1. Identify a disadvantage of implementing group technology in
a firm.
The number of employees required for a process increases
exponentially.
The workers must be flexible enough to run several machines
and processes.
It increases inventory.
The waiting time between operations is increased.
2. A shopkeeper purchases raw materials to manufacture
souvenirs for a local event that happens once every five years.
In this case. identify the model that the shopkeeper is most
likely to use to maintain stock.
Lot sizing model
Fixed—time period model
Fixed—order quantity model p.
Single-period model
3 Define synchronous manufacturing as stated by Goldratt's
theory.
It is a production process organized to achieve the goals of the
firm.
It is an integrated set of activities designed to achieve high
quality and high levels of production with minimal inventories
of raw materials.
It is a production process in which machines are the critical
resource used for scheduling.
It is the optimization of the rate at which cash is generated by
production through sales.
4. involves testing random samples of the end product from a
process to determine if the process is churning out items within
the predetermined range.
Organizational leaming
Statistical process control
Cyclical strategic scheduling
Event simulation
5. Utilization is the ratio between the actual amount of time a
resource is activated for and the total amount of time the
resource is available for use.
Utilization
Lead time
Service rate
Pacing
6. The manager of a shop floor schedules production based on
the equipment that are used in the process as a key resource. In
this case. the manager is most likely using a
backward scheduling
forward scheduling
machine-limited process
labor-limited process
7 Define lead time.
It is the time required to achieve high customer service with
minimum levels of inventory investment.
It is the time required to produce a variety of products typically
at lower volume levels.
It is the time required to attend to a customer order.
It is the time required to position inventory in the supply chain.
8. refers to the integrated activities designed to achieve high
quality and high levels of production with minimal inventories
of raw materials and to eliminate wastes.
The Shingo system
Kanban system
Lean production
Process mapping
9. Define preventive maintenance.
It is the grouping of similar parts and processes into a
specialized workcell.
It is the improvement that stems from both a person's
experience and the changes in equipment. product design. and
administration.
It is the periodic inspection and repair of equipment to avoid
breakdowns.
It is the emphasis of getting a product or a process right the
first time.
10. shows the relationship between the total number of units
produced and the unit production tim
A Poisson distribution
A learning curve
Cycle time
Service rate
11 Identify a true statement about services.
A service is a tangible process.
A service is inherently heterogeneous
A service has physical dimensions.
A service has very limited or no customer interaction.
12. In a the product remains in a specific location and the
equipment labor and material required for the product are
gathered to the specific location
project layout
functional layout
manufacturing cell
workcenter
13. Rachel performs an analysis in which she analyzes the
performance of the clients of her organization relative to the
expectations of the client's customers. In this scenario. Rachel
is most likely using a
Pareto analysis
gap analysis
Gantt chart
bar chart
14. is the design operation and improvement of the processes
that create and deliver a company's essential products and
services.
Inventory control
Operations and supply chain management
Product routing
Aggregate sales and operations planning
15. determines the amount of inventory, which includes parts.
components. and materials. necessary to produce a product
Break-even analysis
Dynamic programming
Material requirements planning
GAP analysis
16. Define customer order decoupling point.
It involves the analysis of current business data to better solve
business problems using mathematical calculations.
It is the time required to attend a customer order.
It is the positioning of inventory in a supply chain.
It illustrates the method by which a company's strategy is
delivered through a set of supporting activities.
17. Define waste reduction.
It is the process of combining the concept of cross-docking and
consolidation.
It is the elimination of non—value-adding activities and the
optimization of value-adding activities that are part of a
process.
It is the optimization of the rate at which cash is generated by
production through sales.
It is the integration of activities to increase the customer value
of a process.
18. Identify the true statements about the learning curve
theory.
It assumes that the unit time for a task will decrease at a
decreasing rate.
A drawback of the learning curve theory is that the
performance can be measured only in terms of time per unit.
In a learning curve. the time for task completion will increase
each time the task is undertaken.
In a learning curve the reduction in time will be unpredictable.
19. is the characteristics of a product in terms of quality that
are sorted as either conforming or nonconforming to
specification.
The capability index
A throughput rate
A learning curve
An attribute
20. Identify a true statement about an operations consulting
process.
Its results are immediately measurable.
It leads to changes in attitudes and culture of an organization.
Unlike general management consulting. operations consulting
does not require extensive interviewing of employees.
It takes a longer time than general management consulting to
yield results that can be measured.
21. Identify a true statement about water transportation mode.
It is a highly specialized mode of transport limited to the
delivery of gases-
Moving high volumes of products is costly.
It can handle a high capacity of materials.
Fast transit times can be achieved in this mode of
transportation.
22. A pharmaceutical company keeps detailed documentation
of its inventory. The company replenishes its inventory
whenever the inventory level falls below a certain limit and
there is a threat of a stockout. This company is most likely
using a model.
fixed-order quantity
fixed-time period
regression
single-period
23. According to Goldratt's definition, is the rate at which cash
is generated by production through sales.
expediting
throughput
productivity
cash flow
24. Identify an advantage of pure projects.
Team pride, motivation, and commitment are high.
Team members have authority over the project.
Organizational goals and policies are upheld.
Duplication of resources is eliminated
25. are used for decisions that are related to aggregate and
strategy demand-
Process assessments
P-models
Periodic review systems
Strategic forecasts
26. Identify a disadvantage of pure projects.
Equipment and people are not shared across projects.
A lot of time is consumed while making decisions.
Lines of communication are lengthened.
The project manager has no authority over the project.
27. is responsible for scheduling, dispatching, monitoring, and
regulating production on the shop floor.
Manufacturing execution system
P-model
ABC classification
Enterprise resource planning
28. is the average time required to finish a cycle of an
operation.
Cycle time
Lead time
Queue time
Changeover time
29. A manufacturing firm efficiently assembles an airplane by
bringing all the necessary raw materials, parts, and equipment
to a central location. This scenario illustrates a
functional layout
workcenter
manufacturing cell
project layout
30. The main objective of the aggregate operations plan is to:
achieve better integration between suppliers and
manufacturers.
minimize the cost of resources necessary to meet demand.
determine future demand with the help of past data.
keep demand and supply in balance.

