SlideShare a Scribd company logo
1 of 57
Download to read offline
DENR -7, PENR Office Siquijor
THE
PHILIPPINE
EIS SYSTEM
Presidential Decree No. 1586
EMB
P.D. 1586
Philippine
Environmental Impact
Statement System
R.A. 6969
Toxic Substances and
Hazardous and Nuclear
Wastes
R.A. 8749
Philippine Clean
Air Act of 1999
R.A. 9003
Ecological Solid
Waste
Management Act
R.A. 9275
Philippine Clean
Water Act of 2004
Forefront in
environmental
protection
Planning & management
tool to determine
environmental impacts &
means to mitigate them
“The State shall protect and advance the right of the
people to a balanced and healthful ecology in
accord with the rhythm and harmony of nature.”
No person, partnership or
corporation shall undertake or
operate any such declared
environmentally critical project or area
without first securing an
Environmental Compliance
Certificate (ECC)
Section 4 of P.D. 1586
What are the salient points of
P.D. 1586?
Declares as a State Policy to attain
and maintain a rational and orderly
balance between socio-economic
growth and environmental
protection.
What are the salient points of
P.D. 1586?
All agencies and instrumentalities of the National
Government, including government-owned and
controlled corporations, firms, and entities to undertake
an EIA for all proposed projects and undertakings which
significantly affect the quality of the environment.
Declares Environmental Critical Projects and Areas
and to secure Environmental Compliance Certificate
(ECC) before commencing or undertaking projects.
What are the salient points of
P.D. 1586?
Fines and/or penalties for every
violation of conditions stipulated
in the ECC and commencing
projects without ECC.
Documents issued related to PD 1586
PROJECT
CATEGORY
DESCRIPTION
DOCUMENT
TO SECURE
HOW TO
APPLY
APPROVING
OFFICE
A
Environmentally
Critical Project
(ECP)
ECC
Manual
Central
Office
B Non-ECP Online
Regional
Office
C
Environmental
enhancement
Pre-1982 Project CNC
Manual
Regional
Office
D
Not covered by
PD 1586
Online
Regional
Office
• Evaluating and predicting the likely
impacts of a project
• Designing appropriate measures to
address negative effects or risks to
the environment incorporated in the
project design
• Identification of possible impacts
• Evaluation of identified impacts
• Mitigation of significant impacts
Environmental
Compliance Certificate
Decision document issued
by EMB after a positive
review of an ECC
application
Environmental
Compliance Certificate
Certifies that proponent has
complied with requirements
of the EIS System
Environmental
Compliance Certificate
Proponent committed to
implement its Environmental
Management Plan
Environmental
Compliance Certificate
Contains specific measures
and conditions proponent
has to undertake
Project
Grouping
Matrix
Screening for ECC Requirement Coverage
Annex A of EMB MC 2014-005
(modified by EMB MC 2019-003)
*Contents from Annex A of EMB MC 2014-005
PROJECTS /
DESCRIPTION
CAT. A:
ECP
EIS
CAT. B:
NON-ECP
ECC Online
CAT. D:
CNC
CNC Online
Buildings none > 1 ha ≤ 1 ha
Institutional and
other structures
with laboratory
facilities (example:
hospital)
none
Primary,
Secondary,
Tertiary Hospitals
or Medical
Facilities
Clinics
COVERAGE SCREENING GUIDELINES
ECC CNC
CATEGORY A
Environmentally
Critical Project
(ECP)
CATEGORY B
non-ECP
CATEGORY C
Environmental
Enhancement or
Pre-1982
Project
CATEGORY D
Not Covered by
PD 1586
required to secure ECC
may secure CNC
CATEGORY A PROJECTS
• Classified as Environmentally Critical
Projects (ECPs)
• Required to secure an ECC
• Processing done manually via EMB
Central Office
CATEGORY B PROJECTS
• Not classified as ECP
• Deemed to significantly affect the quality
of environment being located in an
