SlideShare a Scribd company logo
1 of 16
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
INTRODUCTION
SITE STUDY
1.CLIMATE : COLD AND TEMPERATE
2. ORIENTATION : E-W
3. SURROUNDING : GRAND
CROSSING NEIGHBOURHOOD
LIES IN NORTH
4. PARKING : POROUS CONCRETE
SURFACE SURROUNDED BY
GREENARIES NO.S
OBJECTIVES
ARCHITECTURAL APPERANCE:
CLARITY AND ADAPTABILITY
• ADVERTISE THE ACTIVITY INSIDE ON THE BUILDING EXTERIOR
• SPACES CAN BE MODIFIED OVER TIMES AS PROGRAM IN THE YOUTH
CENTER EVOLVES
• MAINTAINING THE BUILDING PROGRAMMETIC SUSTAINABILITY
FEATURED PROGRAMS AND ACTIVITIES
LOCATION:
CHICAGO,
UNITED STATES
ARCHITECT:
JOHN RONAN
ARCHITECTS
BUILDING :
EDUCATIONAL,R
ECREATION
CENTER
SITE
AREA:
6968M2
BUILT YEAR:
2016 A.D
CLIENT:
COMER
EDUCATION
CAMPUS
SPORTS FITNESS AND
RECREATION
• FIT KIDS
• STRENGTH
TRAINING
LEADERSHIP AND SOCIAL
DEVELOPMENT
• CULTURE CLUB
• DESTINY LEADER CLUB
INTERNATIONAL CASE STUDY: GARY COMER YOUTH CENTER
ADAPTABLE
HALL
WRAPPING SPACES
• TO STUDY ABOUT THE
LANDCSAPE AND
ENVIRONMENTAL AWARENESS IN
YOUTH CENTER
ENVIRONMENTAL AWARENESS
• TO UNDERSTAND ABOUT MATERIALS
AND ITS IMPACT IN EXTERIOR AND
INTERIOR ENVIRONMENT
• TO KNOW ABOUT THE SPACES
,CIRCUALATION AND ITS
RELATIONS IN YOUTH CENTER
• THE ROOF GARDEN SERVES AS OUTDOOR
CLASSROOM TO SUPPORT YOUTH HORTICULTURAL
PROGRAMS
• THE GARDEN COLLECTS AND RECYCLES RAINWATER,
AND SERVES TO REDUCE THE URBAN HEAT ISLAND
EFFECT
• THE SITE SURFACE EMPLOYS POROUS PAVING
SURFACES TO REDUCE THE PRESSURE ON STORM
WATER MANAGEMENT SYSTEMS
CONCEPT/DESIGN APPROACH
• TO BRING SOCIAL PROGRESS IN
BACKWARD NEIGHBOURHOOD
• WITHOUT THE LOT OF
GLASS AT STREET
LEVEL TO CREATE A
SENSE OF SECURITY
WHILE KEEPING THE
BUILDING LIGHT,AIRY
MATERIALS
• RAINSCREEN CALDDING OF FIBER CEMENT PANELS
• BULLETPROOF GLAZING GLASS FACING STRRET
• PERFORATED METAL SCREEN
• USE OF POROUS CONCRETE FOR STORM WATER
MANAGEMENT
1-ROOF GARDEN 2-ARTS AND CRAFT ROOM 3.COMPUTER LAB
4.CONFERENCE ROOM 5.RECORDING STUDIO
6. WC 7. STORAGE 8.CLASSROOM
9.OFFICE 10.ADAPTABLE HALL
11.CAFETERIA
LONGITUDINAL SECTION
1
10
4
6
11
2
3
5
8
9
7
9
1
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
ROOF PLAN S-E VIEW N-W VIEW
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
INTERNATIONAL:FIRSTENBURG COMMUNITY CENTER
SITE INFORMATION
INTRODUCTION
CONCEPT
COMMUNITY LIBRARY:
⮚ FOCUSES VIEWS ON EXIXTING TREES &
CAPTURES FILTERED DAY LIGHT
⮚ OPEN VISUALLY TO SURROUNDING , TEEN
AREA & MEETING ROOM, CHILDREN’S AREA
⮚ COMMUNITY MEETING ROOM FEATURES A
SHARED BUT SECURABLE ENTRANCE FOR
USER
LOCATION : VANCOUVER,WASHINTON
ARCHITECT : OPSIS ARCHITECT
PROJECT TYPE : COMMUNITY CENTER
ESTABLISHED YEAR : 2006 A.D.
SITE AREA : 90,000 SQ.FT
CLIMATE : TEMPERATE ZONE
ORIENTATION : EAST ORIENTATION
SURROUNDING : CENTER OF RESIDENTIAL,
ADJACENT TO HEALTH CENTER
PARKING : ORGANIC SHAPE
SITE ECOLOGY :COURTYAD TO ALLOW INTERIOR
FUNCTION TO PARTICIPATE WITH NATURAL
LANDSCAPE, LARGE WINDOWS FOR DAYLIGHT
⮚ DAYLIGHT THROUGHOUT THE ENTIRE BUILDING
⮚ TRANSPARENCY BETWEEN SPACES
⮚ SUSTAINABILITY
⮚ CREATING STRONG CONNECTIONS TO THE SITE
AND PROVIDING A WELCOMING OPEN DISPLAY OF
RECREATION & COMMUNITY SPACES
DAYLIGHT AND
VENTILATION
FLOOR PLANS
MULTI USE COMMUNITY
FUNCTIONS
⮚ CAPACITY 350 CITIZENS
⮚ VENUE FOR CITY COUNCIL
MEETINGS, SOCIAL DANCES ,
PERFORMANCES,
NEIGHBORHOOD FAIRS &
COMMUNITY FORUMS
9
SPACES
TWO-COURT GYMNASIUM
LAZY POOL
EDUCATIONAL
SPACE
▪ LIBRARY
▪ RESOURCE ROOM
▪ CHILD CARE
SOCIAL SPACE
▪ TEEN LOUNGE
▪ SENIOR LOUNGE
▪ MULTIPURPOSE
ACTIVITY SPACE
▪ MEETING ROOM
▪ MULTI USE HALL
RECREATIONAL SPACE
▪ DANCE STUDIO
▪ GAME ROOM: PINGPONG
,FUSSBALL,POOL
▪ ROCK CLIMBING
PHYSICAL ACTIVITY SPACE
▪ SWIM & WARM WATER
LEISURE
▪ FITNESS SPACE
▪ TWO COURT GYMNASIUM
▪ LOCKER
A.PROGRAM SPACE
B.SERVICE SPACE
▪ ADMINSTRATION
▪ MECHANICAL
▪ WASHROOM ETC.
OPEN COMMUNITY SPACE
WATER MANAGEMENT:
⮚ WATER USE IS REDUCED
⮚ BY THE USE OF WATERLESS URINALS, LOW FLOW
FIXTURES,USE OF GRAYWATER FROM POOL’S
FILTER BACKWASH SYSTEM TO FLUSH TOILET
MATERIALS AND TECHNOLOGY:
⮚ COMMUNITY ROOM-BAMBOO FLOORING,
ACOUSTICAL WALL PANELING
⮚ RECYCLED MATERIALS LIKE GLASS WALL TILES
⮚ NATURAL,NONTOXIC & ENDURING
⮚ WOOD,CONCRETE MASONRY,GLASS,STEEL
⮚ CONSTRUCTION WASTE WAS RECYCLED
ARCHITECTURAL ELEMENT
INDEX
1. NORTH FACING
DAYLIGHT
2. NORTH FACING
AIR INTAKE
3. RADIANT
HEATED SLAB
4. DAYLIGHT AND
STACK
VENTILATION
MONITOR
5. CLEAR GLAZING
TO NATATORIUM
6. SOUTH FACING
DAYLIGHT
MONITOR
7. SOUTH FACING
WOOD SUNSADE
8. POOL FILTER
BACKWASH
SYSTEM TANK
2
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
REGIONAL CASESTUDY : CULTURAL SPORT COMPLEX FOR DISABLED
INTRODUCTION
LOCATION : TEHRAN , IRAN
ARCHITECT : ARASH MAZAFARI
PROJECT TYPE : CULTURAL
SPORT COMPLEX
ESTABLISHED YEAR : 2011 A.D.
BUILT AREA : 18000SQ.M
SITE
INFORMATION
CLIMATE : COLD SEMI ARID
ORIENTATION : E/W ORIENTATION
SURROUNDING : PUBLIC PARK IN NORTHERN SIDE OF SITE AND 100 YEARS
OLD TRESS WITH FOOTBALL IN SOUTHERN SIDE
PARKING : UNDER PUBLIC PARK
CONCEPT AND PLANNING
⮚ SPACES BEHAVE IN REALTION TO
INSIDE AND OUTSIDE OF THE
BUILDING
⮚ FUNCTIONAL BOXES LOCATE AND
SLIP OVER EACH OTHER TO MAKE
VOIDS BETWEEN THE SPACES
SPACE
S
A. PROGRAM SPACES
1 .ADMINSTRATIVE
SECTOR
2.CULTURAL SPACES
▪ AMPHITHEATER
▪ LIBRARY
▪ GALLERY
▪ MEDIA CENTER
▪ PLACE OF WORSHIP
3.EDUCATIONAL SPACES
▪ CONFERENCE HALL
▪ TRAINING CLASSES
▪ WORKSHOPS
4. SPORT SPACES
▪ POOL,STEAM
,SAUNA
▪ HYDROTHERAPY
POOL
▪ TABLE TENNIS HALL
▪ GYM FITNESS
▪ SHOOTIG HALL
▪ MULTIPURPOSE
HALL
▪ CHESS ROOM
B.SERVICE SPACE
▪ BUFFET
▪ PUBLIC HALL
▪ PARKING UTILITY
AND CIRCULATION
SPORT
CULTUR
E
1
2 3
4
5
6
1. PARKING
2. ROOM AIR
3. ELECTRICAL ROOM
4. HYDROTHERAPHY
POOL FACILITIES
5. POOL
6. GENERATOR ROOM
1
2
4
5
6
7
8
9
10
3
11 12
13
1. POOL ENTRANCE
2. ACCEPTANCE
3. REPLACEMENT
WHEELCHAIR
4. POOL
5. HYDROTHERAPHY
POOL
6. DRY SAUNA
7. STEAM SAUNA
8. BUFFET
9. LIFE GUARD ROOM
10. MASSAGE ROOM
11. EMERGENCY ROOM
12. ELECTRICAL ROOM
13. PARKING
FLOOR
PLANS
BASEMENT 1ST FLOOR PLAN
BASEMENT 2ND FLOOR
MASTER PLAN
TRANSPRANT
FACADE MAIN CIRCULATION
SOLID VOLUMES
LEVELS
FORM
DEVELOPMENT
INDEX
3
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
GROUND FLOOR PLAN
REGIONAL CASESTUDY: CULTURAL SPORT COMPLEX FOR DISABLED
ACCESS
1. ENTRANCE
2. ELEVATOR
3. STAIR & EMERGENCY EXIST
4. DISABLE RAMP
5. PARKING RAMP
ADMINISION CONTROL
OFFICES
6. PRESIDENT
7. VICE PRESIDENT
8. STAFF
9. CONFERENCE ROOM
CIRCULATIO
N
FIRST FLOOR PLAN
PUBLIC SPACES
1. RESTAURANT
2. GALLERY
3. PRAYER
ROOM
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FOURTH FLOOR PLAN
ROOF PLAN
SPORT
1. GYM AND FITNESS
2. SHOOTING HALL
3. LOCKER ROOM
EDUCATIONAL
4. TRAINNING CLASSES
5. COUNSELLING CLASSES
6. WORKSHOP
SPORT
1. LOCKER
2. TABLE TENNIS
HALL
3. CHESS ROOM
CULTURAL
WORKSHOP
SPORT
1. LOCKER ROOM
2. MULTIPURPOSE HALL
AMPHITHEATER
3. WAITING ROOM AND BUFFET
4. MAIN HALL
5. DIFFERENTLY ABLE STAGE
1. RUNNING TRACK
1
2
2
3
3
3
2
1
4
3
5
1
5
1
2
4
3
6
6 4
9
8 7
5 1
1
3
1
2
2
4
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
REGIONAL CASESTUDY: CULTURAL SPORT COMPLEX FOR DISABLED
VERTICAL STAKING OF
PROGRAM
LIGHTING
⮚ HAVING GLASS FAÇADE THE BUILDING ALLOWS PLENTY OF
NATURAL LIGHT ENTER INTO THE INTERIOR
⮚ BASICALLY ITS VERY BRIGHT INTERIOR BUILDING DURING DAY
⮚ ALSO PLAYED WITH ARTIFICIAL LIGHTING TO GIVE DIFFERENT
EFFECT AND NIGHT
APPRAISAL
⮚ LIGHTING LEVELS ARE ENOUGH AT DAY & EVEN ARTIFICIAL
LIGHTING HAS BEEN WELL CONSIDERED FOR NIGHT TIME
⮚ A MIDWAY CONNECTION IN THE RAMP MAKES IT EASIER FOR
CIRCULATION IN THE SAME FLOOR
⮚ ACTIVITY ZONE IS ALMOST FAR FROM / HAS BARRIER FROM THE
OUTDOOR NOISES LEDING THE WAR VICTIMS WITH PEACE OF MIND
CRITICISM
⮚ EMERGENCY STAIRCASE LEADS TO THE BASEMENT WHICH CAN
CAUSE CASUALITIES DURING DISASTER
⮚ IN THE MULTIPURPOSE HALL LARGE SIZED COLUMN HAS BEEN
USED
⮚ AND THE LIGHTING IS FROM ONLY ONE SIDE AND IS VERY
INCLUSIVE MAKING IT UNCOMFORTABLE FOR USERS
MATERIAL
S
⮚ GLASS,STEEL ,RCC,TILES
⮚ GYPSUM BOARD & WOOD PANEL TO MANAGE ACOUSTIC IN
AMPHITHEATER
REPLACEMENT WHEEL CHAIR
COURTYARD SPACE STARTING FROM FIRST FLOOR
WAITING AND BUFFET FOR AMPHITHEATRE
MEZZANINE FLOOR WITH MULTIPURPOSE
HALL WITH SEATING AREA
