SlideShare a Scribd company logo
1 of 2
Download to read offline
Marcelino, Darwin Matanguihan
EMERSON MARCH 2008 - PRESENT
Automation Engineer
PASIG CITY, PHILIPPINES MARCH 2008 - PRESENT
• Recognized as a product specialist in the
following areas: DeltaV Controller, SIS, and
upgrade
• Provides root cause failure analysis and
recommendation options to resolve the issue
reported as promptly as possible, considering all
possible effects of such especially for running
installations
• Completes Knowledge Based Articles (KBA)
explaining issues reported and observed for
critical, high severity, outstanding and/or new
concerns regarding DeltaV Controller concerns
• Accesses new concerns and files incident
reports for the continuous improvement of DeltaV
products and components
• Troubleshoots and resolves issues regarding
FAT and SAT for concerns raised by Field
Service Offices (FSO) and/or Local Business
Partners (LBP)
• Troubleshoots and resolves issues in other
product specialization areas that may involve
graphic picture files changes, Visual Basic (VBA)
coding, database files analysis, control strategy
configuration recommendations, I/O cards and
controller hardware condition assessment
• Provides coaching to other members of the team
Product Engineer
EMERSON PROCESS MANAGEMENT, LEICESTER,
UNITED KINGDOM AUGUST2014 – PRESENT
• Responsible for owning, investigating, and
resolving actions assigned for ongoing calls for
proper escalation and faster resolution.
• Involved in numerous AdvancedServices
projects such as Upgrade Evaluation and
Qualification reports and Upgrade
Implementations on various sites.
Resident Engineer
GENENTECH, CALIFORNIA, US JUNE 2013 – DECEMBER
2013
• Involved in the upgrade staging and
implementation of Genentech’s
Development, Validation, and Production
systems.
• Provides post upgrade support for DeltaV
Issues for systems integrated with Batch
Executive Redundancy, PI-based historical
data collection, and Syncade.
NEW ENGLAND CONTROLS (NEC), MASSACHUSETTS, US
JANUARY 2012-DECEMBER 2012
• Developed and implemented product/system
configuration changes at site to meet
customer requirements involving site visits to
conduct surveys, gather relevant data, or
apply software solutions and workarounds
where the customer does not have that
capability.
• Involved in site assessment surveys & reporting,
in-house upgrade testing, upgrade execution
planning, and site implementation.
• DeltaV system Health Check visits (PM) to
customer sites.
• Set up the local office facilities and be prepared
to perform testing and simulation in relation to
customer product issues, upgrade or product
migration
QATAR GAS 3 & 4 (TRAINS 6 & 7), RAS LAFFAN INDUSTRIAL
CITY, QATAR MARCH 2010 – OCT 2010
• Troubleshot and resolved issues raised by
customers, and FSO’s alike that may involve
graphic picture files changes, Visual Basic (VBA)
coding, database files analysis, control strategy
configuration recommendations, I/O cards and
controller hardware condition assessment
• Reviewed control module configuration based on
control narrative and Implement on-line or off-line
changes in control module configuration as
needed
• Installed latest DeltaV software solutions and
Microsoft Security Updates on new machines
that were added
• Performed preventive maintenance on the
DeltaV system by doing regular database
backups and updates of anti-virus definitions.
Performed preventive maintenance on DeltaV
controllers installed by collecting and interpreting
information such as telnet logs, runtime recorder,
alarms and events, and other diagnostic
parameter as needed
CALIFORNIA ENERGY-CASECNAN WATER AND
ENERGY COMPANY, INC. APRIL 2006 –
JANUARY 2008
Electrical Technician
NUEVA ECIJA, PHILIPPINES MAY 2007 – JAN 2008
• Spearheaded the reprogramming and reviewing
of the activities listed in the company’s
Computerized Maintenance Management
System (CMMS)
• Assisted in installation of all types of electrical
plant and equipment, when required, to high
standards and to specifications
• Performed billing meter readings and reports
corresponding to these readings together with
representatives from National Irrigation Authority
and National Transmission Company
• Assisted in performing Plant Capacity Test
together with representatives from National
Irrigation Authority and National Transmission
Company.
• Performed corrective maintenance on one of the
water cooled, oil heat exchanges for a 75MW
unit generator
• Led a team to perform corrective maintenance
on the emergency lighting on the shaft bar, from
the power house leading to the switchyard of the
plant.
• Performed troubleshooting and corrective
maintenance on perimeter and in-house auxiliary
lightings of the plant.
Emerson Location
• Emerson – Pasig City, Philippines Office
Education
• Bachelor of Science, Electrical Engineering,
University of the Philippines Los Baños, Laguna,
Philippines
Certifications
• SIS Associate
• Lifecycle Services – Guardian
• DeltaV Field Service
• DeltaV SIS Implementation
• Dell Tech Direct Certified (Servers and Desktops)
• DeltaV Hardware and Troubleshooting
• Implementing and Supporting MS Win XP
Professional
• DeltaV Implementation I
• DeltaV Systems Administration XP/Server 2003
• Fieldbus Systems and Devices
• Power and Grounding Training
• Tropical – Basic Offshore Safety Induction and
Emergency Training (OPITO Approved)
• Mechatronics Servicing National Certification
• Electrical Engineer Philippines LIC #0039930
Expertise
• DeltaV Controller Level 2 Specialist
• DeltaV SIS Associate Engineer
• DeltaV Upgrade Engineer
• Knowledgeable in Process Control Configuration
Design for PLC and DCS (DeltaV)
• Have a good working knowledge of Fieldbus and
HART Device protocols
• Have a good working knowledge of AMS Device
Manager
• Have a good working knowledge of DeltaV Batch
• Knowledgeable in Computer Programming using
Visual Basic (VB)
• Basic and Advance Electric and Electronic Circuit
Design
• Proficient in Computer Aided Designs (AutoCAD,
OrCAD)
• Proficient in troubleshooting and installation of
various Microsoft Operating Systems and other
Microsoft Applications
• Knowledgeable in Electrical System Design and
Layout
• Knowledgeable in Electrical Machine Designs
• Multilingual: Filipino, English
Contact Information
Office: Darwin.Marcelino@Emerson.com
Personal: DMarcelino1@Yahoo.com
Skype: Darwin.Marcelino3
Mobile: +1 (508) 851-5126

