ENVIRONMENT EMPACT ASSISMENT
M. Arch (Sem. III)
Assignment : I
Topic : CRZ (COSTAL REGULATIN ZONE)
Submitted to : PRO SMITA
Submitted by:
BALDANIYA HITESH
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
INTRODUCTION
 The Government of India earlier issuedinstructions to
all state governments to prohibit development
activities within 500 M of coastal stretches of High Tide
Line.
 This has been done after considering the needfor
protecting the coastal areas and beaches from
environmental degradation.
 Prohibition of developmental activities of any kind has
caused considerable problems to State Governments as
there are existing developedareas within the stretch of
500 M.
 Keeping this in view and ensuring that the use and
activities in the coastal areas are consistent with
principles and requirements of environment
conservation, the Government of India has proposed
Coastal Regulations Zone and toimpose restrictions on
developmentalactivities.
 These regulations among other things permit
developments in the area already developed/partly
developed with certain restrictions and subject to land
use and other regulations framed under the Town&
Country Planning Act prevailing in theState.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
TERMS
 HIGH TIDE LINE (HTL) : means the line on the land upto which the highest water line reaches
during the spring tide.
 LOW TIDE LINE (LTL) : The lowest level of water on the shore.
 SEASHORE: An area of sandy, stony, or rocky land bordering and level with the sea. Area between
HTL and LTL.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
RESTRICTED AREAS (AREAS UNDER CRZ)
 The land area from high tide line (HTL) to 500mts on landward
side along the sea front.
SEA 500
MTS
High tide
line
This area is under
CRZ
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
RESTRICTED AREAS (AREAS UNDER CRZ)
 CRZ shall apply to the land between the HTL to 100mts or width of
the tidal influenced water bodies that are connected to the
sea(whichever is lesser).
 The land area falling between the hazard line and 500mts from HTL –
landward side in case of seafront
 The land area falling between the hazard line and 100 mts in case
of tidal influenced water body
 The land area between the HTL and LTL
(low tide level) will be termed as
Orange- HTL
Green- land zone
Red – hazard line
Plans
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
 The distance upto which development
along tidal influenced water bodies is to
be regulated shall be governed by the
distance up to which the tidal effects
are experienced which shall be
determined based on the salinity
concentration. Concentration levels
of five parts per 1000.
 For lakes, minimum of 30 m buffer to
be kept.
RESTRICTED AREAS (AREAS UNDER CRZ)
What is Costal Zone Management Plan?
 Identifying coastal stretches & classifying them in different CRZ areas.
 Integrated development of these areas.
 State level coastal management authority responsible for monitoring
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
FLOW OF TIDES
Isometric view
• The following diagram show
the different layers in a
coastal region.
• The diagram depicts to the
layers to which a foundation
is to be dugged for a better
grip hold the stilts or the
construction of the building.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
SAND DUNES TO TRAP WATER DURING HIGH
TIDE
• The ground water table plays an
important role in the construction
of the building.
• The ground water flow can put a
tidal force on the foundation ofthe
building.
• Thus the foundation should be
designed so as to exert an
equivalent force to the tidalforce
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
PROTECTION FROM HIGH TIDES USING
SAND DUNES
 There are various ways through which
we can protect the construction in the
coastalregion.
Different ways are:
• Building a huge sand dune in frontof
the house.
• Building a retaining wall.
• Construction over stilts.
• MHWS ( MEAN HIGH WATER SPRING )
Section of seashore and sand dune
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CONSTRUCTION METHODS IN CRZ
Section
• The construction in coastal region
should preferably be done onstilts so as
to prevent the house from high and low
tides, which canlead to destruction.
• Raising the houses on stilts not only
prevent the tides but also helps in
proper ventilationinside the house.
• The diagram shows the difference
between an unelevated and an elevated
house.
• The construction on sand is practically
impossible as thesand recedes along
with the water during high tides.
• Foundation and Stilts are the most
important step in construction.With
stronger foundation and stilts the
destruction to the house can be minimal
Foundation to a
certain height made
of bricks to give
maximum support
during high tides.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
PROHIBITED ACTIVITIES WITHIN CRZ
 Setting up of new industries and expansion of existing
except:
- Projects of Dept. of AtomicEnergy
- Facilities or generating power by non-
conventional energy sources
- Setting up of desalination plants except in CRZ I.
- Reconstruction ,repair work of dwelling units of
local communities
 Manufacturing and handling of oil storage , disposal
of hazardous substances except:
- Transfer from ships to ports, terminals and refineries and
vice versa.
- facilities for receipt and storage of petroleum products and
liquefied natural gas in the areas not classified as CRZ-I
subject to implication of guidelines by the oil Industry
Safety Directorate.
Those directly related to waterfront or
directly needing foreshore facilities
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
PROHIBITED ACTIVITIES WITHIN CRZ
 Setting up and expansion of fish processing units including warehousing
except hatchery and natural fish drying permitted areas .
 Land reclamation ,bunding or disturbing the natural course of
seawater except:
• required or setting up of expansion like ports ,harbors ,bridges.
• Measure for control of erosion
• Maintenance for clearing of waterways
• Measure to prevent sand bars