More Related Content

What's hot

Lean manufacturing case study
Lean manufacturing case studyLean manufacturing case study
Lean manufacturing case studyTri Dung Nguyen
 
operation presentation
operation presentationoperation presentation
operation presentationMohamed Reda
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case studymallicknazrul
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3i4VC
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningKumar Ujjwal
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerAnirban Mazumdar
 
Chapter 7 process strategy production and operation and management
Chapter 7  process strategy production and operation and management Chapter 7  process strategy production and operation and management
Chapter 7 process strategy production and operation and management Christine Aguirre Cayanan
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsSai Praveen Chettupalli
 
what is Productivity
what is  Productivitywhat is  Productivity
what is ProductivityVishal Kachhdiya
 
FINANCIAL ACCOUNTING-Inventory
FINANCIAL ACCOUNTING-InventoryFINANCIAL ACCOUNTING-Inventory
FINANCIAL ACCOUNTING-InventoryTrinity Dwarka
 
Capacity management
Capacity managementCapacity management
Capacity managementyashodeep more
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time AnalysisAshim Roy
 

What's hot (15)

Lean manufacturing case study
Lean manufacturing case studyLean manufacturing case study
Lean manufacturing case study
 
operation presentation
operation presentationoperation presentation
operation presentation
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case study
 
Sop of ie
Sop of ieSop of ie
Sop of ie
 
Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3Tuning the planning and control system to product and process design: G3
Tuning the planning and control system to product and process design: G3
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Operational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturerOperational turnaround at auto components manufacturer
Operational turnaround at auto components manufacturer
 
Rccp report
Rccp reportRccp report
Rccp report
 
Chapter 7 process strategy production and operation and management
Chapter 7  process strategy production and operation and management Chapter 7  process strategy production and operation and management
Chapter 7 process strategy production and operation and management
 
Ppc C1
Ppc C1Ppc C1
Ppc C1
 
Capacity Planning with reference to McDonlds
Capacity Planning with reference to McDonldsCapacity Planning with reference to McDonlds
Capacity Planning with reference to McDonlds
 
what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
 
FINANCIAL ACCOUNTING-Inventory
FINANCIAL ACCOUNTING-InventoryFINANCIAL ACCOUNTING-Inventory
FINANCIAL ACCOUNTING-Inventory
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time Analysis
 

