9. 5 Layered Thinking = Not Easy
• 21 Reasons Noah’s Worldwide Flood Never
Happened by Dr. Lorence Collins.
• AiG response with Dr. Andrew Snelling, a
geologist (youtube video).
• Response to AiG and youtube comments by Dr.
Lorence Collins.
• YEC vs OEC vs Theological Readings (Walton)
• Pray & Identify strong/weak evidence.
10.
11.
12.
13.
14.
15.
16.
17.
18. • 26 years
• 7.5 miles deep
• Scientists surprised to find = water
19. • 250-350 miles below the Earth’s crust
• Maybe up to 620 miles, “water” not liquid FYI
• Scientists estimate 1.5% the weight of planet
31. FALSETurkish Commission says ‘it’s a
FALSEThere is lots of petrified wood
FALSEThere are ‘ship’s ribs’ showing
FALSEMetal artefacts have been proved
by lab
FALSETurkish scientists found metal rods
FALSELab tests show petrified laminated
wood
FALSEThere is a regular metallic pattern
FALSERadar shows man-made (boat)
structure
True/False?The Main Claims at a Glance
32. OT 500 - Survey
Pastor Corey J. McLaughlin
M.A.N.T., M.A.T.H.
Lesson 4-5: Gen. 6-50