I havea total13 years of experience in the processcontrolsystem& Instrumentation in GASPOWER
PLANT, COAL POWERPLANT andREFINARY PLANT, PETRO CHEMICAL PLANT In field of
instrumentation.
If you find qualification and experiencecomply with requirements,Ican assureyou of best service atall
the times.Hope this will merit yourkind consideration and thanking you in anticipation.
Date: 24/09/16 Yoursfaithfully
Encl: Resume
SUTHAR ALPESH.I
CURRICULUM VITAE
ALPESHKUMAR .I.SUTHAR
A/7, SHANTIVILLA RESIDANCY
VILLAGE –VASAD(388306)
DIST- ANAND , STATE –GUJARAT , INDIA
PASSPORTNO.-(K-5751380)
LANGUAGE - ENGLISH ,GUJARATI, HINDI ,SOME ARABIC
MOB. NO.:- +966 571147234(KSA –SELF) , +91 9662437722(INDIA –FATHER)
EMAIL – appu.piusha@gmail.com , asuthar92@yahoo.in
Skype:alpeshsuthar61
_____________________________________________________________________________________
Career Objectives :
To obtain a position of SR.INSTRUMENT TECHNICIAN
Objectives :
To pursue a challenging career in the field of construction, commissioning and maintenance, so that I
can utilize myknowledge andskillof instrumentationeffectivelyand efficiently in a practical manner in
my professional approach.
Education / Technical / Traning Qualification :
 S.S.C EXAMBOARD–GANDHINAGAR-(GUJARAT) - 2001 (70 %)
 D.T.PCOMPUTER COURSE (GOVERNMENT) – VADODARA - 2002 (A – Grade)
 I.T.I - INSTRUMENT MECHANIC –VADODARA -2003 (70 % )
 N.C.V.T EXAMBOARD-GANDHINAGAR-(GUJARAT) -2004 (70 % )
 INDUSTRIALPNUMATICSTRANING(C.R.I.S.P) -BHOPAL -2008 (A Grade)
 DIPLOMA -2012 ( 52.60 % )
 B.TECH INSTRUMENTATION & CONTROL -( 2ND
YEAR Goingon )
Computer Skill :-
 MICROSOFT WORD DOCUMENT
 MICROSOFTPOWERPOINTPRESENTATION
 MICROSOFTEXCEL WORKSHEET
 ORACLE
 D.T.P
 SAP
 EDDMS ( INTERGRAPH)
 PLANTMAPS SYSTEM
 INTERNET SURFING
SAFETY,HSE, PTW Training History :
 Fire prevention and fire frightening.
 Personal safety and social responsibilities.
 Elementary first Aid.
 Personal Survival Techniques.
 H2S / BA Awareness and Escape.
 Chemical Hazard Training
 Permit to Work System.(G.E,Q.G.P.C,S.CHEM,D.P.C,R.I.L ,H.Z.L,H.M.E.L)
 Job Hazard Analyses.
 Supervision of Safety and CPR First Aid.
 Successfully completed 32 EHS online courses From Granite(G.E) University
SUMMARY:-
I HAS KNOWLEDGE & WORK EXPERIENCEIN,
 CALIBRATOR: -
:-SCANDURA,A.O.I.P,ROSEMOUNT,YOKOGAWA,DRUCK ,DEADWEIGHT TESTER, COMPRETOR,
PRESSURE & HOUDRALIC HAND PUMP, VACCUMPUMP,CALIBRATION TEST BENCH ,ANALOG&
DEGITAL MULTIMETER, ANALOG& DEGITAL MEGGAR, M.A SOURCE & MESURE CALIBRATIOR
 HART COMMUNICATOR:-
:- MODEL-275, 375,475 ( EMERSION) ,MODEL-4100(YOKOGAWA) , D.E HONEYWELL
:- HANDHELD TERMINAL COMMUNICATOR (FOXBORO)
 D.C.S. : - FOXBORO,ABB, HONEYWELL, MAX-DNA, YOKOGAWA(CS-3000 )
 P.L.C :- G.E.FAUNC, ALLEN BREDELY , SIMENS , MODE-30-SYSTEM
 G.E SPEED TRONIC :- MARK –V , MARK –VI e
 G.E - GAS TURBINE :- FRAME – 6 B & E , FRAME -7 F a & F e , FRAME -9 F a & F e , FRAME -5
: - L.M –2500 MODEL TURBINE
 BHEL - STEAM TURBINE : - 77 MW CAPACITY,80 MW CAPACITY
 GENERATOR : - BRUSH , BHEL , G.E
 VIBRATION &SPEED MONITORINGSENSOR : -
:- BENTLY NEVADA - SERIES -31000 ,3300 , 3500
:-SESMIC- VELOCITY TRANSDUCER , SPEED SENSOR,NSV VIBRATION PROBE.
 CONVEYERBELT PROTECTOIN SYSTEMINSTRUMENT :-
- PULL COURD SWITCH , BELT SWAY SWITCH , ZERO SPEED SWITCH , METAL DETECTOR
 ANALYTICALINSTRUMENT : - O 2 ANALYZER, GAS SENSOR& HEAT DETECTOR , SO 2 (SULFER -
OXIDE ) ANALYZER, NO 2 ( NITROZEN OXIDE ) ANALYZER, PH METER , TURBIDITY METER ,
COUNDUCTIVITYMETER , ONLINE& LAB GAS CROMATOGRAPHYSYSTEM
 VALVE: -
:- FISHER ,LIMITORQUE ,MESOLIAN , I.L ,BIFFI,ROTORQUE ,KOSHO & othercompany.
:- CONTROLVALVE( SINGLEACTING & DOUBLE ACTING) ,PRESSURE RELISE VALVE,PRESSURE
DRAIN VALVE, SELF OPERATINGVALVE, ON/OFFVALVE, SEFTY VALVE( CHECK
VALVE),S.O.V.,P.D.C.V,P.C.V ,PNEUMATICOPERATEDVALVE(SOV,CONROLVALVE,AIR
REGULATOR ) , HYDRAULIC OPERTED VALVE,MOV (AUMA , LIMITORQUE)
 TRANSMITTTER :-
:- HONEYWELL , ROSEUMOUNT ,FOXBORROW,YOKOGAWA ,EMERSION
:- PT,FT , PDT , LT ,TT ,PI,TI,FI,LI
:- F.T – D/P TYPE , MASS FLOW TRX. , MICORMOTION FLOW TRX, COREOLICFLOW TRX ,
VERTEX FLOW TRX , ULTRA SONICFLOW TRX ,DIAPHRAGMCAPILLARYTYPE FLOW TRX
:- L.T – D.PTYPE , LEVEL TROLL , GUIDED WAVE , RADAR, INTERFACELEVEL,DRY & WET LEG
 ELEMENTS :- PRESSURE ,FLOW, TEMPRATURE , LEVEL
PRESSURE :- PRESSURE GAUGE(BOURDEN , DIAPHRAM ,HELICALSPRING,BELLOWS ,CAPILLARY)
FLOW :- FLOW MASURING GAUGE ( PITTOT TUBE , ORIFICEPLATE , ANUBAR,VENTURITUBE )
TEMPRATURE: - T/C , RTD( 2,3,4 WIRE) ,THERMOSTATE ,BIAMETALIC TEMP. GAUGE ,CAPILARRY -
TYPE TEMP. GAUGE,TEMP .BATH
LEVEL:-LEVEL GAUGE, LEVEL SWITCH,LEVEL TRANSMITER, SIGHT GLASS LEVEL INDICATOR,
MAGNETIC STRIP LEVEL INDICATIOR.