More Related Content

What's hot

Validation Test_Engineer2
Validation Test_Engineer2Validation Test_Engineer2
Validation Test_Engineer2Nathaniel Jarpa
 
Daniel Suddarth 2015 editing
Daniel Suddarth 2015 editingDaniel Suddarth 2015 editing
Daniel Suddarth 2015 editingDaniel Suddarth
 
Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plandeanhofer
 
Jordan_Deese_IT resume_2JAN17
Jordan_Deese_IT resume_2JAN17Jordan_Deese_IT resume_2JAN17
Jordan_Deese_IT resume_2JAN17Jordan Deese
 
Millers_Jason_Resume
Millers_Jason_ResumeMillers_Jason_Resume
Millers_Jason_Resumejason millers
 
Ceps departmental environment
Ceps departmental environmentCeps departmental environment
Ceps departmental environmentcepsuclan
 
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testing
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_TestingPriyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testing
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testingpriyanka sharma
 
The semantic web an inside look at the creation of control loop foundation
The semantic web   an inside look at the creation of control loop foundationThe semantic web   an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundationEmerson Exchange
 
Resume-E-M 2015
Resume-E-M 2015Resume-E-M 2015
Resume-E-M 2015Jun Lin
 
adams sam FINAL (1)
adams sam FINAL (1)adams sam FINAL (1)
adams sam FINAL (1)Samuel Adams
 
Introduction to software Enginering
Introduction to software EngineringIntroduction to software Enginering
Introduction to software Engineringaswin sathish
 

What's hot (20)

Kumaran Murugesan CV
Kumaran Murugesan CVKumaran Murugesan CV
Kumaran Murugesan CV
 
Validation Test_Engineer2
Validation Test_Engineer2Validation Test_Engineer2
Validation Test_Engineer2
 
ResRAM2016
ResRAM2016ResRAM2016
ResRAM2016
 
Daniel Suddarth 2015 editing
Daniel Suddarth 2015 editingDaniel Suddarth 2015 editing
Daniel Suddarth 2015 editing
 
Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plan
 
Adrian Alexandar - 2015
Adrian Alexandar - 2015Adrian Alexandar - 2015
Adrian Alexandar - 2015
 
Blensky_Mintor
Blensky_MintorBlensky_Mintor
Blensky_Mintor
 
Jordan_Deese_IT resume_2JAN17
Jordan_Deese_IT resume_2JAN17Jordan_Deese_IT resume_2JAN17
Jordan_Deese_IT resume_2JAN17
 
Pankaj Singh_CV
Pankaj Singh_CVPankaj Singh_CV
Pankaj Singh_CV
 
Millers_Jason_Resume
Millers_Jason_ResumeMillers_Jason_Resume
Millers_Jason_Resume
 
Ceps departmental environment
Ceps departmental environmentCeps departmental environment
Ceps departmental environment
 
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testing
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_TestingPriyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testing
Priyanka_Sharma_6yr_UNIX_SQL_Prod_Support_Testing
 