Environmentally Critical Area (ECA)
• Required to secure an ECC
• Processing done online via EMB Regional
Office
CATEGORY C PROJECTS
• Directly enhance the quality of the
environment
• Directly address existing environmental
problems
• NOT required to secure an ECC
CATEGORY D PROJECTS
• Unlikely to cause significant adverse
impact on the quality of the
environment
• NOT required to secure an ECC
• May secure CNC through online
system
Certification issued by EMB
certifying that project is:
not covered by the EIS
System
not required to secure an
ECC
www.r7.emb.gov.ph (or www.emb.gov.ph) 
CNC Online
Online Screening for CNC Requirement
Coverage
Implementation of Online
Processing of CNC Applications
for Category D Projects under the
Philippine Environmental Impact
Statement System (PEISS)
EMB Memorandum Circular
No. 2015-003
Project
Screening
Save
Application
Pay via LBP
Update and
Submit
Application
Evaluation by
Casehandler
Approval/Denial
by Chiefs and
Director
Printing of
CNC/Denial
Letter
Implementation of Online Processing
of Environmental Compliance Certificate
(ECC) Applications
for Category B Projects requiring
Initial Environmental Examination (IEE)
Checklist Report Forms
under the Philippine Environmental Impact
Statement System (PEISS)
EMB Memorandum Circular
No. 2015-008
Project Screening
Submit
Application
Evaluation by
Casehandler
Approval/Denial
by Chiefs and
Director
Payment via LBP
Printing of ECC
Signing and
Notarizing of
Submission of
Signed
Approval of ECC
Submission of
Notice to Proceed
Requirements
BASIC REQUIREMENTS
• Project Description & Project Components
• Environmental Impact & Management Plan
• Abandonment Plan
• Geotagged Photos
• Topographic map
• LGU Certification on land use compatibility
• Site Development Plan/Vicinity Map & Project/Plant Layout
• Schematic diagram of WTF and APCF
• Organizational Chart
• Proof of authority over site
• Accountability statement & Bank Receipt
• PEMAPS
• Affidavit of No Complaint
Wastewater Treatment
Facility
• Floor Area
• Daily wastewater generation
• Volumetric Capacity
• Retention Time of wastewater
• Efficiency (In terms of priority parameters)
Supplemental Requirements
WASTEWATER TREATMENT
FACILITY
Material Recovery Facility
• Types of solid waste generated
• Daily solid waste generation
• Area of MRF (with divisions for
different types of wastes-
biodegradable, non-biodegradable,
recyclable, etc.)
Additional Requirements
MATERIALS RECOVERY FACILITY
Rainwater Cistern Tank
• Floor Area
• Volumetric Capacity
𝑽𝒐𝒍𝒖𝒎𝒆 = 𝒂𝒏𝒏𝒖𝒂𝒍 𝒓𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝒅𝒂𝒕𝒂 ∗ 𝒕𝒐𝒕𝒂𝒍 𝒓𝒐𝒐𝒇 𝒂𝒓𝒆𝒂 ∗ 𝟎. 𝟏𝟓
Additional Requirements
RAINWATER CISTERN
Existing projects that will
undertake expansion,
rehabilitation and/or
modification shall request
EMB Regional Office for
AMENDMENT OF ECC
• Expansion of project area
• Increase in the project size
parameter / production capacity
• Change in process flow or
technology
• Additional components
Examples of MAJOR Amendment
• Change in company name /
ownership
• Decrease in land / project area or
production capacity
• Typographical error
• Change in project layout without
change in process/production
capacity
Examples of MINOR Amendment
Projects that start or operate without an ECC;
Violation of ECC conditions, Environmental
Management Plan, or the rules and
regulations of the EIS System;
Proponents or EIS/IEE preparers involved in
misrepresentation in the documents or other
presentations, and therefore breach their
Accountability Statements, or commit other
infractions of DAO 30-03 or other relevant
laws and orders, may likewise be sanctioned.
Consume less. Share more. Live
simply.
3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf

