Challenge
To ensure the integrity and reliability of Pemex’s System 1
oil infrastructure, including 1,600 kilometers of offshore
pipelines, the Cayo Arcas offshore facility, the Dos Bocas
maritime terminal, with a storage capacity of 7 million barrels,
and the Rebombeo pumping complex.
Services
•	 Internal and external corrosion inspection and monitoring,
including direct assessments, the supply of inhibitors, probe
monitoring and laboratory analysis
•	 Execution of maintenance planning, scheduling, revisions
and reprogramming
•	 Predictive maintenance of rotating equipment for oil
pumping and gas compression. Inspection techniques used
include thermographic, vibration monitoring and lubricating
oil analysis
•	 Non-destructive testing (NDT) of pressure vessels, pipelines,
static equipment and atmospheric tanks. Inspection
techniques include visual, ultrasonic, radiographic and
guided wave assessments
•	 Risk assessments (pipeline and installation)
•	 Integrity assessments (pipeline and installation)
•	 Flexibility assessment
Contact us:
www.penspen.com
info@penspen.com
Technical Highlight
Responsible for handling
60% of Mexico’s crude oil
production
Case study:
Assuring the Integrity and
Reliability of Pemex System 1
Location:
Tabasco and Campeche, Mexico
Client:
Pemex
Copyright 2015 Penspen Limited. All rights reserved. Penspen and the logo are registered trademarks of Penspen Limited
•	 Development and implementation of integrity and reliability
for installations management plan (PAICI)
•	 Pigging consultancy and management
•	 Technical support (corrosion, inspection and training)
Solution
Penspen developed a comprehensive Facilities Integrity and
Reliability Management System to ensure the structured
planning, programming and implementation of activities in
Rebombeo, Cayo Arcas and Dos Bocas according to criticality
and risk.This management system, together with the effective
corrosion monitoring and predictive maintenance activities, has
enabled the optimisation of resources for System 1.
Result
Informed by accurate and effective technical risk, integrity,
corrosion monitoring, predictive maintenance and reliability
assessments, Penspen developed comprehensive optimisation
inspection and maintenance recommendations for
rehabilitation and repairs across the project.These have helped
ensure the integrity and reliability of all facilities and pipelines
within the scope of the project.
The development of high level integrity policies and procedures
has contributed significantly to the overall optimisation and
effective running of System 1.
About Penspen
At Penspen, we offer complete, customised engineering
solutions to the energy industry, including engineering and
project management, asset management, asset integrity,
training services, software and tools.
We deliver quality and technical excellence with agility to meet
our clients’ needs. We have extensive experience executing large
and technically challenging projects, and provide our clients
with independent advice to ensure maximum returns. Our
global footprint enables us to bring world class experience to
address local client needs.
Case Study

More Related Content

What's hot

Emanis, Dustin Jr. Resume 2015 (1)
Emanis, Dustin Jr.     Resume    2015 (1)Emanis, Dustin Jr.     Resume    2015 (1)
Emanis, Dustin Jr. Resume 2015 (1)Dustin Emanis
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industryAdvisian
 
GEEGO FAN Resume 041608
GEEGO FAN Resume 041608GEEGO FAN Resume 041608
GEEGO FAN Resume 041608Geego Fan
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 
Senior Chemist 4.0
Senior Chemist 4.0Senior Chemist 4.0
Senior Chemist 4.0Evan Coss
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profilelindinger123
 
CV 4 New 17-01-2017 Paul Maney
CV 4 New 17-01-2017 Paul ManeyCV 4 New 17-01-2017 Paul Maney
CV 4 New 17-01-2017 Paul ManeyPaul Maney
 

What's hot (17)

Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016
 
Emanis, Dustin Jr. Resume 2015 (1)
Emanis, Dustin Jr.     Resume    2015 (1)Emanis, Dustin Jr.     Resume    2015 (1)
Emanis, Dustin Jr. Resume 2015 (1)
 
Skills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industrySkills development for the new Oil & Gas industry
Skills development for the new Oil & Gas industry
 
CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
GEEGO FAN Resume 041608
GEEGO FAN Resume 041608GEEGO FAN Resume 041608
GEEGO FAN Resume 041608
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 
Tolu Adesanwo _Resume
Tolu Adesanwo _ResumeTolu Adesanwo _Resume
Tolu Adesanwo _Resume
 
Senior Chemist 4.0
Senior Chemist 4.0Senior Chemist 4.0
Senior Chemist 4.0
 
AF Presentation
AF PresentationAF Presentation
AF Presentation
 
Joshua J
Joshua JJoshua J
Joshua J
 
HENDERSON RESUME TEST SPECIALIST
HENDERSON RESUME TEST SPECIALISTHENDERSON RESUME TEST SPECIALIST
HENDERSON RESUME TEST SPECIALIST
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Lindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company ProfileLindinger Inspection Services Pvt. Ltd Company Profile
Lindinger Inspection Services Pvt. Ltd Company Profile
 