The semantic web an inside look at the creation of control loop foundation
The semantic web   an inside look at the creation of control loop foundationThe semantic web   an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundation
 
Donald L James Jr
Donald L James JrDonald L James Jr
Donald L James Jr
 
Bharath hr
Bharath hrBharath hr
Bharath hr
 
Resume
ResumeResume
Resume
 
Resume-E-M 2015
Resume-E-M 2015Resume-E-M 2015
Resume-E-M 2015
 
HarryResume2016
HarryResume2016HarryResume2016
HarryResume2016
 
adams sam FINAL (1)
adams sam FINAL (1)adams sam FINAL (1)
adams sam FINAL (1)
 
Introduction to software Enginering
Introduction to software EngineringIntroduction to software Enginering
Introduction to software Enginering
 

Similar to Marcelino-Darwin-M

Similar to Marcelino-Darwin-M (20)

Gregg C Sanchez3
Gregg C Sanchez3Gregg C Sanchez3
Gregg C Sanchez3
 
Windows System Administrator
Windows System AdministratorWindows System Administrator
Windows System Administrator
 
Gilbert_Benitez_Jr
Gilbert_Benitez_JrGilbert_Benitez_Jr
Gilbert_Benitez_Jr
 
Mitchell_Resume
Mitchell_ResumeMitchell_Resume
Mitchell_Resume
 
Sar
SarSar
Sar
 
01-15a
01-15a01-15a
01-15a
 
CarolAragonResume
CarolAragonResumeCarolAragonResume
CarolAragonResume
 
Resume_Merry Nguyen_Sept2015
Resume_Merry Nguyen_Sept2015Resume_Merry Nguyen_Sept2015
Resume_Merry Nguyen_Sept2015
 
Updated_2016_IT_20
Updated_2016_IT_20Updated_2016_IT_20
Updated_2016_IT_20
 
Jagan
JaganJagan
Jagan
 
SteveStaabsresumer2
SteveStaabsresumer2SteveStaabsresumer2
SteveStaabsresumer2
 
Rheanna Thomas Resume
Rheanna Thomas ResumeRheanna Thomas Resume
Rheanna Thomas Resume
 
KevinHigginsonResume
KevinHigginsonResumeKevinHigginsonResume
KevinHigginsonResume
 
GaryWBlack_Apr2015
GaryWBlack_Apr2015GaryWBlack_Apr2015
GaryWBlack_Apr2015
 
EDWARD MURPHY CB Resume 04-22-16
EDWARD MURPHY  CB Resume 04-22-16EDWARD MURPHY  CB Resume 04-22-16
EDWARD MURPHY CB Resume 04-22-16
 
Kevin Sherrard resume
Kevin Sherrard resumeKevin Sherrard resume
Kevin Sherrard resume
 
Faisal Mukhtar CV
Faisal Mukhtar CVFaisal Mukhtar CV
Faisal Mukhtar CV
 
CV_VishalSarode
CV_VishalSarodeCV_VishalSarode
CV_VishalSarode
 
Peter Allen Resume
Peter Allen ResumePeter Allen Resume
Peter Allen Resume
 
Robert's_Pega_resume_11_14_16
Robert's_Pega_resume_11_14_16Robert's_Pega_resume_11_14_16
Robert's_Pega_resume_11_14_16
 

