• PERI Integrated Scaffolding Program
Agenda
2
Team Introductions
HSE Topic
Value Creation Topic
Program Introduction
Problem / Cause
Estimating
Controlling
Managing
Closing / Q&A
19.11.2015
Health and Safety
The Risks of Mixing OEM
PERI
4
HSE Topic
Risks of Mixing Original Equipment
Manufacturer Scaffold Components
1. OEM-Components Traceability
2. Destructive Testing meeting 3:1 and
4:1 Safety Factor
3. Unauthorized mixing of copies of
OEM components
5
The Problem
Rosette Copies for 4 systems Ledger Head Copies for 6 systems
Original System Design
6
19.11.2015
Value Creation
PERI
Value Creation Topic
PERI Overview
Value Creation Topic
PERI UP Video
Problem / Cause:
Managing Innovative Scaffold Equipment
Solution
• PERI UP Rosett Flex Scaffold
equipment quality
Benefits
• Optimized to provide maximum flexibility
• Fast assembly increases productivity by
30% - 50%
• Fulfills the highest level of safety
requirements
• Innovatively designed products with proven
quality
Managing Scaffold Technology & Innovation
Problem
• Old technology still being used
Benefits
• Industry and educational support and
culture barriers
Tube and Clamp Cuploc Quick Erect 
Scaffold 
PERI UP
1930 1970 1978 1983 1985 1993 1995 2005
Kwickstage Safway System Excel PERI UP
Rosett Flex
Scaffolding
THEN
Scaffolding
NOW
19.11.2015
Our Value Proposition
PERI
Value Proposition – The Integrated Scaffold Program
Scope Development and Resource Planning
Product QA / QC Guarantee
Engineering Integration
Expert Developed Resourses Loaded Scheduling
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Scaffold Equipment
Program wide integrated material management
Guaranteed material availability
Labor Resources
Subcontract training expertise
Subcontracted provided management expertise
Value Proposition – The Integrated Scaffold Program
Scope Development and Resource Planning
Product QA / QC Guarantee
Engineering Integration
Expert Developed Recourses Loaded Scheduling
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Scaffold Equipment
Program wide integrated material management
Guaranteed material availability
Labor Resources
Subcontract training expertise
Subcontracted provided management expertise
Value Proposition – The Integrated Scaffold Program
Scope Development and Resource Planning
Product QA / QC Guarantee
Engineering Integration
Expert Developed Recourses Loaded Scheduling
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Scaffold Equipment
Program wide integrated material management
Guaranteed material availability
Labor Resources
Subcontractor training expertise
Subcontractor provided management expertise
19.11.2015
QA / QC
PERI
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Safety is predictable
Mixing scaffold components from various OEM’s is a
major risk.
Often not even OSHA inspectors can tell details apart
Non-compatibility of PERI components and
guaranteed product QA and QC increases safety
siginicantly
What does this mean?
Product QA / QC
Product Traceability
OSHA Tested and Approved
19.11.2015
Estimating
PERI
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Accurate Estimating
PERI provides detailed scaffolding target estimates
based on actual design.
top 4 indirect construction costs
What does this mean?
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Accurate Estimating
The target estimate will detail the scaffold
requirements (i.e. equipment, labor, and cost) by work
package and work area
Most wasteful indirect cost!
What does this mean?
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Increased Focus on pre-design
All options are explored in advance
3D model enables the visualization in advance
This increases cost certainty and predictability and
also facilitates the quantification of scaffold material
CAD Drawing Incorporated in Working Site Model!
What does this mean?
Problem / Cause:
3D Planning
Solution
• 3D Planning – photorealistic model
rendering, three dimensional
visualization
Benefits
• Optimized front end planning, cost
transparency, improved construction
progression, improved safety
performance
Cad
