purge for thin .010” weld
New WeldsTechniques
and material concerns
are studied and the
working parameters
are Engineered before
the weld are released.
Weld Macrographs preformed for joint details
Prior to a weld being preformed at Aero-Flex we first:
Evaluation of the weld and materials to be joined!
Review NDT and if Third party resources are required!
Review equipment resources & current personnel training!
Develop test welds and working procedures !
Once we are confident we have engineered the weld:
We will Develop and institute the weld requirements by
Issuing a Weld Technique Sheet (attached at right)!
A Weld Technique Sheet is always referenced in the working
production floor router providing documented controls for all
welders and welds preformed at Aero-Flex!
WELD TECNIQUUE
Control AF- 4QF021
Aero-Flex Prepares and Packages all piping and materials
with Controlled Documentation, Sealed and Secured.
All components are Inspected for cleanliness and
contamination prior to capping.
Packages and crates are in
Compliance with the Federal
And International Standards
For Export : ISPM 15, all crates
and packages are Stamped for
International compliance.
Domestic and
International Shipping
“Certified Export Crates/Wood”
All assemblies are shipped with
individual documentation, project
documentation and required NDT
information. All Documentation is
available for Uploading to
customers online portals and
transportation centers.
FAI’s
supplied per AS 9102
Documentation and
Project Close Out
Full Traceability and Documentation
on all Components and Systems
1) Aero-Flex is in a 10,000 SqFt facility, Primarily a Stainless Alloy shop with limited carbon.
2) We operate under our QMS: AS9100 Rev C. , ISO 9001, PED 97/23/EC.
All Materials are Purchase Order specified and all materials are inspected at receiving for full MTR
documentation, code compliant dimensions and cleanliness, then accepted by inventory.
Inventory stored on separate and organized racks; all inventory items have control numbers.
All Aero-Flex personnel are trained on the QMS and cross trained in various job functions.
QC, CWI & Floor Personnel and Managers have extensive experience and education in their
respective fields and preform regular Process Review Audits.
3) Aero-Flex develops its software and database systems for its manufacturing controls and process
functions for various operations. Aero-Flex maintains and manages its own computers servers and
systems through our internal IT Department. Accounting is done on a Quick Books based accounting
package with independent quarterly reviews.
4) All materials are cleaned before and after processing. All piping is acid washed, welds are
pickled and passivated, followed by cleanliness & FOD inspection and then capped.
ID visual inspection of all materials and piping is preformed on all assemblies.
5) Dimensional Controls are preformed on all assemblies with accurate & appropriate calibrated tools.
6) All Packaging, Shipping and Documentation is controlled and supervised with approved work instructions.
7) Aero-Flex is a private held company and has the financial stability to grow and expand as necessary.
8) EHS, Aero-Flex maintains a clean and safe facility and works with our local and state agencies to
maintain full compliance to Environmental and Health Regulations. See Attached Compliance Letter
In Summary “Expectations from the Supplier”
for your consideration
…Small enough to be highly
reactive while Growing Strong.
Large enough to be
very competitive…

More Related Content

What's hot

Consultant presentation english
Consultant presentation english Consultant presentation english
Consultant presentation english Tarek Osman
 
Consultant presentation-English
Consultant presentation-English Consultant presentation-English
Consultant presentation-English Tarek Osman
 
Steam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarSteam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarLeigh Ridlington
 
JoshuaVMiner1Resume
JoshuaVMiner1ResumeJoshuaVMiner1Resume
JoshuaVMiner1ResumeJoshua Miner
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016Iain Loudon
 
Caleb J. Powell Resume
Caleb J. Powell ResumeCaleb J. Powell Resume
Caleb J. Powell Resumecaleb Powell
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync
 
Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016Wade Striemer
 
EF boiler house risk assessment
EF boiler house risk assessmentEF boiler house risk assessment
EF boiler house risk assessmentLeigh Ridlington
 
Damage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipmentsDamage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipmentsMarcep Inc.
 

What's hot (19)

Rey BongatoCV
Rey BongatoCVRey BongatoCV
Rey BongatoCV
 
CV TemplateREV [1]
CV TemplateREV [1]CV TemplateREV [1]
CV TemplateREV [1]
 
Print products CIGRE-2014
Print products CIGRE-2014Print products CIGRE-2014
Print products CIGRE-2014
 
Pemex System 1
Pemex System 1Pemex System 1
Pemex System 1
 
Consultant presentation english
Consultant presentation english Consultant presentation english
Consultant presentation english
 
Consultant presentation-English
Consultant presentation-English Consultant presentation-English
Consultant presentation-English
 
Vincent P. Azcuna
Vincent P. AzcunaVincent P. Azcuna
Vincent P. Azcuna
 
Steam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with FlomarSteam Boiler BG01 Compliance with Flomar
Steam Boiler BG01 Compliance with Flomar
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
GS Profile Presentation(Jacobs)
GS Profile Presentation(Jacobs)GS Profile Presentation(Jacobs)
GS Profile Presentation(Jacobs)
 