 Regularcheck-up,andTroubleshootingof a,Smart fieldTransmittingandFinal control elements,
PID Controllers,I/Pconvertor, I/Hconvertor,CCTV SYSTEM.
 Overhauling,ModificationON andOFFline,Preventive Maintenance,Correctivemaintenance &
Shutdownmaintenance of SmartElectronicsinstruments &pneumaticsinstrument,valve,
actuator ,damper,analyzer, Flame scanner,Igniterchecking,GASsensor, fire &gas system&all
type switches&Transmitter, SERVO VALVES, GAS CONTROLVALVES,ESD VALVE,PDV ,L.V.D.T
& etc.
 LOOPCHECKING (HOT LOOP& COLD LOOP),ESD, SIS,IPL/Safe guardtesting,Logicchecking&
Interlockchecking etc.Knowledgeaboutinstallation,P&IDDiagrams,ILDdiagram, data sheetof
instrument,Cause &effectdiagram, cable rootingandtermination.
 Erectioncommissioning,Labtesting,Calibration&Differenttypesof modernprocessfield
Instrumentation.
 Dynamicweighingscale operation(EVERYINDIA &SENLOGICSYSTEM)
 I was workedonFOUNDATION FIELDBUS systeminProject,Commissioning&Maintenance
workduringUNIT OF (D.C.U,FCCU,CPP& H.D.P.E,Ethylene ,EBSM ,Furnace , Powerrecovery
unit,Cracked gas compressor,Wet GAS Compressor,Boiler) inRefinery &Petrochemical plant,
Smelterplant,GasPowerplant,Thermal powerplant.
 I has alsoexperience in Manufacturingof R.T.D ,T /C , PRESSURE GAUGE , TEMP. GAUGE ,
Temperature bath,Comparator.
 Planning,Supervision( instrumenttech+Electrician)
 CONDUCTINGTOOL BOX TALK & DAILY,WEEKLY & MONTHLY SAFETY MEETING ,JOB
RESPONCIBALEPERSON ASA LEAD ,DISTRUBETINGJOB & KNOWLEDGE & ATTAIN MEETING
RELATED TO NEW PLANINGFORJOB , DAY TO DAY REPORTING ACTIVITY.
 Housekeeping&Safe workpractice.
EXPERIENCE -
1. S-CHEM ,CHEVORN PHILIPS COMPANY,LLC - SAUDI ARABIA
DURATION :- 07/05/2015 TO PRESENTWORKING
DESIGNATION :- SR.INSTRUMENT TECHNICIAN
COMPANY :- MS .Al SUWAIDIINDUSTRIAL SERVICE -SAUDIARBIA
WORK DESCRIPTION :- (MAINTENANCEJOB - PETROCHEMICAL PLANT & UTILITY PLANT )
RESPONSIBILITY - P.M& C.MJOB . WORKINGON IPL & S.I.SSYTEM ,H.M.I ., CLEAR OF TROUBLE
SHOOTINGOF D.C.SYOKOGAWA CENTUM CS 3000 SERIES,FILED BUS INSTRUMENT ,SIEMENS
PLC , IDENTIFICATION OFSIS& IPL INTSTRUMENT IN P&ID & FIELD & LOGIC SIDE , PREPARING
OF ALL DOCUMENENTS FROM EDDMS SYSTEM FOR IPL & SIS INSTRUMENT , PREPARINGOF
CALIBRATION SHEET , PREPARINGOF INSTRUMENT LIST FOR TURNAROUND ,SERVICINGOFALL
INSTRUEMENT , TESTING,CALIBRATION &CHECKINGOF ESD VALVE,CONTROLVALVES&
TRANSMITTER , CONDUCTINGOF TOOL BOXMEETING DAILY , WEEKLY & MONTHELY , PERMIT
TO WORK PRECTICE ,SAFEWORKPRACTICE.& ETC.
2. GRANITE INTERNATIONAL SERVICES INCORPORATON.(AFFILIEATE WITH G.E).–INDIA BRANCH
DURATION : - 20-05-2011 TO 30-04-2015
DESIGNATION :- SR. INSTRUMENT TECHNICIAN
WORK DESCRIPTION :- (SERVICING & COMMISSIONING JOB–POWER & REFINARY PLANT )
RESPONSIBILITY - POWER PLANT GAS TURBINE SERVICING& COMMISSIONINGJOB IN
VARIOUSLOCATION LIKE INDIA ,QATAR,OMAN , BAHRIN ,ABUDHABI,SAUDIARABIA &
DIFFERENTGAS TURBINE FRAME LIKE (FRAME-5,6 b ,7 F a ,7 Fe , 9 F a ,9 F e )MY
RESPONCIBILTYISDURING C.I, H.G.P.I& MEASUE INSPECTION TO DISMENTAL& ASSEMBLE OF
ALL TURBINE INSTUREMENT SAFELYWITH FOLLOWINGFILED WORK PROCEDURE OF G.E ,NEW
MODIFACATION JOB,CALIBRATION OFTRANSMITTER, VALVE,SWITCHES , CBD VALVE,
VIBRATION SENSOR(BENTLYNEVADA 3200,3300 SERIES),VELOCITYTRANSDUCER,MAGNETIC
PICKUP SENSOR ,GASCONTROL VALVE,SERVO CONTROLVALVE(RATIOVALVE),L.V.D.T.,
TESTING & SERVICINGOF FLAME SCANNER,SPARKPLUG , CDM PROBE, BHM PROBE ,BEARING
& WHEEL SPACETHERMOCOUPLE , HEAT DETECTOR ,GAS SENSOR,FIRESYSTEM & INVOLVE IN
START UP ACTIVITYOF MARK -6 e G.E SPEED TRONIXSYSTEM , TOOL BOX TALKACTIVITY
,PERMIT TO WORK PRACTICE,SAFEWORK PRACITCE & ETC.
3. HINDUSTAN MITTAL ENEARGY LTD.(REFINERY DEVISION )-PUNJAB.-INDIA
DURATION : - 08-11-2010 TO 18-05-2011
DESIGNATION :- INSTRUMENT SUPERVISOR
COMPANY : - REKNOWNENGINEERING SERVICES. –INDIA.
WORK DESCRIPTION :- (COMMISSIONING JOB& START UP ACTIVITY )
RESPONSIBILITY - COMMISSIONINGWORK & START UP ACTIVITY, FOR REFINARYPLANTOF
D.C. U & FCCU , CLEAR A PUNCH POINTLIST , LOOPCHEKCING& COMMISSIONING OF FILED
BUS TRANSMITTER ,VALVE,SMAR DVC POSITIONER,SWITCH & ESD VALVE ,FURNACE , OIL
SKID& GAS SKIDINSTUREMENT , GAS TURBINE & COMPRESSOR PROTECTION INSTRUMENT
,CONVYERBELT PROTECTION INSTRUEMENT , STEAM SHOOT BLOWINGSYSTEM, FAN
VIBRATION &DAMPER VAVLE , PERMIT TO WORK PRACTICE,SAFEWORK PRACTICE
,CONDUCTINGOF TOOL BOXTALK MEETING DAILY.&ETC.
4. DOFAR POWER COMPANYS.A.O.G – SALLALAH -OMAN
WOOD GROUPGASTURBINE SERVICES COMPANY. - OMAN
DURATION :- 19-10-2009 TO 02-11-2010
DESIGNATION :- INSTRUMENT TECHNICIAN
COMPANY : - BAHWAN ENGINEERING COMPANY - OMAN.
WORK DESCRIPTION :- (MAINTENANCEJOB – GAS& POWER PLANT -255 MW CAPACITY)
RESPONSIBILITY - MAINTENANCEJOBFOR GAS BASED POWER PLANT“255 MW “ CAPACITY.