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Cost Certainty
The added value of design and planning drives a
reduction in equipment required
This also translates to fewer craft hours expended.
Scaffolding is in most challenging cost to manage!
What does this mean?
19.11.2015
Controlling
PERI
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Monitoring and Managing Scaffolding Costs
PERI Path provides accurate crew performance
metrics that aid in supervision and cost forecasting.
Actual crew performance against estimated work
hours can be reviewed to take corrective actions long
before significant budget overruns occur.
PERI Path dashboard with reporting charts
What does this mean?
is designed to organize:
•Estimating Figures
•Design
•Project management
•Material management
•Forecasting
Consolidates All Information
Problem / Cause:
Controlling Tracking and Reporting
Solution
• real
time information through technology
Benefit
• Collect, store, organize, and share
accurate data
• Scaffold performance reporting –
cost, requisition, asset allocation, etc.
path
Problem / Cause:
Traditional Estimating Methods
Problem
• Traditional Estimating Methods (% of
Direct Field Labor )
Cause
• Scaffold is treated as a support
service
Concrete
Mechanical
Equipment
Mechanical
Equipment
CivilCivil SteelSteel
Control SystemsControl Systems
PipingPiping
ElectricalElectrical
InsulationInsulationPainting CoatingsPainting Coatings
RefractoryRefractory
ScaffoldingScaffoldingBuildingsBuildings
Productivity Tracking
Time is money
But that’s not all. Keeping costs down involves more than cutting hours. It requires knowledge of the site and
accurate stat management
Rental Utilization
Problem / Cause:
Managing Scaffold Equipment Utilization
Solution
• Scaffold equipment recycle rate
optimization through model-related
cycle planning
Benefit
• Decreases scaffold equipment
wastefulness
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
Scaffold Equipment Utilization
FU00
CU20
AU20
AU10
GU00
BU20
BU10
CU10
EU00
DU00
$0
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
Scaffold Equipment Utilization
FU00
CU20
AU20
AU10
GU00
BU20
BU10
CU10
EU00
DU00
Value Proposition – The Integrated Scaffold Program
Increased
Predictability
Reduced
Inventory Costs
Growing
Efficient
Strong Partners
We have strong training partners to ensure self
performed scaffolding yields the best results
Our cooperation with dedicated subcontractors that
are exclusively specialized in using PERI material
ensures the most efficient operations
What does this mean?
Brace Industrial Group uses PERI
Problem / Cause
Managing Training and Testing
Solution
• Informative, practice–oriented on-site
training and testing specifically
tailored for craft and supervision
Benefit
• Optimal use of PERI system scaffold
equipment and technologies
• On a typical project, costs are distributed as
follows
The savings potential is greater on the labor portion.
Do you want to focus on reducing 30% on the 15% which is your rental costs or focus on
saving 30% on the 85% which is you real cost and problem Labor costs?
Savings Potential by Dollar Breakdown
• You need to stop overspending on labor for minimal
material cost savings
Working with PERI will help you achieve this.
85% Scaffold Labor Cost 15% Material Cost
Scaffold Program vs. Scaffold System
• Working with PERI can help you become more cost
effective
20% Material Cost60% Scaffold Labor Cost
20% Cost Savings
Scaffold Program vs. Scaffold System
• Working with PERI can help you become more cost
effective
20% Material Cost60% Scaffold Labor Cost
20% Cost Savings
Scaffold Program vs. Tube & Clamp
• Working with PERI can help you become more cost
effective
20% Material Cost42.5% Scaffold Labor Cost
37.5% Cost Savings
Scaffold Program vs. Tube & Clamp
• Working with PERI can help you become more cost
effective
20% Material Cost42.5% Scaffold Labor Cost
37.5% Cost Savings
Problem / Cause:
Managing Labor Overruns
Problem
Old systems creating additional
work
Cause
Metric vs Imperial
Different systems introduced
19.11.2015
Questions and Answers
PERI

