SlideShare a Scribd company logo
1 of 4
LAXMIKANT JAYAVANT GAJINKAR
B6/101, Manjri Greens Annexe
Opposite to Manjri Stud Farm,
Near Bharat Petrol Pump,
Pune Solapur Road,
Manjri, Pune 411 307
Contact: +91-8087068972 (M)
Email: lgainkar@rediffmail.com
Career Objective:
Securing a challenging position to harness my technical skills and knowledge and to optimize my
potential for the organization’s and self growth.
Educational Qualifications:
SSC – 74.71% Mumbai Board
MEA High School, Marol Maroshi Road, Andheri (W), Mumbai 400059. 1995
HSC – 64.00% Mumbai Board
S.K. Somaiya Vinay Mandir, Vidhyavihar (E), Mumbai 400077 1997
Diploma in Industrial Electronics – 70.01% (FIRST CLASS) University of Mumbai
Bhartiya Vidhyapeeth College of Engineering, Kharghar, Navi Mumbai 2000
Other Qualifications:
PGMBA in Operations in 2012 – First Class
Welingkar Institute of Management Development & Research, Matunga, Mumbai
Certification of Internal Auditor for ISO 9001 in 2005
TQMI, Mumbai
Certification of Lead Auditor for ISO14001 & OHSAS in 2012
DNV, Pune
Work Experience: 1 SUZLON ENERGY LTD.
Asst. Manager QHSE , Pune May ‘11-‘at present’
Roles and Responsibilities:
Asst. Manager QHSE , Pune
PLANNING PHASE: Responsible for implementing quality systems as Asst. MR. Directly plans and
disseminates QMS and QAQC activities, Co-ordination with third party for equipment calibration. System
and Process Based Audit as per ISO and OHSAS standard.
NCR & AUDIT MANAGEMENT: Responsible for execution of internal on-site audits at site across globe,
prepare audit schedules, Conduct audits, assistance to departments for CAPA and root cause analysis.
Monitor the effectiveness of preventive and corrective actions taken.
ONSITE PRODUCT FAILURE HANDELLING: Monitoring & analyzing field performance(With help of 7-
QC Tools ), Analyzing field failures & taking corrective & preventive actions to ensure the errors do not
reoccur, ensuring zero defects in field.
QMS TOOLS APPLICATION: Develop P.F.M.E.A (Potential Failure Mode & Effect Analysis) for Met
Mast (Tower used for wind study), for sites related repeated failure Quality Improvements projects
through DMAIC (Define, Measure, Analyze, Improve & Control) methodology implementation. Use of
PPAP, SPC, 7 QC tools for the process and their failure analysis and defining proper controls.
VENDOR DEVELOPMENT & SUPPLIER QUALITY: Prioritize, perform vendor assessment and identify
high business impact areas related to supplier quality improvement, Suppliers & Contractors Credentials
evaluation on the Quality safety, Productivity, Performance etc parameters, Factory Inspections and
depending upon their performance approving them for the execution of order as pilot or series. Monitoring
Supplier Quality Monitor the performance of suppliers in terms of rejections & defects & evolve action
plan for improvements along with materials & supplier.
COPQ MONITORING: Monitor External & Internal cost of poor quality on the defined parameters by the
management and reporting the cost to the management along with the steps for the reduction of the
same.
MATERIAL INSPECTION: Stage, in- process & final inspection for the material like Anemometer, Solar
Panel, Fabricated Lattice mast structure, Wind Vane, Data logger, Pressure sensor, Humidity sensors ,
CT /PT , circuit breaker , insulators etc. at supplier end.
CONDUCTING MRM: Plan, Schedule & conduct the Management Review Meeting.
HSE MANAGEMENT: Incident reporting and investigation at Site. Risk assessment in daily operations.
Risks are continuously identified, assessed and minimized, controlled or eliminated. Trains employees
and contractors to be aware of any potential risks to personal safety on the job. Generate DHSEIR, HSE,
DQR reports and highlight to Top Management. Monthly reporting to Top Management for the
consumption of natural resources major/minor incidences and carbon production and reduce
environmental impacts.
Achievements in Suzlon
 Reduction of COPQ (Cost of Poor Quality) by 30%.
 Completed 10 nos. Quality Improvement project using 8D methodology.
 DNV certification of Wind Resource function across India for ISO 9001:2008 standard in 2012 &
Completion of Work for certification of ISO 14001 & OHSAS 18001 standard.
 Suzlon Legal register compliance by 99% of site and offices.
 “LEAD AUDITOR” Certification completed for ISO 14001 & OHSAS 18001.
 Successfully completion of SCEP (Skill Competency & Enhancement Program) for Site employees,
analyzing the skill gap in their specific competencies and reduction of skill gap by 23%.
 Mock Drill conduction for Employee and Contractors at all sites i.e. Height Rescue, Fire break out,
Electric shock, Fall from height, First aid, Snake and Scorpion bite etc.
 Vendor/Contractor Evaluation criteria developed and implemented.