BUILDING AT NIGHT
TIME
5
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
NIRVANA WELLNESS CENTER
LOCATION : JAWALAKHEL, LALITPUR.
SITE AREA : 2100 SQ.METER
FLOOR HEIGHT : 8’ TO 11’
STRUCTURAL SYSTEM : FRAMED
SERVICES : GYMNASIUM,
CARDIOVASCULAR,
SWIMMING POOL, SPA, CAFÉ, ZUMBA
AND MULTIPURPOSE HALL.
OBJECTIVE
• TO STUDY THE ASPECTS OF WELL-DESIGNED COMPONENTS
OF YOUTH CENTER.
•TO STUDY THE OPERATION OF GYMNASIUM IN NATURAL CONDITION
(WITHOUT THE USE OF AIR CONDITION AND USE OF NATURAL
LIGHT )
•TO STUDY THE OUTDOOR SPACE IN MAKING THE COMPLEX
VIBRANT.
BUILDING FROM
• THREE STORIED BUILDING WITH
• FITNESS IN THE GROUND FLOOR AND AEROBICS HALL IN THE
FIRST FLOOR.
• ADDITIONAL BLOCK ATTACHED WITH MAIN BLOCK OF SINGLE
STOREY
FOR FITNESS CENTER.
SITE PLANING :
• WELL-DESIGNED FITNESS CENTER.
• MODIFICATIONS DONE HAVE ALTERED THE CIRCULATION
SOMEHOW
• RECEPTION AND SWIMMING POOL IS PLACED ADJACENT TO EACH
OTHER.
• PARKING AND BADMINTON IN SAME SPACE.
• DAYLIGHT FROM ROOF.
• TRUSS ON ROOF : STEELTRUSS ROOF: TRUSS PRATT FRAME.
ZONING/BUBBLE DIAGRAM/MASTERPLAN
MASTERPLAN
ENTRANCE :
• SEPARATE VEHICLE AND PEDESTRIAN
PATH.
• PROVIDED WITH GUARD HOUSE.
• GREEN VEGETATION CREATING
WELCOMING ENVIRONMENT.
• MAIN GATE DESIGNED AS VISIBLY
CONNECTED.
RECEPTION
• AREA: 105 SQ.
• SERVES FOR BOTH THE VISITORS
AND RECEPTION FOR SWIMMING POOL
• UPPER FLOOR USED AS OFFICE.
SWIMMING POOL
• FREEFORM AND GEOMETRIC SHAPES
• DEPTH: 4’ TO 5’ (MAIN POOL)
2’ TO 2’-6’’ (CHILDREN POOL)
• FLOORING : TILES, STONE PAVED
ALONG THE POOL..
• FILTER NEXT TO SWIMMING POOL.
• OPERATES ONLY DURING SUMMER.
• MOST POPULAR SERVICE HERE.
CHANGING ROOM:
• SWIMMING POOL NEXT TO
CHANGING ROOM
• 44 LOCKERS ARE PROVIDED.
• PRIVACY MAINTAINED.
MULTIPURPOSE HALL:
• AREA: 996 SQ. FT.
• AEROBICS/ ZUMBA TRAINING
(25- 30 USERS).
• ZUMBA 4 DAYS A WEEK.
• NO STORE ROOM FOR FURNITURES
PARQUET FLOORING.
• GYPSUM BOARD FALSE CEILING.
• ELECTRIC FANS (2 FANS AND
4 EXHAUST FANS) AND AIR COOLERS.
FITNESS CENTER
• SINGLE STOREY BLOCK.
• FLOOR HEIGHT : 3.4M.
• BAMBOO CEILING, PARQUETTE FLOORING
• NEAR TO RECEPTION AREA.
• CHANGING ROOM (30 LOCKERS).
CARDIO VASCULAR
WEIGHT TRAINING STRETCH AREA
PARKING
• BADMINTON COURT AS PARKING.
• INSUFFICIENT PARKING DURING THE
USE OF MULTIPURPOSE HALL.
• SPACE FOR 15-20 CARS AND 20-30
BIKES NEAR THE FITNESS CENTER.
INFERENCES
• NATURAL LIGHTING AND VENTILATION IN THE FITNESS HALL.
• PARKING SPACES CAN BE MODIFIED INTO BASEMENT FOR MORE
SPACE.
• COMFORTABLE FOR USER.
• BASIC PLANING PRINCIPLES DESIGN APPROACH OF FITNESS COMPLEX
NATIONAL CASE STUDY: NIRVANA WELLNESS CENTER
6
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
NATIONAL CASE STUDY : SPORT AREA OF LINCOLN
SCHOOL
ARCHITECTURAL ELEMENT
SITE INFORMATION
INTRODUCTIO
N
ZONING
FLOOR PLANS
SAFETY AND SECURITY:
⮚ LIGHTNING DETECTION SYSTEM
⮚ EARTHQUAKE RESISTANT
⮚ FIRE DETECTORS,ALARAMS ,
⮚ SECURITY CAMERAS
⮚ 24 HRS GUARD FORCES
⮚ EMERGENCY BOARDCAST SYSTEMZ
LIBRARY:
⮚ SEPARATE LIBRARY FOR PRIMARY
& SECONDARY STUDENTS
⮚ LIVE LIGHT FROM CEILING
⮚ GLASS WALL FOR PROPER
LIGHTING
EXTRA CURRICULAR ACTIVITIES:
⮚ OPEN BASKET BALL COURT(28M X 15M) FACING N-S &
A FOOTBALL GROUND BESIDE IT
⮚ INDOOR PLAYGROUND ON TOP OF THE ROOF OF THE
ACADEMIC BLOCK
⮚ AN INDOOR BASKETALL COURT WITH FLEXIBLE
IMPACT ABSORBING FLOOR OF NBA STANDARD IS ON
1ST FLOOR
⮚ SWIMMING POOL WITH DEPTH FROM ( 3FT TO 9FT)
PROGRAMS:
LOCATION : RABIBHAWAN , KATHMANDU
ARCHITECT : KAI WAISE
PROJECT TYPE : EDUCATIONAL COMPLEX
ESTABLISHED YEAR : 1954 A.D.
SITE AREA : 11132 SQ.M
CLIMATE : TEMPERATE ZONE
ORIENTATION : MULTIPURPOSE SPACE FACES
WEST
SURROUNDING AND ROAD APPROACH: FEW
TREES INSIDE ,MANY RESIDENTIAL BUILDING & A
COMMERCIAL BUILDING (HOTEL) OUTSIDE THE
SCHOOL
PARKING AND LANDSCAPING : PARKING OUTSIDE
THE SITE
GROUND FLOOR
FIRST FLOOR
MATERIALS AND TECHNOLOGY:
⮚ RCC,BRICK MASONRY
⮚ PANELED GLASS WALLS
⮚ FLOORING: STONE,TILES,CEMENTED
LIBRARY-PARQUETTED FLOOR
STAIRCASE-BROWN TILE
TOILET-MARBLE FLOOR & DABBED WALLS
PASSAGE WAY-GLASS RAILING
VENTILATION AND ACOUSTIC:
⮚ NATURAL & ARTIFICIAL VENTILATIONS
⮚ BIG WIDOWS (6” HT)
⮚ AIR PURIFICATION SYSTEM
⮚ SOUND ABSORBING MATERIALS IN MUSIC ROOM,
MULTIPURPOSE HALL & CANTEEN
CIRCULATION SPACE:
⮚ RAMP & ELEVATOR FOR UNIVERSAL ACCESSIBILITY
⮚ PASSAGE & CORRIDOR ARE SKY LIT & COVERED BY
TRANSPARENT MATERIALS
COLOUR USED:
⮚ BRIGHT COLORS (WHITE, RED & YELLOW , LIGHT
GREEN, BLUE & ORANGE) ARE USED IN CLASSROOM
⮚ COLORFUL CHAIRS, TABLES, BEANBAGS, EXERCISE
BALLS ALSO HELPS LIGHTEN THE ENVIRONMENT
INDEX OF 1ST F.L
1. COURTYARD
2. COMPUTER LAB
3. IT BULLPEN
4. IT WORKSTATION
5. OFFICE
6. STORAGE
7. COUNSELORS
OFFICE
8. OFFICE
9. SPEECH ROOM
10. CORRIDORS
11. STORAGE
12. UPPER LIBRARY
13. ELEMENTARY
LIBRARY
14. DOUBLE FLOOR HT.
GYMNASIUM
INDEX
1. SITTING AREA
2. CONFERENCE
3. PROJECT ROOM
4. PROJECT ROOM
5. OFFICE
6. HALL
7. WORKROOM
8. VIDEOROOM
9. GIRLS CHANGING
ROOM
10. BOYS CHANGING
ROOM
11. STORAGE
INDEX OF 2ND F.L
1. OPEN CORRIDOR
2. DOUBLE FLOOR
HT. GYMNASIUM
SECOND FLOOR
MASTER PLAN
7
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
INTRODUCTION SOCIALZONES
LOCATION : BARGACHI,DHARAN
PROJECT TYPE : SPORTS ZONE
BUILT YEAR : 2016 A.D
CLIMATE : SUB-TROPICAL
SITE
SITE AREA :
PRIMARY ACCESS : EAST PRIMARY ROAD 8M
TOPOGRAPHY : FLAT LAND WITH VEGETATION AROUND PLAN
SPACES RELATION
CREATIVE ZONES
SPORTS ZONES
LANGALI SAMUDAYEK VAWAN
LOCATION: TINKUNEA, DHARAN
BUILT: 2058BS
CAPACITY : 200 aprox
USE :CULTURAL PROGRAM
PARKING FUTSAL
COURT
SEATINGS
BADMINTON COURT
CAFE STORE
MATERIALS AND CONSTRUCTION TECHNOLOGY
MATERIALS USED
CONCRETE FLOORING, TIMBRE POST,
TIMBER ROOFING MEMBER, CGI- SHEET
ROOFING,
PLYWOOD FALSE CEILLING
LIGHTING
EXTENSIVE USE OF NATURAL LIGHT
USE OF CLEAR WINDOW FOR
LIGHTING IN BOTH THE SIDE OF
HALLL
DIRECT LIGHT VIA LED LIGHT
STRUCTURE AND CONSTRUCTION
TIMBER FRAME STRUCTURE, TIMBER
POST, QUEEN POST ROOF TRUSS
ORIENTATION
EAST-WEST ORIIENTED MAIN
HALL WITH MAIN ENTRANCE AT
EAST & STAGE AT WEST
APROX 150M BETWEEN THE
HALL & ROAD
• STEEL TRUSS
• CONCRETE BLOCKS
• EXPANDED METAL
• CGI SHEETS
LOCAL CASE STUDY : BIG FOOT FUTSAL AND LANGALI SAMUDAYEK VAWAN
SAFTY AND PRECAUTIONS
TIMBER STRUCTURE SHOULD BE WELL
PRESERVED FROM FIRE AND MOISTURE
8
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
COMPARATIVE ANALYSIS
LITERATURE INTERNATION REGIONAL NATIONAL LOCAL
NAME GARY COMER FIRSTERNBURG
COMMUNITY CENTER
CULTURAL SPORT
COMPLEX FOR DISABLE
NIRVANA SPORT AREA OF LINCOLN
SCHOOL
BIG FUTSAL LANGHALI SAMUDHAYEK
BHAWAN
AREA 6968M2 90000 SQ. FT 5000 SQ. M 2100 SQ. M 11132 SQ. M 1,986.31 m² 17,556.01 m²
CLIMATE COLD AND TEMPERATE HIGHEST TEMP :28 C
LOWEST TEMP : -3 C
HIGHEST TEMP :7 C – 32 C
LOWEST TEMP : -2.3 C – 5.8 C
HIGHEST TEMP : 19.1 C
LOWEST TEMP : 2.4 C
HIGHEST TEMP : 25 C
(AVERAGE)
LOWEST TEMP : 3 C , 9 C (
AVERAGE )
RAINFALL 14.4 MM
WARM AND TEMPRATE WARM AND TEMPRATE
USERS YOUTH COMER EDUCATION CAMPUS GENERAL PUBLIC FOCUSED TO THE
DIFFERENTLY ABLED PEOPLE
GENERAL PUBLIC STUDENTS AND STAFFS OF
THE SCHOOL
GENERALLY YOUTH GENERAL PUBLIC
PUBLIC FLOW &
CIRCULATION
RAMPS , STAIRCASE , CORRIDORS STAIRCASE,LOBBY,CORTYAR
D
STAIRCASE , WIDE
CORRIDOR
RAMPS , ELEVATOR ,
STAIRCASE, SPACIOUS
CORTYARD
PATHWAYS PATHWAYS
LOCATION NEAR HOUSING AREA, SCHOOLS &
SPORT COMPLEX
FUTURE EXPANSION
CHICAGO,UNITED STATES VANCOVER , WASHINGTON,
USA
TEHRAN , IRAN JWALAKHEL ,
KATHMANDU
RABIBHAWAN ,KATHMANDU
, NEPAL
DHARAN, NEPAL DHARAN, NEPAL
PROGRAMS
INCLUDED
EDUCATIONAL SPACE
SOCIAL SPACE
RECREATIONALSPACE
PHYSICAL ACTIVITY SPACE
SERVICE SPACE
ADAPTABLE
HALL,CAFETERIA,GYMNASIU
M,CLASSROOM,OFFICES,ART
S AND CRAFT,DANCE
ROOM,COMPUTER
LAB,RECORDING
STUDIO,CONFERENCE HALL
LIBRARY, DOUBLE COURT
GYMNASIUM, LAZY POOL,
GAME ROOM, ROCK
CLIMBING, MEETING ROOM,
RESOURCE ROOM
LIBRARY, GYM FIYNESS, POOL
& HYDROTHERAPY POOL,
GAME ROOM, MULTIPURPOSE
HALL, TRAINNING CLASSES,
WORKSHOP, PLACE OF
WORSHIP, OUTDOOR
FOOTBALL COURT,
COUNSELLING ROOM
GYMNASIUM,
CARDIOVASCULAR,
SWIMMING POOL, SPA,
CAFÉ, ZUMBA
MULTIPURPOSE HALL
LIBRARY , GYMNASIUM ,
COPUTER LAB , SWIMMNING
POOL , OUTDOOR
BASKETBALL COURT ,
FOOTBALL GROUND , VIDEO
ROOM , COUNSELOR’S
OFFICE , SPEECH ROOM
FUTSAL, BADMINTON,