More Related Content

What's hot

Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awarenessedale07
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliancesHARISH J
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System SilkThreadJewellery
 
2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment2014 Existing Building Conditions Assessment
2014 Existing Building Conditions AssessmentWalter Bone, RLA ASLA
 
Applying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEEDApplying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEEDleluongvang
 
Modular construction
Modular constructionModular construction
Modular constructionKiran Gill
 
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSHEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSLakshmi Ravi Chandu Kolusu
 
31_SHRUTIGARG_BC REPORT-2.pdf
31_SHRUTIGARG_BC REPORT-2.pdf31_SHRUTIGARG_BC REPORT-2.pdf
31_SHRUTIGARG_BC REPORT-2.pdfShrutiGarg261479
 
Services in high rise building unit 1
Services in high rise building unit 1Services in high rise building unit 1
Services in high rise building unit 1Vankadari Kedar
 
Nodullar -Lightweight aggregates for roof waterproofing & insulation
Nodullar -Lightweight aggregates for roof  waterproofing & insulation Nodullar -Lightweight aggregates for roof  waterproofing & insulation
Nodullar -Lightweight aggregates for roof waterproofing & insulation Litagg Industries Pvt Ltd
 
National building code
National building codeNational building code
National building codeMayank Rawat
 
Confined space awareness session
Confined space awareness sessionConfined space awareness session
Confined space awareness sessionMomen Muhsen
 
Work At Height Regulations
Work At Height RegulationsWork At Height Regulations
Work At Height RegulationsAsep Herman
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers pptSAI KIRAN
 

What's hot (20)

Loading and unloading white
Loading and unloading whiteLoading and unloading white
Loading and unloading white
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliances
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System
 
2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment2014 Existing Building Conditions Assessment
2014 Existing Building Conditions Assessment
 
Applying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEEDApplying ashrae 62.1 to LEED
Applying ashrae 62.1 to LEED
 
Modular construction
Modular constructionModular construction
Modular construction
 
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMSHEATING VENTILATION AND AIR CONDITIONING SYSTEMS
HEATING VENTILATION AND AIR CONDITIONING SYSTEMS
 
31_SHRUTIGARG_BC REPORT-2.pdf
31_SHRUTIGARG_BC REPORT-2.pdf31_SHRUTIGARG_BC REPORT-2.pdf
31_SHRUTIGARG_BC REPORT-2.pdf
 
Services in high rise building unit 1
Services in high rise building unit 1Services in high rise building unit 1
Services in high rise building unit 1
 
Nodullar -Lightweight aggregates for roof waterproofing & insulation
Nodullar -Lightweight aggregates for roof  waterproofing & insulation Nodullar -Lightweight aggregates for roof  waterproofing & insulation
Nodullar -Lightweight aggregates for roof waterproofing & insulation
 
National building code
National building codeNational building code
National building code
 
Confined space awareness session
Confined space awareness sessionConfined space awareness session
Confined space awareness session
 
Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
Cooling tower Inspection Guide
Cooling tower Inspection GuideCooling tower Inspection Guide
Cooling tower Inspection Guide
 
Lift
LiftLift
Lift
 
Work At Height Regulations
Work At Height RegulationsWork At Height Regulations
Work At Height Regulations
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Construction Site Safety
Construction Site SafetyConstruction Site Safety
Construction Site Safety
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers ppt
 

Viewers also liked

Doka Corporate Presentation 2016
Doka Corporate Presentation 2016Doka Corporate Presentation 2016
Doka Corporate Presentation 2016Doka
 
ApresentaçãO Peri Maio 2009 Ing
ApresentaçãO Peri Maio 2009 IngApresentaçãO Peri Maio 2009 Ing
ApresentaçãO Peri Maio 2009 Inghelcio_moraes
 
Pt. pks medan centre point
Pt. pks   medan centre pointPt. pks   medan centre point
Pt. pks medan centre pointDarwis Sutriadi
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Bridges and Tunnels - Building Systems
Bridges and Tunnels - Building SystemsBridges and Tunnels - Building Systems
Bridges and Tunnels - Building SystemsDaniel Campos
 
Successful construction with PERI
Successful construction with PERISuccessful construction with PERI
Successful construction with PERIluisaam
 
Mastercraft construction associates limited various formwork projects
Mastercraft construction associates limited various formwork projectsMastercraft construction associates limited various formwork projects
Mastercraft construction associates limited various formwork projectsMicheál O'Kane
 
Madeira´s airport
Madeira´s airportMadeira´s airport
Madeira´s airportluisaam
 
1.pocket book vario
1.pocket book vario1.pocket book vario
1.pocket book varionugrohoery83
 
Peri vario column square
Peri vario column squarePeri vario column square
Peri vario column squareDarwis Sutriadi
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on FormworkEsri India
 