 Tool box talk & Permit to Work Adherence.
 Release of Safety alerts, Incident reporting and investigation.
Work Experience: 2 HIND RECTIFIERS LTD.
Asst. Manager Quality & Testing Engineer, Rolling Stock April ‘07-May’09
Manager Quality & Testing Engineer, Rolling Stock May’09-May’11
Roles and Responsibilities:
Manager Quality & Testing Engineer , Traction-Rolling Stock
Quality Management: Ensuring defined processes are documented, implemented & adhered to at each
level & strict compliance to ISO procedures.
Testing & Inspection : Testing of 25kVA Inverter, 180KVA Converter, 1Phase & 3 Phase high
Voltage/High Current Rectifiers used for Indian Railways as per CLW & RDSO Specifications
Joint Inspection and Type test: Type test and joint inspection of Proto Unit in Loco shade and
manufacturing unit with RDSO, CLW, RITES, ICF (Integral Coach Factory), Intertek representative.
Customer Management: Attending the meeting periodically organized by RDSO, Railway Board,CLW,
Loco Shade to review the performance of the product delivered. Analyzing field failures & taking
corrective & preventive actions to ensure the errors do not reoccur, ensuring zero defects in field, Provide
Corrective and Preventive Action for the Failure at Customer end.
Achievements in Hind Rectifiers
 Involved in successful completion of “external and internal earth fault scheme” for 180 KVA
converters.
 Successfully implemented Earth fault Scheme in all over HIRECT MAKE Static Inverter in India
railways as per RDSO specifications.
 Involved in development of UPRATED Single Phase Rectifier 3000A used for ICF (Integral Coach
Factory) and RCF (Rail Coach Factory).
 Handled successfully the Proto type testing of 3-Phase alternator mounted rectifier in Diesel Loco
Engine in Presence of RDSO at Diesel Loco shade, Varanasi.
 Successfully Design a RECTIFIER for Kurla Loco Shed (Mumbai).
 Successfully completed the periodic type test of 180KVA static inverter and 25KVA inverter in
presence of RDSO representative.
Work Experience: 3 JABIL CIRCUIT.
Sr. Quality Engineer –Supplier Quality Oct ‘03-April’07
Roles and Responsibilities:
Sr. Quality Engineer –Supplier Quality
Quality Management:
Provide strong leadership to the work-cell in activities relating to product quality.
Assume the quality conscience of the work-cell in all aspects of the business.
Understand and champion customer requests for corrective/preventive action.
Focus on the quality efforts from material qualification to end user reliability.
Escalate issues and declining trends to the appropriate personnel for resolution.
Protecting the customer from all internal issues.
Maintain the 5S.
Perform Out of Box Audit (OBA).
Supplier Quality Management
Supplier Survey: To audit the probable supplier’s facility for
collection of database of supplier’s capabilities and supplier development along with commodity team.
Raise SCAR (Supplier Corrective action Request) on supplier for
non-conformity found at Jabil.
Achievements in Jabil
 Vendor development for customized Electronics components e.g. Choke, Transformers, Ferrite core,
insulated wires, tapes etc. , packaging material e.g. Foam & corrugated box, Printed Circuit Board (PCB),
 Reduction of failures on assembly line due to incoming material by controlling the process at vendor site
Work Experience: 3 ADVANCE POWER
DISPLAY SYSTEM LTD.
Quality Engineer July ‘2001-Oct’03
Roles and Responsibilities:
Quality Engineer
Quality Management:
On line Set up Audit at Product assembly line.
Incoming, in -process & final quality inspection of Product.
Raise CAR (Corrective action Request) on supplier for non-conformity found at Advance Power Display
System IQA.
Follow up with Vendor for any defects in Incoming Material.
Work with New Product Department for development of New Product.
Perform Internal ISO audit.
Work Experience: 3 FINE LINE CIRCUIT LTD.
Quality Engineer July ‘2000- June’2001
Roles and Responsibilities:
Quality Engineer
Quality Management:
Responsible for outgoing quality and in-process quality control of product.
Responsible for improving LAR and DPPM for outgoing parts.
Responsible for in-process training and continuous monitoring of
every workmanship stages.
Software Proficiency & Skills :
 Trained in using MS office & Basic SAP.
 Good writing skills, communication skills, proficient in English.
Personal Profile:
Date of Birth: December 12, 1976 Marital status: Married
Languages known: English, Hindi, Marathi Interests: Travelling, Watching News
Nationality: Indian Passport : Validity up to March 2017
Declaration:
I, hereby declare that the information furnished above is true to the best of my knowledge and solely bear
the responsibility for the correctness of the above-mentioned particulars.
Date: 17.02.2015
Place: Pune (Laxmikant Gajinkar)