CAFEA SOCIAL GATHERING
SPACE,STORE
CULTURAL PROGRAM, KID’S
FUNPARK, PARK, GREEN
SPACE, SOCIAL GATHERING
AND PROGRAM
EMERGENCY EXITS TWO SEPARATE EXIT IN EACH
STOREY
2 STAIRS & EMERGENCY EXIST
AT THE TWO VERY END
CORNERS OF THE NORTH
FACADE
DESIGN CONCEPT CONSTRUCTIVE
ENVIRONMENT AND BRING
SOCIAL PROGRESS
DAYLIGHT THROUGHOUT
ENTIRE BUILDING
TRANSPARENCY BETWEEN
SPACES
FAÇADE AS LANDSCAPE
FUNCTIONAL BOXEX LOCATE
& SLIP OVER EACH OTHER TO
MAKE VOIDS BETWEEN THE
SPACES
USE OF NATURAL LIGHT
THROUGH ROOF
TO ENHANCE MICRO-
CLIMATE
WATER BODIES PRESENT
NATURAL BAMBOO SHADING
WITH TOTAL USE OF
DAYLIGHT. CAFÉ TO ADD
MORE DELIGHT.
UTILIZATION OF
COMMUNITY FOREST,
NATURAL PATHWAYS
SUSTAINABILITY HIGHLY SUSTAINABLE
RAINWATER HARVETSING
SOLAR ENERGY
ROOF GARDEN FOR
REDUCING URBAN HEAT
ISLAND EFFECT,USE OF
POROUS CONCRETE TO
PREVENT PRESSURE ON
STROM MANANGEMENT
HIGHLY SUSTAINABLE ,
MADE FROM LOCAL
MATERIAL (WOOD) , USE OF
RECYCLED MATERIALS , USE
OF GREY WATER FOR
FLUSHING , CONTROL F THE
HEATING OF THE BUILDING
THROUGH THE MATERIALS
USED
MAXIMUM DAYLIGHTING
THROUGH GLASSES
MAXIMUM DAYLIGHT
THROUGH ROOF.
NATURAL VEGETATION, USE
OF LEFT OVER SPACE AS
VEGETABLE PLANTATION
DAYLIGHT THROUGH THE
WHOLE LENGTH SPAN OF
THE HALL ON BOTH THE
SIDE, USE OF LOCALLY
AVAILABLE MATERIAL
STRUCTURAL
SYSTEM
FRAMED FRAMED LONG SPAN STRUCTURE,
STEEL TRUSS, STEEL POST
TIMBER STRUCTURE
LIGHT WEIGHT STRUCTURE
MATERIALS FIBER CEMENT PANELS,
GLASS ,PERFORATED
METAL SCREEN POROUS
CONCRETE
WOOD , TILES , GLASS ,
BAMBOO , RCC
GLASS , STEELS , RCC BRICKS EXPOSED, TIN
ROOF, FALSE CEILLING
RCC, BRICK MASONRY ,
GLASS , STONE TILES
STEEL, GLASS, CONCRETE,
CONCRETE SLAB ON FLOOR
TIMBER, CONCRETE FLOOR
AND PAVEMENT
CRISIS
MANAGEMENT
FIRE SAFETY , SMOKE DETECTOR
SESMIC DESIGN CONSIDERATION ,
FIRE SAFETY FIRE SAFETY FIRE SAFETY FIRE SAFETY FIRE SAFETY , EARTHQUAKE
RESISTANT
LIGHT WEIGHT STRUCTURE
CONCLUSION DEVELOPS PHYSICAL AND
SOCIAL SKILLS AND
CREATES HOSPITABLE
ENVIRONMENT FOR YOUTH
EASY ACCESS FROM THE
MAIN ROAD, PROVIDES A
GATHERONG SPACES FOR
THE COMMUNITY PEOPLE ,
SPACE FOR ALL AGE GROUP
,
DESIGNED TO PROVIDE A
DEDICATED SPACES FOR THE
DIFFERENTLY ABLE PEOPLE ,
WHERE THEY CAN SOCIALIZE
EASY ACCESS FROM THE
MAIN ROAD, SPACE FOR
ALL AGE GROUP
DESIGNED TO INVOLVE
STUDENTS IN THE PHYSICAL
AND RECREATIONAL
ACTIVITIES TOO
A GREEN SPACE AND CAFÉ
WELCOMING THE SPORTS
ENTHUSIASTS.
A SIMPLE RECTANGULAR
PLANED HALL TO
ACCOMMODATE MAXIMUM
NUMBER OF PEOPLE.
USE OF TIMBER AND
PITCHED ROOF RESEMBLES
NEPALESE ARCHITECTURAL
STYLE.
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
SITE ANALYSIS
INTRODUCTION
THE FOLLOWING SITE IS SELECTED
FOR THE DESIGN OF YOUTH
CENTER
SITE DETAILS
LOCATION : PANBARI , DHARAN
LATITUDE: 26 46’2” N
LONGITUDE: 27 19’03” E
ALTITUDE: 349.91 M
SITE AREA: 15,123.54 M^2
CLIMATE: WARM TEMPERATE
ENTRY AND ACCESS POINT:
FROM THE SECONDARY PITCHED
ROAD WHICH IS CONNECTED TO THE
MAIN ROAD( DEUTI PANBARI ROAD)
MAIN ENTRY THROUGH EAST
NEAREST LANDMARK
MONEYGRAM
HEBRON ENGLISH BOARDING SCHOOL
SARASWATI H.S. SCHOOL
POLICE OFFICE
DHARAN MALPOT KARYALAYA
SHIKSHA SANDESH BOARDING SCHOOL
SITE CHARACTERISTICS
TOPOGRAPHY : PLAIN AND SLIGHTLY
SLOPY
THE SITE IS CURENTLY HALF
AGRICULTURAL LAND AND REMAINING
PLOTTED BARE LAND BY SOIL FILLING
SURROUNDED BY RESIDENCE
IRRIGTION CANAL ON BOTH SIDE
WHY THIS SITE
⮚ ACCESS TO THE SITE CAN BE EASY BECAUSE OF THE
EXISTING ROAD
⮚ SITE IS LOCATED NEAR TO COMMUNITY SO IT WILL BE
MORE COMMUNAL
⮚ SITE IS LOCATED IN THE CENTER OF PANBARI SO IT IS
NEARLY EQUALLY FAR FROM EVERY CORNER
⮚ LOCATED NEAR THREE SCHOOLS
THINGS TO BE CONSIDERED
⮚ ACCESS FOR SERVICE AND EMERCENGY VEHICLES
⮚ SPACE FOR FUTURE EXPANSION
GROWTH BEHAVIOUR
PANBARI
POPULATION : 5911 (2068 B.S. CENSUS)
POPULATION DENSITY : 1286 / SQ . M
RESIDENTIAL UNIT : 1371
AREA OF WARD : 4.60 SQ . KM
LITERACY RATE : 71.67 %
MAIN OCCUPATION : AGRICULTURE
⮚ LINEAR GROWTH ALONG THE MAIN ROAD
⮚ HOUSES DEVELOPED ARROUND THE FARMLAND
⮚ ORGANIC GROWTH
PHYSICAL ASPECT
⮚ WATER SUPPLIED FROM SERA KHOLA
⮚ LACK OF PROPER SEWAGE OR DRAINAGE SYSTEM
⮚ TWO MINOR ROAD PASS BY THE SITE
SOCIO ECONOMIC ASPECT
⮚ ETHNIC GROUPS : RAI, LIMBU, BRAHMIN , CHETTRI
⮚ RELIGION : KIRAT , HINDUISM , CHRISTIANITY
CONTOUR VISUALIZATION
BYE LAWS
⮚ FAR = 1
⮚ GCR = 35-40%
⮚ SETBACK FROM ROAD = 3 M
⮚ SETBACK FROM PROPERTY LINE = 2 M
⮚ 5 M SETBACK IF HEIGHT GREATER THEN 17 M
⮚ TOTAL PARKING 20% OF LAND AREA
⮚ PARKING PER VEHICLE 18 SQ. M
DHARAN MALPOT KARYALAYA
HERBON H.S SCHOOL
SHIKSHA SANDESH BOARDING
SCHOOL
SITE WITH LANDMARK
SITE
ANALYSIS
SITE ANALYSIS FOR
10
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
S
W O
T
SWOT
STRENGTH
• WITHIN THE PROXICIMITY OF CORE
CITY AREA
• ADEQUATE SPACE FOR FUTURE
EXPANSION
• PROVISION FOR DRAINAGE
• EASY ACESS BY THE MAIN ROAD
WEAKNESS
• HIGH VOLTAGE TRANSMISSION LINE
• HOUSES TOO CLOSE TO THE
BOUNDARY LINE
• ENCROACHMENT OF AGRICULTURAL
LAND
OPPORTUNITIES
• GOOD NATURAL VEGETATION
• WITHIN URBAN SETTLEMENT AREA
• YOUTH DEVELOPMENT BY CREATING A
PRODUCTIVE PLATFORM
THREATS
THE HIGH TENSION LINE MAY BE A
MAJOR THREAT FOR THE SITE
SWOT
ANALYSIS
SECTION X-X (S-N)
SECTION Y-Y (E-W)
SITE ANALYSIS
X
X
Y
Y
S
I
T
E
V
I
E
W
S
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
PROGRAM FORMULATION
S.N SPACE CAPACITY QUANTITY AREA TOTAL(m^2)
1. LIBRARY
READING AREA
50 1 165 165
2. ART & CRAFT
ROOM
14 3 5*5.5=27.5 82.5
3. COMPUTER
ROOM
40 2 60-65 m^2 130
A.PROGRAM SPACE
a. EDUCATIONAL SPACE
b. SOCIAL
SPACE
S.N. SPACE CAPACITY QUANTITY AREA TOTAL(m^2)
1. CLUB ROOM 14 2 1.4*14=19.6 39.2
3. MULTI
PURPOSE HALL
277 TO 380
SEATS
1 15 * 26 390
c. RECREATION
SPACE
S.N. SPACE CAPACITY QUANTITY AREA TOTAL(m^2)
1. MUSIC ROOM 60 1 9.14*6.7=61.23
8
61.238
2. YOGA ROOM 15 1 2 m^2 per
person
30
3. DANCE ROOM 20 1 2.32 m^2 per
person
46.4
PROGRAM FORMULATION
PROGRAM FORMULATION
11
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
PROGRAM FORMULATION
4.GAME ROOM
S.N SPACE CAPACITY QUANTITY AREA TOTAL(m^2)
1. BASKETBALL 5-5(PLAYERS) 2 15*28=420m^2 840
2. FUTSAL 5-5(PLAYERS) 1 40*20=800m^2 800
3. VOLLEYBALL 6-6(PLAYERS) 1 21*12=252m^2 262
4. BADMINTON 1-1 OR 2-
2(PLAYERS)
2 15*7=105m^2 210
5. TABLETENNIS 1-1 OR 2-
2(PLAYERS)
4 6.7*3.5=23.45m^
2
93.8
6. CRICKET(NET
PRACTICE)
2 16*4=64m^2 128
PROGRAM FORMULATION
PROGRAM FORMULATION
d. PHYSICAL ACTIVITY
SPACE
S.N. SPACE CAPACITY QUANTITY AREA TOTAL m^2
1. GYMANASIUM 18.28*24.39 445.85
2. SWIMMING
POOL
6 lane 1 16.6*25=830 400
3. CHANGING
ROOM
1*1.25 =1.25
1*2 = 2
(4)(WHEELCHAIR
BOUND)
4. SHOWER
ROOMS
4 1*1.8 7.2
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
PROGRAM FORMULATION
B.SERVICE
SPACE
S.N. SPACE CAPACITY QUANTITY AREA 9(SQ. FT) TOTAL(sq.ft)
1. OFFICES 4
6
8
8 10’*15’=150 sq. ft
10’*20’=200 sq. ft
350
3000
2. STORAGE ROOM 4% of total FAR
3. MEETING ROOM UP TO 10
11-20
2 150 sq.ft
400 sq.ft
700
CONFERENCE ROOM UPTO 150 1 4000 sq.ft 4000
4. CIRCULATION 15% OF TOTAL BUILT
UP AREA
5. SECURITY &
CONTROL ROOM
8.85*8.85=78.32 78.32 sq.ft
6. KITCHEN
7. CAFE/CANTEEN 40 1 12-16 PER PERSON 640
8. MEDICAL UNIT 1 180 180
TOTAL 8598.32 sq.ft
PROGRAM FORMULATION
PROGRAM FORMULATION
PARKING
⮚ 20% OF TOTAL
SITE
S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT)
1 LIFT 5 7 150 1050
2 ESCAPE ROUTE 3 60 180
3 STAIRCASE 3 100 300
4 TOTAL 1530
C.VERTICAL CIRCULATION
CASESTUDY PRESENTATION
DEPARTMENT OF ARCHITECTURE
2075
TRIBHUWAN UNIVERSITY|INSTITUTE OF
ENGINEERING
PURWANCHAL CAMPUS | DHARAN
DEPARTMENT OF ARCHITECTURE
SHEET TILTE:
CASE STUDY ON
YOUTH CENTER
SUBMITTED TO:
AR. MILAN BHATTRAI
AR. MIMANG HANG
KIRAT
SUBMITTED BY:
ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21
SHEET
NO.
WC PER FLOOR AREA (SQ.M) TOTAL(SQ.M)
BOYS 3 WC(1.85)
3 URINAL(0.9)
4 WASHNASIN
13.94 41.82
GIRLS 4 WC
3 WASHBASIN(0.9)
13 38.20
DIFFERENTLY ABLE 2 WC 8.4 9.75
TOTAL 89.77
SANITARY
PARKING
S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT)
1 CAR(SURFACE) 25 135 3375
2 MOTORCYCLE(SUR
FACE)
80 22 1760
3 CAR(BASEMENT) 18 135 2430
4 MOTORCYCLE(BAS
EMENT)
50 22 1100
5 TOTAL 8665
EMERGENCY
S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT)
1 ASSISTANT 1 1 45 45
2 MEDICAL OFFICER 2 1 125 125
3 WARD 4 2 150 300
5 TOTAL 470