Doka self climbing system
Doka self climbing systemDoka self climbing system
Doka self climbing systemKuldeep Pandit
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2Gali Suresh
 
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARAT
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARATPROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARAT
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARATDarwis Sutriadi
 
Seminar Report on Supply Chain Management
Seminar Report on Supply Chain ManagementSeminar Report on Supply Chain Management
Seminar Report on Supply Chain ManagementAnkur Mehta
 

Viewers also liked (20)

Doka Corporate Presentation 2016
Doka Corporate Presentation 2016Doka Corporate Presentation 2016
Doka Corporate Presentation 2016
 
ApresentaçãO Peri Maio 2009 Ing
ApresentaçãO Peri Maio 2009 IngApresentaçãO Peri Maio 2009 Ing
ApresentaçãO Peri Maio 2009 Ing
 
Pt. pks medan centre point
Pt. pks   medan centre pointPt. pks   medan centre point
Pt. pks medan centre point
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Bridges and Tunnels - Building Systems
Bridges and Tunnels - Building SystemsBridges and Tunnels - Building Systems
Bridges and Tunnels - Building Systems
 
Successful construction with PERI
Successful construction with PERISuccessful construction with PERI
Successful construction with PERI
 
Mastercraft construction associates limited various formwork projects
Mastercraft construction associates limited various formwork projectsMastercraft construction associates limited various formwork projects
Mastercraft construction associates limited various formwork projects
 
Madeira´s airport
Madeira´s airportMadeira´s airport
Madeira´s airport
 
1.pocket book vario
1.pocket book vario1.pocket book vario
1.pocket book vario
 
Peri vario column square
Peri vario column squarePeri vario column square
Peri vario column square
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Doka self climbing system
Doka self climbing systemDoka self climbing system
Doka self climbing system
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
 
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARAT
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARATPROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARAT
PROYEK COAL PROCESSING PLAN - PT. BAMA, MEULABOH - ACEH BARAT
 
Seminar Report on Supply Chain Management
Seminar Report on Supply Chain ManagementSeminar Report on Supply Chain Management
Seminar Report on Supply Chain Management
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Ppt
PptPpt
Ppt
 
Peri implantitis
Peri implantitisPeri implantitis
Peri implantitis
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 

Similar to PERI UP Presentation 11-18-15

slides PTC smart factory.pdf
slides PTC smart factory.pdfslides PTC smart factory.pdf
slides PTC smart factory.pdfCarlosLopes408217
 
PureApp Presentation
PureApp PresentationPureApp Presentation
PureApp PresentationProlifics
 
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...Keynote 2 - The 20% of software engineering practices that contribute to 80% ...
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...ESEM 2014
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceTechWell
 
#FiaComit - Advanced Works Packaging & Integrated Materials Management
#FiaComit - Advanced Works Packaging & Integrated Materials Management#FiaComit - Advanced Works Packaging & Integrated Materials Management
#FiaComit - Advanced Works Packaging & Integrated Materials ManagementComit Projects Ltd
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
Costof quality
Costof qualityCostof quality
Costof qualityOmnex Inc.
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Supply Chain Group
 
Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change Prolifics
 
Gear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingGear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingNicola Accialini
 

Similar to PERI UP Presentation 11-18-15 (20)

Ares I Instrument Unit Status and Progress
Ares I Instrument Unit Status and ProgressAres I Instrument Unit Status and Progress
Ares I Instrument Unit Status and Progress
 
slides PTC smart factory.pdf
slides PTC smart factory.pdfslides PTC smart factory.pdf
slides PTC smart factory.pdf
 
PureApp Presentation
PureApp PresentationPureApp Presentation
PureApp Presentation
 
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...Keynote 2 - The 20% of software engineering practices that contribute to 80% ...
Keynote 2 - The 20% of software engineering practices that contribute to 80% ...
 
olivier_a.pdf
olivier_a.pdfolivier_a.pdf
olivier_a.pdf
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
An approach for implementing key performance indicators of a discrete manufa...
An approach for implementing key performance  indicators of a discrete manufa...An approach for implementing key performance  indicators of a discrete manufa...
An approach for implementing key performance indicators of a discrete manufa...
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
 