,installation of tidal regulators or structures or prevention of salinity
 Setting up expansion of units or mechanism for disposal of water and
effluents except:
- Discharging treated effluents into the water course with approval.
- Storm water drains and ancillary structures for pumping
- Treatment of waste and effluents from human settlement located in CRZ
areas. Ports and harbours
Formation of sandbars
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
PROHIBITED ACTIVITIES WITHIN CRZ
 Discharge of untreated water and effluents from
industries, cities and other human settlement.
 Dumping of cities or towns wastes including
constructional debris, industrial solid waste, fly ash for
the purpose of land filling.
 Port and harbour projects in high eroding stretches of
the coast, except those projects classified as strategic
and defence related.
 Reclamation for commercial purposes such as
shopping and housing complexes, hotels and
entertainment activities.
 Mining of sand, rocks and other sub-strata materials
except
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
PROHIBITED ACTIVITIES WITHIN CRZ
 Drawl of groundwater and construction related
thereto, within 200mts of HTL; except the
following:-
• in the areas which are inhabited by the local
communities and only for their use.
• In the area between 200mts-500mts zone the
drawl of groundwater shall be permitted only
when done manually through
ordinary wells for drinking, horticulture,
agriculture and fisheries and where no other
source of water is available.
 Dressing or altering the sand dunes, hills,
natural features including landscape changes
for beautification, recreation and other such
purpose.
 Facilities required for patrolling and vigilance
activities of marine/coastal police stations.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CLASSIFICATION OF CRZ
 CRZ 1
 The areas that are ecologically sensitive and the geomorphological features
which play a role in the maintaining the integrity of the coast,-
• Mangroves, in case mangrove area is more than 1000 sq mts, a buffer of
50meters
• Corals and coral reefs and associated biodiversity;
• Sand Dunes;
• Mudflats which are biologically active;
• National parks, marine parks, sanctuaries, reserve forests, wildlife habitats and
other along the mangroves shall be provided; protected areas under the
provisions of Wild Life (Protection) Act, 1972 (53 of 1972), the Forest
(Conservation) Act, 1980 (69 of 1980) or Environment (Protection) Act, 1986 (29
of 1986); including Biosphere Reserves;
Coral reefs
Mud flats
Sand dunes
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CLASSIFICATION OF CRZ
• Salt Marshes;
• Turtle nesting grounds;
• Horse shoe crabs habitats;
• Sea grass beds;
• Nesting grounds of birds;
• Areas or structures of
archaeological importance
and heritage sites.
• The area between Low Tide
Line and High Tide Line.
Plan
Sea grass beds
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
CRZ-I
 no new construction shall be permitted in CRZ-I except,-
• projects relating to Department of Atomic Energy
• pipelines, conveying systems including transmission lines
• facilities that are essential for activities permissible under CRZ-I
• installation of weather radar for monitoring of cyclones movement and prediction by
• construction of trans harbour sea link and without affecting the tidal flow of water,
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
 Areas between LTL and HTL which are not ecologically sensitive, necessary safety measures will
be incorporated while permitting the following, namely:-
• exploration and extraction of natural gas;
• construction of dispensaries, schools, public rainshelter, community toilets, bridges, roads, jetties,
water supply, drainage, sewerage which are required for traditional inhabitants living within the
biosphere reserves after obtaining approval from concerned CZMA.
• necessary safety measure shall be incorporated while permitting suchdevelopmental
activities in the area falling in the hazard zone;
• salt harvesting by solar evaporation of seawater;
• desalination plants;
• storage of non-hazardous cargo such as edible oil, fertilizers and food grain within notified
ports;
• construction of trans harbour sea links, roads on stilts or pillars without affecting thetidal
flow of water.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CLASSIFICATION OF CRZ
CRZII
• The areas that have been developed upto or
close to theshoreline.
• Developed area: area within the existing
municipal limits or in other existing legally
designated urban areas which are substantially
built-up and has been provided with drainage
and approach roads and other infrastructural
facilities, such aswater supply and sewerage
mains
CRZ III
• Areas that are relatively undisturbed and those do not
belong to either CRZ-I or II which include coastal zone in
the rural areas (developed and undeveloped) and also
areas within municipal limits or in other legally designated
urban areas, which are not substantially built up.
Buildings are only
permitted on the
landward side if
there is an
existing road in
close proximity to
the coastal line.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
CRZ-II
 buildings shall be permitted only on the landward side
of the existing road, or on the landward sideof existing
authorized structures;
 Buildings shall be subject to the existing localtown and
country planning regulations including the ‘existing’
norms of Floor Space Index or FloorArea Ratio:
• Provided that no permission for construction of
buildings shall be given on landward sideof any new
roads which are constructed on theseaward side of
an existing road
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
 reconstruction of authorized building to be permitted subject with the existing Floor Space Index or
Floor Area Ratio Norms and without change in present use
 facilities for receipt and storage of petroleum products and liquefied natural gas
 desalination plants and associated facilities;
 storage of non-hazardous cargo, such as edible oil, fertilizers and food grain in notified ports;
