SlideShare a Scribd company logo
1 of 1
Download to read offline
Case Study




 Improvement of operational
 processes in a company belonging
 to the jewellery sector
   FeedBackGround’s       most     powerful  and     important
   experiences in the jewellery sector have been acquired in
   the field of operations. It is common for companies with
   many references to have a certain degree of
   craftsmanship in their work processes, as well as using raw
   material of great value, which occasion stoppages and
   bottlenecks that lead to inefficiency and financial
   problems. Below we describe a specifically successful case.




 Executive Summary                                             Strategy/Approach
  Our client had an almost full order book that it was        Feedbackground’s contribution to this project was as
   unable to address thoroughly and productively               follows:
                                                                Define the bottlenecks and consider solutions for
  Constant occurrence of stock outs                              increasing capacity
  Despite the high number of orders to be fulfilled,           Achieve a more balanced production planning
   there was considerable financial stress                       and set priorities

  The quality of the items was high, although was not          Measures to reduce the incidences of quality
   constant throughout all the process. In many cases,
                                                                Reduction in the size of batches, stocks and cycle
   it depended on people
                                                                 times
  Although the computer system was powerful, it was            Undertake action at points causing drops in profit
   not being used to its full potential                          margins
  There was obviously a lack of discipline and rigor in        Points of overall improvement
   the execution of improvements
                                                                Develop a computer program to control production
                                                                 in real time



 Opportunity                                                   Results
  It was clear that the time was just right for overhauling    Full time project lasting 6 months with the
   the whole production process, and our client was fully        participation of a senior and a junior consultant
   aware of the fact
                                                                Production was increased by 18 % in just a few
  Attractive quick wins were envisaged simply by                weeks
   applying certain lean and TOC techniques
                                                                Bottlenecks were controlled with only minimum
  The need to set up a program for the transfer of              investment by the client
   knowledge from seniors to juniors was also clear, in
                                                                The financial situation improved after only 3 months
   order to ensure the continuation of complicated tasks
                                                                 thanks to the rationalization of stocks
  It was necessary to optimize the whole process to
                                                                Initiation of the cultural change for the sustainability
   ensure the economic and financial viability of the
                                                                 of new processes
   company
                                                                The customer accepted a fixed estimate plus a
  Clear possibilities existed for leadership in certain
                                                                 variable. Everyone has benefitted!
   markets



Contact name: Màrius Mollà
Position: Partner and Director of Projects
marius.molla@feedbackground.com                                                     Customer Experience – July 2012
Telephone: +34 619762870                                                                www.feedbackground.com

More Related Content

What's hot

Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016
SAMARTH_KUMAR2002
 
7 steps to world class manufacturing
7 steps to world class manufacturing7 steps to world class manufacturing
7 steps to world class manufacturing
Navneet Sharma
 
Built a CADIS center of excellence and reduced time to market for a UK based ...
Built a CADIS center of excellence and reduced time to market for a UK based ...Built a CADIS center of excellence and reduced time to market for a UK based ...
Built a CADIS center of excellence and reduced time to market for a UK based ...
Mindtree Ltd.
 
Scott Moore relevant accomplishments bio
Scott Moore relevant accomplishments bioScott Moore relevant accomplishments bio
Scott Moore relevant accomplishments bio
Scott Moore
 
Ev+agile=success (final v2)
Ev+agile=success (final v2)Ev+agile=success (final v2)
Ev+agile=success (final v2)
Glen Alleman
 
RGP--NPI Case Study July 2016
RGP--NPI Case Study July 2016RGP--NPI Case Study July 2016
RGP--NPI Case Study July 2016
Robert Galloway
 

What's hot (19)

CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3CMMI & PMBOK & OPM3
CMMI & PMBOK & OPM3
 
Cmmi 2.0 deployment case study
Cmmi 2.0 deployment case studyCmmi 2.0 deployment case study
Cmmi 2.0 deployment case study
 
Case Studies2
Case Studies2Case Studies2
Case Studies2
 
Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016Samarth_Kumar_Resume_Jul_2016
Samarth_Kumar_Resume_Jul_2016
 
Project management - key concepts
Project management - key concepts Project management - key concepts
Project management - key concepts
 
Productive community services releasing time to care
Productive community services   releasing time to careProductive community services   releasing time to care
Productive community services releasing time to care
 
Aspiring Entrepreneurs Transform your Business in 2 Steps - STEP 2 Creating a...
Aspiring Entrepreneurs Transform your Business in 2 Steps - STEP 2 Creating a...Aspiring Entrepreneurs Transform your Business in 2 Steps - STEP 2 Creating a...
Aspiring Entrepreneurs Transform your Business in 2 Steps - STEP 2 Creating a...
 