More Related Content

What's hot

GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYAJAYS100
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case studySimi Sayed
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYSheraniDaniel
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisahed sohail
 
Auditorium Desktop Study
Auditorium Desktop StudyAuditorium Desktop Study
Auditorium Desktop StudyAaqib Iqbal
 
case study of School of planning and architecture, delhi
case study of School of planning and architecture, delhicase study of School of planning and architecture, delhi
case study of School of planning and architecture, delhiFaizan Ahmad
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture Abhijeet Roy
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature studyKiruthika Selvi K J
 
college campus Case study
college campus Case studycollege campus Case study
college campus Case studyAdyasha Adyasha
 
Gated community thesis
Gated community thesisGated community thesis
Gated community thesisGeeva Chandana
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...NafeeZullah
 
A Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHA Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHArvinth GM
 
Mlr convention centre, bangloor.
Mlr convention centre, bangloor.Mlr convention centre, bangloor.
Mlr convention centre, bangloor.self employer
 

What's hot (20)

CASE STUDY.pptx
CASE STUDY.pptxCASE STUDY.pptx
CASE STUDY.pptx
 
GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDY
 
Mixed use building case study
Mixed use building case studyMixed use building case study
Mixed use building case study
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
CAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDYCAMPUS DESIGN - CONCEPT STUDY
CAMPUS DESIGN - CONCEPT STUDY
 
Museum literature study
Museum literature studyMuseum literature study
Museum literature study
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsis
 
Auditorium Desktop Study
Auditorium Desktop StudyAuditorium Desktop Study
Auditorium Desktop Study
 
case study of School of planning and architecture, delhi
case study of School of planning and architecture, delhicase study of School of planning and architecture, delhi
case study of School of planning and architecture, delhi
 
Case study college of architecture
Case study college of architecture Case study college of architecture
Case study college of architecture
 
CASE STUDY-LANDSCAPE
CASE STUDY-LANDSCAPECASE STUDY-LANDSCAPE
CASE STUDY-LANDSCAPE
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature study
 
college campus Case study
college campus Case studycollege campus Case study
college campus Case study
 
Planning analysis and design of museum building
Planning analysis and design of museum buildingPlanning analysis and design of museum building
Planning analysis and design of museum building
 
Gated community thesis
Gated community thesisGated community thesis
Gated community thesis
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
 
IIM, Ahmedabad.
IIM, Ahmedabad.IIM, Ahmedabad.
IIM, Ahmedabad.
 
A Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHA Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTH
 
Mlr convention centre, bangloor.
Mlr convention centre, bangloor.Mlr convention centre, bangloor.
Mlr convention centre, bangloor.
 

