“Root causes for the Mail Processing Machines (MPM) unable to sort averagely 40,000 pieces of mail per hour
with throughput of 95%”
5. INTRODUCTION
Background of the Study
The main purpose of this study was aimed to identify the
root causes for the Mail Processing Machines (MPM) unable
to sort averagely 40,000 pieces of mail per hour with
throughput of 95%.
POS MEL NASIONAL
Delivering More Connecting People
6. INTRODUCTION
Objective of the Study
Identify the root causes for the Mail Processing Machines
(MPM) unable to sort averagely 40,000 pieces of mail per
hour with throughput of 95%.
A study has to be carried out with these primary
objectives.
9. PROBLEM STATEMENT
MPM’s OEE performance seem inconsistently and achieve below 85%
The productivity is under performance ~ 32,400 pieces per hour instead of
40,000 per hour
Cause to back lock at MPM Work Center
Increasing workload to the manual work center due to unprocessed mail
from the machines
11. OBSERVATION DATA COLLECTION
- Machine MPM operator will
observe and alert with the
machine downtime
- Monitoring Check Sheet
- Record the reason & time why
machine stop (downtime)
METHODOLOGY
16. SOLUTIONS and RECOMMENDATIONS
Issues Recommendations
1. Mail Jammed
- Various mail size
- Machine Operators lack of knowledge
- Barcode machine low on ink
1. Educate customers on proper usage of
envelope
2. Regular on the job trainings for
machine operators to recognize and
identify machine able and non-
machine able mails
3. Autonomous maintenance
4. Early preparation when barcode ink is
low
2. Setup Time
- Technical issues; server down / alarm
not working
1. Competent employee scheduled for
morning startup operation
17. SOLUTIONS and RECOMMENDATIONS
Issues Recommendations
3. Scheme Change
- Interchangeable period of
scheme is taking too long- 30 mins
1. Utilize stacker separator for the
MPM during scheme changeover
time. Time can be improved to 15
mins
4. Planned Maintenance
- Monthly machine maintenance
abandoned
1. Warning for misconduct
2. Written explanation on action
3. Penalized
5. Material Shortages
- Bulk mailer lodge mails at
inconsistent time
- Machine not fully utilized
1. Discounts for early mail lodged
at the processing hub
19. CONCLUSION
In order to make sure that the Mail Processing Machines
(MPM) able to achieve throughput of 95%, there are three
solution that are suggested.
First, provide or conduct a regular on-job-training to the
staff that manning the MPM
Second, implementation of autonomous maintenance for
staff that operating the MPM. Provide a basic troubleshoot
for MPM