7 steps to world class manufacturing
7 steps to world class manufacturing7 steps to world class manufacturing
7 steps to world class manufacturing
 
Sustaining lean process improvement
Sustaining lean process improvementSustaining lean process improvement
Sustaining lean process improvement
 
Cv april 2016
Cv april 2016Cv april 2016
Cv april 2016
 
Benefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paperBenefits-led decision making drives value maximisation white paper
Benefits-led decision making drives value maximisation white paper
 
Process FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by TetrahedronProcess FMEA 2-Day Workshop by Tetrahedron
Process FMEA 2-Day Workshop by Tetrahedron
 
Built a CADIS center of excellence and reduced time to market for a UK based ...
Built a CADIS center of excellence and reduced time to market for a UK based ...Built a CADIS center of excellence and reduced time to market for a UK based ...
Built a CADIS center of excellence and reduced time to market for a UK based ...
 
Continuous Improvement techniques
Continuous Improvement techniquesContinuous Improvement techniques
Continuous Improvement techniques
 
Mindtree risk based testing offerings.
Mindtree risk based testing offerings.Mindtree risk based testing offerings.
Mindtree risk based testing offerings.
 
Scott Moore relevant accomplishments bio
Scott Moore relevant accomplishments bioScott Moore relevant accomplishments bio
Scott Moore relevant accomplishments bio
 
Cost estimating and risk in complex projects
Cost estimating and risk in complex projectsCost estimating and risk in complex projects
Cost estimating and risk in complex projects
 
Ev+agile=success (final v2)
Ev+agile=success (final v2)Ev+agile=success (final v2)
Ev+agile=success (final v2)
 
RGP--NPI Case Study July 2016
RGP--NPI Case Study July 2016RGP--NPI Case Study July 2016
RGP--NPI Case Study July 2016
 

Viewers also liked (8)

Portfolio serveis auto_2016
Portfolio serveis auto_2016Portfolio serveis auto_2016
Portfolio serveis auto_2016
 
Sist operativo pop_v1
Sist operativo pop_v1Sist operativo pop_v1
Sist operativo pop_v1
 
Google Partners - Certification Search Ronald Jackson
Google Partners - Certification Search Ronald JacksonGoogle Partners - Certification Search Ronald Jackson
Google Partners - Certification Search Ronald Jackson
 
ITIL_Certificate
ITIL_CertificateITIL_Certificate
ITIL_Certificate
 
Spohn Curriculum Vitae IV
Spohn Curriculum Vitae IVSpohn Curriculum Vitae IV
Spohn Curriculum Vitae IV
 
Resumen construir competencias Profordems
Resumen construir competencias ProfordemsResumen construir competencias Profordems
Resumen construir competencias Profordems
 
Pocher leaflet
Pocher leafletPocher leaflet
Pocher leaflet
 
FINAL CV JAMAL NASIR
FINAL CV JAMAL NASIRFINAL CV JAMAL NASIR
FINAL CV JAMAL NASIR
 

Similar to Cs 1 fbg - operational processes jewellery - rev2

Lean KaiKaiku
Lean KaiKaikuLean KaiKaiku
Lean KaiKaiku
Robert_
 
Banker's note - Blackstone Synergy Pitch
Banker's note - Blackstone Synergy PitchBanker's note - Blackstone Synergy Pitch
Banker's note - Blackstone Synergy Pitch
Debashish Banerjee
 
Exec Brief Rir
Exec Brief RirExec Brief Rir
Exec Brief Rir
skokoev
 
Cs 5 fbg - concurrent engineering and multifunctionality - rev1
Cs 5  fbg - concurrent engineering and multifunctionality - rev1Cs 5  fbg - concurrent engineering and multifunctionality - rev1
Cs 5 fbg - concurrent engineering and multifunctionality - rev1
Cesc Alcaraz
 
Enablers of productivity_report
Enablers of productivity_reportEnablers of productivity_report
Enablers of productivity_report
Neha_Nair
 