MAINTENANC OFOIL SKID& GAS SKIDINSTRUEMNT , R.O PLANT , TANKAGEAREA , GAS
METERING SKID, GAS PRESSURIESSTATION , FIRE FIGHITINGSTATION & SYSTEM,
MAINTAININGOF P.MCHECK LIST , PST OF INSTRUMENT , BAG FILTER SOLENOIDTESTING , ON
LINE & OFF LINEWATER WASHINGOF TURBINE , INVOLVEIN SHUT DOWN ACTIVITYLIKE C.I
,H.G.P.I, MEJOR INSPECTION OFTURBINE , START UP ACTIVITY,CLEAR A TRUOUBBLE SHOTING
OF INSTRUEMENT , CALIBRTION SHEET MAINTANING,CALIBRATION & SERVICINVG WORKOF
ALL INSTRUEMENT ASPER P.MSCHIDULE . FOLLOW PERMIT TO WORK PROCEDURE ,SAFE
WORK PRECTICE. & CONDUCTINGOF TOOL BOXTALK MEETING DAILY ,WEEKLY & MONTHELY ,
GROUP DISSCUTION & KNOWELDGE SHERING & ETC.
5. HINDSTAN ZINC LTD.-CHITTROGARH. –RAJASTHAN -INDIA
DURATION : - 17-11-2007 TO 15-10-2009
DESIGNATION :- JR. INSTRUMENT ENGINEER
COMPANY : - KOREA PLANT SER. & ENG. CORPO. L.T.D.- RAJASTHAN.- INDIA
WORK DESCRIPTION :- ( COMMISSIONING JOB& MAINTENANCEJOB – 234 MW CPP PLANT)
RESPONSIBILITY - COAL FIRE CAPTIVEPOWERPLANT 2 x 77 MW & 1 x 80 MW
COMMISSIONINGJOB& MAINTANANCEJOB(P.M& C.M) & TROUBBLE SHOOTINGJOB
,MAINTANANCEWORKFORSTEAMTURBINE & BOILER AREA , BUNKER AREA , COAL HANDLING
PLANT,E.S.P, BOWL MILL , CONVEYERBELT PORTECTION SYSTEM , IN MOTION WEIGH BRIDGE
OPERATION SYSTEM(SENLOGIC& EVERY INDIA ) ,D.MPLANT(R.OPLANT),HANDLING&
TROUBBLE SHOOTINGOF PLC ( ALLEN BREDLY ,SIEMANS),D.C.S (MAX-DNA BHEL ),HMI
,HANDLINGSTAEAM& WATER ANALYSISINSTRUMENT LIKE ONLINEGAS CHROMETO GRAPH
(ABB) ,SILICA ANALYZER(ABB) PHMETER ,TURBIDITY METER ,CONDUCTIVITYMETER , O2
ANALYZER,SOX& NOX (SO2& NO2 ANALYZER), CALIBRATION OFFLAME SCANNER,INGNITER
,SADCDAMPERE ,VALVE, TUBINE PROTECTION INSTRUMENT SYSTEM, SMARTPOSITIONER,
CONTROLVAVLE TRANSMITTER ,DAILYP.MCHECK LIST WORK , MATERIAL IDENTIFICAITON ,
SAPOPERATION ,PERMITTO WORKPRACTISE,SAFEWORK PRACTICE,CONDUCTINGTOOL BOX
TALK , KNOWLEDGE SHARING & OTHER ACTIVITY
6. RATNAGIRI GAS& POWRPLANT LTD – MAHARASTRA
DURATION : - 27-11-2005 TO 15-11-2007
DESIGNATION :- INSTRUMENT TECHNCIAN /SUPERVISOR
COMPANY : - SWAMINAINTERNATIONAL PVT L.T.D – VADODARA.
WORK DESCRIPTION :- ( COMMISSIONING JOB& MAINTENANCEJOB – 1967 MW CAPACITY)
RESPONSIBILITY - 1967 MW (GASTURBINE 9341 & 9351 FA + ) COMBINNEDCYCLE POWER
PLANT (RGPPL) COMMISSIONINGJOB& MAINTANANCEJOB(P.M& C.M) & TROUBBLE
SHOOTINGJOB ,MAINTANANCEWORKFOR (G.E SPEED TRONIXMARK –V & VIe ),SIEMANSPLC
SYSTEM , BENTLY NEVADA 3300 & 3200 VIBRATION SYSTEM,LNGTERMINAL LOADING &
UNLOADING, TANKAGEAREA INSTRMENT MAINTANANCEJOB,COOLING TOWER INSTRUMENT
,OIL SKID& GAS SKID ,HRSG ,BOILER& TURBINE INSTUREMENT MAINTANANCEJOBLIKEFLAME
SCANNER,SPARKPLUG , EXHAUST T/C , BERING T/C,SPEEDPICKSENDSOR,VELOCITY
TRANSDUCER,C.D.MPROBE ,VLVE,SMART POSITIONER,TRANSMITTER,ANALYZER ,HYDORGEN
COOLED GENERATOR INSTURMENT , SOV ,SHUTDOWN ACTIVITY, START UP ACTIVITY,PERMIT
TO WORK PROCUDER , SAFETY TOOL BOKTALK ACTIVITY& E.T.C
7. RELIANCE INDUSTRIES LTD.(REFINARY DIVISION) –JAMNAGAR - INDIA
DURATION : - 28-09-2005 TO 23-11-2005
DESIGNATION :- INSTRUMENT TECHNCIAN
COMPANY : - TYCO - HOFFICONS IND. SERVIES L.T.D –JAMNAGAR.
WORK DESCRIPTION :- (SHUTDOWNJOB –FCCU UNIT , REFINARY)
RESPONSIBILITY - SHUTDOWN ACTIVITYOF FCCU PLANT, POWER RECOVERYUNIT
(MITSUBISHI) COMPRESSOR& TURBINE , WET GAS COMPRESSOR ,EXPANDER ,INSTRUMENT
CALIBRATION &SERVICINGLIKE ALL TYPE OF TRANSMITTER , IGV ,CBD ,LVTD
,VIBRTAION(BENTLYNEVADA ,SPPEDPICKUP(MAGNETICPROBE),VELOCITYTRANSDUCER
,CONTROLVALVE, ANALYZERSUPPORT,PRESSURE GAUGE,ALL TYPE SWITCH , USING
CALIBRATOR SCANDURA , TK-3 ,DRUCK ,AOIP,LOOPCHEKING,STARTUP ACTIVITY,SAFEWORK
PRACTICE& PERMIT TO WORK SYSTEM,& ETC.
8. I.O.C.L (REFINARYDIVISION ) –VADODARA
DURATION : - 17-09-2004 TO 20-09-2005
DESIGNATION :- INSTRUMENT TECHNCIAN
COMPANY : - TOUCH CONTROL PVT L.T.D – VADODARA.
WORK DESCRIPTION :- ( MAINTENANCEJOB –REFINARY PLANT )
RESPONSIBILITY :- MAINTANANCEJOBFORCRUDE PLANT ,CALIBRATON OF TRANSMITTER ,
VALVE,PRESSURE GAUGE ,ANALYTICAL INSTRUEMENT ,P.M & C.M WORK , SERVICINGOFALL
TYPE VALVE,REGULATOR , TRUOUBLE SHOOTING,SUPPORTTO VENDOR, CHEK LIST ACTIVITY,
SAFEWORK PRACTICE ,PERMIT TO WORK.& ETC.
9. RELIANCE INDUSTRIES LTD (I.P.C.L) –VADODARA
DURATION : - 15-09-2003TO 14-09-2004
DESIGNATION :- INSTRUMENT TECHNCIAN
COMPANY : - ALTOP INDUSTRIES PVT LTD. – VADODARA
WORK DESCRIPTION :- ( MAINTENANCEJOB & PROJECT WORK –PETROCHEMICAL PLANT )
RESPONSIBILITY :- MAINTENANCEJOB& PROJECT WORKOF H.D.P.E PLANT , INSTALLATION &
CLAILBRATION OFALL TYPE INSTUREMNT ,STARTUP ACTIVITY,SHUT DOWN ACTIVITY,
SERVICINGOFCONTROL VALVE,REGULATORS , PRESSURE GUGE ,PNEUMATICPOSITIONER,
PNEUMATIC RELAY , SMART INSTUREMNT , LOOP CHEKCING , PERMIT TO WORK PRACTICE
,SAFEWORK PARACTICE.&ETC.
Thanking you ……………………
ALPESH SUTHAR
+966 - 571147234