More Related Content

What's hot

Environmental presidential decrees
Environmental presidential decreesEnvironmental presidential decrees
Environmental presidential decrees
Alvin Almo
 
Philippine laws in Protecting Environtment
Philippine laws in Protecting EnvirontmentPhilippine laws in Protecting Environtment
Philippine laws in Protecting Environtment
Elly Brent Baldovino
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
Prateek Bansal
 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
Apoorva Mathur
 

What's hot (20)

Waste Management and Disposal
Waste Management and DisposalWaste Management and Disposal
Waste Management and Disposal
 
Environmental presidential decrees
Environmental presidential decreesEnvironmental presidential decrees
Environmental presidential decrees
 
Environmental Laws PD 1586
Environmental Laws PD 1586Environmental Laws PD 1586
Environmental Laws PD 1586
 
Ecological Sold Waste Management
Ecological Sold Waste ManagementEcological Sold Waste Management
Ecological Sold Waste Management
 
Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)Republic act no. 9003(Ecological Solid Waste Management act of 2000)
Republic act no. 9003(Ecological Solid Waste Management act of 2000)
 
03 ra9003-pco
03   ra9003-pco03   ra9003-pco
03 ra9003-pco
 
Environmental Laws RA 6969
Environmental Laws RA 6969Environmental Laws RA 6969
Environmental Laws RA 6969
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
RA 9003.pptx
RA 9003.pptxRA 9003.pptx
RA 9003.pptx
 
Philippine laws in Protecting Environtment
Philippine laws in Protecting EnvirontmentPhilippine laws in Protecting Environtment
Philippine laws in Protecting Environtment
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
 
Ra 9184
Ra 9184Ra 9184
Ra 9184
 
General Provisions of RA 9184
General Provisions of RA 9184General Provisions of RA 9184
General Provisions of RA 9184
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Ra9003
Ra9003Ra9003
Ra9003
 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
 
Denr mandate and role on climate change 11 march 2013
Denr mandate and role on climate change   11 march 2013Denr mandate and role on climate change   11 march 2013
Denr mandate and role on climate change 11 march 2013
 
EIA
EIAEIA
EIA
 
Dao 2001-34
Dao 2001-34Dao 2001-34
Dao 2001-34
 
E-Waste (Management) Rules, 2016- What’s New
E-Waste (Management) Rules, 2016- What’s NewE-Waste (Management) Rules, 2016- What’s New
E-Waste (Management) Rules, 2016- What’s New
 

Similar to 3.-DENR-Compliances-for-Business-Operation.pdf

ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
B. BHASKAR
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ChandanLawrence
 
Guidelines emp
Guidelines   empGuidelines   emp
Guidelines emp
slydze4
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
Adewunmi Okumodi
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
Chandrakant Singh
 

Similar to 3.-DENR-Compliances-for-Business-Operation.pdf (20)

Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Eia regulations
Eia regulationsEia regulations
Eia regulations
 
The-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.pptThe-EIS-System-in-Phillipine.ppt
The-EIS-System-in-Phillipine.ppt
 
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the PhilippinesEIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
EIA FE COURSE Lecture for Aspiring Field Engineers in the Philippines
 
PEISS
PEISSPEISS
PEISS
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
 
PIA REPORT PRESENTATION
PIA REPORT PRESENTATIONPIA REPORT PRESENTATION
PIA REPORT PRESENTATION
 
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, ECENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
ENVIRONMENTAL IMPACT Assessment, concepts, mitigation, EC
 
Group-10.pptx
Group-10.pptxGroup-10.pptx
Group-10.pptx
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Guidelines emp
Guidelines   empGuidelines   emp
Guidelines emp
 
Environmental Impact Assignment
Environmental Impact Assignment Environmental Impact Assignment
Environmental Impact Assignment
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
EMP Procedure in Malaysia_32.pdf
EMP Procedure in Malaysia_32.pdfEMP Procedure in Malaysia_32.pdf
EMP Procedure in Malaysia_32.pdf
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
Environment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal AuditEnvironment management Tools : EIA & Environmetal Audit
Environment management Tools : EIA & Environmetal Audit
 

Recently uploaded

Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
The Hebrew University of Jerusalem
 

Recently uploaded (20)

Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)Elemental Analysis of Plants using ICP-OES(2023)
Elemental Analysis of Plants using ICP-OES(2023)
 
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptxCAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
CAUSES,EFFECTS,CONTROL OF DEFORESTATION.pptx
 
Understanding Air Quality Monitoring A Comprehensive Guide.pdf
Understanding Air Quality Monitoring A Comprehensive Guide.pdfUnderstanding Air Quality Monitoring A Comprehensive Guide.pdf
Understanding Air Quality Monitoring A Comprehensive Guide.pdf
 
A Complete Guide to Understanding Air Quality Monitoring.pptx
A Complete Guide to Understanding Air Quality Monitoring.pptxA Complete Guide to Understanding Air Quality Monitoring.pptx
A Complete Guide to Understanding Air Quality Monitoring.pptx
 
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
Christmas Palm Trees in Florida The Ultimate Guide to Festive Landscaping wit...
 
Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.Global warming, Types, Causes and Effects.
Global warming, Types, Causes and Effects.
 
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
Sungsang Mangrove Restoration and Ecotourism (SMART): A participatory action ...
 