Marcelino-Darwin-M

  • 1. Marcelino, Darwin Matanguihan EMERSON MARCH 2008 - PRESENT Automation Engineer PASIG CITY, PHILIPPINES MARCH 2008 - PRESENT • Recognized as a product specialist in the following areas: DeltaV Controller, SIS, and upgrade • Provides root cause failure analysis and recommendation options to resolve the issue reported as promptly as possible, considering all possible effects of such especially for running installations • Completes Knowledge Based Articles (KBA) explaining issues reported and observed for critical, high severity, outstanding and/or new concerns regarding DeltaV Controller concerns • Accesses new concerns and files incident reports for the continuous improvement of DeltaV products and components • Troubleshoots and resolves issues regarding FAT and SAT for concerns raised by Field Service Offices (FSO) and/or Local Business Partners (LBP) • Troubleshoots and resolves issues in other product specialization areas that may involve graphic picture files changes, Visual Basic (VBA) coding, database files analysis, control strategy configuration recommendations, I/O cards and controller hardware condition assessment • Provides coaching to other members of the team Product Engineer EMERSON PROCESS MANAGEMENT, LEICESTER, UNITED KINGDOM AUGUST2014 – PRESENT • Responsible for owning, investigating, and resolving actions assigned for ongoing calls for proper escalation and faster resolution. • Involved in numerous AdvancedServices projects such as Upgrade Evaluation and Qualification reports and Upgrade Implementations on various sites. Resident Engineer GENENTECH, CALIFORNIA, US JUNE 2013 – DECEMBER 2013 • Involved in the upgrade staging and implementation of Genentech’s Development, Validation, and Production systems. • Provides post upgrade support for DeltaV Issues for systems integrated with Batch Executive Redundancy, PI-based historical data collection, and Syncade. NEW ENGLAND CONTROLS (NEC), MASSACHUSETTS, US JANUARY 2012-DECEMBER 2012 • Developed and implemented product/system configuration changes at site to meet customer requirements involving site visits to conduct surveys, gather relevant data, or apply software solutions and workarounds where the customer does not have that capability. • Involved in site assessment surveys & reporting, in-house upgrade testing, upgrade execution planning, and site implementation. • DeltaV system Health Check visits (PM) to customer sites. • Set up the local office facilities and be prepared to perform testing and simulation in relation to customer product issues, upgrade or product migration QATAR GAS 3 & 4 (TRAINS 6 & 7), RAS LAFFAN INDUSTRIAL CITY, QATAR MARCH 2010 – OCT 2010 • Troubleshot and resolved issues raised by customers, and FSO’s alike that may involve graphic picture files changes, Visual Basic (VBA) coding, database files analysis, control strategy configuration recommendations, I/O cards and controller hardware condition assessment • Reviewed control module configuration based on control narrative and Implement on-line or off-line changes in control module configuration as needed • Installed latest DeltaV software solutions and Microsoft Security Updates on new machines that were added • Performed preventive maintenance on the DeltaV system by doing regular database backups and updates of anti-virus definitions. Performed preventive maintenance on DeltaV controllers installed by collecting and interpreting information such as telnet logs, runtime recorder,
  • 2. alarms and events, and other diagnostic parameter as needed CALIFORNIA ENERGY-CASECNAN WATER AND ENERGY COMPANY, INC. APRIL 2006 – JANUARY 2008 Electrical Technician NUEVA ECIJA, PHILIPPINES MAY 2007 – JAN 2008 • Spearheaded the reprogramming and reviewing of the activities listed in the company’s Computerized Maintenance Management System (CMMS) • Assisted in installation of all types of electrical plant and equipment, when required, to high standards and to specifications • Performed billing meter readings and reports corresponding to these readings together with representatives from National Irrigation Authority and National Transmission Company • Assisted in performing Plant Capacity Test together with representatives from National Irrigation Authority and National Transmission Company. • Performed corrective maintenance on one of the water cooled, oil heat exchanges for a 75MW unit generator • Led a team to perform corrective maintenance on the emergency lighting on the shaft bar, from the power house leading to the switchyard of the plant. • Performed troubleshooting and corrective maintenance on perimeter and in-house auxiliary lightings of the plant. Emerson Location • Emerson – Pasig City, Philippines Office Education • Bachelor of Science, Electrical Engineering, University of the Philippines Los Baños, Laguna, Philippines Certifications • SIS Associate • Lifecycle Services – Guardian • DeltaV Field Service • DeltaV SIS Implementation • Dell Tech Direct Certified (Servers and Desktops) • DeltaV Hardware and Troubleshooting • Implementing and Supporting MS Win XP Professional • DeltaV Implementation I • DeltaV Systems Administration XP/Server 2003 • Fieldbus Systems and Devices • Power and Grounding Training • Tropical – Basic Offshore Safety Induction and Emergency Training (OPITO Approved) • Mechatronics Servicing National Certification • Electrical Engineer Philippines LIC #0039930 Expertise • DeltaV Controller Level 2 Specialist • DeltaV SIS Associate Engineer • DeltaV Upgrade Engineer • Knowledgeable in Process Control Configuration Design for PLC and DCS (DeltaV) • Have a good working knowledge of Fieldbus and HART Device protocols • Have a good working knowledge of AMS Device Manager • Have a good working knowledge of DeltaV Batch • Knowledgeable in Computer Programming using Visual Basic (VB) • Basic and Advance Electric and Electronic Circuit Design • Proficient in Computer Aided Designs (AutoCAD, OrCAD) • Proficient in troubleshooting and installation of various Microsoft Operating Systems and other Microsoft Applications • Knowledgeable in Electrical System Design and Layout • Knowledgeable in Electrical Machine Designs • Multilingual: Filipino, English Contact Information Office: Darwin.Marcelino@Emerson.com Personal: DMarcelino1@Yahoo.com Skype: Darwin.Marcelino3 Mobile: +1 (508) 851-5126