More Related Content

What's hot

Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Apolinario Fontiveros
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance newNoel Roque
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRavi D
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)Amit More
 
Vivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek Nair
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
Instrument Technician.
Instrument Technician.Instrument Technician.
Instrument Technician.Naushad Alam
 

What's hot (20)

Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-
 
Instrument Technician for Maintenance new
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
 
RAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument TechnicianRAVI_D Sr.Instrument Technician
RAVI_D Sr.Instrument Technician
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
JAFAR CV
JAFAR CVJAFAR CV
JAFAR CV
 
Instrument Technician (1)
Instrument  Technician  (1)Instrument  Technician  (1)
Instrument Technician (1)
 
Vivek - Instrumentation engineer
Vivek - Instrumentation engineerVivek - Instrumentation engineer
Vivek - Instrumentation engineer
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
New cv rohit
New cv rohitNew cv rohit
New cv rohit
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
Instrument Technician CV
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
 
CV
CVCV
CV
 
Manoj Ahire-Resume
Manoj Ahire-ResumeManoj Ahire-Resume
Manoj Ahire-Resume
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
Instrument Technician.
Instrument Technician.Instrument Technician.
Instrument Technician.
 

Viewers also liked

Brad:Mearow Lab Paper - September 28, 2015
Brad:Mearow Lab Paper - September 28, 2015Brad:Mearow Lab Paper - September 28, 2015
Brad:Mearow Lab Paper - September 28, 2015John Bradley Williams
 
Elinkaaritehokas rakentaminen // 22.1.2015
Elinkaaritehokas rakentaminen // 22.1.2015Elinkaaritehokas rakentaminen // 22.1.2015
Elinkaaritehokas rakentaminen // 22.1.2015Kivirakentaminen
 
Danilo Obado resume June 2016
Danilo Obado resume  June 2016Danilo Obado resume  June 2016
Danilo Obado resume June 2016Danilo Obado
 
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...GSI SLV-TR Kaynak Teknolojisi Merkezi
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRajesh Raval
 
MediaEval 2016 - Emotional Impact of Movies Task
MediaEval 2016 - Emotional Impact of Movies Task MediaEval 2016 - Emotional Impact of Movies Task
MediaEval 2016 - Emotional Impact of Movies Task multimediaeval
 
MediaEval 2016 - Retrieving Diverse Social Images Task Overview
MediaEval 2016 - Retrieving Diverse Social Images Task OverviewMediaEval 2016 - Retrieving Diverse Social Images Task Overview
MediaEval 2016 - Retrieving Diverse Social Images Task Overviewmultimediaeval
 
MediaEval 2016 - IR Evaluation: Putting the User Back in the Loop
MediaEval 2016 - IR Evaluation: Putting the User Back in the LoopMediaEval 2016 - IR Evaluation: Putting the User Back in the Loop
MediaEval 2016 - IR Evaluation: Putting the User Back in the Loopmultimediaeval
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huuhuu ho
 

Viewers also liked (10)