ADBB 5cladba Precursor JWH018 +85244677121
ADBB 5cladba Precursor JWH018 +85244677121ADBB 5cladba Precursor JWH018 +85244677121
ADBB 5cladba Precursor JWH018 +85244677121
 
Heavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.pptHeavy metals with their causes and effect.ppt
Heavy metals with their causes and effect.ppt
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
My Museum presentation by Jamilyn Gonzalez
My Museum presentation by Jamilyn GonzalezMy Museum presentation by Jamilyn Gonzalez
My Museum presentation by Jamilyn Gonzalez
 
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
NO1 Pakistan online istikhara for love marriage vashikaran specialist love pr...
 
slidesgo-maximizing-sustainability-the-case-for-plastic-reuse
slidesgo-maximizing-sustainability-the-case-for-plastic-reuseslidesgo-maximizing-sustainability-the-case-for-plastic-reuse
slidesgo-maximizing-sustainability-the-case-for-plastic-reuse
 
Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...Palynology: History, branches, basic principles and application, collection o...
Palynology: History, branches, basic principles and application, collection o...
 
Smart Watering Solutions for Your Garden
Smart Watering Solutions for Your GardenSmart Watering Solutions for Your Garden
Smart Watering Solutions for Your Garden
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Urban Farming: 3 Benefits, Challenges & The Rise of Green Cities | CIO Women ...
Urban Farming: 3 Benefits, Challenges & The Rise of Green Cities | CIO Women ...Urban Farming: 3 Benefits, Challenges & The Rise of Green Cities | CIO Women ...
Urban Farming: 3 Benefits, Challenges & The Rise of Green Cities | CIO Women ...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
Determination of Total Iodine using ICP-MS in Israeli Bottled and Tap Water: ...
 