Campbell Nash Chemicals Industry
Campbell Nash   Chemicals IndustryCampbell Nash   Chemicals Industry
Campbell Nash Chemicals Industry
James Armstrong
 
Achieving Customer Specifications Through Process Improv.docx
Achieving Customer  Specifications Through  Process Improv.docxAchieving Customer  Specifications Through  Process Improv.docx
Achieving Customer Specifications Through Process Improv.docx
bartholomeocoombs
 

Similar to Cs 1 fbg - operational processes jewellery - rev2 (20)

Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case StudyProcess Excellence At Credit Agricole Corporate & Investment Bank Case Study
Process Excellence At Credit Agricole Corporate & Investment Bank Case Study
 
Bi kpmg
Bi kpmgBi kpmg
Bi kpmg
 
Bi kpmg
Bi kpmgBi kpmg
Bi kpmg
 
01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides
 
Lean KaiKaiku
Lean KaiKaikuLean KaiKaiku
Lean KaiKaiku
 
Untangling Product Complexity in M&A
Untangling Product Complexity in M&AUntangling Product Complexity in M&A
Untangling Product Complexity in M&A
 
Banker's note - Blackstone Synergy Pitch
Banker's note - Blackstone Synergy PitchBanker's note - Blackstone Synergy Pitch
Banker's note - Blackstone Synergy Pitch
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An Introduction
 
BD CMM
BD CMMBD CMM
BD CMM
 
Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...
Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...
Scrum_BLR 10th meet up 13 sept-2014 - The Slippery Slope from Agile to Scrum ...
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Exec Brief Rir
Exec Brief RirExec Brief Rir
Exec Brief Rir
 
Cs 5 fbg - concurrent engineering and multifunctionality - rev1
Cs 5  fbg - concurrent engineering and multifunctionality - rev1Cs 5  fbg - concurrent engineering and multifunctionality - rev1
Cs 5 fbg - concurrent engineering and multifunctionality - rev1
 
2008 Ebu Training BBC Scotland From QMD to PQ
2008 Ebu Training BBC Scotland From QMD to PQ2008 Ebu Training BBC Scotland From QMD to PQ
2008 Ebu Training BBC Scotland From QMD to PQ
 
Enablers of productivity_report
Enablers of productivity_reportEnablers of productivity_report
Enablers of productivity_report
 
Campbell Nash Chemicals Industry
Campbell Nash   Chemicals IndustryCampbell Nash   Chemicals Industry
Campbell Nash Chemicals Industry
 
Change Is Inevitable Focus Brief 11.17.10
Change Is Inevitable Focus Brief 11.17.10Change Is Inevitable Focus Brief 11.17.10
Change Is Inevitable Focus Brief 11.17.10
 
Achieving Customer Specifications Through Process Improv.docx
Achieving Customer  Specifications Through  Process Improv.docxAchieving Customer  Specifications Through  Process Improv.docx
Achieving Customer Specifications Through Process Improv.docx
 
Improving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster CloseImproving Intercompany Reconciliation for a Faster Close
Improving Intercompany Reconciliation for a Faster Close
 
Real time
Real timeReal time
Real time
 

More from Cesc Alcaraz

el fridom slideshare
el fridom slideshareel fridom slideshare
el fridom slideshare
Cesc Alcaraz
 
Fridom invitacio 1
Fridom invitacio 1Fridom invitacio 1
Fridom invitacio 1
Cesc Alcaraz
 
Cs 9 fbg - integración sistemas de gestión - rev0
Cs 9   fbg - integración sistemas de gestión - rev0Cs 9   fbg - integración sistemas de gestión - rev0
Cs 9 fbg - integración sistemas de gestión - rev0
Cesc Alcaraz
 

More from Cesc Alcaraz (20)

Feedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remotoFeedbackground porfolio servicios en remoto
Feedbackground porfolio servicios en remoto
 
Fbg 2019 025 IT Business description
Fbg  2019 025 IT Business descriptionFbg  2019 025 IT Business description
Fbg 2019 025 IT Business description
 
Fbg 2017 07 presentacio automocio-angles
Fbg   2017 07 presentacio automocio-anglesFbg   2017 07 presentacio automocio-angles
Fbg 2017 07 presentacio automocio-angles
 
Fbg mentoring automocio-v4
Fbg mentoring automocio-v4Fbg mentoring automocio-v4
Fbg mentoring automocio-v4
 