Resume Ramagost k 8 2016
Resume Ramagost k 8 2016Resume Ramagost k 8 2016
Resume Ramagost k 8 2016
 
Brad:Mearow Lab Paper - September 28, 2015
Brad:Mearow Lab Paper - September 28, 2015Brad:Mearow Lab Paper - September 28, 2015
Brad:Mearow Lab Paper - September 28, 2015
 
Elinkaaritehokas rakentaminen // 22.1.2015
Elinkaaritehokas rakentaminen // 22.1.2015Elinkaaritehokas rakentaminen // 22.1.2015
Elinkaaritehokas rakentaminen // 22.1.2015
 
Danilo Obado resume June 2016
Danilo Obado resume  June 2016Danilo Obado resume  June 2016
Danilo Obado resume June 2016
 
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...
2016 ilk 6 aylık dönemde malzeme ve kaynaklı üretim standartlarındaki değişik...
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
 
MediaEval 2016 - Emotional Impact of Movies Task
MediaEval 2016 - Emotional Impact of Movies Task MediaEval 2016 - Emotional Impact of Movies Task
MediaEval 2016 - Emotional Impact of Movies Task
 
MediaEval 2016 - Retrieving Diverse Social Images Task Overview
MediaEval 2016 - Retrieving Diverse Social Images Task OverviewMediaEval 2016 - Retrieving Diverse Social Images Task Overview
MediaEval 2016 - Retrieving Diverse Social Images Task Overview
 
MediaEval 2016 - IR Evaluation: Putting the User Back in the Loop
MediaEval 2016 - IR Evaluation: Putting the User Back in the LoopMediaEval 2016 - IR Evaluation: Putting the User Back in the Loop
MediaEval 2016 - IR Evaluation: Putting the User Back in the Loop
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 

Similar to SR. instrument technician

Similar to SR. instrument technician (20)

Shibu Thomas-CV
Shibu Thomas-CVShibu Thomas-CV
Shibu Thomas-CV
 
resume
resumeresume
resume
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
Umair Naz cv
Umair Naz cvUmair Naz cv
Umair Naz cv
 
senthilkumar resume 2016
senthilkumar resume 2016senthilkumar resume 2016
senthilkumar resume 2016
 
CV MECH QC
CV MECH QCCV MECH QC
CV MECH QC
 
CV_MWC_BESELAAR
CV_MWC_BESELAARCV_MWC_BESELAAR
CV_MWC_BESELAAR
 
Senthilkumar Resume for Analyzer/Instrument service/maintenance engg ....pdf
Senthilkumar Resume for Analyzer/Instrument service/maintenance engg ....pdfSenthilkumar Resume for Analyzer/Instrument service/maintenance engg ....pdf
Senthilkumar Resume for Analyzer/Instrument service/maintenance engg ....pdf
 
mintu updated cv
mintu updated cvmintu updated cv
mintu updated cv
 
MUHAMMAD SHAHID NAZIR DOC (1)
MUHAMMAD SHAHID NAZIR DOC (1)MUHAMMAD SHAHID NAZIR DOC (1)
MUHAMMAD SHAHID NAZIR DOC (1)
 
Electrochemical Analyzer by ACMAS Technologies Pvt Ltd.
Electrochemical Analyzer by ACMAS Technologies Pvt Ltd.Electrochemical Analyzer by ACMAS Technologies Pvt Ltd.
Electrochemical Analyzer by ACMAS Technologies Pvt Ltd.
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
CV Deepak Singh Karki
CV Deepak Singh KarkiCV Deepak Singh Karki
CV Deepak Singh Karki
 
Raja CV Instrument
Raja CV InstrumentRaja CV Instrument
Raja CV Instrument
 
CV -MANZAR ALI
CV -MANZAR ALICV -MANZAR ALI
CV -MANZAR ALI
 
Latest Resume VKB
Latest Resume VKBLatest Resume VKB
Latest Resume VKB
 
PRODUCT PROFILE 23.01
PRODUCT PROFILE 23.01PRODUCT PROFILE 23.01
PRODUCT PROFILE 23.01
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
NAVI SHO CV 2017
NAVI SHO CV 2017 NAVI SHO CV 2017
NAVI SHO CV 2017
 