 facilities for generating power by non-conventional power sources and associated facilities;
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
the NDZ shall not be applicable in such area falling within any notified port limits;
 No construction shall be permitted within NDZ except:
• repairs or reconstruction of existing authorized structure not exceeding existing Floor Space Index,
existing plinth area and existing density and for permissible activities under the notification
including facilities essential for activities.
• Dwelling units for traditional coastal communities and fisher folk.
CRZ III
Area upto 200mts from HTL on the
landward side in case of seafront and
100mts along tidal influenced water
bodies or width of the creek whichever is
less is to be earmarked as “No
Development Zone (NDZ)”.
Construction/reconstru
ctio n of dwelling units
of traditional coastal
communities including
fisherfolk may be
permitted within 100-
200 m by the
government in
consultation with the
traditional coastal
communities and
concerned authorities.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
 CRZ IV
 the water area from the Low Tide Line to twelve nautical miles on the seaward side;
 shall include the water area of the tidal influenced water body from the mouth of the water body at the sea upto the influence of
tide which is measured as five parts per thousand during the driest season of the year.
 The activities impugning on the sea and tidal influenced water bodies will be regulated except for traditional fishing and related
activities undertaken by local communities as follows:-
• No untreated sewage, effluents, ballast water, ship washes, fly ash or solid waste from all activities including from aquaculture
operations shall be let off or dumped. A comprehensive plan for treatment of sewage generating from the coastal towns and cities
shall be formulated within a period of one year in consultation with stakeholders including traditional coastal communities,
traditional fisherfolk and implemented;
• Pollution from oil and gas exploration and drilling, mining, boat house and shipping;
• There shall be no restriction on the traditional fishing and allied activities undertaken by local communities.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
NORMS FOR REGULATION OF ACTIVITIES
 However, the following activities may be permitted in NDZ –
• agriculture, horticulture, gardens, pasture, parks, play field, andforestry;
• projects relating to Department of AtomicEnergy;
• mining of rare minerals;
• salt manufacture from seawater;
• facilities for receipt and storage of petroleum products and liquefied natural gas as specified in Annexure-II;
• facilities for generating power by non conventional energy sources;
• Foreshore facilities for desalination plants and associated facilities;
• weather radars;
• construction of dispensaries, schools, public rain shelter, community toilets, bridges, roads, provision of
facilities for water supply, drainage, sewerage, crematoria, cemeteries and electric sub-station which are
required for the local inhabitants may be permitted on a case to case basis by CZMA;
• construction of units or auxiliary thereto for domestic sewage, treatment and disposal withthe
prior approval of the concerned Pollution Control Board orCommittee;
• Facilities required for local fishing communities such as fish drying yards, auction halls, net mending yards,
traditional boat building yards, ice plant, ice crushing units, fish curing facilities and the like;
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
SPECIAL CONSIDERATION
CRZ V
A.
 CRZ area falling within municipal limits ofGreater
Mumbai;
 The CRZ areas of Kerala including the backwatersand
backwater islands;
 CRZ areas of Goa.
 B. Critically Vulnerable Coastal Areas (CVCA) such as
Sunderbans region of West Bengal and other ecologically
sensitive areas identified as under Environment(Protection)
Act, 1986 and managed with the involvement of coastal
communities including fishermen.
Sundarbans
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CONSTRUCTION OF BEACH RESORTS OR
HOTELS- CONDITIONS
Live fencing and barbed wire fencing
with vegetative cover allowed around
private properties subject to the
condition that such fencing shall in no
way hamper public access to the beach.
Plan: The proposed constructions shallbe
beyond the hazard line or 200mts fromthe
High Tide Line whichever is more.
Section: Basement construction will not
adversely affect fee flow of groundwater inthat
area
no permanent structures for sports facilities
shall be permitted except construction of goal
posts, net posts and lamp posts.
Plan of a coastal plot:
• Plot area: Not less than 0.4 hectares.
• FSI: Not more than 0.33
No flattening of sand
dunes shall be carried
out.
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
CONSTRUCTION OF BEACH RESORTS OR
HOTELS- CONDITIONS
Elevation of a coastal building:
Overall height: 9m.
Max. floors: G + 1.
Plan: Tapping of ground water
Plan: Altering sandystretches
the construction shall be consistent with
the surrounding landscape and local
architectural style.
necessary arrangements for the
treatment of the effluents and solid
wastes must be made and it must be
ensured
If the project involves diversion
of forestland for non-forest
purposes, clearance as required
under the Forest (Conservation)
Act, 1980 shall be obtained and
the requirements of other
Central and State laws as
applicable to the project shall be
met with
Floor Space Index: the
area of entire plot
including the portion
which falls within the
no development zone
shall be taken into
account.
approval of the State
or Union territory
Tourism Department
shall be obtained
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
BIBLIOGAPHY
 http://www.moef.nic.in/downloads/public-information/CRZ-Notification-
2011.pdf
 http://envfor.nic.in/
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02
FACULTY OF ARCHITECTURE
SCET, SURAT
M.ARCH II SEM IIIURBAN RENEWAL 2019
SURAT MASTERS IN URBAN DESIGN
BALDANIYA
HITESH
ROLL NO 02