JoshuaVMiner1Resume
JoshuaVMiner1ResumeJoshuaVMiner1Resume
JoshuaVMiner1Resume
 
jayaprakash
jayaprakashjayaprakash
jayaprakash
 
iain loudon CV 2016
iain loudon CV 2016iain loudon CV 2016
iain loudon CV 2016
 
Caleb J. Powell Resume
Caleb J. Powell ResumeCaleb J. Powell Resume
Caleb J. Powell Resume
 
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource DocumentPetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
PetroSync - API 580 & API 581 Risk Based Inspection & Base Resource Document
 
Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016Industry Services Portfolio Feb 2016
Industry Services Portfolio Feb 2016
 
EDITED HVAC REUME
EDITED HVAC REUMEEDITED HVAC REUME
EDITED HVAC REUME
 
EF boiler house risk assessment
EF boiler house risk assessmentEF boiler house risk assessment
EF boiler house risk assessment
 
Damage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipmentsDamage mechanism affecting fixed equipments
Damage mechanism affecting fixed equipments
 

Similar to AF Presentation

Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016Darren Bergin
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Abdulkader Sayed
 
Joseph Hinkle Resume 01_2015 Visual Resume
Joseph Hinkle Resume 01_2015  Visual ResumeJoseph Hinkle Resume 01_2015  Visual Resume
Joseph Hinkle Resume 01_2015 Visual ResumeJoseph Hinkle
 
Bereau Veritas Marine and offshore - oil and gas brochures
Bereau Veritas Marine and offshore - oil and gas brochuresBereau Veritas Marine and offshore - oil and gas brochures
Bereau Veritas Marine and offshore - oil and gas brochuresKiet Nguyen
 
Dyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesDyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesGrant Pegden-Wright
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - CopyJesse Lopez
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilatorMinh Bui Si
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerAhmed Helmy
 
Aerotek Profile_2016
Aerotek Profile_2016Aerotek Profile_2016
Aerotek Profile_2016Tom Jacobs
 
Protecting Our Trading Partners
Protecting Our Trading PartnersProtecting Our Trading Partners
Protecting Our Trading Partnersnakenatter
 
Aircraft Resume New-1
Aircraft Resume New-1Aircraft Resume New-1
Aircraft Resume New-1Tulasiram M
 
WH Scott - Load Testing
WH Scott - Load TestingWH Scott - Load Testing
WH Scott - Load TestingLeighton Glynn
 

Similar to AF Presentation (20)

RUSSELL W Givens
RUSSELL W GivensRUSSELL W Givens
RUSSELL W Givens
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 
Joseph Hinkle Resume 01_2015 Visual Resume
Joseph Hinkle Resume 01_2015  Visual ResumeJoseph Hinkle Resume 01_2015  Visual Resume
Joseph Hinkle Resume 01_2015 Visual Resume
 
Bereau Veritas Marine and offshore - oil and gas brochures
Bereau Veritas Marine and offshore - oil and gas brochuresBereau Veritas Marine and offshore - oil and gas brochures
Bereau Veritas Marine and offshore - oil and gas brochures
 
Dyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best PracticesDyna-Flo Manufacturing Processes & Best Practices
Dyna-Flo Manufacturing Processes & Best Practices
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - Copy
 
2 cm-ms-bld-012 - roof fan & natural ventilator
2   cm-ms-bld-012 - roof fan & natural ventilator2   cm-ms-bld-012 - roof fan & natural ventilator
2 cm-ms-bld-012 - roof fan & natural ventilator
 
1.0 Company Profile
1.0 Company Profile1.0 Company Profile
1.0 Company Profile
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 
Abdelhamid boulemkahel
Abdelhamid boulemkahelAbdelhamid boulemkahel
Abdelhamid boulemkahel
 
Aerotek Profile_2016
Aerotek Profile_2016Aerotek Profile_2016
Aerotek Profile_2016
 
cv
cvcv
cv
 
Stephen Murphy Resume
Stephen Murphy ResumeStephen Murphy Resume
Stephen Murphy Resume
 
Aerotechnic Asia Presentation
Aerotechnic Asia  PresentationAerotechnic Asia  Presentation
Aerotechnic Asia Presentation
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
Profile Section RevB
Profile Section RevBProfile Section RevB
Profile Section RevB
 
Protecting Our Trading Partners
Protecting Our Trading PartnersProtecting Our Trading Partners
Protecting Our Trading Partners
 
Aircraft Resume New-1
Aircraft Resume New-1Aircraft Resume New-1
Aircraft Resume New-1
 
WH Scott - Load Testing
WH Scott - Load TestingWH Scott - Load Testing
WH Scott - Load Testing
 