Similar to Uop ops 571 final exam guide new 2017

13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajpptdoremonlovers365
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigmaMuhammad Islam
 
CU Operations Management module 5
CU Operations Management module 5CU Operations Management module 5
CU Operations Management module 5ChathamkulamInstitut
 
Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019MRPeasy
 
Chapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docxChapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docxchristinemaritza
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsley Aduma
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptxryan gementiza
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptxryan gementiza
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3riyavidya
 
Customer Supplier chain TQM
Customer Supplier chain TQM Customer Supplier chain TQM
Customer Supplier chain TQM Jun Sollestre
 
OPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxOPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxShrajal Gupta
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto businessAjit Kumar
 
Products & processes
Products & processesProducts & processes
Products & processesEbtehalTamer1
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.commyrealit
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxMeetLalcheta
 

Similar to Uop ops 571 final exam guide new 2017 (20)

13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt13.jajajajajajajajjajajajqjajqjajqjajjaajppt
13.jajajajajajajajjajajajqjajqjajqjajjaajppt
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
 
CU Operations Management module 5
CU Operations Management module 5CU Operations Management module 5
CU Operations Management module 5
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
 
Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019
 
Chapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docxChapter 6 terms Assemble-to-orderA production environment wher.docx
Chapter 6 terms Assemble-to-orderA production environment wher.docx
 
Kingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptxKingsleys Power Point Presentation on Operations Management.pptx
Kingsleys Power Point Presentation on Operations Management.pptx
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
Resume -TARAK
Resume -TARAKResume -TARAK
Resume -TARAK
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
Customer Supplier chain TQM
Customer Supplier chain TQM Customer Supplier chain TQM
Customer Supplier chain TQM
 
OPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptxOPERATIONS MANAGEMENT_jims.pptx
OPERATIONS MANAGEMENT_jims.pptx
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Products & processes
Products & processesProducts & processes
Products & processes
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.com
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptx
 

More from Noahliamwilliam

Ash hlt 540 week 3 assignment 1 coyne and messina articles
Ash  hlt 540 week 3 assignment 1 coyne and messina articlesAsh  hlt 540 week 3 assignment 1 coyne and messina articles
Ash hlt 540 week 3 assignment 1 coyne and messina articlesNoahliamwilliam
 
V grand canyon university nrs 440 v week 3 reflection paper new
V grand canyon university nrs 440 v week 3 reflection paper newV grand canyon university nrs 440 v week 3 reflection paper new
V grand canyon university nrs 440 v week 3 reflection paper newNoahliamwilliam
 
Ash bus 308 week 5 quiz
Ash bus 308 week 5 quizAsh bus 308 week 5 quiz
Ash bus 308 week 5 quizNoahliamwilliam
 
Ash bus 308 week 4 quiz
Ash bus 308 week 4 quizAsh bus 308 week 4 quiz
Ash bus 308 week 4 quizNoahliamwilliam
 
Ash bus 308 week 2 problem set new
Ash bus 308 week 2 problem set newAsh bus 308 week 2 problem set new
Ash bus 308 week 2 problem set newNoahliamwilliam
 
Uop qnt 275 final exam guide
Uop qnt 275 final exam guideUop qnt 275 final exam guide
Uop qnt 275 final exam guideNoahliamwilliam
 
Devry mgmt 591 week 7 course project
Devry mgmt 591 week 7 course projectDevry mgmt 591 week 7 course project
Devry mgmt 591 week 7 course projectNoahliamwilliam
 
Devry mgmt 591 week 7 course project (veterinary centers of america) new
Devry mgmt 591 week 7 course project (veterinary centers of america) newDevry mgmt 591 week 7 course project (veterinary centers of america) new
Devry mgmt 591 week 7 course project (veterinary centers of america) newNoahliamwilliam
 
Devry mgmt 591 week 7 course project (marcelos care home) new
Devry mgmt 591 week 7 course project (marcelos care home) newDevry mgmt 591 week 7 course project (marcelos care home) new
Devry mgmt 591 week 7 course project (marcelos care home) newNoahliamwilliam
 