Project management per empreses industrials
Project management per empreses industrialsProject management per empreses industrials
Project management per empreses industrials
 
Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02Fbg entrevista adolf-Project Management v2 02
Fbg entrevista adolf-Project Management v2 02
 
Coach operatiu ind
Coach operatiu indCoach operatiu ind
Coach operatiu ind
 
Solución sostenible
Solución sostenibleSolución sostenible
Solución sostenible
 
Cs 10 fbg - pop - rev 0
Cs 10   fbg - pop - rev 0Cs 10   fbg - pop - rev 0
Cs 10 fbg - pop - rev 0
 
Cs 10 fbg - sistema operatiu
Cs 10   fbg - sistema operatiuCs 10   fbg - sistema operatiu
Cs 10 fbg - sistema operatiu
 
Automatización de procesos con Filemaker
Automatización de procesos con FilemakerAutomatización de procesos con Filemaker
Automatización de procesos con Filemaker
 
Primer estudi processos 201504
Primer estudi processos 201504Primer estudi processos 201504
Primer estudi processos 201504
 
Integrated reporting v0
Integrated reporting v0Integrated reporting v0
Integrated reporting v0
 
el fridom slideshare
el fridom slideshareel fridom slideshare
el fridom slideshare
 
Solución Lean lay-out
Solución Lean lay-outSolución Lean lay-out
Solución Lean lay-out
 
Proyectos Automoción
Proyectos AutomociónProyectos Automoción
Proyectos Automoción
 
Fridom invitacio 1
Fridom invitacio 1Fridom invitacio 1
Fridom invitacio 1
 
Proceso postventa
Proceso postventaProceso postventa
Proceso postventa
 
Cs 9 fbg - integració sistemes gestió - rev 0
Cs 9  fbg - integració sistemes gestió - rev 0Cs 9  fbg - integració sistemes gestió - rev 0
Cs 9 fbg - integració sistemes gestió - rev 0
 
Cs 9 fbg - integración sistemas de gestión - rev0
Cs 9   fbg - integración sistemas de gestión - rev0Cs 9   fbg - integración sistemas de gestión - rev0
Cs 9 fbg - integración sistemas de gestión - rev0
 

Cs 1 fbg - operational processes jewellery - rev2

  • 1. Case Study Improvement of operational processes in a company belonging to the jewellery sector FeedBackGround’s most powerful and important experiences in the jewellery sector have been acquired in the field of operations. It is common for companies with many references to have a certain degree of craftsmanship in their work processes, as well as using raw material of great value, which occasion stoppages and bottlenecks that lead to inefficiency and financial problems. Below we describe a specifically successful case. Executive Summary Strategy/Approach  Our client had an almost full order book that it was Feedbackground’s contribution to this project was as unable to address thoroughly and productively follows:  Define the bottlenecks and consider solutions for  Constant occurrence of stock outs increasing capacity  Despite the high number of orders to be fulfilled,  Achieve a more balanced production planning there was considerable financial stress and set priorities  The quality of the items was high, although was not  Measures to reduce the incidences of quality constant throughout all the process. In many cases,  Reduction in the size of batches, stocks and cycle it depended on people times  Although the computer system was powerful, it was  Undertake action at points causing drops in profit not being used to its full potential margins  There was obviously a lack of discipline and rigor in  Points of overall improvement the execution of improvements  Develop a computer program to control production in real time Opportunity Results  It was clear that the time was just right for overhauling  Full time project lasting 6 months with the the whole production process, and our client was fully participation of a senior and a junior consultant aware of the fact  Production was increased by 18 % in just a few  Attractive quick wins were envisaged simply by weeks applying certain lean and TOC techniques  Bottlenecks were controlled with only minimum  The need to set up a program for the transfer of investment by the client knowledge from seniors to juniors was also clear, in  The financial situation improved after only 3 months order to ensure the continuation of complicated tasks thanks to the rationalization of stocks  It was necessary to optimize the whole process to  Initiation of the cultural change for the sustainability ensure the economic and financial viability of the of new processes company  The customer accepted a fixed estimate plus a  Clear possibilities existed for leadership in certain variable. Everyone has benefitted! markets Contact name: Màrius Mollà Position: Partner and Director of Projects marius.molla@feedbackground.com Customer Experience – July 2012 Telephone: +34 619762870 www.feedbackground.com