Feb 20
Feb 20Feb 20
Feb 20
 

SR. instrument technician

  • 1. Sub: - Anapplicationforthe suitable postof SR.INSTRUMENT TECHNICIAN Respected sir, I wish to apply forthe above-mentioned position in yourprestigiouscompany with my experienceand qualification and enclosed here with is my comprehensivebiographicaldata foryourperusal. I havea total13 years of experience in the processcontrolsystem& Instrumentation in GASPOWER PLANT, COAL POWERPLANT andREFINARY PLANT, PETRO CHEMICAL PLANT In field of instrumentation. If you find qualification and experiencecomply with requirements,Ican assureyou of best service atall the times.Hope this will merit yourkind consideration and thanking you in anticipation. Date: 24/09/16 Yoursfaithfully Encl: Resume SUTHAR ALPESH.I
  • 2. CURRICULUM VITAE ALPESHKUMAR .I.SUTHAR A/7, SHANTIVILLA RESIDANCY VILLAGE –VASAD(388306) DIST- ANAND , STATE –GUJARAT , INDIA PASSPORTNO.-(K-5751380) LANGUAGE - ENGLISH ,GUJARATI, HINDI ,SOME ARABIC MOB. NO.:- +966 571147234(KSA –SELF) , +91 9662437722(INDIA –FATHER) EMAIL – appu.piusha@gmail.com , asuthar92@yahoo.in Skype:alpeshsuthar61 _____________________________________________________________________________________ Career Objectives : To obtain a position of SR.INSTRUMENT TECHNICIAN Objectives : To pursue a challenging career in the field of construction, commissioning and maintenance, so that I can utilize myknowledge andskillof instrumentationeffectivelyand efficiently in a practical manner in my professional approach. Education / Technical / Traning Qualification :  S.S.C EXAMBOARD–GANDHINAGAR-(GUJARAT) - 2001 (70 %)  D.T.PCOMPUTER COURSE (GOVERNMENT) – VADODARA - 2002 (A – Grade)  I.T.I - INSTRUMENT MECHANIC –VADODARA -2003 (70 % )  N.C.V.T EXAMBOARD-GANDHINAGAR-(GUJARAT) -2004 (70 % )  INDUSTRIALPNUMATICSTRANING(C.R.I.S.P) -BHOPAL -2008 (A Grade)  DIPLOMA -2012 ( 52.60 % )  B.TECH INSTRUMENTATION & CONTROL -( 2ND YEAR Goingon )
  • 3. Computer Skill :-  MICROSOFT WORD DOCUMENT  MICROSOFTPOWERPOINTPRESENTATION  MICROSOFTEXCEL WORKSHEET  ORACLE  D.T.P  SAP  EDDMS ( INTERGRAPH)  PLANTMAPS SYSTEM  INTERNET SURFING SAFETY,HSE, PTW Training History :  Fire prevention and fire frightening.  Personal safety and social responsibilities.  Elementary first Aid.  Personal Survival Techniques.  H2S / BA Awareness and Escape.  Chemical Hazard Training  Permit to Work System.(G.E,Q.G.P.C,S.CHEM,D.P.C,R.I.L ,H.Z.L,H.M.E.L)  Job Hazard Analyses.  Supervision of Safety and CPR First Aid.  Successfully completed 32 EHS online courses From Granite(G.E) University SUMMARY:- I HAS KNOWLEDGE & WORK EXPERIENCEIN,  CALIBRATOR: - :-SCANDURA,A.O.I.P,ROSEMOUNT,YOKOGAWA,DRUCK ,DEADWEIGHT TESTER, COMPRETOR, PRESSURE & HOUDRALIC HAND PUMP, VACCUMPUMP,CALIBRATION TEST BENCH ,ANALOG& DEGITAL MULTIMETER, ANALOG& DEGITAL MEGGAR, M.A SOURCE & MESURE CALIBRATIOR  HART COMMUNICATOR:- :- MODEL-275, 375,475 ( EMERSION) ,MODEL-4100(YOKOGAWA) , D.E HONEYWELL :- HANDHELD TERMINAL COMMUNICATOR (FOXBORO)  D.C.S. : - FOXBORO,ABB, HONEYWELL, MAX-DNA, YOKOGAWA(CS-3000 )  P.L.C :- G.E.FAUNC, ALLEN BREDELY , SIMENS , MODE-30-SYSTEM  G.E SPEED TRONIC :- MARK –V , MARK –VI e  G.E - GAS TURBINE :- FRAME – 6 B & E , FRAME -7 F a & F e , FRAME -9 F a & F e , FRAME -5
  • 4. : - L.M –2500 MODEL TURBINE  BHEL - STEAM TURBINE : - 77 MW CAPACITY,80 MW CAPACITY  GENERATOR : - BRUSH , BHEL , G.E  VIBRATION &SPEED MONITORINGSENSOR : - :- BENTLY NEVADA - SERIES -31000 ,3300 , 3500 :-SESMIC- VELOCITY TRANSDUCER , SPEED SENSOR,NSV VIBRATION PROBE.  CONVEYERBELT PROTECTOIN SYSTEMINSTRUMENT :- - PULL COURD SWITCH , BELT SWAY SWITCH , ZERO SPEED SWITCH , METAL DETECTOR  ANALYTICALINSTRUMENT : - O 2 ANALYZER, GAS SENSOR& HEAT DETECTOR , SO 2 (SULFER - OXIDE ) ANALYZER, NO 2 ( NITROZEN OXIDE ) ANALYZER, PH METER , TURBIDITY METER , COUNDUCTIVITYMETER , ONLINE& LAB GAS CROMATOGRAPHYSYSTEM  VALVE: - :- FISHER ,LIMITORQUE ,MESOLIAN , I.L ,BIFFI,ROTORQUE ,KOSHO & othercompany. :- CONTROLVALVE( SINGLEACTING & DOUBLE ACTING) ,PRESSURE RELISE VALVE,PRESSURE DRAIN VALVE, SELF OPERATINGVALVE, ON/OFFVALVE, SEFTY VALVE( CHECK VALVE),S.O.V.,P.D.C.V,P.C.V ,PNEUMATICOPERATEDVALVE(SOV,CONROLVALVE,AIR REGULATOR ) , HYDRAULIC OPERTED VALVE,MOV (AUMA , LIMITORQUE)  TRANSMITTTER :- :- HONEYWELL , ROSEUMOUNT ,FOXBORROW,YOKOGAWA ,EMERSION :- PT,FT , PDT , LT ,TT ,PI,TI,FI,LI :- F.T – D/P TYPE , MASS FLOW TRX. , MICORMOTION FLOW TRX, COREOLICFLOW TRX , VERTEX FLOW TRX , ULTRA SONICFLOW TRX ,DIAPHRAGMCAPILLARYTYPE FLOW TRX :- L.T – D.PTYPE , LEVEL TROLL , GUIDED WAVE , RADAR, INTERFACELEVEL,DRY & WET LEG  ELEMENTS :- PRESSURE ,FLOW, TEMPRATURE , LEVEL PRESSURE :- PRESSURE GAUGE(BOURDEN , DIAPHRAM ,HELICALSPRING,BELLOWS ,CAPILLARY) FLOW :- FLOW MASURING GAUGE ( PITTOT TUBE , ORIFICEPLATE , ANUBAR,VENTURITUBE ) TEMPRATURE: - T/C , RTD( 2,3,4 WIRE) ,THERMOSTATE ,BIAMETALIC TEMP. GAUGE ,CAPILARRY - TYPE TEMP. GAUGE,TEMP .BATH LEVEL:-LEVEL GAUGE, LEVEL SWITCH,LEVEL TRANSMITER, SIGHT GLASS LEVEL INDICATOR, MAGNETIC STRIP LEVEL INDICATIOR.  