#FiaComit - Advanced Works Packaging & Integrated Materials Management
#FiaComit - Advanced Works Packaging & Integrated Materials Management#FiaComit - Advanced Works Packaging & Integrated Materials Management
#FiaComit - Advanced Works Packaging & Integrated Materials Management
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Costof quality
Costof qualityCostof quality
Costof quality
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
LeanCor-PFEP-Webinar_May-2015
LeanCor-PFEP-Webinar_May-2015LeanCor-PFEP-Webinar_May-2015
LeanCor-PFEP-Webinar_May-2015
 
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
 
Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change Pure App + Patterns + Prolifics = Feeding Change
Pure App + Patterns + Prolifics = Feeding Change
 
Agile Journey to agile
Agile   Journey to agileAgile   Journey to agile
Agile Journey to agile
 
Res 10-30-15
Res 10-30-15Res 10-30-15
Res 10-30-15
 
Gear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingGear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & Consulting
 

PERI UP Presentation 11-18-15

  • 1. • PERI Integrated Scaffolding Program
  • 2. Agenda 2 Team Introductions HSE Topic Value Creation Topic Program Introduction Problem / Cause Estimating Controlling Managing Closing / Q&A
  • 3. 19.11.2015 Health and Safety The Risks of Mixing OEM PERI
  • 4. 4 HSE Topic Risks of Mixing Original Equipment Manufacturer Scaffold Components 1. OEM-Components Traceability 2. Destructive Testing meeting 3:1 and 4:1 Safety Factor 3. Unauthorized mixing of copies of OEM components
  • 5. 5 The Problem Rosette Copies for 4 systems Ledger Head Copies for 6 systems Original System Design
  • 6. 6
  • 10. Problem / Cause: Managing Innovative Scaffold Equipment Solution • PERI UP Rosett Flex Scaffold equipment quality Benefits • Optimized to provide maximum flexibility • Fast assembly increases productivity by 30% - 50% • Fulfills the highest level of safety requirements • Innovatively designed products with proven quality
  • 11. Managing Scaffold Technology & Innovation Problem • Old technology still being used Benefits • Industry and educational support and culture barriers Tube and Clamp Cuploc Quick Erect  Scaffold  PERI UP 1930 1970 1978 1983 1985 1993 1995 2005 Kwickstage Safway System Excel PERI UP Rosett Flex Scaffolding THEN Scaffolding NOW
  • 13. Value Proposition – The Integrated Scaffold Program Scope Development and Resource Planning Product QA / QC Guarantee Engineering Integration Expert Developed Resourses Loaded Scheduling Increased Predictability Reduced Inventory Costs Growing Efficient Scaffold Equipment Program wide integrated material management Guaranteed material availability Labor Resources Subcontract training expertise Subcontracted provided management expertise
  • 14. Value Proposition – The Integrated Scaffold Program Scope Development and Resource Planning Product QA / QC Guarantee Engineering Integration Expert Developed Recourses Loaded Scheduling Increased Predictability Reduced Inventory Costs Growing Efficient Scaffold Equipment Program wide integrated material management Guaranteed material availability Labor Resources Subcontract training expertise Subcontracted provided management expertise
  • 15. Value Proposition – The Integrated Scaffold Program Scope Development and Resource Planning Product QA / QC Guarantee Engineering Integration Expert Developed Recourses Loaded Scheduling Increased Predictability Reduced Inventory Costs Growing Efficient Scaffold Equipment Program wide integrated material management Guaranteed material availability Labor Resources Subcontractor training expertise Subcontractor provided management expertise
  • 17. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Safety is predictable Mixing scaffold components from various OEM’s is a major risk. Often not even OSHA inspectors can tell details apart Non-compatibility of PERI components and guaranteed product QA and QC increases safety siginicantly What does this mean?
  • 20. OSHA Tested and Approved
  • 22. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Accurate Estimating PERI provides detailed scaffolding target estimates based on actual design. top 4 indirect construction costs What does this mean?
  • 23. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Accurate Estimating The target estimate will detail the scaffold requirements (i.e. equipment, labor, and cost) by work package and work area Most wasteful indirect cost! What does this mean?