More Related Content

What's hot

Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)Arun Chandra Babu
 
Trivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalTrivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalAjay Prasad
 
gandhinagar town planning literature study
  gandhinagar town planning literature study  gandhinagar town planning literature study
gandhinagar town planning literature studyTanmay Roy
 
URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)Shivani Nandgowle
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochiArun Chandra Babu
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront developmentmisschand
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 ExamplesRohit Kumar Singh
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 
surat gdcr
surat gdcr surat gdcr
surat gdcr Rishii2i
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmatiSyam M
 
La promenade presentation
La promenade presentationLa promenade presentation
La promenade presentationVishal Singh
 

What's hot (20)

Pondicherry tourism
Pondicherry tourismPondicherry tourism
Pondicherry tourism
 
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
Kochi  city study(intro, history, demography, infrastructure, economy, tourism)Kochi  city study(intro, history, demography, infrastructure, economy, tourism)
Kochi city study(intro, history, demography, infrastructure, economy, tourism)
 
Trivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - FinalTrivandrum Master Plan Inputs - Final
Trivandrum Master Plan Inputs - Final
 
Mumbai
MumbaiMumbai
Mumbai
 
gandhinagar town planning literature study
  gandhinagar town planning literature study  gandhinagar town planning literature study
gandhinagar town planning literature study
 
Crz
CrzCrz
Crz
 
Library study cbd
Library study cbdLibrary study cbd
Library study cbd
 
URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)URBAN DESIGN (Mehdipatnam HYD)
URBAN DESIGN (Mehdipatnam HYD)
 
Coastal regulation zone
Coastal regulation zoneCoastal regulation zone
Coastal regulation zone
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochi
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 Examples
 
Gopi Talav
Gopi Talav Gopi Talav
Gopi Talav
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 
surat gdcr
surat gdcr surat gdcr
surat gdcr
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmati
 
Gandhinagar
GandhinagarGandhinagar
Gandhinagar
 
New mumbai
New mumbaiNew mumbai
New mumbai
 
La promenade presentation
La promenade presentationLa promenade presentation
La promenade presentation
 

Similar to CRZ rule notification

Coastal Regulation Zone – By laws.vgbbbbbbbbpptx
Coastal Regulation Zone – By laws.vgbbbbbbbbpptxCoastal Regulation Zone – By laws.vgbbbbbbbbpptx
Coastal Regulation Zone – By laws.vgbbbbbbbbpptxsrushtideokar0537
 
COASTAL REGULATION ZONE, 2019.pptx
COASTAL REGULATION ZONE, 2019.pptxCOASTAL REGULATION ZONE, 2019.pptx
COASTAL REGULATION ZONE, 2019.pptxRamprasathJayabalan1
 
CRZ By Rangeet Mitra
CRZ By Rangeet MitraCRZ By Rangeet Mitra
CRZ By Rangeet MitraRangeet Mitra
 
River front development
River front developmentRiver front development
River front developmentBismi S
 
Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991DEVIKA ANTHARJANAM
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623VATSAL PATEL
 
IRJET- A Sustainable Approach for Urban Riverfront Development
IRJET-  	  A Sustainable Approach for Urban Riverfront DevelopmentIRJET-  	  A Sustainable Approach for Urban Riverfront Development
IRJET- A Sustainable Approach for Urban Riverfront DevelopmentIRJET Journal
 