More Related Content

What's hot (17)

venu QAQC Resume
venu QAQC Resumevenu QAQC Resume
venu QAQC Resume
 
Mallappa Beleri Resume
Mallappa Beleri ResumeMallappa Beleri Resume
Mallappa Beleri Resume
 
SG_CV___28.01_16
SG_CV___28.01_16SG_CV___28.01_16
SG_CV___28.01_16
 
Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)Present Resume -Mohan (22.12.2016)
Present Resume -Mohan (22.12.2016)
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
Resume
ResumeResume
Resume
 
PROJECT REPORT
PROJECT REPORTPROJECT REPORT
PROJECT REPORT
 
Pankaj-prajapati
Pankaj-prajapatiPankaj-prajapati
Pankaj-prajapati
 
Curriculum Vitae 2016_updated
Curriculum Vitae 2016_updatedCurriculum Vitae 2016_updated
Curriculum Vitae 2016_updated
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Resume
ResumeResume
Resume
 
Mangesh-Resume
Mangesh-ResumeMangesh-Resume
Mangesh-Resume
 
DOUGLAS D 2
DOUGLAS D 2DOUGLAS D 2
DOUGLAS D 2
 
JCardinal,RESUME_2016
JCardinal,RESUME_2016JCardinal,RESUME_2016
JCardinal,RESUME_2016
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 

Similar to Resume_Laxmikant (20)

Resume_Anuradha Jagadale
Resume_Anuradha JagadaleResume_Anuradha Jagadale
Resume_Anuradha Jagadale
 
ROOP(1)
ROOP(1)ROOP(1)
ROOP(1)
 
ashi new
ashi newashi new
ashi new
 
Nanthakumar_SQA (1)
Nanthakumar_SQA (1)Nanthakumar_SQA (1)
Nanthakumar_SQA (1)
 
JAYANT KUMAR
JAYANT KUMARJAYANT KUMAR
JAYANT KUMAR
 
Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
Resume _ Sathishkumar
Resume _ SathishkumarResume _ Sathishkumar
Resume _ Sathishkumar
 
Thiruchelvan K
Thiruchelvan KThiruchelvan K
Thiruchelvan K
 
ANAND.Resume.SQ
ANAND.Resume.SQANAND.Resume.SQ
ANAND.Resume.SQ
 
HARISH1 (1)
HARISH1 (1)HARISH1 (1)
HARISH1 (1)
 
Resume Manu
Resume ManuResume Manu
Resume Manu
 
shanmuganathan-Chennai
shanmuganathan-Chennaishanmuganathan-Chennai
shanmuganathan-Chennai
 
Update cv.msrattan 2016
Update cv.msrattan 2016Update cv.msrattan 2016
Update cv.msrattan 2016
 
CV (1)
CV (1)CV (1)
CV (1)
 
cv- L
cv- Lcv- L
cv- L
 
Deven Resume
Deven ResumeDeven Resume
Deven Resume
 
Khushmeet Khushi
Khushmeet KhushiKhushmeet Khushi
Khushmeet Khushi
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit Pandya
 