Devry mgmt 591 week 1to 7 all discussion question new
Devry mgmt 591 week 1to 7 all discussion question newDevry mgmt 591 week 1to 7 all discussion question new
Devry mgmt 591 week 1to 7 all discussion question newNoahliamwilliam
 
Devry mgmt 591 final exam guide set 2 new
Devry mgmt 591 final exam guide set 2 newDevry mgmt 591 final exam guide set 2 new
Devry mgmt 591 final exam guide set 2 newNoahliamwilliam
 
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...Noahliamwilliam
 
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...Chamberlain college of nursing nr 351 week 1 assignment time management plan ...
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...Noahliamwilliam
 
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...Noahliamwilliam
 
V grand canyon university nrs 429 v week 5 assignment clc new
V grand canyon university nrs 429 v week 5 assignment clc newV grand canyon university nrs 429 v week 5 assignment clc new
V grand canyon university nrs 429 v week 5 assignment clc newNoahliamwilliam
 
V grand canyon university nrs 429 v week 2 assignment health promotion among ...
V grand canyon university nrs 429 v week 2 assignment health promotion among ...V grand canyon university nrs 429 v week 2 assignment health promotion among ...
V grand canyon university nrs 429 v week 2 assignment health promotion among ...Noahliamwilliam
 
V grand canyon university nrs 429 v week 1 assignment vark analysis paper new
V grand canyon university nrs 429 v week 1 assignment vark analysis paper newV grand canyon university nrs 429 v week 1 assignment vark analysis paper new
V grand canyon university nrs 429 v week 1 assignment vark analysis paper newNoahliamwilliam
 
Uop qnt 561 final exam guide
Uop qnt 561 final exam guideUop qnt 561 final exam guide
Uop qnt 561 final exam guideNoahliamwilliam
 
Uop acc 547 week 4 jordan and diana diego
Uop acc 547 week 4 jordan and diana diegoUop acc 547 week 4 jordan and diana diego
Uop acc 547 week 4 jordan and diana diegoNoahliamwilliam
 
Uop acc 545 final exam guide new
Uop acc 545 final exam guide newUop acc 545 final exam guide new
Uop acc 545 final exam guide newNoahliamwilliam
 

More from Noahliamwilliam (20)

Ash hlt 540 week 3 assignment 1 coyne and messina articles
Ash  hlt 540 week 3 assignment 1 coyne and messina articlesAsh  hlt 540 week 3 assignment 1 coyne and messina articles
Ash hlt 540 week 3 assignment 1 coyne and messina articles
 
V grand canyon university nrs 440 v week 3 reflection paper new
V grand canyon university nrs 440 v week 3 reflection paper newV grand canyon university nrs 440 v week 3 reflection paper new
V grand canyon university nrs 440 v week 3 reflection paper new
 
Ash bus 308 week 5 quiz
Ash bus 308 week 5 quizAsh bus 308 week 5 quiz
Ash bus 308 week 5 quiz
 
Ash bus 308 week 4 quiz
Ash bus 308 week 4 quizAsh bus 308 week 4 quiz
Ash bus 308 week 4 quiz
 
Ash bus 308 week 2 problem set new
Ash bus 308 week 2 problem set newAsh bus 308 week 2 problem set new
Ash bus 308 week 2 problem set new
 
Uop qnt 275 final exam guide
Uop qnt 275 final exam guideUop qnt 275 final exam guide
Uop qnt 275 final exam guide
 
Devry mgmt 591 week 7 course project
Devry mgmt 591 week 7 course projectDevry mgmt 591 week 7 course project
Devry mgmt 591 week 7 course project
 
Devry mgmt 591 week 7 course project (veterinary centers of america) new
Devry mgmt 591 week 7 course project (veterinary centers of america) newDevry mgmt 591 week 7 course project (veterinary centers of america) new
Devry mgmt 591 week 7 course project (veterinary centers of america) new
 
Devry mgmt 591 week 7 course project (marcelos care home) new
Devry mgmt 591 week 7 course project (marcelos care home) newDevry mgmt 591 week 7 course project (marcelos care home) new
Devry mgmt 591 week 7 course project (marcelos care home) new
 
Devry mgmt 591 week 1to 7 all discussion question new
Devry mgmt 591 week 1to 7 all discussion question newDevry mgmt 591 week 1to 7 all discussion question new
Devry mgmt 591 week 1to 7 all discussion question new
 
Devry mgmt 591 final exam guide set 2 new
Devry mgmt 591 final exam guide set 2 newDevry mgmt 591 final exam guide set 2 new
Devry mgmt 591 final exam guide set 2 new
 
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...
Chamberlain college of nursing nr 351 week 3 assignment professional paper wo...
 