Leacock steven resume
Leacock steven   resumeLeacock steven   resume
Leacock steven resume
 
Saudi Oger Job
Saudi Oger JobSaudi Oger Job
Saudi Oger Job
 
CV 4 New 17-01-2017 Paul Maney
CV 4 New 17-01-2017 Paul ManeyCV 4 New 17-01-2017 Paul Maney
CV 4 New 17-01-2017 Paul Maney
 
Andy Peterkin CV
Andy Peterkin CVAndy Peterkin CV
Andy Peterkin CV
 

Similar to Pemex System 1 (20)

Intertek - Industry Services
Intertek - Industry ServicesIntertek - Industry Services
Intertek - Industry Services
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & Wells
 
CV Jbriceno December 2014e
CV Jbriceno December 2014eCV Jbriceno December 2014e
CV Jbriceno December 2014e
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
 
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
CV Eng LTMuniz _QAQC Manager_ 11 Sep, 2016
 
KABE LANTRY2 (2)
KABE LANTRY2 (2)KABE LANTRY2 (2)
KABE LANTRY2 (2)
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
Our Capabilities
Our CapabilitiesOur Capabilities
Our Capabilities
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
Bwk resume 040116
Bwk resume 040116Bwk resume 040116
Bwk resume 040116
 
Randel j. croteau resume - ats
Randel j. croteau   resume - atsRandel j. croteau   resume - ats
Randel j. croteau resume - ats
 
Resume new
Resume newResume new
Resume new
 
Umar inam karim CV
Umar inam karim  CVUmar inam karim  CV
Umar inam karim CV
 
NABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_docNABIL_WAGDY_ELBAZ_HSE_2015_doc
NABIL_WAGDY_ELBAZ_HSE_2015_doc
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1
 
Tank Inspection by Consultec
Tank Inspection by ConsultecTank Inspection by Consultec
Tank Inspection by Consultec
 
ECoW_Leaflet_HighRes
ECoW_Leaflet_HighResECoW_Leaflet_HighRes
ECoW_Leaflet_HighRes
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 

Pemex System 1

  • 1. Copyright 2015 Penspen Limited. All rights reserved. Penspen and the logo are registered trademarks of Penspen Limited Case Study Challenge To ensure the integrity and reliability of Pemex’s System 1 oil infrastructure, including 1,600 kilometers of offshore pipelines, the Cayo Arcas offshore facility, the Dos Bocas maritime terminal, with a storage capacity of 7 million barrels, and the Rebombeo pumping complex. Services • Internal and external corrosion inspection and monitoring, including direct assessments, the supply of inhibitors, probe monitoring and laboratory analysis • Execution of maintenance planning, scheduling, revisions and reprogramming • Predictive maintenance of rotating equipment for oil pumping and gas compression. Inspection techniques used include thermographic, vibration monitoring and lubricating oil analysis • Non-destructive testing (NDT) of pressure vessels, pipelines, static equipment and atmospheric tanks. Inspection techniques include visual, ultrasonic, radiographic and guided wave assessments • Risk assessments (pipeline and installation) • Integrity assessments (pipeline and installation) • Flexibility assessment Contact us: www.penspen.com info@penspen.com Technical Highlight Responsible for handling 60% of Mexico’s crude oil production Case study: Assuring the Integrity and Reliability of Pemex System 1 Location: Tabasco and Campeche, Mexico Client: Pemex
  • 2. Copyright 2015 Penspen Limited. All rights reserved. Penspen and the logo are registered trademarks of Penspen Limited • Development and implementation of integrity and reliability for installations management plan (PAICI) • Pigging consultancy and management • Technical support (corrosion, inspection and training) Solution Penspen developed a comprehensive Facilities Integrity and Reliability Management System to ensure the structured planning, programming and implementation of activities in Rebombeo, Cayo Arcas and Dos Bocas according to criticality and risk.This management system, together with the effective corrosion monitoring and predictive maintenance activities, has enabled the optimisation of resources for System 1. Result Informed by accurate and effective technical risk, integrity, corrosion monitoring, predictive maintenance and reliability assessments, Penspen developed comprehensive optimisation inspection and maintenance recommendations for rehabilitation and repairs across the project.These have helped ensure the integrity and reliability of all facilities and pipelines within the scope of the project. The development of high level integrity policies and procedures has contributed significantly to the overall optimisation and effective running of System 1. About Penspen At Penspen, we offer complete, customised engineering solutions to the energy industry, including engineering and project management, asset management, asset integrity, training services, software and tools. We deliver quality and technical excellence with agility to meet our clients’ needs. We have extensive experience executing large and technically challenging projects, and provide our clients with independent advice to ensure maximum returns. Our global footprint enables us to bring world class experience to address local client needs. Case Study