Similar to Adaptive Youth Center Case Study

CEPT university Sustainability case study
CEPT university  Sustainability case study CEPT university  Sustainability case study
CEPT university Sustainability case study harshavardhanvanukur
 
Gaurav jhunjhunwala design portfolio 2007 - 2012
Gaurav jhunjhunwala design portfolio 2007 - 2012Gaurav jhunjhunwala design portfolio 2007 - 2012
Gaurav jhunjhunwala design portfolio 2007 - 2012Gaurav Jhunjhunwala
 
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...Anupama Krishnan
 
Hannaa Adam Portfolio
Hannaa Adam PortfolioHannaa Adam Portfolio
Hannaa Adam PortfolioHannaa Adam
 
Himanshu choudhary report
Himanshu choudhary reportHimanshu choudhary report
Himanshu choudhary reportakshay814788
 
Jinglin Zhao_Portfolio
Jinglin Zhao_PortfolioJinglin Zhao_Portfolio
Jinglin Zhao_PortfolioJinglin Zhao
 
Xun Lei port folio
Xun Lei port folioXun Lei port folio
Xun Lei port folioXun Lei
 
case study of architecture students
case study of architecture studentscase study of architecture students
case study of architecture studentsAbhishek Râghûbïr
 
Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)Madhura Udapure
 
Internship Report
Internship ReportInternship Report
Internship ReportBala Murali
 
Loralai medical college thesis book-mubashra khan 13285-pdf
Loralai medical college thesis book-mubashra khan 13285-pdfLoralai medical college thesis book-mubashra khan 13285-pdf
Loralai medical college thesis book-mubashra khan 13285-pdfmubashra88
 
Andrew Davies Portfolio 2019
Andrew Davies Portfolio 2019Andrew Davies Portfolio 2019
Andrew Davies Portfolio 2019Andrew Davies
 
Report on stadium constructio2n
Report on stadium constructio2nReport on stadium constructio2n
Report on stadium constructio2nLOKESH
 
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDY
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDYATMA HOUSE & CEPT ARCHITECTURE CASE STUDY
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDYAnushka Bhargava
 

Similar to Adaptive Youth Center Case Study (20)

CEPT university Sustainability case study
CEPT university  Sustainability case study CEPT university  Sustainability case study
CEPT university Sustainability case study
 
Final project 1
Final project 1Final project 1
Final project 1
 
Portfolio 2019
Portfolio 2019 Portfolio 2019
Portfolio 2019
 
Gaurav jhunjhunwala design portfolio 2007 - 2012
Gaurav jhunjhunwala design portfolio 2007 - 2012Gaurav jhunjhunwala design portfolio 2007 - 2012
Gaurav jhunjhunwala design portfolio 2007 - 2012
 
Neighbourhood planning
Neighbourhood planningNeighbourhood planning
Neighbourhood planning
 
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
Resident’s acceptance of internal courtyard buildings Adi Ainurzaman Jamaludi...
 
Hannaa Adam Portfolio
Hannaa Adam PortfolioHannaa Adam Portfolio
Hannaa Adam Portfolio
 
Porrtfolio of S'phakeme
Porrtfolio of S'phakemePorrtfolio of S'phakeme
Porrtfolio of S'phakeme
 
Himanshu choudhary report
Himanshu choudhary reportHimanshu choudhary report
Himanshu choudhary report
 
Jinglin Zhao_Portfolio
Jinglin Zhao_PortfolioJinglin Zhao_Portfolio
Jinglin Zhao_Portfolio
 
Xun Lei port folio
Xun Lei port folioXun Lei port folio
Xun Lei port folio
 
WORK SAMPLE TFT
WORK SAMPLE TFTWORK SAMPLE TFT
WORK SAMPLE TFT
 
case study of architecture students
case study of architecture studentscase study of architecture students
case study of architecture students
 
Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)Architecture Portfolio (Undergradute)
Architecture Portfolio (Undergradute)
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Loralai medical college thesis book-mubashra khan 13285-pdf
Loralai medical college thesis book-mubashra khan 13285-pdfLoralai medical college thesis book-mubashra khan 13285-pdf
Loralai medical college thesis book-mubashra khan 13285-pdf
 
Andrew Davies Portfolio 2019
Andrew Davies Portfolio 2019Andrew Davies Portfolio 2019
Andrew Davies Portfolio 2019
 
Design portfolio
Design portfolioDesign portfolio
Design portfolio
 
Report on stadium constructio2n
Report on stadium constructio2nReport on stadium constructio2n
Report on stadium constructio2n
 
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDY
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDYATMA HOUSE & CEPT ARCHITECTURE CASE STUDY
ATMA HOUSE & CEPT ARCHITECTURE CASE STUDY
 

Recently uploaded

PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Recently uploaded (20)

PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 

Adaptive Youth Center Case Study

  • 1. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. INTRODUCTION SITE STUDY 1.CLIMATE : COLD AND TEMPERATE 2. ORIENTATION : E-W 3. SURROUNDING : GRAND CROSSING NEIGHBOURHOOD LIES IN NORTH 4. PARKING : POROUS CONCRETE SURFACE SURROUNDED BY GREENARIES NO.S OBJECTIVES ARCHITECTURAL APPERANCE: CLARITY AND ADAPTABILITY • ADVERTISE THE ACTIVITY INSIDE ON THE BUILDING EXTERIOR • SPACES CAN BE MODIFIED OVER TIMES AS PROGRAM IN THE YOUTH CENTER EVOLVES • MAINTAINING THE BUILDING PROGRAMMETIC SUSTAINABILITY FEATURED PROGRAMS AND ACTIVITIES LOCATION: CHICAGO, UNITED STATES ARCHITECT: JOHN RONAN ARCHITECTS BUILDING : EDUCATIONAL,R ECREATION CENTER SITE AREA: 6968M2 BUILT YEAR: 2016 A.D CLIENT: COMER EDUCATION CAMPUS SPORTS FITNESS AND RECREATION • FIT KIDS • STRENGTH TRAINING LEADERSHIP AND SOCIAL DEVELOPMENT • CULTURE CLUB • DESTINY LEADER CLUB INTERNATIONAL CASE STUDY: GARY COMER YOUTH CENTER ADAPTABLE HALL WRAPPING SPACES • TO STUDY ABOUT THE LANDCSAPE AND ENVIRONMENTAL AWARENESS IN YOUTH CENTER ENVIRONMENTAL AWARENESS • TO UNDERSTAND ABOUT MATERIALS AND ITS IMPACT IN EXTERIOR AND INTERIOR ENVIRONMENT • TO KNOW ABOUT THE SPACES ,CIRCUALATION AND ITS RELATIONS IN YOUTH CENTER • THE ROOF GARDEN SERVES AS OUTDOOR CLASSROOM TO SUPPORT YOUTH HORTICULTURAL PROGRAMS • THE GARDEN COLLECTS AND RECYCLES RAINWATER, AND SERVES TO REDUCE THE URBAN HEAT ISLAND EFFECT • THE SITE SURFACE EMPLOYS POROUS PAVING SURFACES TO REDUCE THE PRESSURE ON STORM WATER MANAGEMENT SYSTEMS CONCEPT/DESIGN APPROACH • TO BRING SOCIAL PROGRESS IN BACKWARD NEIGHBOURHOOD • WITHOUT THE LOT OF GLASS AT STREET LEVEL TO CREATE A SENSE OF SECURITY WHILE KEEPING THE BUILDING LIGHT,AIRY MATERIALS • RAINSCREEN CALDDING OF FIBER CEMENT PANELS • BULLETPROOF GLAZING GLASS FACING STRRET • PERFORATED METAL SCREEN • USE OF POROUS CONCRETE FOR STORM WATER MANAGEMENT 1-ROOF GARDEN 2-ARTS AND CRAFT ROOM 3.COMPUTER LAB 4.CONFERENCE ROOM 5.RECORDING STUDIO 6. WC 7. STORAGE 8.CLASSROOM 9.OFFICE 10.ADAPTABLE HALL 11.CAFETERIA LONGITUDINAL SECTION 1 10 4 6 11 2 3 5 8 9 7 9 1
  • 2. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. ROOF PLAN S-E VIEW N-W VIEW
  • 3. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. INTERNATIONAL:FIRSTENBURG COMMUNITY CENTER SITE INFORMATION INTRODUCTION CONCEPT COMMUNITY LIBRARY: ⮚ FOCUSES VIEWS ON EXIXTING TREES & CAPTURES FILTERED DAY LIGHT ⮚ OPEN VISUALLY TO SURROUNDING , TEEN AREA & MEETING ROOM, CHILDREN’S AREA ⮚ COMMUNITY MEETING ROOM FEATURES A SHARED BUT SECURABLE ENTRANCE FOR USER LOCATION : VANCOUVER,WASHINTON ARCHITECT : OPSIS ARCHITECT PROJECT TYPE : COMMUNITY CENTER ESTABLISHED YEAR : 2006 A.D. SITE AREA : 90,000 SQ.FT CLIMATE : TEMPERATE ZONE ORIENTATION : EAST ORIENTATION SURROUNDING : CENTER OF RESIDENTIAL, ADJACENT TO HEALTH CENTER PARKING : ORGANIC SHAPE SITE ECOLOGY :COURTYAD TO ALLOW INTERIOR FUNCTION TO PARTICIPATE WITH NATURAL LANDSCAPE, LARGE WINDOWS FOR DAYLIGHT ⮚ DAYLIGHT THROUGHOUT THE ENTIRE BUILDING ⮚ TRANSPARENCY BETWEEN SPACES ⮚ SUSTAINABILITY ⮚ CREATING STRONG CONNECTIONS TO THE SITE AND PROVIDING A WELCOMING OPEN DISPLAY OF RECREATION & COMMUNITY SPACES DAYLIGHT AND VENTILATION FLOOR PLANS MULTI USE COMMUNITY FUNCTIONS ⮚ CAPACITY 350 CITIZENS ⮚ VENUE FOR CITY COUNCIL MEETINGS, SOCIAL DANCES , PERFORMANCES, NEIGHBORHOOD FAIRS & COMMUNITY FORUMS 9 SPACES TWO-COURT GYMNASIUM LAZY POOL EDUCATIONAL SPACE ▪ LIBRARY ▪ RESOURCE ROOM ▪ CHILD CARE SOCIAL SPACE ▪ TEEN LOUNGE ▪ SENIOR LOUNGE ▪ MULTIPURPOSE ACTIVITY SPACE ▪ MEETING ROOM ▪ MULTI USE HALL RECREATIONAL SPACE ▪ DANCE STUDIO ▪ GAME ROOM: PINGPONG ,FUSSBALL,POOL ▪ ROCK CLIMBING PHYSICAL ACTIVITY SPACE ▪ SWIM & WARM WATER LEISURE ▪ FITNESS SPACE ▪ TWO COURT GYMNASIUM ▪ LOCKER A.PROGRAM SPACE B.SERVICE SPACE ▪ ADMINSTRATION ▪ MECHANICAL ▪ WASHROOM ETC. OPEN COMMUNITY SPACE WATER MANAGEMENT: ⮚ WATER USE IS REDUCED ⮚ BY THE USE OF WATERLESS URINALS, LOW FLOW FIXTURES,USE OF GRAYWATER FROM POOL’S FILTER BACKWASH SYSTEM TO FLUSH TOILET MATERIALS AND TECHNOLOGY: ⮚ COMMUNITY ROOM-BAMBOO FLOORING, ACOUSTICAL WALL PANELING ⮚ RECYCLED MATERIALS LIKE GLASS WALL TILES ⮚ NATURAL,NONTOXIC & ENDURING ⮚ WOOD,CONCRETE MASONRY,GLASS,STEEL ⮚ CONSTRUCTION WASTE WAS RECYCLED ARCHITECTURAL ELEMENT INDEX 1. NORTH FACING DAYLIGHT 2. NORTH FACING AIR INTAKE 3. RADIANT HEATED SLAB 4. DAYLIGHT AND STACK VENTILATION MONITOR 5. CLEAR GLAZING TO NATATORIUM 6. SOUTH FACING DAYLIGHT MONITOR 7. SOUTH FACING WOOD SUNSADE 8. POOL FILTER BACKWASH SYSTEM TANK 2
  • 4. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. REGIONAL CASESTUDY : CULTURAL SPORT COMPLEX FOR DISABLED INTRODUCTION LOCATION : TEHRAN , IRAN ARCHITECT : ARASH MAZAFARI PROJECT TYPE : CULTURAL SPORT COMPLEX ESTABLISHED YEAR : 2011 A.D. BUILT AREA : 18000SQ.M SITE INFORMATION CLIMATE : COLD SEMI ARID ORIENTATION : E/W ORIENTATION SURROUNDING : PUBLIC PARK IN NORTHERN SIDE OF SITE AND 100 YEARS OLD TRESS WITH FOOTBALL IN SOUTHERN SIDE PARKING : UNDER PUBLIC PARK CONCEPT AND PLANNING ⮚ SPACES BEHAVE IN REALTION TO INSIDE AND OUTSIDE OF THE BUILDING ⮚ FUNCTIONAL BOXES LOCATE AND SLIP OVER EACH OTHER TO MAKE VOIDS BETWEEN THE SPACES SPACE S A. PROGRAM SPACES 1 .ADMINSTRATIVE SECTOR 2.CULTURAL SPACES ▪ AMPHITHEATER ▪ LIBRARY ▪ GALLERY ▪ MEDIA CENTER ▪ PLACE OF WORSHIP 3.EDUCATIONAL SPACES ▪ CONFERENCE HALL ▪ TRAINING CLASSES ▪ WORKSHOPS 4. SPORT SPACES ▪ POOL,STEAM ,SAUNA ▪ HYDROTHERAPY POOL ▪ TABLE TENNIS HALL ▪ GYM FITNESS ▪ SHOOTIG HALL ▪ MULTIPURPOSE HALL ▪ CHESS ROOM B.SERVICE SPACE ▪ BUFFET ▪ PUBLIC HALL ▪ PARKING UTILITY AND CIRCULATION SPORT CULTUR E 1 2 3 4 5 6 1. PARKING 2. ROOM AIR 3. ELECTRICAL ROOM 4. HYDROTHERAPHY POOL FACILITIES 5. POOL 6. GENERATOR ROOM 1 2 4 5 6 7 8 9 10 3 11 12 13 1. POOL ENTRANCE 2. ACCEPTANCE 3. REPLACEMENT WHEELCHAIR 4. POOL 5. HYDROTHERAPHY POOL 6. DRY SAUNA 7. STEAM SAUNA 8. BUFFET 9. LIFE GUARD ROOM 10. MASSAGE ROOM 11. EMERGENCY ROOM 12. ELECTRICAL ROOM 13. PARKING FLOOR PLANS BASEMENT 1ST FLOOR PLAN BASEMENT 2ND FLOOR MASTER PLAN TRANSPRANT FACADE MAIN CIRCULATION SOLID VOLUMES LEVELS FORM DEVELOPMENT INDEX 3
  • 5. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. GROUND FLOOR PLAN REGIONAL CASESTUDY: CULTURAL SPORT COMPLEX FOR DISABLED ACCESS 1. ENTRANCE 2. ELEVATOR 3. STAIR & EMERGENCY EXIST 4. DISABLE RAMP 5. PARKING RAMP ADMINISION CONTROL OFFICES 6. PRESIDENT 7. VICE PRESIDENT 8. STAFF 9. CONFERENCE ROOM CIRCULATIO N FIRST FLOOR PLAN PUBLIC SPACES 1. RESTAURANT 2. GALLERY 3. PRAYER ROOM SECOND FLOOR PLAN THIRD FLOOR PLAN FOURTH FLOOR PLAN ROOF PLAN SPORT 1. GYM AND FITNESS 2. SHOOTING HALL 3. LOCKER ROOM EDUCATIONAL 4. TRAINNING CLASSES 5. COUNSELLING CLASSES 6. WORKSHOP SPORT 1. LOCKER 2. TABLE TENNIS HALL 3. CHESS ROOM CULTURAL WORKSHOP SPORT 1. LOCKER ROOM 2. MULTIPURPOSE HALL AMPHITHEATER 3. WAITING ROOM AND BUFFET 4. MAIN HALL 5. DIFFERENTLY ABLE STAGE 1. RUNNING TRACK 1 2 2 3 3 3 2 1 4 3 5 1 5 1 2 4 3 6 6 4 9 8 7 5 1 1 3 1 2 2 4
  • 6. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. REGIONAL CASESTUDY: CULTURAL SPORT COMPLEX FOR DISABLED VERTICAL STAKING OF PROGRAM LIGHTING ⮚ HAVING GLASS FAÇADE THE BUILDING ALLOWS PLENTY OF NATURAL LIGHT ENTER INTO THE INTERIOR ⮚ BASICALLY ITS VERY BRIGHT INTERIOR BUILDING DURING DAY ⮚ ALSO PLAYED WITH ARTIFICIAL LIGHTING TO GIVE DIFFERENT EFFECT AND NIGHT APPRAISAL ⮚ LIGHTING LEVELS ARE ENOUGH AT DAY & EVEN ARTIFICIAL LIGHTING HAS BEEN WELL CONSIDERED FOR NIGHT TIME ⮚ A MIDWAY CONNECTION IN THE RAMP MAKES IT EASIER FOR CIRCULATION IN THE SAME FLOOR ⮚ ACTIVITY ZONE IS ALMOST FAR FROM / HAS BARRIER FROM THE OUTDOOR NOISES LEDING THE WAR VICTIMS WITH PEACE OF MIND CRITICISM ⮚ EMERGENCY STAIRCASE LEADS TO THE BASEMENT WHICH CAN CAUSE CASUALITIES DURING DISASTER ⮚ IN THE MULTIPURPOSE HALL LARGE SIZED COLUMN HAS BEEN USED ⮚ AND THE LIGHTING IS FROM ONLY ONE SIDE AND IS VERY INCLUSIVE MAKING IT UNCOMFORTABLE FOR USERS MATERIAL S ⮚ GLASS,STEEL ,RCC,TILES ⮚ GYPSUM BOARD & WOOD PANEL TO MANAGE ACOUSTIC IN AMPHITHEATER REPLACEMENT WHEEL CHAIR COURTYARD SPACE STARTING FROM FIRST FLOOR WAITING AND BUFFET FOR AMPHITHEATRE MEZZANINE FLOOR WITH MULTIPURPOSE HALL WITH SEATING AREA BUILDING AT NIGHT TIME 5