  • 24. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Increased Focus on pre-design All options are explored in advance 3D model enables the visualization in advance This increases cost certainty and predictability and also facilitates the quantification of scaffold material CAD Drawing Incorporated in Working Site Model! What does this mean?
  • 25. Problem / Cause: 3D Planning Solution • 3D Planning – photorealistic model rendering, three dimensional visualization Benefits • Optimized front end planning, cost transparency, improved construction progression, improved safety performance
  • 26. Cad
  • 27. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Cost Certainty The added value of design and planning drives a reduction in equipment required This also translates to fewer craft hours expended. Scaffolding is in most challenging cost to manage! What does this mean?
  • 29. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Monitoring and Managing Scaffolding Costs PERI Path provides accurate crew performance metrics that aid in supervision and cost forecasting. Actual crew performance against estimated work hours can be reviewed to take corrective actions long before significant budget overruns occur. PERI Path dashboard with reporting charts What does this mean?
  • 30. is designed to organize: •Estimating Figures •Design •Project management •Material management •Forecasting Consolidates All Information
  • 31. Problem / Cause: Controlling Tracking and Reporting Solution • real time information through technology Benefit • Collect, store, organize, and share accurate data • Scaffold performance reporting – cost, requisition, asset allocation, etc. path
  • 32. Problem / Cause: Traditional Estimating Methods Problem • Traditional Estimating Methods (% of Direct Field Labor ) Cause • Scaffold is treated as a support service Concrete Mechanical Equipment Mechanical Equipment CivilCivil SteelSteel Control SystemsControl Systems PipingPiping ElectricalElectrical InsulationInsulationPainting CoatingsPainting Coatings RefractoryRefractory ScaffoldingScaffoldingBuildingsBuildings
  • 33. Productivity Tracking Time is money But that’s not all. Keeping costs down involves more than cutting hours. It requires knowledge of the site and accurate stat management
  • 35. Problem / Cause: Managing Scaffold Equipment Utilization Solution • Scaffold equipment recycle rate optimization through model-related cycle planning Benefit • Decreases scaffold equipment wastefulness $0 $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 Scaffold Equipment Utilization FU00 CU20 AU20 AU10 GU00 BU20 BU10 CU10 EU00 DU00 $0 $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 Scaffold Equipment Utilization FU00 CU20 AU20 AU10 GU00 BU20 BU10 CU10 EU00 DU00
  • 36. Value Proposition – The Integrated Scaffold Program Increased Predictability Reduced Inventory Costs Growing Efficient Strong Partners We have strong training partners to ensure self performed scaffolding yields the best results Our cooperation with dedicated subcontractors that are exclusively specialized in using PERI material ensures the most efficient operations What does this mean? Brace Industrial Group uses PERI
  • 37. Problem / Cause Managing Training and Testing Solution • Informative, practice–oriented on-site training and testing specifically tailored for craft and supervision Benefit • Optimal use of PERI system scaffold equipment and technologies
  • 38. • On a typical project, costs are distributed as follows The savings potential is greater on the labor portion. Do you want to focus on reducing 30% on the 15% which is your rental costs or focus on saving 30% on the 85% which is you real cost and problem Labor costs?
  • 39. Savings Potential by Dollar Breakdown • You need to stop overspending on labor for minimal material cost savings Working with PERI will help you achieve this. 85% Scaffold Labor Cost 15% Material Cost
  • 40. Scaffold Program vs. Scaffold System • Working with PERI can help you become more cost effective 20% Material Cost60% Scaffold Labor Cost 20% Cost Savings
  • 41. Scaffold Program vs. Scaffold System • Working with PERI can help you become more cost effective 20% Material Cost60% Scaffold Labor Cost 20% Cost Savings
  • 42. Scaffold Program vs. Tube & Clamp • Working with PERI can help you become more cost effective 20% Material Cost42.5% Scaffold Labor Cost 37.5% Cost Savings
  • 43. Scaffold Program vs. Tube & Clamp • Working with PERI can help you become more cost effective 20% Material Cost42.5% Scaffold Labor Cost 37.5% Cost Savings
  • 44. Problem / Cause: Managing Labor Overruns Problem Old systems creating additional work Cause Metric vs Imperial Different systems introduced