CRZ Coastal and Marine Areas Notifications
CRZ Coastal and Marine Areas NotificationsCRZ Coastal and Marine Areas Notifications
CRZ Coastal and Marine Areas NotificationsGAURAV. H .TANDON
 
Advanced technologies for costal protection
Advanced technologies for costal protectionAdvanced technologies for costal protection
Advanced technologies for costal protectionLINGA SAI TEJA
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Ecotist
 
Making and unmaking of Chandigarh - making public spaces -
Making and unmaking of Chandigarh   - making public spaces -Making and unmaking of Chandigarh   - making public spaces -
Making and unmaking of Chandigarh - making public spaces -JIT KUMAR GUPTA
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalSyed Salman
 
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Satyajit Behera
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
Example model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEExample model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEMrs Coles
 
Impact of Chandigarh on the India Urban Planning & Architecture
Impact of Chandigarh on the India Urban Planning & ArchitectureImpact of Chandigarh on the India Urban Planning & Architecture
Impact of Chandigarh on the India Urban Planning & ArchitectureJIT KUMAR GUPTA
 

Similar to CRZ rule notification (20)

Coastal Regulation Zone – By laws.vgbbbbbbbbpptx
Coastal Regulation Zone – By laws.vgbbbbbbbbpptxCoastal Regulation Zone – By laws.vgbbbbbbbbpptx
Coastal Regulation Zone – By laws.vgbbbbbbbbpptx
 
Crz notification 2018
Crz notification 2018Crz notification 2018
Crz notification 2018
 
COASTAL REGULATION ZONE, 2019.pptx
COASTAL REGULATION ZONE, 2019.pptxCOASTAL REGULATION ZONE, 2019.pptx
COASTAL REGULATION ZONE, 2019.pptx
 
Coastal regulation zone
Coastal regulation   zoneCoastal regulation   zone
Coastal regulation zone
 
CRZ By Rangeet Mitra
CRZ By Rangeet MitraCRZ By Rangeet Mitra
CRZ By Rangeet Mitra
 
River front development
River front developmentRiver front development
River front development
 
Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991Suraj 1 coastal zone notification 1991
Suraj 1 coastal zone notification 1991
 
Calbiga River Care
Calbiga River CareCalbiga River Care
Calbiga River Care
 
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 31706237. SEAPORT MAINTENANCE (PHE) GTU 3170623
7. SEAPORT MAINTENANCE (PHE) GTU 3170623
 
IRJET- A Sustainable Approach for Urban Riverfront Development
IRJET-  	  A Sustainable Approach for Urban Riverfront DevelopmentIRJET-  	  A Sustainable Approach for Urban Riverfront Development
IRJET- A Sustainable Approach for Urban Riverfront Development
 
CRZ Coastal and Marine Areas Notifications
CRZ Coastal and Marine Areas NotificationsCRZ Coastal and Marine Areas Notifications
CRZ Coastal and Marine Areas Notifications
 
Advanced technologies for costal protection
Advanced technologies for costal protectionAdvanced technologies for costal protection
Advanced technologies for costal protection
 
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
 
Making and unmaking of Chandigarh - making public spaces -
Making and unmaking of Chandigarh   - making public spaces -Making and unmaking of Chandigarh   - making public spaces -
Making and unmaking of Chandigarh - making public spaces -
 
Design of flood control structures
Design of flood control structuresDesign of flood control structures
Design of flood control structures
 
Design of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E finalDesign of concrete Gravity Dam_Project B.E final
Design of concrete Gravity Dam_Project B.E final
 
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
Raising, widening & strengthening with protection to scoured bank of Bedpur-K...
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
Example model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEExample model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSE
 
Impact of Chandigarh on the India Urban Planning & Architecture
Impact of Chandigarh on the India Urban Planning & ArchitectureImpact of Chandigarh on the India Urban Planning & Architecture
Impact of Chandigarh on the India Urban Planning & Architecture
 

Recently uploaded

Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 

Recently uploaded (20)

Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 

CRZ rule notification

  • 1. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 ENVIRONMENT EMPACT ASSISMENT M. Arch (Sem. III) Assignment : I Topic : CRZ (COSTAL REGULATIN ZONE) Submitted to : PRO SMITA Submitted by: BALDANIYA HITESH
  • 2. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 INTRODUCTION  The Government of India earlier issuedinstructions to all state governments to prohibit development activities within 500 M of coastal stretches of High Tide Line.  This has been done after considering the needfor protecting the coastal areas and beaches from environmental degradation.  Prohibition of developmental activities of any kind has caused considerable problems to State Governments as there are existing developedareas within the stretch of 500 M.  Keeping this in view and ensuring that the use and activities in the coastal areas are consistent with principles and requirements of environment conservation, the Government of India has proposed Coastal Regulations Zone and toimpose restrictions on developmentalactivities.  These regulations among other things permit developments in the area already developed/partly developed with certain restrictions and subject to land use and other regulations framed under the Town& Country Planning Act prevailing in theState.
  • 3. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 TERMS  HIGH TIDE LINE (HTL) : means the line on the land upto which the highest water line reaches during the spring tide.  LOW TIDE LINE (LTL) : The lowest level of water on the shore.  SEASHORE: An area of sandy, stony, or rocky land bordering and level with the sea. Area between HTL and LTL.
  • 4. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 RESTRICTED AREAS (AREAS UNDER CRZ)  The land area from high tide line (HTL) to 500mts on landward side along the sea front. SEA 500 MTS High tide line This area is under CRZ
  • 5. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 RESTRICTED AREAS (AREAS UNDER CRZ)  CRZ shall apply to the land between the HTL to 100mts or width of the tidal influenced water bodies that are connected to the sea(whichever is lesser).  The land area falling between the hazard line and 500mts from HTL – landward side in case of seafront  The land area falling between the hazard line and 100 mts in case of tidal influenced water body  The land area between the HTL and LTL (low tide level) will be termed as Orange- HTL Green- land zone Red – hazard line Plans
  • 6. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02  The distance upto which development along tidal influenced water bodies is to be regulated shall be governed by the distance up to which the tidal effects are experienced which shall be determined based on the salinity concentration. Concentration levels of five parts per 1000.  For lakes, minimum of 30 m buffer to be kept. RESTRICTED AREAS (AREAS UNDER CRZ) What is Costal Zone Management Plan?  Identifying coastal stretches & classifying them in different CRZ areas.  Integrated development of these areas.  State level coastal management authority responsible for monitoring
  • 7. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 FLOW OF TIDES Isometric view • The following diagram show the different layers in a coastal region. • The diagram depicts to the layers to which a foundation is to be dugged for a better grip hold the stilts or the construction of the building.
  • 8. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 SAND DUNES TO TRAP WATER DURING HIGH TIDE • The ground water table plays an important role in the construction of the building. • The ground water flow can put a tidal force on the foundation ofthe building. • Thus the foundation should be designed so as to exert an equivalent force to the tidalforce
  • 9. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 PROTECTION FROM HIGH TIDES USING SAND DUNES  There are various ways through which we can protect the construction in the coastalregion. Different ways are: • Building a huge sand dune in frontof the house. • Building a retaining wall. • Construction over stilts. • MHWS ( MEAN HIGH WATER SPRING ) Section of seashore and sand dune
  • 10. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CONSTRUCTION METHODS IN CRZ Section • The construction in coastal region should preferably be done onstilts so as to prevent the house from high and low tides, which canlead to destruction. • Raising the houses on stilts not only prevent the tides but also helps in proper ventilationinside the house. • The diagram shows the difference between an unelevated and an elevated house. • The construction on sand is practically impossible as thesand recedes along with the water during high tides. • Foundation and Stilts are the most important step in construction.With stronger foundation and stilts the destruction to the house can be minimal Foundation to a certain height made of bricks to give maximum support during high tides.
  • 11. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 PROHIBITED ACTIVITIES WITHIN CRZ  Setting up of new industries and expansion of existing except: - Projects of Dept. of AtomicEnergy - Facilities or generating power by non- conventional energy sources - Setting up of desalination plants except in CRZ I. - Reconstruction ,repair work of dwelling units of local communities  Manufacturing and handling of oil storage , disposal of hazardous substances except: - Transfer from ships to ports, terminals and refineries and vice versa. - facilities for receipt and storage of petroleum products and liquefied natural gas in the areas not classified as CRZ-I subject to implication of guidelines by the oil Industry Safety Directorate. Those directly related to waterfront or directly needing foreshore facilities