3.-DENR-Compliances-for-Business-Operation.pdf

  • 1. DENR -7, PENR Office Siquijor THE PHILIPPINE EIS SYSTEM Presidential Decree No. 1586
  • 2.
  • 3.
  • 4. EMB P.D. 1586 Philippine Environmental Impact Statement System R.A. 6969 Toxic Substances and Hazardous and Nuclear Wastes R.A. 8749 Philippine Clean Air Act of 1999 R.A. 9003 Ecological Solid Waste Management Act R.A. 9275 Philippine Clean Water Act of 2004 Forefront in environmental protection Planning & management tool to determine environmental impacts & means to mitigate them
  • 5. “The State shall protect and advance the right of the people to a balanced and healthful ecology in accord with the rhythm and harmony of nature.”
  • 6. No person, partnership or corporation shall undertake or operate any such declared environmentally critical project or area without first securing an Environmental Compliance Certificate (ECC) Section 4 of P.D. 1586
  • 7. What are the salient points of P.D. 1586? Declares as a State Policy to attain and maintain a rational and orderly balance between socio-economic growth and environmental protection.
  • 8. What are the salient points of P.D. 1586? All agencies and instrumentalities of the National Government, including government-owned and controlled corporations, firms, and entities to undertake an EIA for all proposed projects and undertakings which significantly affect the quality of the environment. Declares Environmental Critical Projects and Areas and to secure Environmental Compliance Certificate (ECC) before commencing or undertaking projects.
  • 9. What are the salient points of P.D. 1586? Fines and/or penalties for every violation of conditions stipulated in the ECC and commencing projects without ECC.
  • 10. Documents issued related to PD 1586 PROJECT CATEGORY DESCRIPTION DOCUMENT TO SECURE HOW TO APPLY APPROVING OFFICE A Environmentally Critical Project (ECP) ECC Manual Central Office B Non-ECP Online Regional Office C Environmental enhancement Pre-1982 Project CNC Manual Regional Office D Not covered by PD 1586 Online Regional Office
  • 11. • Evaluating and predicting the likely impacts of a project • Designing appropriate measures to address negative effects or risks to the environment incorporated in the project design
  • 12. • Identification of possible impacts • Evaluation of identified impacts • Mitigation of significant impacts
  • 13. Environmental Compliance Certificate Decision document issued by EMB after a positive review of an ECC application
  • 14. Environmental Compliance Certificate Certifies that proponent has complied with requirements of the EIS System
  • 15. Environmental Compliance Certificate Proponent committed to implement its Environmental Management Plan
  • 16. Environmental Compliance Certificate Contains specific measures and conditions proponent has to undertake
  • 17.
  • 18.
  • 19.
  • 20. Project Grouping Matrix Screening for ECC Requirement Coverage Annex A of EMB MC 2014-005 (modified by EMB MC 2019-003)
  • 21.
  • 22. *Contents from Annex A of EMB MC 2014-005 PROJECTS / DESCRIPTION CAT. A: ECP EIS CAT. B: NON-ECP ECC Online CAT. D: CNC CNC Online Buildings none > 1 ha ≤ 1 ha Institutional and other structures with laboratory facilities (example: hospital) none Primary, Secondary, Tertiary Hospitals or Medical Facilities Clinics COVERAGE SCREENING GUIDELINES ECC CNC
  • 23. CATEGORY A Environmentally Critical Project (ECP) CATEGORY B non-ECP CATEGORY C Environmental Enhancement or Pre-1982 Project CATEGORY D Not Covered by PD 1586 required to secure ECC may secure CNC
  • 24. CATEGORY A PROJECTS • Classified as Environmentally Critical Projects (ECPs) • Required to secure an ECC • Processing done manually via EMB Central Office
  • 25.
  • 26.
  • 27. CATEGORY B PROJECTS • Not classified as ECP • Deemed to significantly affect the quality of environment being located in an Environmentally Critical Area (ECA) • Required to secure an ECC • Processing done online via EMB Regional Office
  • 28.
  • 29.
  • 30.
  • 31. CATEGORY C PROJECTS • Directly enhance the quality of the environment • Directly address existing environmental problems • NOT required to secure an ECC
  • 32.
  • 33. CATEGORY D PROJECTS • Unlikely to cause significant adverse impact on the quality of the environment • NOT required to secure an ECC • May secure CNC through online system
  • 34. Certification issued by EMB certifying that project is: not covered by the EIS System not required to secure an ECC
  • 35. www.r7.emb.gov.ph (or www.emb.gov.ph)  CNC Online Online Screening for CNC Requirement Coverage
  • 36.
  • 37. Implementation of Online Processing of CNC Applications for Category D Projects under the Philippine Environmental Impact Statement System (PEISS) EMB Memorandum Circular No. 2015-003
  • 38. Project Screening Save Application Pay via LBP Update and Submit Application Evaluation by Casehandler Approval/Denial by Chiefs and Director Printing of CNC/Denial Letter
  • 39.
  • 40.
  • 41. Implementation of Online Processing of Environmental Compliance Certificate (ECC) Applications for Category B Projects requiring Initial Environmental Examination (IEE) Checklist Report Forms under the Philippine Environmental Impact Statement System (PEISS) EMB Memorandum Circular No. 2015-008
  • 42. Project Screening Submit Application Evaluation by Casehandler Approval/Denial by Chiefs and Director Payment via LBP Printing of ECC Signing and Notarizing of Submission of Signed Approval of ECC Submission of Notice to Proceed Requirements
  • 43. BASIC REQUIREMENTS • Project Description & Project Components • Environmental Impact & Management Plan • Abandonment Plan • Geotagged Photos • Topographic map • LGU Certification on land use compatibility • Site Development Plan/Vicinity Map & Project/Plant Layout • Schematic diagram of WTF and APCF • Organizational Chart • Proof of authority over site • Accountability statement & Bank Receipt • PEMAPS • Affidavit of No Complaint
  • 44. Wastewater Treatment Facility • Floor Area • Daily wastewater generation • Volumetric Capacity • Retention Time of wastewater • Efficiency (In terms of priority parameters) Supplemental Requirements
  • 46. Material Recovery Facility • Types of solid waste generated • Daily solid waste generation • Area of MRF (with divisions for different types of wastes- biodegradable, non-biodegradable, recyclable, etc.) Additional Requirements
  • 48. Rainwater Cistern Tank • Floor Area • Volumetric Capacity 𝑽𝒐𝒍𝒖𝒎𝒆 = 𝒂𝒏𝒏𝒖𝒂𝒍 𝒓𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝒅𝒂𝒕𝒂 ∗ 𝒕𝒐𝒕𝒂𝒍 𝒓𝒐𝒐𝒇 𝒂𝒓𝒆𝒂 ∗ 𝟎. 𝟏𝟓 Additional Requirements
  • 50.
  • 51. Existing projects that will undertake expansion, rehabilitation and/or modification shall request EMB Regional Office for AMENDMENT OF ECC
  • 52. • Expansion of project area • Increase in the project size parameter / production capacity • Change in process flow or technology • Additional components Examples of MAJOR Amendment
  • 53. • Change in company name / ownership • Decrease in land / project area or production capacity • Typographical error • Change in project layout without change in process/production capacity Examples of MINOR Amendment
  • 54. Projects that start or operate without an ECC; Violation of ECC conditions, Environmental Management Plan, or the rules and regulations of the EIS System; Proponents or EIS/IEE preparers involved in misrepresentation in the documents or other presentations, and therefore breach their Accountability Statements, or commit other infractions of DAO 30-03 or other relevant laws and orders, may likewise be sanctioned.
  • 55. Consume less. Share more. Live simply.