  • 7. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. NIRVANA WELLNESS CENTER LOCATION : JAWALAKHEL, LALITPUR. SITE AREA : 2100 SQ.METER FLOOR HEIGHT : 8’ TO 11’ STRUCTURAL SYSTEM : FRAMED SERVICES : GYMNASIUM, CARDIOVASCULAR, SWIMMING POOL, SPA, CAFÉ, ZUMBA AND MULTIPURPOSE HALL. OBJECTIVE • TO STUDY THE ASPECTS OF WELL-DESIGNED COMPONENTS OF YOUTH CENTER. •TO STUDY THE OPERATION OF GYMNASIUM IN NATURAL CONDITION (WITHOUT THE USE OF AIR CONDITION AND USE OF NATURAL LIGHT ) •TO STUDY THE OUTDOOR SPACE IN MAKING THE COMPLEX VIBRANT. BUILDING FROM • THREE STORIED BUILDING WITH • FITNESS IN THE GROUND FLOOR AND AEROBICS HALL IN THE FIRST FLOOR. • ADDITIONAL BLOCK ATTACHED WITH MAIN BLOCK OF SINGLE STOREY FOR FITNESS CENTER. SITE PLANING : • WELL-DESIGNED FITNESS CENTER. • MODIFICATIONS DONE HAVE ALTERED THE CIRCULATION SOMEHOW • RECEPTION AND SWIMMING POOL IS PLACED ADJACENT TO EACH OTHER. • PARKING AND BADMINTON IN SAME SPACE. • DAYLIGHT FROM ROOF. • TRUSS ON ROOF : STEELTRUSS ROOF: TRUSS PRATT FRAME. ZONING/BUBBLE DIAGRAM/MASTERPLAN MASTERPLAN ENTRANCE : • SEPARATE VEHICLE AND PEDESTRIAN PATH. • PROVIDED WITH GUARD HOUSE. • GREEN VEGETATION CREATING WELCOMING ENVIRONMENT. • MAIN GATE DESIGNED AS VISIBLY CONNECTED. RECEPTION • AREA: 105 SQ. • SERVES FOR BOTH THE VISITORS AND RECEPTION FOR SWIMMING POOL • UPPER FLOOR USED AS OFFICE. SWIMMING POOL • FREEFORM AND GEOMETRIC SHAPES • DEPTH: 4’ TO 5’ (MAIN POOL) 2’ TO 2’-6’’ (CHILDREN POOL) • FLOORING : TILES, STONE PAVED ALONG THE POOL.. • FILTER NEXT TO SWIMMING POOL. • OPERATES ONLY DURING SUMMER. • MOST POPULAR SERVICE HERE. CHANGING ROOM: • SWIMMING POOL NEXT TO CHANGING ROOM • 44 LOCKERS ARE PROVIDED. • PRIVACY MAINTAINED. MULTIPURPOSE HALL: • AREA: 996 SQ. FT. • AEROBICS/ ZUMBA TRAINING (25- 30 USERS). • ZUMBA 4 DAYS A WEEK. • NO STORE ROOM FOR FURNITURES PARQUET FLOORING. • GYPSUM BOARD FALSE CEILING. • ELECTRIC FANS (2 FANS AND 4 EXHAUST FANS) AND AIR COOLERS. FITNESS CENTER • SINGLE STOREY BLOCK. • FLOOR HEIGHT : 3.4M. • BAMBOO CEILING, PARQUETTE FLOORING • NEAR TO RECEPTION AREA. • CHANGING ROOM (30 LOCKERS). CARDIO VASCULAR WEIGHT TRAINING STRETCH AREA PARKING • BADMINTON COURT AS PARKING. • INSUFFICIENT PARKING DURING THE USE OF MULTIPURPOSE HALL. • SPACE FOR 15-20 CARS AND 20-30 BIKES NEAR THE FITNESS CENTER. INFERENCES • NATURAL LIGHTING AND VENTILATION IN THE FITNESS HALL. • PARKING SPACES CAN BE MODIFIED INTO BASEMENT FOR MORE SPACE. • COMFORTABLE FOR USER. • BASIC PLANING PRINCIPLES DESIGN APPROACH OF FITNESS COMPLEX NATIONAL CASE STUDY: NIRVANA WELLNESS CENTER 6
  • 8. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. NATIONAL CASE STUDY : SPORT AREA OF LINCOLN SCHOOL ARCHITECTURAL ELEMENT SITE INFORMATION INTRODUCTIO N ZONING FLOOR PLANS SAFETY AND SECURITY: ⮚ LIGHTNING DETECTION SYSTEM ⮚ EARTHQUAKE RESISTANT ⮚ FIRE DETECTORS,ALARAMS , ⮚ SECURITY CAMERAS ⮚ 24 HRS GUARD FORCES ⮚ EMERGENCY BOARDCAST SYSTEMZ LIBRARY: ⮚ SEPARATE LIBRARY FOR PRIMARY & SECONDARY STUDENTS ⮚ LIVE LIGHT FROM CEILING ⮚ GLASS WALL FOR PROPER LIGHTING EXTRA CURRICULAR ACTIVITIES: ⮚ OPEN BASKET BALL COURT(28M X 15M) FACING N-S & A FOOTBALL GROUND BESIDE IT ⮚ INDOOR PLAYGROUND ON TOP OF THE ROOF OF THE ACADEMIC BLOCK ⮚ AN INDOOR BASKETALL COURT WITH FLEXIBLE IMPACT ABSORBING FLOOR OF NBA STANDARD IS ON 1ST FLOOR ⮚ SWIMMING POOL WITH DEPTH FROM ( 3FT TO 9FT) PROGRAMS: LOCATION : RABIBHAWAN , KATHMANDU ARCHITECT : KAI WAISE PROJECT TYPE : EDUCATIONAL COMPLEX ESTABLISHED YEAR : 1954 A.D. SITE AREA : 11132 SQ.M CLIMATE : TEMPERATE ZONE ORIENTATION : MULTIPURPOSE SPACE FACES WEST SURROUNDING AND ROAD APPROACH: FEW TREES INSIDE ,MANY RESIDENTIAL BUILDING & A COMMERCIAL BUILDING (HOTEL) OUTSIDE THE SCHOOL PARKING AND LANDSCAPING : PARKING OUTSIDE THE SITE GROUND FLOOR FIRST FLOOR MATERIALS AND TECHNOLOGY: ⮚ RCC,BRICK MASONRY ⮚ PANELED GLASS WALLS ⮚ FLOORING: STONE,TILES,CEMENTED LIBRARY-PARQUETTED FLOOR STAIRCASE-BROWN TILE TOILET-MARBLE FLOOR & DABBED WALLS PASSAGE WAY-GLASS RAILING VENTILATION AND ACOUSTIC: ⮚ NATURAL & ARTIFICIAL VENTILATIONS ⮚ BIG WIDOWS (6” HT) ⮚ AIR PURIFICATION SYSTEM ⮚ SOUND ABSORBING MATERIALS IN MUSIC ROOM, MULTIPURPOSE HALL & CANTEEN CIRCULATION SPACE: ⮚ RAMP & ELEVATOR FOR UNIVERSAL ACCESSIBILITY ⮚ PASSAGE & CORRIDOR ARE SKY LIT & COVERED BY TRANSPARENT MATERIALS COLOUR USED: ⮚ BRIGHT COLORS (WHITE, RED & YELLOW , LIGHT GREEN, BLUE & ORANGE) ARE USED IN CLASSROOM ⮚ COLORFUL CHAIRS, TABLES, BEANBAGS, EXERCISE BALLS ALSO HELPS LIGHTEN THE ENVIRONMENT INDEX OF 1ST F.L 1. COURTYARD 2. COMPUTER LAB 3. IT BULLPEN 4. IT WORKSTATION 5. OFFICE 6. STORAGE 7. COUNSELORS OFFICE 8. OFFICE 9. SPEECH ROOM 10. CORRIDORS 11. STORAGE 12. UPPER LIBRARY 13. ELEMENTARY LIBRARY 14. DOUBLE FLOOR HT. GYMNASIUM INDEX 1. SITTING AREA 2. CONFERENCE 3. PROJECT ROOM 4. PROJECT ROOM 5. OFFICE 6. HALL 7. WORKROOM 8. VIDEOROOM 9. GIRLS CHANGING ROOM 10. BOYS CHANGING ROOM 11. STORAGE INDEX OF 2ND F.L 1. OPEN CORRIDOR 2. DOUBLE FLOOR HT. GYMNASIUM SECOND FLOOR MASTER PLAN 7
  • 9. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. INTRODUCTION SOCIALZONES LOCATION : BARGACHI,DHARAN PROJECT TYPE : SPORTS ZONE BUILT YEAR : 2016 A.D CLIMATE : SUB-TROPICAL SITE SITE AREA : PRIMARY ACCESS : EAST PRIMARY ROAD 8M TOPOGRAPHY : FLAT LAND WITH VEGETATION AROUND PLAN SPACES RELATION CREATIVE ZONES SPORTS ZONES LANGALI SAMUDAYEK VAWAN LOCATION: TINKUNEA, DHARAN BUILT: 2058BS CAPACITY : 200 aprox USE :CULTURAL PROGRAM PARKING FUTSAL COURT SEATINGS BADMINTON COURT CAFE STORE MATERIALS AND CONSTRUCTION TECHNOLOGY MATERIALS USED CONCRETE FLOORING, TIMBRE POST, TIMBER ROOFING MEMBER, CGI- SHEET ROOFING, PLYWOOD FALSE CEILLING LIGHTING EXTENSIVE USE OF NATURAL LIGHT USE OF CLEAR WINDOW FOR LIGHTING IN BOTH THE SIDE OF HALLL DIRECT LIGHT VIA LED LIGHT STRUCTURE AND CONSTRUCTION TIMBER FRAME STRUCTURE, TIMBER POST, QUEEN POST ROOF TRUSS ORIENTATION EAST-WEST ORIIENTED MAIN HALL WITH MAIN ENTRANCE AT EAST & STAGE AT WEST APROX 150M BETWEEN THE HALL & ROAD • STEEL TRUSS • CONCRETE BLOCKS • EXPANDED METAL • CGI SHEETS LOCAL CASE STUDY : BIG FOOT FUTSAL AND LANGALI SAMUDAYEK VAWAN SAFTY AND PRECAUTIONS TIMBER STRUCTURE SHOULD BE WELL PRESERVED FROM FIRE AND MOISTURE 8
  • 10. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. COMPARATIVE ANALYSIS LITERATURE INTERNATION REGIONAL NATIONAL LOCAL NAME GARY COMER FIRSTERNBURG COMMUNITY CENTER CULTURAL SPORT COMPLEX FOR DISABLE NIRVANA SPORT AREA OF LINCOLN SCHOOL BIG FUTSAL LANGHALI SAMUDHAYEK BHAWAN AREA 6968M2 90000 SQ. FT 5000 SQ. M 2100 SQ. M 11132 SQ. M 1,986.31 m² 17,556.01 m² CLIMATE COLD AND TEMPERATE HIGHEST TEMP :28 C LOWEST TEMP : -3 C HIGHEST TEMP :7 C – 32 C LOWEST TEMP : -2.3 C – 5.8 C HIGHEST TEMP : 19.1 C LOWEST TEMP : 2.4 C HIGHEST TEMP : 25 C (AVERAGE) LOWEST TEMP : 3 C , 9 C ( AVERAGE ) RAINFALL 14.4 MM WARM AND TEMPRATE WARM AND TEMPRATE USERS YOUTH COMER EDUCATION CAMPUS GENERAL PUBLIC FOCUSED TO THE DIFFERENTLY ABLED PEOPLE GENERAL PUBLIC STUDENTS AND STAFFS OF THE SCHOOL GENERALLY YOUTH GENERAL PUBLIC PUBLIC FLOW & CIRCULATION RAMPS , STAIRCASE , CORRIDORS STAIRCASE,LOBBY,CORTYAR D STAIRCASE , WIDE CORRIDOR RAMPS , ELEVATOR , STAIRCASE, SPACIOUS CORTYARD PATHWAYS PATHWAYS LOCATION NEAR HOUSING AREA, SCHOOLS & SPORT COMPLEX FUTURE EXPANSION CHICAGO,UNITED STATES VANCOVER , WASHINGTON, USA TEHRAN , IRAN JWALAKHEL , KATHMANDU RABIBHAWAN ,KATHMANDU , NEPAL DHARAN, NEPAL DHARAN, NEPAL PROGRAMS INCLUDED EDUCATIONAL SPACE SOCIAL SPACE RECREATIONALSPACE PHYSICAL ACTIVITY SPACE SERVICE SPACE ADAPTABLE HALL,CAFETERIA,GYMNASIU M,CLASSROOM,OFFICES,ART S AND CRAFT,DANCE ROOM,COMPUTER LAB,RECORDING STUDIO,CONFERENCE HALL LIBRARY, DOUBLE COURT GYMNASIUM, LAZY POOL, GAME ROOM, ROCK CLIMBING, MEETING ROOM, RESOURCE ROOM LIBRARY, GYM FIYNESS, POOL & HYDROTHERAPY POOL, GAME ROOM, MULTIPURPOSE HALL, TRAINNING CLASSES, WORKSHOP, PLACE OF WORSHIP, OUTDOOR FOOTBALL COURT, COUNSELLING ROOM GYMNASIUM, CARDIOVASCULAR, SWIMMING POOL, SPA, CAFÉ, ZUMBA MULTIPURPOSE HALL LIBRARY , GYMNASIUM , COPUTER LAB , SWIMMNING POOL , OUTDOOR BASKETBALL COURT , FOOTBALL GROUND , VIDEO ROOM , COUNSELOR’S OFFICE , SPEECH ROOM