  • 12. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 PROHIBITED ACTIVITIES WITHIN CRZ  Setting up and expansion of fish processing units including warehousing except hatchery and natural fish drying permitted areas .  Land reclamation ,bunding or disturbing the natural course of seawater except: • required or setting up of expansion like ports ,harbors ,bridges. • Measure for control of erosion • Maintenance for clearing of waterways • Measure to prevent sand bars ,installation of tidal regulators or structures or prevention of salinity  Setting up expansion of units or mechanism for disposal of water and effluents except: - Discharging treated effluents into the water course with approval. - Storm water drains and ancillary structures for pumping - Treatment of waste and effluents from human settlement located in CRZ areas. Ports and harbours Formation of sandbars
  • 13. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 PROHIBITED ACTIVITIES WITHIN CRZ  Discharge of untreated water and effluents from industries, cities and other human settlement.  Dumping of cities or towns wastes including constructional debris, industrial solid waste, fly ash for the purpose of land filling.  Port and harbour projects in high eroding stretches of the coast, except those projects classified as strategic and defence related.  Reclamation for commercial purposes such as shopping and housing complexes, hotels and entertainment activities.  Mining of sand, rocks and other sub-strata materials except
  • 14. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 PROHIBITED ACTIVITIES WITHIN CRZ  Drawl of groundwater and construction related thereto, within 200mts of HTL; except the following:- • in the areas which are inhabited by the local communities and only for their use. • In the area between 200mts-500mts zone the drawl of groundwater shall be permitted only when done manually through ordinary wells for drinking, horticulture, agriculture and fisheries and where no other source of water is available.  Dressing or altering the sand dunes, hills, natural features including landscape changes for beautification, recreation and other such purpose.  Facilities required for patrolling and vigilance activities of marine/coastal police stations.
  • 15. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CLASSIFICATION OF CRZ  CRZ 1  The areas that are ecologically sensitive and the geomorphological features which play a role in the maintaining the integrity of the coast,- • Mangroves, in case mangrove area is more than 1000 sq mts, a buffer of 50meters • Corals and coral reefs and associated biodiversity; • Sand Dunes; • Mudflats which are biologically active; • National parks, marine parks, sanctuaries, reserve forests, wildlife habitats and other along the mangroves shall be provided; protected areas under the provisions of Wild Life (Protection) Act, 1972 (53 of 1972), the Forest (Conservation) Act, 1980 (69 of 1980) or Environment (Protection) Act, 1986 (29 of 1986); including Biosphere Reserves; Coral reefs Mud flats Sand dunes
  • 16. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CLASSIFICATION OF CRZ • Salt Marshes; • Turtle nesting grounds; • Horse shoe crabs habitats; • Sea grass beds; • Nesting grounds of birds; • Areas or structures of archaeological importance and heritage sites. • The area between Low Tide Line and High Tide Line. Plan Sea grass beds
  • 17. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES CRZ-I  no new construction shall be permitted in CRZ-I except,- • projects relating to Department of Atomic Energy • pipelines, conveying systems including transmission lines • facilities that are essential for activities permissible under CRZ-I • installation of weather radar for monitoring of cyclones movement and prediction by • construction of trans harbour sea link and without affecting the tidal flow of water,
  • 18. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES  Areas between LTL and HTL which are not ecologically sensitive, necessary safety measures will be incorporated while permitting the following, namely:- • exploration and extraction of natural gas; • construction of dispensaries, schools, public rainshelter, community toilets, bridges, roads, jetties, water supply, drainage, sewerage which are required for traditional inhabitants living within the biosphere reserves after obtaining approval from concerned CZMA. • necessary safety measure shall be incorporated while permitting suchdevelopmental activities in the area falling in the hazard zone; • salt harvesting by solar evaporation of seawater; • desalination plants; • storage of non-hazardous cargo such as edible oil, fertilizers and food grain within notified ports; • construction of trans harbour sea links, roads on stilts or pillars without affecting thetidal flow of water.
  • 19. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CLASSIFICATION OF CRZ CRZII • The areas that have been developed upto or close to theshoreline. • Developed area: area within the existing municipal limits or in other existing legally designated urban areas which are substantially built-up and has been provided with drainage and approach roads and other infrastructural facilities, such aswater supply and sewerage mains CRZ III • Areas that are relatively undisturbed and those do not belong to either CRZ-I or II which include coastal zone in the rural areas (developed and undeveloped) and also areas within municipal limits or in other legally designated urban areas, which are not substantially built up. Buildings are only permitted on the landward side if there is an existing road in close proximity to the coastal line.
  • 20. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES CRZ-II  buildings shall be permitted only on the landward side of the existing road, or on the landward sideof existing authorized structures;  Buildings shall be subject to the existing localtown and country planning regulations including the ‘existing’ norms of Floor Space Index or FloorArea Ratio: • Provided that no permission for construction of buildings shall be given on landward sideof any new roads which are constructed on theseaward side of an existing road
  • 21. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES  reconstruction of authorized building to be permitted subject with the existing Floor Space Index or Floor Area Ratio Norms and without change in present use  facilities for receipt and storage of petroleum products and liquefied natural gas  desalination plants and associated facilities;  storage of non-hazardous cargo, such as edible oil, fertilizers and food grain in notified ports;  facilities for generating power by non-conventional power sources and associated facilities;