Regularcheck-up,andTroubleshootingof a,Smart fieldTransmittingandFinal control elements, PID Controllers,I/Pconvertor, I/Hconvertor,CCTV SYSTEM.  Overhauling,ModificationON andOFFline,Preventive Maintenance,Correctivemaintenance & Shutdownmaintenance of SmartElectronicsinstruments &pneumaticsinstrument,valve, actuator ,damper,analyzer, Flame scanner,Igniterchecking,GASsensor, fire &gas system&all type switches&Transmitter, SERVO VALVES, GAS CONTROLVALVES,ESD VALVE,PDV ,L.V.D.T & etc.  LOOPCHECKING (HOT LOOP& COLD LOOP),ESD, SIS,IPL/Safe guardtesting,Logicchecking& Interlockchecking etc.Knowledgeaboutinstallation,P&IDDiagrams,ILDdiagram, data sheetof instrument,Cause &effectdiagram, cable rootingandtermination.  Erectioncommissioning,Labtesting,Calibration&Differenttypesof modernprocessfield
  • 5. Instrumentation.  Dynamicweighingscale operation(EVERYINDIA &SENLOGICSYSTEM)  I was workedonFOUNDATION FIELDBUS systeminProject,Commissioning&Maintenance workduringUNIT OF (D.C.U,FCCU,CPP& H.D.P.E,Ethylene ,EBSM ,Furnace , Powerrecovery unit,Cracked gas compressor,Wet GAS Compressor,Boiler) inRefinery &Petrochemical plant, Smelterplant,GasPowerplant,Thermal powerplant.  I has alsoexperience in Manufacturingof R.T.D ,T /C , PRESSURE GAUGE , TEMP. GAUGE , Temperature bath,Comparator.  Planning,Supervision( instrumenttech+Electrician)  CONDUCTINGTOOL BOX TALK & DAILY,WEEKLY & MONTHLY SAFETY MEETING ,JOB RESPONCIBALEPERSON ASA LEAD ,DISTRUBETINGJOB & KNOWLEDGE & ATTAIN MEETING RELATED TO NEW PLANINGFORJOB , DAY TO DAY REPORTING ACTIVITY.  Housekeeping&Safe workpractice. EXPERIENCE - 1. S-CHEM ,CHEVORN PHILIPS COMPANY,LLC - SAUDI ARABIA DURATION :- 07/05/2015 TO PRESENTWORKING DESIGNATION :- SR.INSTRUMENT TECHNICIAN COMPANY :- MS .Al SUWAIDIINDUSTRIAL SERVICE -SAUDIARBIA WORK DESCRIPTION :- (MAINTENANCEJOB - PETROCHEMICAL PLANT & UTILITY PLANT ) RESPONSIBILITY - P.M& C.MJOB . WORKINGON IPL & S.I.SSYTEM ,H.M.I ., CLEAR OF TROUBLE SHOOTINGOF D.C.SYOKOGAWA CENTUM CS 3000 SERIES,FILED BUS INSTRUMENT ,SIEMENS PLC , IDENTIFICATION OFSIS& IPL INTSTRUMENT IN P&ID & FIELD & LOGIC SIDE , PREPARING OF ALL DOCUMENENTS FROM EDDMS SYSTEM FOR IPL & SIS INSTRUMENT , PREPARINGOF CALIBRATION SHEET , PREPARINGOF INSTRUMENT LIST FOR TURNAROUND ,SERVICINGOFALL INSTRUEMENT , TESTING,CALIBRATION &CHECKINGOF ESD VALVE,CONTROLVALVES& TRANSMITTER , CONDUCTINGOF TOOL BOXMEETING DAILY , WEEKLY & MONTHELY , PERMIT TO WORK PRECTICE ,SAFEWORKPRACTICE.& ETC. 2. GRANITE INTERNATIONAL SERVICES INCORPORATON.(AFFILIEATE WITH G.E).–INDIA BRANCH DURATION : - 20-05-2011 TO 30-04-2015 DESIGNATION :- SR. INSTRUMENT TECHNICIAN WORK DESCRIPTION :- (SERVICING & COMMISSIONING JOB–POWER & REFINARY PLANT ) RESPONSIBILITY - POWER PLANT GAS TURBINE SERVICING& COMMISSIONINGJOB IN VARIOUSLOCATION LIKE INDIA ,QATAR,OMAN , BAHRIN ,ABUDHABI,SAUDIARABIA & DIFFERENTGAS TURBINE FRAME LIKE (FRAME-5,6 b ,7 F a ,7 Fe , 9 F a ,9 F e )MY RESPONCIBILTYISDURING C.I, H.G.P.I& MEASUE INSPECTION TO DISMENTAL& ASSEMBLE OF ALL TURBINE INSTUREMENT SAFELYWITH FOLLOWINGFILED WORK PROCEDURE OF G.E ,NEW MODIFACATION JOB,CALIBRATION OFTRANSMITTER, VALVE,SWITCHES , CBD VALVE, VIBRATION SENSOR(BENTLYNEVADA 3200,3300 SERIES),VELOCITYTRANSDUCER,MAGNETIC PICKUP SENSOR ,GASCONTROL VALVE,SERVO CONTROLVALVE(RATIOVALVE),L.V.D.T.,
  • 6. TESTING & SERVICINGOF FLAME SCANNER,SPARKPLUG , CDM PROBE, BHM PROBE ,BEARING & WHEEL SPACETHERMOCOUPLE , HEAT DETECTOR ,GAS SENSOR,FIRESYSTEM & INVOLVE IN START UP ACTIVITYOF MARK -6 e G.E SPEED TRONIXSYSTEM , TOOL BOX TALKACTIVITY ,PERMIT TO WORK PRACTICE,SAFEWORK PRACITCE & ETC. 3. HINDUSTAN MITTAL ENEARGY LTD.(REFINERY DEVISION )-PUNJAB.-INDIA DURATION : - 08-11-2010 TO 18-05-2011 DESIGNATION :- INSTRUMENT SUPERVISOR COMPANY : - REKNOWNENGINEERING SERVICES. –INDIA. WORK DESCRIPTION :- (COMMISSIONING JOB& START UP ACTIVITY ) RESPONSIBILITY - COMMISSIONINGWORK & START UP ACTIVITY, FOR REFINARYPLANTOF D.C. U & FCCU , CLEAR A PUNCH POINTLIST , LOOPCHEKCING& COMMISSIONING OF FILED BUS TRANSMITTER ,VALVE,SMAR DVC POSITIONER,SWITCH & ESD VALVE ,FURNACE , OIL SKID& GAS SKIDINSTUREMENT , GAS TURBINE & COMPRESSOR PROTECTION INSTRUMENT ,CONVYERBELT PROTECTION INSTRUEMENT , STEAM SHOOT BLOWINGSYSTEM, FAN VIBRATION &DAMPER VAVLE , PERMIT TO WORK PRACTICE,SAFEWORK PRACTICE ,CONDUCTINGOF TOOL BOXTALK MEETING DAILY.