CaseStudy




 Improvement of layout in a company
 belonging to the automotive sector
   Many of FeedBackGround’s powerful and important
   experiences in layout improvement have been acquired in the
   automotive sector. Day-to-day activity does not always allow the
   spatial needs of each element in the plant to be analyzed in-
   depth. Furthermore, the paradigms inherited over the years
   hinder the emergence of new ideas. In most cases, internal
   personnel are unable to devote attention to this matter or do not
   have an overall vision. Below we describe a particular case
   successfully solved.



 Executive Summary                                              Strategy/Approach
  Our client wished to extend its portfolio of products        FeedBackGround’s contribution to this project was as
   with the acquisition of new machinery                        follows:

  This made it necessary to redesign a sufficiently             To conduct a casuistical analysis of the plant in a
                                                                  week
   large section of the plant
                                                                 To draw up, compare and discuss layout and
  The client took this as the opportunity to redesign
                                                                  logistical flow proposals and solutions
   the entire layout of the plant in order to optimize
   efficiency                                                    To evaluate and select solutions to enable
                                                                  improved performance to be achieved
  Given the nature of the product, the flow of raw
   material and finished product was of prime                    To plan introduction of solutions in detail and reach
   importance                                                     agreement on the plan with all those involved
  The impossibility of expansion on the industrial              To determine the costs and resources associated
   estate had restricted plant space to a critical                with the plan
   extent.
                                                                 To supervise assembly of the new machinery and
                                                                  the redistribution of existing elements



 Opportunity                                                    Results
  This was the key moment at which to rethink the               Project lasting for 3 months with the participation of
   layout of the plant, both for the present and the              one part-time consultant and occasional support
   future                                                         from a project Director

  The training and experience of management                     New machinery put in place with optimization of
   personnel were optimum for achieving the best                  available space
   results
                                                                 Improvement in flow of goods has reduced
  Internal friction and unhelpful company culture made           stoppages on the line caused by lack of material
   it difficult to achieve the best results in the absence of     supply
   an important project to justify significant changes in
   the company                                                     Redistribution was carried out on schedule and
                                                                    errors averted, thereby obviating the need to
  It was advisable to study the company to determine
                                                                    repeat work againThe opportunity was taken to lay
   how it was run and decide on the best new layout
                                                                    the foundations for teamwork among
  Clear possibility of improvement existed (with return            management personnel
   on investment) in the short-term




Contact name: Màrius Mollà
Position: Partner and Director of Projects
marius.molla@feedbackground.com                                                    Customer experience – Sept. 2012
Telephone:+34 619762870                                                                 www.feedbackground.com

More Related Content

What's hot

Agile Project Manager
Agile Project ManagerAgile Project Manager
Agile Project ManagerYogesh Hubli
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industryharikrishnanjl
 
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resumeresume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resumeH K Sharma
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims studentmrgauravkhadse
 
Goodwin, John EXPANDED RESUME
Goodwin, John EXPANDED RESUMEGoodwin, John EXPANDED RESUME
Goodwin, John EXPANDED RESUMEJohn Goodwin
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering Dilawar Abbas
 

What's hot (7)

Agile Project Manager
Agile Project ManagerAgile Project Manager
Agile Project Manager
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industry
 
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resumeresume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
resume_Hiranya_resume-plus-visual-resume_resume-plus-visual-resume
 
Bpr Case Study
Bpr Case StudyBpr Case Study
Bpr Case Study
 
Bpr case study by sims student
Bpr case study by sims studentBpr case study by sims student
Bpr case study by sims student
 
Goodwin, John EXPANDED RESUME
Goodwin, John EXPANDED RESUMEGoodwin, John EXPANDED RESUME
Goodwin, John EXPANDED RESUME
 
Business Process Re-Engineering
Business Process Re-Engineering Business Process Re-Engineering
Business Process Re-Engineering
 

Viewers also liked (19)

Documento atividades desenvolvidas 2.29
Documento atividades desenvolvidas 2.29Documento atividades desenvolvidas 2.29
Documento atividades desenvolvidas 2.29
 
Você sabia que...
Você sabia que...Você sabia que...
Você sabia que...
 