FUTSAL, BADMINTON, CAFEA SOCIAL GATHERING SPACE,STORE CULTURAL PROGRAM, KID’S FUNPARK, PARK, GREEN SPACE, SOCIAL GATHERING AND PROGRAM EMERGENCY EXITS TWO SEPARATE EXIT IN EACH STOREY 2 STAIRS & EMERGENCY EXIST AT THE TWO VERY END CORNERS OF THE NORTH FACADE DESIGN CONCEPT CONSTRUCTIVE ENVIRONMENT AND BRING SOCIAL PROGRESS DAYLIGHT THROUGHOUT ENTIRE BUILDING TRANSPARENCY BETWEEN SPACES FAÇADE AS LANDSCAPE FUNCTIONAL BOXEX LOCATE & SLIP OVER EACH OTHER TO MAKE VOIDS BETWEEN THE SPACES USE OF NATURAL LIGHT THROUGH ROOF TO ENHANCE MICRO- CLIMATE WATER BODIES PRESENT NATURAL BAMBOO SHADING WITH TOTAL USE OF DAYLIGHT. CAFÉ TO ADD MORE DELIGHT. UTILIZATION OF COMMUNITY FOREST, NATURAL PATHWAYS SUSTAINABILITY HIGHLY SUSTAINABLE RAINWATER HARVETSING SOLAR ENERGY ROOF GARDEN FOR REDUCING URBAN HEAT ISLAND EFFECT,USE OF POROUS CONCRETE TO PREVENT PRESSURE ON STROM MANANGEMENT HIGHLY SUSTAINABLE , MADE FROM LOCAL MATERIAL (WOOD) , USE OF RECYCLED MATERIALS , USE OF GREY WATER FOR FLUSHING , CONTROL F THE HEATING OF THE BUILDING THROUGH THE MATERIALS USED MAXIMUM DAYLIGHTING THROUGH GLASSES MAXIMUM DAYLIGHT THROUGH ROOF. NATURAL VEGETATION, USE OF LEFT OVER SPACE AS VEGETABLE PLANTATION DAYLIGHT THROUGH THE WHOLE LENGTH SPAN OF THE HALL ON BOTH THE SIDE, USE OF LOCALLY AVAILABLE MATERIAL STRUCTURAL SYSTEM FRAMED FRAMED LONG SPAN STRUCTURE, STEEL TRUSS, STEEL POST TIMBER STRUCTURE LIGHT WEIGHT STRUCTURE MATERIALS FIBER CEMENT PANELS, GLASS ,PERFORATED METAL SCREEN POROUS CONCRETE WOOD , TILES , GLASS , BAMBOO , RCC GLASS , STEELS , RCC BRICKS EXPOSED, TIN ROOF, FALSE CEILLING RCC, BRICK MASONRY , GLASS , STONE TILES STEEL, GLASS, CONCRETE, CONCRETE SLAB ON FLOOR TIMBER, CONCRETE FLOOR AND PAVEMENT CRISIS MANAGEMENT FIRE SAFETY , SMOKE DETECTOR SESMIC DESIGN CONSIDERATION , FIRE SAFETY FIRE SAFETY FIRE SAFETY FIRE SAFETY FIRE SAFETY , EARTHQUAKE RESISTANT LIGHT WEIGHT STRUCTURE CONCLUSION DEVELOPS PHYSICAL AND SOCIAL SKILLS AND CREATES HOSPITABLE ENVIRONMENT FOR YOUTH EASY ACCESS FROM THE MAIN ROAD, PROVIDES A GATHERONG SPACES FOR THE COMMUNITY PEOPLE , SPACE FOR ALL AGE GROUP , DESIGNED TO PROVIDE A DEDICATED SPACES FOR THE DIFFERENTLY ABLE PEOPLE , WHERE THEY CAN SOCIALIZE EASY ACCESS FROM THE MAIN ROAD, SPACE FOR ALL AGE GROUP DESIGNED TO INVOLVE STUDENTS IN THE PHYSICAL AND RECREATIONAL ACTIVITIES TOO A GREEN SPACE AND CAFÉ WELCOMING THE SPORTS ENTHUSIASTS. A SIMPLE RECTANGULAR PLANED HALL TO ACCOMMODATE MAXIMUM NUMBER OF PEOPLE. USE OF TIMBER AND PITCHED ROOF RESEMBLES NEPALESE ARCHITECTURAL STYLE.
  • 11. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. SITE ANALYSIS INTRODUCTION THE FOLLOWING SITE IS SELECTED FOR THE DESIGN OF YOUTH CENTER SITE DETAILS LOCATION : PANBARI , DHARAN LATITUDE: 26 46’2” N LONGITUDE: 27 19’03” E ALTITUDE: 349.91 M SITE AREA: 15,123.54 M^2 CLIMATE: WARM TEMPERATE ENTRY AND ACCESS POINT: FROM THE SECONDARY PITCHED ROAD WHICH IS CONNECTED TO THE MAIN ROAD( DEUTI PANBARI ROAD) MAIN ENTRY THROUGH EAST NEAREST LANDMARK MONEYGRAM HEBRON ENGLISH BOARDING SCHOOL SARASWATI H.S. SCHOOL POLICE OFFICE DHARAN MALPOT KARYALAYA SHIKSHA SANDESH BOARDING SCHOOL SITE CHARACTERISTICS TOPOGRAPHY : PLAIN AND SLIGHTLY SLOPY THE SITE IS CURENTLY HALF AGRICULTURAL LAND AND REMAINING PLOTTED BARE LAND BY SOIL FILLING SURROUNDED BY RESIDENCE IRRIGTION CANAL ON BOTH SIDE WHY THIS SITE ⮚ ACCESS TO THE SITE CAN BE EASY BECAUSE OF THE EXISTING ROAD ⮚ SITE IS LOCATED NEAR TO COMMUNITY SO IT WILL BE MORE COMMUNAL ⮚ SITE IS LOCATED IN THE CENTER OF PANBARI SO IT IS NEARLY EQUALLY FAR FROM EVERY CORNER ⮚ LOCATED NEAR THREE SCHOOLS THINGS TO BE CONSIDERED ⮚ ACCESS FOR SERVICE AND EMERCENGY VEHICLES ⮚ SPACE FOR FUTURE EXPANSION GROWTH BEHAVIOUR PANBARI POPULATION : 5911 (2068 B.S. CENSUS) POPULATION DENSITY : 1286 / SQ . M RESIDENTIAL UNIT : 1371 AREA OF WARD : 4.60 SQ . KM LITERACY RATE : 71.67 % MAIN OCCUPATION : AGRICULTURE ⮚ LINEAR GROWTH ALONG THE MAIN ROAD ⮚ HOUSES DEVELOPED ARROUND THE FARMLAND ⮚ ORGANIC GROWTH PHYSICAL ASPECT ⮚ WATER SUPPLIED FROM SERA KHOLA ⮚ LACK OF PROPER SEWAGE OR DRAINAGE SYSTEM ⮚ TWO MINOR ROAD PASS BY THE SITE SOCIO ECONOMIC ASPECT ⮚ ETHNIC GROUPS : RAI, LIMBU, BRAHMIN , CHETTRI ⮚ RELIGION : KIRAT , HINDUISM , CHRISTIANITY CONTOUR VISUALIZATION BYE LAWS ⮚ FAR = 1 ⮚ GCR = 35-40% ⮚ SETBACK FROM ROAD = 3 M ⮚ SETBACK FROM PROPERTY LINE = 2 M ⮚ 5 M SETBACK IF HEIGHT GREATER THEN 17 M ⮚ TOTAL PARKING 20% OF LAND AREA ⮚ PARKING PER VEHICLE 18 SQ. M DHARAN MALPOT KARYALAYA HERBON H.S SCHOOL SHIKSHA SANDESH BOARDING SCHOOL SITE WITH LANDMARK SITE ANALYSIS SITE ANALYSIS FOR 10
  • 12. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. S W O T SWOT STRENGTH • WITHIN THE PROXICIMITY OF CORE CITY AREA • ADEQUATE SPACE FOR FUTURE EXPANSION • PROVISION FOR DRAINAGE • EASY ACESS BY THE MAIN ROAD WEAKNESS • HIGH VOLTAGE TRANSMISSION LINE • HOUSES TOO CLOSE TO THE BOUNDARY LINE • ENCROACHMENT OF AGRICULTURAL LAND OPPORTUNITIES • GOOD NATURAL VEGETATION • WITHIN URBAN SETTLEMENT AREA • YOUTH DEVELOPMENT BY CREATING A PRODUCTIVE PLATFORM THREATS THE HIGH TENSION LINE MAY BE A MAJOR THREAT FOR THE SITE SWOT ANALYSIS SECTION X-X (S-N) SECTION Y-Y (E-W) SITE ANALYSIS X X Y Y S I T E V I E W S
  • 13. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. PROGRAM FORMULATION S.N SPACE CAPACITY QUANTITY AREA TOTAL(m^2) 1. LIBRARY READING AREA 50 1 165 165 2. ART & CRAFT ROOM 14 3 5*5.5=27.5 82.5 3. COMPUTER ROOM 40 2 60-65 m^2 130 A.PROGRAM SPACE a. EDUCATIONAL SPACE b. SOCIAL SPACE S.N. SPACE CAPACITY QUANTITY AREA TOTAL(m^2) 1. CLUB ROOM 14 2 1.4*14=19.6 39.2 3. MULTI PURPOSE HALL 277 TO 380 SEATS 1 15 * 26 390 c. RECREATION SPACE S.N. SPACE CAPACITY QUANTITY AREA TOTAL(m^2) 1. MUSIC ROOM 60 1 9.14*6.7=61.23 8 61.238 2. YOGA ROOM 15 1 2 m^2 per person 30 3. DANCE ROOM 20 1 2.32 m^2 per person 46.4 PROGRAM FORMULATION PROGRAM FORMULATION 11
  • 14. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. PROGRAM FORMULATION 4.GAME ROOM S.N SPACE CAPACITY QUANTITY AREA TOTAL(m^2) 1. BASKETBALL 5-5(PLAYERS) 2 15*28=420m^2 840 2. FUTSAL 5-5(PLAYERS) 1 40*20=800m^2 800 3. VOLLEYBALL 6-6(PLAYERS) 1 21*12=252m^2 262 4. BADMINTON 1-1 OR 2- 2(PLAYERS) 2 15*7=105m^2 210 5. TABLETENNIS 1-1 OR 2- 2(PLAYERS) 4 6.7*3.5=23.45m^ 2 93.8 6. CRICKET(NET PRACTICE) 2 16*4=64m^2 128 PROGRAM FORMULATION PROGRAM FORMULATION d. PHYSICAL ACTIVITY SPACE S.N. SPACE CAPACITY QUANTITY AREA TOTAL m^2 1. GYMANASIUM 18.28*24.39 445.85 2. SWIMMING POOL 6 lane 1 16.6*25=830 400 3. CHANGING ROOM 1*1.25 =1.25 1*2 = 2 (4)(WHEELCHAIR BOUND) 4. SHOWER ROOMS 4 1*1.8 7.2
  • 15. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. PROGRAM FORMULATION B.SERVICE SPACE S.N. SPACE CAPACITY QUANTITY AREA 9(SQ. FT) TOTAL(sq.ft) 1. OFFICES 4 6 8 8 10’*15’=150 sq. ft 10’*20’=200 sq. ft 350 3000 2. STORAGE ROOM 4% of total FAR 3. MEETING ROOM UP TO 10 11-20 2 150 sq.ft 400 sq.ft 700 CONFERENCE ROOM UPTO 150 1 4000 sq.ft 4000 4. CIRCULATION 15% OF TOTAL BUILT UP AREA 5. SECURITY & CONTROL ROOM 8.85*8.85=78.32 78.32 sq.ft 6. KITCHEN 7. CAFE/CANTEEN 40 1 12-16 PER PERSON 640 8. MEDICAL UNIT 1 180 180 TOTAL 8598.32 sq.ft PROGRAM FORMULATION PROGRAM FORMULATION PARKING ⮚ 20% OF TOTAL SITE S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT) 1 LIFT 5 7 150 1050 2 ESCAPE ROUTE 3 60 180 3 STAIRCASE 3 100 300 4 TOTAL 1530 C.VERTICAL CIRCULATION
  • 16. CASESTUDY PRESENTATION DEPARTMENT OF ARCHITECTURE 2075 TRIBHUWAN UNIVERSITY|INSTITUTE OF ENGINEERING PURWANCHAL CAMPUS | DHARAN DEPARTMENT OF ARCHITECTURE SHEET TILTE: CASE STUDY ON YOUTH CENTER SUBMITTED TO: AR. MILAN BHATTRAI AR. MIMANG HANG KIRAT SUBMITTED BY: ROLL NO. 075/BAR/5 ,12, 13, 15, 18, 21 SHEET NO. WC PER FLOOR AREA (SQ.M) TOTAL(SQ.M) BOYS 3 WC(1.85) 3 URINAL(0.9) 4 WASHNASIN 13.94 41.82 GIRLS 4 WC 3 WASHBASIN(0.9) 13 38.20 DIFFERENTLY ABLE 2 WC 8.4 9.75 TOTAL 89.77 SANITARY PARKING S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT) 1 CAR(SURFACE) 25 135 3375 2 MOTORCYCLE(SUR FACE) 80 22 1760 3 CAR(BASEMENT) 18 135 2430 4 MOTORCYCLE(BAS EMENT) 50 22 1100 5 TOTAL 8665 EMERGENCY S.N SPACE CAPACITY QUANTITY AREA TOTAL(SQ.FT) 1 ASSISTANT 1 1 45 45 2 MEDICAL OFFICER 2 1 125 125 3 WARD 4 2 150 300 5 TOTAL 470