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...Chamberlain college of nursing nr 351 week 1 assignment time management plan ...
Chamberlain college of nursing nr 351 week 1 assignment time management plan ...
 
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...
V grand canyon university nrs 430 v week 3 clc nursing conceptual model prese...
 
V grand canyon university nrs 429 v week 5 assignment clc new
V grand canyon university nrs 429 v week 5 assignment clc newV grand canyon university nrs 429 v week 5 assignment clc new
V grand canyon university nrs 429 v week 5 assignment clc new
 
V grand canyon university nrs 429 v week 2 assignment health promotion among ...
V grand canyon university nrs 429 v week 2 assignment health promotion among ...V grand canyon university nrs 429 v week 2 assignment health promotion among ...
V grand canyon university nrs 429 v week 2 assignment health promotion among ...
 
V grand canyon university nrs 429 v week 1 assignment vark analysis paper new
V grand canyon university nrs 429 v week 1 assignment vark analysis paper newV grand canyon university nrs 429 v week 1 assignment vark analysis paper new
V grand canyon university nrs 429 v week 1 assignment vark analysis paper new
 
Uop qnt 561 final exam guide
Uop qnt 561 final exam guideUop qnt 561 final exam guide
Uop qnt 561 final exam guide
 
Uop acc 547 week 4 jordan and diana diego
Uop acc 547 week 4 jordan and diana diegoUop acc 547 week 4 jordan and diana diego
Uop acc 547 week 4 jordan and diana diego
 
Uop acc 545 final exam guide new
Uop acc 545 final exam guide newUop acc 545 final exam guide new
Uop acc 545 final exam guide new
 

Recently uploaded

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)Dr. Mazin Mohamed alkathiri
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 

Recently uploaded (20)