CV-Chinmoy
CV-ChinmoyCV-Chinmoy
CV-Chinmoy
 
PQC & Testing
PQC & TestingPQC & Testing
PQC & Testing
 

Resume_Laxmikant

  • 1. LAXMIKANT JAYAVANT GAJINKAR B6/101, Manjri Greens Annexe Opposite to Manjri Stud Farm, Near Bharat Petrol Pump, Pune Solapur Road, Manjri, Pune 411 307 Contact: +91-8087068972 (M) Email: lgainkar@rediffmail.com Career Objective: Securing a challenging position to harness my technical skills and knowledge and to optimize my potential for the organization’s and self growth. Educational Qualifications: SSC – 74.71% Mumbai Board MEA High School, Marol Maroshi Road, Andheri (W), Mumbai 400059. 1995 HSC – 64.00% Mumbai Board S.K. Somaiya Vinay Mandir, Vidhyavihar (E), Mumbai 400077 1997 Diploma in Industrial Electronics – 70.01% (FIRST CLASS) University of Mumbai Bhartiya Vidhyapeeth College of Engineering, Kharghar, Navi Mumbai 2000 Other Qualifications: PGMBA in Operations in 2012 – First Class Welingkar Institute of Management Development & Research, Matunga, Mumbai Certification of Internal Auditor for ISO 9001 in 2005 TQMI, Mumbai Certification of Lead Auditor for ISO14001 & OHSAS in 2012 DNV, Pune Work Experience: 1 SUZLON ENERGY LTD. Asst. Manager QHSE , Pune May ‘11-‘at present’ Roles and Responsibilities: Asst. Manager QHSE , Pune PLANNING PHASE: Responsible for implementing quality systems as Asst. MR. Directly plans and disseminates QMS and QAQC activities, Co-ordination with third party for equipment calibration. System and Process Based Audit as per ISO and OHSAS standard. NCR & AUDIT MANAGEMENT: Responsible for execution of internal on-site audits at site across globe, prepare audit schedules, Conduct audits, assistance to departments for CAPA and root cause analysis. Monitor the effectiveness of preventive and corrective actions taken. ONSITE PRODUCT FAILURE HANDELLING: Monitoring & analyzing field performance(With help of 7- QC Tools ), Analyzing field failures & taking corrective & preventive actions to ensure the errors do not reoccur, ensuring zero defects in field. QMS TOOLS APPLICATION: Develop P.F.M.E.A (Potential Failure Mode & Effect Analysis) for Met Mast (Tower used for wind study), for sites related repeated failure Quality Improvements projects through DMAIC (Define, Measure, Analyze, Improve & Control) methodology implementation. Use of PPAP, SPC, 7 QC tools for the process and their failure analysis and defining proper controls.
  • 2. VENDOR DEVELOPMENT & SUPPLIER QUALITY: Prioritize, perform vendor assessment and identify high business impact areas related to supplier quality improvement, Suppliers & Contractors Credentials evaluation on the Quality safety, Productivity, Performance etc parameters, Factory Inspections and depending upon their performance approving them for the execution of order as pilot or series. Monitoring Supplier Quality Monitor the performance of suppliers in terms of rejections & defects & evolve action plan for improvements along with materials & supplier. COPQ MONITORING: Monitor External & Internal cost of poor quality on the defined parameters by the management and reporting the cost to the management along with the steps for the reduction of the same. MATERIAL INSPECTION: Stage, in- process & final inspection for the material like Anemometer, Solar Panel, Fabricated Lattice mast structure, Wind Vane, Data logger, Pressure sensor, Humidity sensors , CT /PT , circuit breaker , insulators etc. at supplier end. CONDUCTING MRM: Plan, Schedule & conduct the Management Review Meeting. HSE MANAGEMENT: Incident reporting and investigation at Site. Risk assessment in daily operations. Risks are continuously identified, assessed and minimized, controlled or eliminated. Trains employees and contractors to be aware of any potential risks to personal safety on the job. Generate DHSEIR, HSE, DQR reports and highlight to Top Management. Monthly reporting to Top Management for the consumption of natural resources major/minor incidences and carbon production and reduce environmental impacts. Achievements in Suzlon  Reduction of COPQ (Cost of Poor Quality) by 30%.  Completed 10 nos. Quality Improvement project using 8D methodology.  DNV certification of Wind Resource function across India for ISO 9001:2008 standard in 2012 & Completion of Work for certification of ISO 14001 & OHSAS 18001 standard.  Suzlon Legal register compliance by 99% of site and offices.  “LEAD AUDITOR” Certification completed for ISO 14001 & OHSAS 18001.  Successfully completion of SCEP (Skill Competency & Enhancement Program) for Site employees, analyzing the skill gap in their specific competencies and reduction of skill gap by 23%.  Mock Drill conduction for Employee and Contractors at all sites i.e. Height Rescue, Fire break out, Electric shock, Fall from height, First aid, Snake and Scorpion bite etc.  Vendor/Contractor Evaluation criteria developed and implemented.  Tool box talk & Permit to Work Adherence.  Release of Safety alerts, Incident reporting and investigation. Work Experience: 2 HIND RECTIFIERS LTD. Asst. Manager Quality & Testing Engineer, Rolling Stock April ‘07-May’09 Manager Quality & Testing Engineer, Rolling Stock May’09-May’11 Roles and Responsibilities: Manager Quality & Testing Engineer , Traction-Rolling Stock