  • 22. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES the NDZ shall not be applicable in such area falling within any notified port limits;  No construction shall be permitted within NDZ except: • repairs or reconstruction of existing authorized structure not exceeding existing Floor Space Index, existing plinth area and existing density and for permissible activities under the notification including facilities essential for activities. • Dwelling units for traditional coastal communities and fisher folk. CRZ III Area upto 200mts from HTL on the landward side in case of seafront and 100mts along tidal influenced water bodies or width of the creek whichever is less is to be earmarked as “No Development Zone (NDZ)”. Construction/reconstru ctio n of dwelling units of traditional coastal communities including fisherfolk may be permitted within 100- 200 m by the government in consultation with the traditional coastal communities and concerned authorities.
  • 23. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02  CRZ IV  the water area from the Low Tide Line to twelve nautical miles on the seaward side;  shall include the water area of the tidal influenced water body from the mouth of the water body at the sea upto the influence of tide which is measured as five parts per thousand during the driest season of the year.  The activities impugning on the sea and tidal influenced water bodies will be regulated except for traditional fishing and related activities undertaken by local communities as follows:- • No untreated sewage, effluents, ballast water, ship washes, fly ash or solid waste from all activities including from aquaculture operations shall be let off or dumped. A comprehensive plan for treatment of sewage generating from the coastal towns and cities shall be formulated within a period of one year in consultation with stakeholders including traditional coastal communities, traditional fisherfolk and implemented; • Pollution from oil and gas exploration and drilling, mining, boat house and shipping; • There shall be no restriction on the traditional fishing and allied activities undertaken by local communities.
  • 24. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 NORMS FOR REGULATION OF ACTIVITIES  However, the following activities may be permitted in NDZ – • agriculture, horticulture, gardens, pasture, parks, play field, andforestry; • projects relating to Department of AtomicEnergy; • mining of rare minerals; • salt manufacture from seawater; • facilities for receipt and storage of petroleum products and liquefied natural gas as specified in Annexure-II; • facilities for generating power by non conventional energy sources; • Foreshore facilities for desalination plants and associated facilities; • weather radars; • construction of dispensaries, schools, public rain shelter, community toilets, bridges, roads, provision of facilities for water supply, drainage, sewerage, crematoria, cemeteries and electric sub-station which are required for the local inhabitants may be permitted on a case to case basis by CZMA; • construction of units or auxiliary thereto for domestic sewage, treatment and disposal withthe prior approval of the concerned Pollution Control Board orCommittee; • Facilities required for local fishing communities such as fish drying yards, auction halls, net mending yards, traditional boat building yards, ice plant, ice crushing units, fish curing facilities and the like;
  • 25. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 SPECIAL CONSIDERATION CRZ V A.  CRZ area falling within municipal limits ofGreater Mumbai;  The CRZ areas of Kerala including the backwatersand backwater islands;  CRZ areas of Goa.  B. Critically Vulnerable Coastal Areas (CVCA) such as Sunderbans region of West Bengal and other ecologically sensitive areas identified as under Environment(Protection) Act, 1986 and managed with the involvement of coastal communities including fishermen. Sundarbans
  • 26. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CONSTRUCTION OF BEACH RESORTS OR HOTELS- CONDITIONS Live fencing and barbed wire fencing with vegetative cover allowed around private properties subject to the condition that such fencing shall in no way hamper public access to the beach. Plan: The proposed constructions shallbe beyond the hazard line or 200mts fromthe High Tide Line whichever is more. Section: Basement construction will not adversely affect fee flow of groundwater inthat area no permanent structures for sports facilities shall be permitted except construction of goal posts, net posts and lamp posts. Plan of a coastal plot: • Plot area: Not less than 0.4 hectares. • FSI: Not more than 0.33 No flattening of sand dunes shall be carried out.
  • 27. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 CONSTRUCTION OF BEACH RESORTS OR HOTELS- CONDITIONS Elevation of a coastal building: Overall height: 9m. Max. floors: G + 1. Plan: Tapping of ground water Plan: Altering sandystretches the construction shall be consistent with the surrounding landscape and local architectural style. necessary arrangements for the treatment of the effluents and solid wastes must be made and it must be ensured If the project involves diversion of forestland for non-forest purposes, clearance as required under the Forest (Conservation) Act, 1980 shall be obtained and the requirements of other Central and State laws as applicable to the project shall be met with Floor Space Index: the area of entire plot including the portion which falls within the no development zone shall be taken into account. approval of the State or Union territory Tourism Department shall be obtained
  • 28. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02
  • 29. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02
  • 30. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02 BIBLIOGAPHY  http://www.moef.nic.in/downloads/public-information/CRZ-Notification- 2011.pdf  http://envfor.nic.in/
  • 31. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02
  • 32. FACULTY OF ARCHITECTURE SCET, SURAT M.ARCH II SEM IIIURBAN RENEWAL 2019 SURAT MASTERS IN URBAN DESIGN BALDANIYA HITESH ROLL NO 02