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 

Uop ops 571 final exam guide new 2017

  • 1. UOP OPS 571 Final Exam Guide New 2017 (Score 30/30) NEW Check this A+ tutorial guideline at http://www.assignmentcloud.com/ops-571-uop/ops-571- final-exam-guide-new For more classes visit http://www.assignmentcloud.com 1. Identify a disadvantage of implementing group technology in a firm. The number of employees required for a process increases exponentially. The workers must be flexible enough to run several machines and processes. It increases inventory. The waiting time between operations is increased. 2. A shopkeeper purchases raw materials to manufacture souvenirs for a local event that happens once every five years. In this case. identify the model that the shopkeeper is most likely to use to maintain stock. Lot sizing model Fixed—time period model Fixed—order quantity model p. Single-period model 3 Define synchronous manufacturing as stated by Goldratt's theory. It is a production process organized to achieve the goals of the firm. It is an integrated set of activities designed to achieve high
  • 2. quality and high levels of production with minimal inventories of raw materials. It is a production process in which machines are the critical resource used for scheduling. It is the optimization of the rate at which cash is generated by production through sales. 4. involves testing random samples of the end product from a process to determine if the process is churning out items within the predetermined range. Organizational leaming Statistical process control Cyclical strategic scheduling Event simulation 5. Utilization is the ratio between the actual amount of time a resource is activated for and the total amount of time the resource is available for use. Utilization Lead time Service rate Pacing 6. The manager of a shop floor schedules production based on the equipment that are used in the process as a key resource. In this case. the manager is most likely using a backward scheduling forward scheduling machine-limited process labor-limited process 7 Define lead time. It is the time required to achieve high customer service with minimum levels of inventory investment. It is the time required to produce a variety of products typically
  • 3. at lower volume levels. It is the time required to attend to a customer order. It is the time required to position inventory in the supply chain. 8. refers to the integrated activities designed to achieve high quality and high levels of production with minimal inventories of raw materials and to eliminate wastes. The Shingo system Kanban system Lean production Process mapping 9. Define preventive maintenance. It is the grouping of similar parts and processes into a specialized workcell. It is the improvement that stems from both a person's experience and the changes in equipment. product design. and administration. It is the periodic inspection and repair of equipment to avoid breakdowns. It is the emphasis of getting a product or a process right the first time. 10. shows the relationship between the total number of units produced and the unit production tim A Poisson distribution A learning curve Cycle time Service rate 11 Identify a true statement about services. A service is a tangible process. A service is inherently heterogeneous A service has physical dimensions. A service has very limited or no customer interaction.
  • 4. 12. In a the product remains in a specific location and the equipment labor and material required for the product are gathered to the specific location project layout functional layout manufacturing cell workcenter 13. Rachel performs an analysis in which she analyzes the performance of the clients of her organization relative to the expectations of the client's customers. In this scenario. Rachel is most likely using a Pareto analysis gap analysis Gantt chart bar chart 14. is the design operation and improvement of the processes that create and deliver a company's essential products and services. Inventory control Operations and supply chain management Product routing Aggregate sales and operations planning 15. determines the amount of inventory, which includes parts. components. and materials. necessary to produce a product Break-even analysis Dynamic programming Material requirements planning GAP analysis 16. Define customer order decoupling point. It involves the analysis of current business data to better solve business problems using mathematical calculations.
  • 5. It is the time required to attend a customer order. It is the positioning of inventory in a supply chain. It illustrates the method by which a company's strategy is delivered through a set of supporting activities. 17. Define waste reduction. It is the process of combining the concept of cross-docking and consolidation. It is the elimination of non—value-adding activities and the optimization of value-adding activities that are part of a process. It is the optimization of the rate at which cash is generated by production through sales. It is the integration of activities to increase the customer value of a process. 18. Identify the true statements about the learning curve theory. It assumes that the unit time for a task will decrease at a decreasing rate. A drawback of the learning curve theory is that the performance can be measured only in terms of time per unit. In a learning curve. the time for task completion will increase each time the task is undertaken. In a learning curve the reduction in time will be unpredictable. 19. is the characteristics of a product in terms of quality that are sorted as either conforming or nonconforming to specification. The capability index A throughput rate A learning curve An attribute
  • 6. 20. Identify a true statement about an operations consulting process. Its results are immediately measurable. It leads to changes in attitudes and culture of an organization. Unlike general management consulting. operations consulting does not require extensive interviewing of employees. It takes a longer time than general management consulting to yield results that can be measured. 21. Identify a true statement about water transportation mode. It is a highly specialized mode of transport limited to the delivery of gases- Moving high volumes of products is costly. It can handle a high capacity of materials. Fast transit times can be achieved in this mode of transportation. 22. A pharmaceutical company keeps detailed documentation of its inventory. The company replenishes its inventory whenever the inventory level falls below a certain limit and there is a threat of a stockout. This company is most likely using a model. fixed-order quantity fixed-time period regression single-period 23. According to Goldratt's definition, is the rate at which cash is generated by production through sales. expediting throughput productivity cash flow
  • 7. 24. Identify an advantage of pure projects. Team pride, motivation, and commitment are high. Team members have authority over the project. Organizational goals and policies are upheld. Duplication of resources is eliminated 25. are used for decisions that are related to aggregate and strategy demand- Process assessments P-models Periodic review systems Strategic forecasts 26. Identify a disadvantage of pure projects. Equipment and people are not shared across projects. A lot of time is consumed while making decisions. Lines of communication are lengthened. The project manager has no authority over the project. 27. is responsible for scheduling, dispatching, monitoring, and regulating production on the shop floor. Manufacturing execution system P-model ABC classification Enterprise resource planning 28. is the average time required to finish a cycle of an operation. Cycle time Lead time Queue time Changeover time 29. A manufacturing firm efficiently assembles an airplane by bringing all the necessary raw materials, parts, and equipment to a central location. This scenario illustrates a
  • 8. functional layout workcenter manufacturing cell project layout 30. The main objective of the aggregate operations plan is to: achieve better integration between suppliers and manufacturers. minimize the cost of resources necessary to meet demand. determine future demand with the help of past data. keep demand and supply in balance.