AF Presentation

  • 1. Manufacturer, Fabricator and Distributor of Rigid Piping Assemblies and Flexible Metal Hoses to the Turbine Power , Oil & Gas Exploration and Aerospace.
  • 2. Aerospace Power Gen/Oil & Gas Our Products are used Globally Always Compliant with Local, State, Federal and DEFAR requirements
  • 3. Aerospace Flex Hoses Rigid Tubes Machine Parts Machine Facility AS9100 Certified with High Volume Capacity
  • 4. Power Generation ASME/ASTM Fittings ASME 31.1 Power Piping Turbine Flex Hoses
  • 5. Our Facility and Systems DataBase Management Inventory Inspection & Control ControlledWork Stations SegregatedTest Areas IT and Data Base Servers Clean and A/C Facility
  • 6. 6”, 8” & 12” Prepared for CW I Review, Pressure testing Weld Pickling and Pipe Passivation. Followed by final cleaning FOD , Inspection and capping B31.1 Power Piping & B31.3 Process Piping
  • 7. Aero-Flex Quality AS9100 Rev C and PED 97/24/EC
  • 8. Aero-Flex maintains its PED Compliance and Certification of European Union 97/23/EC through the British Standards Institute. BSI acts as our Notified Body for all Cat I and CAT II Assemblies as well as consultant for all materials and Required Documentation. PED TAG
  • 9. Additional Aero-Flex Quality CWI’s on Staff and on the Floor EVERYWELD CWI INSPECTED Crating/Wood Third Party Inspections
  • 10. DUAL CERTIFICATION OF WELDERS ASME IX AND AWS D17.1
  • 11. WELD MAP AND TECHNIQUES
  • 12. TEST LABORATORY X-RAY TECHNIQUES
  • 13. Their Way Aero-Flex Way Why some assemblies fail and ours doesn’t!
  • 14. The Aero-Flex Way using Independent Third Party (NADCAP) Analysis and Validation
  • 15.
  • 16. Thermocouple and Cold Argon Purge for thin .010” weld
  • 17. New WeldsTechniques and material concerns are studied and the working parameters are Engineered before the weld are released. Weld Macrographs preformed for joint details
  • 18. Prior to a weld being preformed at Aero-Flex we first: Evaluation of the weld and materials to be joined! Review NDT and if Third party resources are required! Review equipment resources & current personnel training! Develop test welds and working procedures ! Once we are confident we have engineered the weld: We will Develop and institute the weld requirements by Issuing a Weld Technique Sheet (attached at right)! A Weld Technique Sheet is always referenced in the working production floor router providing documented controls for all welders and welds preformed at Aero-Flex! WELD TECNIQUUE Control AF- 4QF021
  • 19. Aero-Flex Prepares and Packages all piping and materials with Controlled Documentation, Sealed and Secured. All components are Inspected for cleanliness and contamination prior to capping. Packages and crates are in Compliance with the Federal And International Standards For Export : ISPM 15, all crates and packages are Stamped for International compliance. Domestic and International Shipping “Certified Export Crates/Wood”
  • 20. All assemblies are shipped with individual documentation, project documentation and required NDT information. All Documentation is available for Uploading to customers online portals and transportation centers. FAI’s supplied per AS 9102 Documentation and Project Close Out Full Traceability and Documentation on all Components and Systems
  • 21. 1) Aero-Flex is in a 10,000 SqFt facility, Primarily a Stainless Alloy shop with limited carbon. 2) We operate under our QMS: AS9100 Rev C. , ISO 9001, PED 97/23/EC. All Materials are Purchase Order specified and all materials are inspected at receiving for full MTR documentation, code compliant dimensions and cleanliness, then accepted by inventory. Inventory stored on separate and organized racks; all inventory items have control numbers. All Aero-Flex personnel are trained on the QMS and cross trained in various job functions. QC, CWI & Floor Personnel and Managers have extensive experience and education in their respective fields and preform regular Process Review Audits. 3) Aero-Flex develops its software and database systems for its manufacturing controls and process functions for various operations. Aero-Flex maintains and manages its own computers servers and systems through our internal IT Department. Accounting is done on a Quick Books based accounting package with independent quarterly reviews. 4) All materials are cleaned before and after processing. All piping is acid washed, welds are pickled and passivated, followed by cleanliness & FOD inspection and then capped. ID visual inspection of all materials and piping is preformed on all assemblies. 5) Dimensional Controls are preformed on all assemblies with accurate & appropriate calibrated tools. 6) All Packaging, Shipping and Documentation is controlled and supervised with approved work instructions. 7) Aero-Flex is a private held company and has the financial stability to grow and expand as necessary. 8) EHS, Aero-Flex maintains a clean and safe facility and works with our local and state agencies to maintain full compliance to Environmental and Health Regulations. See Attached Compliance Letter In Summary “Expectations from the Supplier” for your consideration
  • 22. …Small enough to be highly reactive while Growing Strong. Large enough to be very competitive…