  • 3. Quality Management: Ensuring defined processes are documented, implemented & adhered to at each level & strict compliance to ISO procedures. Testing & Inspection : Testing of 25kVA Inverter, 180KVA Converter, 1Phase & 3 Phase high Voltage/High Current Rectifiers used for Indian Railways as per CLW & RDSO Specifications Joint Inspection and Type test: Type test and joint inspection of Proto Unit in Loco shade and manufacturing unit with RDSO, CLW, RITES, ICF (Integral Coach Factory), Intertek representative. Customer Management: Attending the meeting periodically organized by RDSO, Railway Board,CLW, Loco Shade to review the performance of the product delivered. Analyzing field failures & taking corrective & preventive actions to ensure the errors do not reoccur, ensuring zero defects in field, Provide Corrective and Preventive Action for the Failure at Customer end. Achievements in Hind Rectifiers  Involved in successful completion of “external and internal earth fault scheme” for 180 KVA converters.  Successfully implemented Earth fault Scheme in all over HIRECT MAKE Static Inverter in India railways as per RDSO specifications.  Involved in development of UPRATED Single Phase Rectifier 3000A used for ICF (Integral Coach Factory) and RCF (Rail Coach Factory).  Handled successfully the Proto type testing of 3-Phase alternator mounted rectifier in Diesel Loco Engine in Presence of RDSO at Diesel Loco shade, Varanasi.  Successfully Design a RECTIFIER for Kurla Loco Shed (Mumbai).  Successfully completed the periodic type test of 180KVA static inverter and 25KVA inverter in presence of RDSO representative. Work Experience: 3 JABIL CIRCUIT. Sr. Quality Engineer –Supplier Quality Oct ‘03-April’07 Roles and Responsibilities: Sr. Quality Engineer –Supplier Quality Quality Management: Provide strong leadership to the work-cell in activities relating to product quality. Assume the quality conscience of the work-cell in all aspects of the business. Understand and champion customer requests for corrective/preventive action. Focus on the quality efforts from material qualification to end user reliability. Escalate issues and declining trends to the appropriate personnel for resolution. Protecting the customer from all internal issues. Maintain the 5S. Perform Out of Box Audit (OBA). Supplier Quality Management Supplier Survey: To audit the probable supplier’s facility for collection of database of supplier’s capabilities and supplier development along with commodity team. Raise SCAR (Supplier Corrective action Request) on supplier for non-conformity found at Jabil.
  • 4. Achievements in Jabil  Vendor development for customized Electronics components e.g. Choke, Transformers, Ferrite core, insulated wires, tapes etc. , packaging material e.g. Foam & corrugated box, Printed Circuit Board (PCB),  Reduction of failures on assembly line due to incoming material by controlling the process at vendor site Work Experience: 3 ADVANCE POWER DISPLAY SYSTEM LTD. Quality Engineer July ‘2001-Oct’03 Roles and Responsibilities: Quality Engineer Quality Management: On line Set up Audit at Product assembly line. Incoming, in -process & final quality inspection of Product. Raise CAR (Corrective action Request) on supplier for non-conformity found at Advance Power Display System IQA. Follow up with Vendor for any defects in Incoming Material. Work with New Product Department for development of New Product. Perform Internal ISO audit. Work Experience: 3 FINE LINE CIRCUIT LTD. Quality Engineer July ‘2000- June’2001 Roles and Responsibilities: Quality Engineer Quality Management: Responsible for outgoing quality and in-process quality control of product. Responsible for improving LAR and DPPM for outgoing parts. Responsible for in-process training and continuous monitoring of every workmanship stages. Software Proficiency & Skills :  Trained in using MS office & Basic SAP.  Good writing skills, communication skills, proficient in English. Personal Profile: Date of Birth: December 12, 1976 Marital status: Married Languages known: English, Hindi, Marathi Interests: Travelling, Watching News Nationality: Indian Passport : Validity up to March 2017 Declaration: I, hereby declare that the information furnished above is true to the best of my knowledge and solely bear the responsibility for the correctness of the above-mentioned particulars. Date: 17.02.2015 Place: Pune (Laxmikant Gajinkar)