Noa guanya el certamen
Noa guanya el certamen Noa guanya el certamen
Noa guanya el certamen
 
Base participante
Base participanteBase participante
Base participante
 
Documento 3 conclusão
Documento 3 conclusãoDocumento 3 conclusão
Documento 3 conclusão
 
Activities laguna lang co
Activities   laguna lang coActivities   laguna lang co
Activities laguna lang co
 
Tax Strategies for 2013
Tax Strategies for 2013Tax Strategies for 2013
Tax Strategies for 2013
 
12
1212
12
 
Hasil uca 3 wilayah 017 bali - kongres advokat indonesia - copy (9)
Hasil uca 3 wilayah 017   bali - kongres advokat indonesia - copy (9)Hasil uca 3 wilayah 017   bali - kongres advokat indonesia - copy (9)
Hasil uca 3 wilayah 017 bali - kongres advokat indonesia - copy (9)
 
Documento atividades desenvolvidas 2.7
Documento atividades desenvolvidas 2.7Documento atividades desenvolvidas 2.7
Documento atividades desenvolvidas 2.7
 
Medan land survey jasa pemetaan medan
Medan land survey   jasa pemetaan medanMedan land survey   jasa pemetaan medan
Medan land survey jasa pemetaan medan
 
Documento 5 assinatura e carimbo
Documento 5 assinatura e carimboDocumento 5 assinatura e carimbo
Documento 5 assinatura e carimbo
 
S VOYLES4
S VOYLES4S VOYLES4
S VOYLES4
 
New Microsoft Word Document
New Microsoft Word DocumentNew Microsoft Word Document
New Microsoft Word Document
 
Forces and their effects
Forces and their effectsForces and their effects
Forces and their effects
 
Microbes
MicrobesMicrobes
Microbes
 
Mapa productivo
Mapa productivoMapa productivo
Mapa productivo
 
S VOYLES 2
S VOYLES 2S VOYLES 2
S VOYLES 2
 
10 oracione se
10 oracione se10 oracione se
10 oracione se
 

Similar to Cs 6 fbg - layout automotive - rev 2

Cs 1 fbg - operational processes jewellery - rev2
Cs 1  fbg - operational processes jewellery - rev2Cs 1  fbg - operational processes jewellery - rev2
Cs 1 fbg - operational processes jewellery - rev2Cesc Alcaraz
 
Cs 1 fbg - operational processes jewellery - rev2
Cs 1  fbg - operational processes jewellery - rev2Cs 1  fbg - operational processes jewellery - rev2
Cs 1 fbg - operational processes jewellery - rev2Cesc Alcaraz
 
Smarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of ViewSmarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of ViewDerek Newton
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An IntroductionVipen Mahajan
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo06
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newNoahliamwilliam
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) neweshwaryyyy
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo06
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017eshwaryyyy
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Noahliamwilliam
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newindi7257
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017shyaminfo00
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...Djadja Sardjana
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017indi7257
 

Similar to Cs 6 fbg - layout automotive - rev 2 (20)

Cs 1 fbg - operational processes jewellery - rev2
Cs 1  fbg - operational processes jewellery - rev2Cs 1  fbg - operational processes jewellery - rev2
Cs 1 fbg - operational processes jewellery - rev2
 
Cs 1 fbg - operational processes jewellery - rev2
Cs 1  fbg - operational processes jewellery - rev2Cs 1  fbg - operational processes jewellery - rev2
Cs 1 fbg - operational processes jewellery - rev2
 
Smarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of ViewSmarter Oil and Gas - IBM Rational Point of View
Smarter Oil and Gas - IBM Rational Point of View
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Stanford apm ashish v0.1
Stanford apm   ashish v0.1Stanford apm   ashish v0.1
Stanford apm ashish v0.1
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An Introduction
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
IMT Lecture:Creating Project Plans To Focus Product Development.Mm Biztel 13 ...
 
project updated 1
project updated 1project updated 1
project updated 1
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017
 

More from Cesc Alcaraz

Feedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remotoFeedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remotoCesc Alcaraz
 
Fbg 2019 025 IT Business description
Fbg  2019 025 IT Business descriptionFbg  2019 025 IT Business description
Fbg 2019 025 IT Business descriptionCesc Alcaraz
 
Fbg 2017 07 presentacio automocio-angles
Fbg   2017 07 presentacio automocio-anglesFbg   2017 07 presentacio automocio-angles
Fbg 2017 07 presentacio automocio-anglesCesc Alcaraz
 
Fbg mentoring automocio-v4
Fbg mentoring automocio-v4Fbg mentoring automocio-v4
Fbg mentoring automocio-v4Cesc Alcaraz
 
Project management per empreses industrials
Project management per empreses industrialsProject management per empreses industrials
Project management per empreses industrialsCesc Alcaraz
 
Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02Cesc Alcaraz
 
Portfolio serveis auto_2016
Portfolio serveis auto_2016Portfolio serveis auto_2016
Portfolio serveis auto_2016Cesc Alcaraz
 
Coach operatiu ind
Coach operatiu indCoach operatiu ind
Coach operatiu indCesc Alcaraz
 
Solución sostenible
Solución sostenibleSolución sostenible
Solución sostenibleCesc Alcaraz
 
Cs 10 fbg - pop - rev 0
Cs 10   fbg - pop - rev 0Cs 10   fbg - pop - rev 0
Cs 10 fbg - pop - rev 0Cesc Alcaraz
 
Cs 10 fbg - sistema operatiu
Cs 10   fbg - sistema operatiuCs 10   fbg - sistema operatiu
Cs 10 fbg - sistema operatiuCesc Alcaraz
 
Sist operativo pop_v1
Sist operativo pop_v1Sist operativo pop_v1
Sist operativo pop_v1Cesc Alcaraz
 
Automatización de procesos con Filemaker
Automatización de procesos con FilemakerAutomatización de procesos con Filemaker
Automatización de procesos con FilemakerCesc Alcaraz
 
Primer estudi processos 201504
Primer estudi processos 201504Primer estudi processos 201504
Primer estudi processos 201504Cesc Alcaraz
 
Integrated reporting v0
Integrated reporting v0Integrated reporting v0
Integrated reporting v0Cesc Alcaraz
 
el fridom slideshare
el fridom slideshareel fridom slideshare
el fridom slideshareCesc Alcaraz
 
Solución Lean lay-out
Solución Lean lay-outSolución Lean lay-out
Solución Lean lay-outCesc Alcaraz
 
Proyectos Automoción
Proyectos AutomociónProyectos Automoción
Proyectos AutomociónCesc Alcaraz
 
Fridom invitacio 1
Fridom invitacio 1Fridom invitacio 1
Fridom invitacio 1Cesc Alcaraz
 

More from Cesc Alcaraz (20)

Feedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remotoFeedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remoto
 
Fbg 2019 025 IT Business description
Fbg  2019 025 IT Business descriptionFbg  2019 025 IT Business description
Fbg 2019 025 IT Business description
 
Fbg 2017 07 presentacio automocio-angles
Fbg   2017 07 presentacio automocio-anglesFbg   2017 07 presentacio automocio-angles
Fbg 2017 07 presentacio automocio-angles
 
Fbg mentoring automocio-v4
Fbg mentoring automocio-v4Fbg mentoring automocio-v4
Fbg mentoring automocio-v4
 
Project management per empreses industrials
Project management per empreses industrialsProject management per empreses industrials
Project management per empreses industrials
 
Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02
 
Portfolio serveis auto_2016
Portfolio serveis auto_2016Portfolio serveis auto_2016
Portfolio serveis auto_2016
 
Coach operatiu ind
Coach operatiu indCoach operatiu ind
Coach operatiu ind
 
Solución sostenible
Solución sostenibleSolución sostenible
Solución sostenible
 
Cs 10 fbg - pop - rev 0
Cs 10   fbg - pop - rev 0Cs 10   fbg - pop - rev 0
Cs 10 fbg - pop - rev 0
 
Cs 10 fbg - sistema operatiu
Cs 10   fbg - sistema operatiuCs 10   fbg - sistema operatiu
Cs 10 fbg - sistema operatiu
 
Sist operativo pop_v1
Sist operativo pop_v1Sist operativo pop_v1
Sist operativo pop_v1
 
Automatización de procesos con Filemaker
Automatización de procesos con FilemakerAutomatización de procesos con Filemaker
Automatización de procesos con Filemaker
 
Primer estudi processos 201504
Primer estudi processos 201504Primer estudi processos 201504
Primer estudi processos 201504
 
Integrated reporting v0
Integrated reporting v0Integrated reporting v0
Integrated reporting v0
 
el fridom slideshare
el fridom slideshareel fridom slideshare
el fridom slideshare
 
Solución Lean lay-out
Solución Lean lay-outSolución Lean lay-out
Solución Lean lay-out
 
Proyectos Automoción
Proyectos AutomociónProyectos Automoción
Proyectos Automoción
 
Fridom invitacio 1
Fridom invitacio 1Fridom invitacio 1
Fridom invitacio 1
 
Proceso postventa
Proceso postventaProceso postventa
Proceso postventa
 

Cs 6 fbg - layout automotive - rev 2

  • 1. CaseStudy Improvement of layout in a company belonging to the automotive sector Many of FeedBackGround’s powerful and important experiences in layout improvement have been acquired in the automotive sector. Day-to-day activity does not always allow the spatial needs of each element in the plant to be analyzed in- depth. Furthermore, the paradigms inherited over the years hinder the emergence of new ideas. In most cases, internal personnel are unable to devote attention to this matter or do not have an overall vision. Below we describe a particular case successfully solved. Executive Summary Strategy/Approach  Our client wished to extend its portfolio of products FeedBackGround’s contribution to this project was as with the acquisition of new machinery follows:  This made it necessary to redesign a sufficiently  To conduct a casuistical analysis of the plant in a week large section of the plant  To draw up, compare and discuss layout and  The client took this as the opportunity to redesign logistical flow proposals and solutions the entire layout of the plant in order to optimize efficiency  To evaluate and select solutions to enable improved performance to be achieved  Given the nature of the product, the flow of raw material and finished product was of prime  To plan introduction of solutions in detail and reach importance agreement on the plan with all those involved  The impossibility of expansion on the industrial  To determine the costs and resources associated estate had restricted plant space to a critical with the plan extent.  To supervise assembly of the new machinery and the redistribution of existing elements Opportunity Results  This was the key moment at which to rethink the  Project lasting for 3 months with the participation of layout of the plant, both for the present and the one part-time consultant and occasional support future from a project Director  The training and experience of management  New machinery put in place with optimization of personnel were optimum for achieving the best available space results  Improvement in flow of goods has reduced  Internal friction and unhelpful company culture made stoppages on the line caused by lack of material it difficult to achieve the best results in the absence of supply an important project to justify significant changes in the company  Redistribution was carried out on schedule and errors averted, thereby obviating the need to  It was advisable to study the company to determine repeat work againThe opportunity was taken to lay how it was run and decide on the best new layout the foundations for teamwork among  Clear possibility of improvement existed (with return management personnel on investment) in the short-term Contact name: Màrius Mollà Position: Partner and Director of Projects marius.molla@feedbackground.com Customer experience – Sept. 2012 Telephone:+34 619762870 www.feedbackground.com