10. Problem / Cause:
Managing Innovative Scaffold Equipment
Solution
• PERI UP Rosett Flex Scaffold
equipment quality
Benefits
• Optimized to provide maximum flexibility
• Fast assembly increases productivity by
30% - 50%
• Fulfills the highest level of safety
requirements
• Innovatively designed products with proven
quality
11. Managing Scaffold Technology & Innovation
Problem
• Old technology still being used
Benefits
• Industry and educational support and
culture barriers
Tube and Clamp Cuploc Quick Erect
Scaffold
PERI UP
1930 1970 1978 1983 1985 1993 1995 2005
Kwickstage Safway System Excel PERI UP
Rosett Flex
Scaffolding
THEN
Scaffolding
NOW
17. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Safety is predictable
Mixing scaffold components from various OEM’s is a
major risk.
Often not even OSHA inspectors can tell details apart
Non-compatibility of PERI components and
guaranteed product QA and QC increases safety
siginicantly
What does this mean?
22. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Accurate Estimating
PERI provides detailed scaffolding target estimates
based on actual design.
top 4 indirect construction costs
What does this mean?
23. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Accurate Estimating
The target estimate will detail the scaffold
requirements (i.e. equipment, labor, and cost) by work
package and work area
Most wasteful indirect cost!
What does this mean?
24. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Increased Focus on pre-design
All options are explored in advance
3D model enables the visualization in advance
This increases cost certainty and predictability and
also facilitates the quantification of scaffold material
CAD Drawing Incorporated in Working Site Model!
What does this mean?
25. Problem / Cause:
3D Planning
Solution
• 3D Planning – photorealistic model
rendering, three dimensional
visualization
Benefits
• Optimized front end planning, cost
transparency, improved construction
progression, improved safety
performance
27. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Cost Certainty
The added value of design and planning drives a
reduction in equipment required
This also translates to fewer craft hours expended.
Scaffolding is in most challenging cost to manage!
What does this mean?
29. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Monitoring and Managing Scaffolding Costs
PERI Path provides accurate crew performance
metrics that aid in supervision and cost forecasting.
Actual crew performance against estimated work
hours can be reviewed to take corrective actions long
before significant budget overruns occur.
PERI Path dashboard with reporting charts
What does this mean?
30. is designed to organize:
•Estimating Figures
•Design
•Project management
•Material management
•Forecasting
Consolidates All Information
31. Problem / Cause:
Controlling Tracking and Reporting
Solution
• real
time information through technology
Benefit
• Collect, store, organize, and share
accurate data
• Scaffold performance reporting –
cost, requisition, asset allocation, etc.
path
32. Problem / Cause:
Traditional Estimating Methods
Problem
• Traditional Estimating Methods (% of
Direct Field Labor )
Cause
• Scaffold is treated as a support
service
Concrete
Mechanical
Equipment
Mechanical
Equipment
CivilCivil SteelSteel
Control SystemsControl Systems
PipingPiping
ElectricalElectrical
InsulationInsulationPainting CoatingsPainting Coatings
RefractoryRefractory
ScaffoldingScaffoldingBuildingsBuildings
33. Productivity Tracking
Time is money
But that’s not all. Keeping costs down involves more than cutting hours. It requires knowledge of the site and
accurate stat management
36. Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Strong Partners
We have strong training partners to ensure self
performed scaffolding yields the best results
Our cooperation with dedicated subcontractors that
are exclusively specialized in using PERI material
ensures the most efficient operations
What does this mean?
Brace Industrial Group uses PERI
37. Problem / Cause
Managing Training and Testing
Solution
• Informative, practice–oriented on-site
training and testing specifically
tailored for craft and supervision
Benefit
• Optimal use of PERI system scaffold
equipment and technologies
38. • On a typical project, costs are distributed as
follows
The savings potential is greater on the labor portion.
Do you want to focus on reducing 30% on the 15% which is your rental costs or focus on
saving 30% on the 85% which is you real cost and problem Labor costs?
39. Savings Potential by Dollar Breakdown
• You need to stop overspending on labor for minimal
material cost savings
Working with PERI will help you achieve this.
85% Scaffold Labor Cost 15% Material Cost
40. Scaffold Program vs. Scaffold System
• Working with PERI can help you become more cost
effective
20% Material Cost60% Scaffold Labor Cost
20% Cost Savings
41. Scaffold Program vs. Scaffold System
• Working with PERI can help you become more cost
effective
20% Material Cost60% Scaffold Labor Cost
20% Cost Savings
42. Scaffold Program vs. Tube & Clamp
• Working with PERI can help you become more cost
effective
20% Material Cost42.5% Scaffold Labor Cost
37.5% Cost Savings
43. Scaffold Program vs. Tube & Clamp
• Working with PERI can help you become more cost
effective
20% Material Cost42.5% Scaffold Labor Cost
37.5% Cost Savings
44. Problem / Cause:
Managing Labor Overruns
Problem
Old systems creating additional
work
Cause
Metric vs Imperial
Different systems introduced