&ETC. 4. DOFAR POWER COMPANYS.A.O.G – SALLALAH -OMAN WOOD GROUPGASTURBINE SERVICES COMPANY. - OMAN DURATION :- 19-10-2009 TO 02-11-2010 DESIGNATION :- INSTRUMENT TECHNICIAN COMPANY : - BAHWAN ENGINEERING COMPANY - OMAN. WORK DESCRIPTION :- (MAINTENANCEJOB – GAS& POWER PLANT -255 MW CAPACITY) RESPONSIBILITY - MAINTENANCEJOBFOR GAS BASED POWER PLANT“255 MW “ CAPACITY. MAINTENANC OFOIL SKID& GAS SKIDINSTRUEMNT , R.O PLANT , TANKAGEAREA , GAS METERING SKID, GAS PRESSURIESSTATION , FIRE FIGHITINGSTATION & SYSTEM, MAINTAININGOF P.MCHECK LIST , PST OF INSTRUMENT , BAG FILTER SOLENOIDTESTING , ON LINE & OFF LINEWATER WASHINGOF TURBINE , INVOLVEIN SHUT DOWN ACTIVITYLIKE C.I ,H.G.P.I, MEJOR INSPECTION OFTURBINE , START UP ACTIVITY,CLEAR A TRUOUBBLE SHOTING OF INSTRUEMENT , CALIBRTION SHEET MAINTANING,CALIBRATION & SERVICINVG WORKOF ALL INSTRUEMENT ASPER P.MSCHIDULE . FOLLOW PERMIT TO WORK PROCEDURE ,SAFE WORK PRECTICE. & CONDUCTINGOF TOOL BOXTALK MEETING DAILY ,WEEKLY & MONTHELY , GROUP DISSCUTION & KNOWELDGE SHERING & ETC.
  • 7. 5. HINDSTAN ZINC LTD.-CHITTROGARH. –RAJASTHAN -INDIA DURATION : - 17-11-2007 TO 15-10-2009 DESIGNATION :- JR. INSTRUMENT ENGINEER COMPANY : - KOREA PLANT SER. & ENG. CORPO. L.T.D.- RAJASTHAN.- INDIA WORK DESCRIPTION :- ( COMMISSIONING JOB& MAINTENANCEJOB – 234 MW CPP PLANT) RESPONSIBILITY - COAL FIRE CAPTIVEPOWERPLANT 2 x 77 MW & 1 x 80 MW COMMISSIONINGJOB& MAINTANANCEJOB(P.M& C.M) & TROUBBLE SHOOTINGJOB ,MAINTANANCEWORKFORSTEAMTURBINE & BOILER AREA , BUNKER AREA , COAL HANDLING PLANT,E.S.P, BOWL MILL , CONVEYERBELT PORTECTION SYSTEM , IN MOTION WEIGH BRIDGE OPERATION SYSTEM(SENLOGIC& EVERY INDIA ) ,D.MPLANT(R.OPLANT),HANDLING& TROUBBLE SHOOTINGOF PLC ( ALLEN BREDLY ,SIEMANS),D.C.S (MAX-DNA BHEL ),HMI ,HANDLINGSTAEAM& WATER ANALYSISINSTRUMENT LIKE ONLINEGAS CHROMETO GRAPH (ABB) ,SILICA ANALYZER(ABB) PHMETER ,TURBIDITY METER ,CONDUCTIVITYMETER , O2 ANALYZER,SOX& NOX (SO2& NO2 ANALYZER), CALIBRATION OFFLAME SCANNER,INGNITER ,SADCDAMPERE ,VALVE, TUBINE PROTECTION INSTRUMENT SYSTEM, SMARTPOSITIONER, CONTROLVAVLE TRANSMITTER ,DAILYP.MCHECK LIST WORK , MATERIAL IDENTIFICAITON , SAPOPERATION ,PERMITTO WORKPRACTISE,SAFEWORK PRACTICE,CONDUCTINGTOOL BOX TALK , KNOWLEDGE SHARING & OTHER ACTIVITY 6. RATNAGIRI GAS& POWRPLANT LTD – MAHARASTRA DURATION : - 27-11-2005 TO 15-11-2007 DESIGNATION :- INSTRUMENT TECHNCIAN /SUPERVISOR COMPANY : - SWAMINAINTERNATIONAL PVT L.T.D – VADODARA. WORK DESCRIPTION :- ( COMMISSIONING JOB& MAINTENANCEJOB – 1967 MW CAPACITY) RESPONSIBILITY - 1967 MW (GASTURBINE 9341 & 9351 FA + ) COMBINNEDCYCLE POWER PLANT (RGPPL) COMMISSIONINGJOB& MAINTANANCEJOB(P.M& C.M) & TROUBBLE SHOOTINGJOB ,MAINTANANCEWORKFOR (G.E SPEED TRONIXMARK –V & VIe ),SIEMANSPLC SYSTEM , BENTLY NEVADA 3300 & 3200 VIBRATION SYSTEM,LNGTERMINAL LOADING & UNLOADING, TANKAGEAREA INSTRMENT MAINTANANCEJOB,COOLING TOWER INSTRUMENT ,OIL SKID& GAS SKID ,HRSG ,BOILER& TURBINE INSTUREMENT MAINTANANCEJOBLIKEFLAME SCANNER,SPARKPLUG , EXHAUST T/C , BERING T/C,SPEEDPICKSENDSOR,VELOCITY TRANSDUCER,C.D.MPROBE ,VLVE,SMART POSITIONER,TRANSMITTER,ANALYZER ,HYDORGEN COOLED GENERATOR INSTURMENT , SOV ,SHUTDOWN ACTIVITY, START UP ACTIVITY,PERMIT TO WORK PROCUDER , SAFETY TOOL BOKTALK ACTIVITY& E.T.C 7. RELIANCE INDUSTRIES LTD.(REFINARY DIVISION) –JAMNAGAR - INDIA DURATION : - 28-09-2005 TO 23-11-2005 DESIGNATION :- INSTRUMENT TECHNCIAN COMPANY : - TYCO - HOFFICONS IND. SERVIES L.T.D –JAMNAGAR. WORK DESCRIPTION :- (SHUTDOWNJOB –FCCU UNIT , REFINARY) RESPONSIBILITY - SHUTDOWN ACTIVITYOF FCCU PLANT, POWER RECOVERYUNIT (MITSUBISHI) COMPRESSOR& TURBINE , WET GAS COMPRESSOR ,EXPANDER ,INSTRUMENT
  • 8. CALIBRATION &SERVICINGLIKE ALL TYPE OF TRANSMITTER , IGV ,CBD ,LVTD ,VIBRTAION(BENTLYNEVADA ,SPPEDPICKUP(MAGNETICPROBE),VELOCITYTRANSDUCER ,CONTROLVALVE, ANALYZERSUPPORT,PRESSURE GAUGE,ALL TYPE SWITCH , USING CALIBRATOR SCANDURA , TK-3 ,DRUCK ,AOIP,LOOPCHEKING,STARTUP ACTIVITY,SAFEWORK PRACTICE& PERMIT TO WORK SYSTEM,& ETC. 8. I.O.C.L (REFINARYDIVISION ) –VADODARA DURATION : - 17-09-2004 TO 20-09-2005 DESIGNATION :- INSTRUMENT TECHNCIAN COMPANY : - TOUCH CONTROL PVT L.T.D – VADODARA. WORK DESCRIPTION :- ( MAINTENANCEJOB –REFINARY PLANT ) RESPONSIBILITY :- MAINTANANCEJOBFORCRUDE PLANT ,CALIBRATON OF TRANSMITTER , VALVE,PRESSURE GAUGE ,ANALYTICAL INSTRUEMENT ,P.M & C.M WORK , SERVICINGOFALL TYPE VALVE,REGULATOR , TRUOUBLE SHOOTING,SUPPORTTO VENDOR, CHEK LIST ACTIVITY, SAFEWORK PRACTICE ,PERMIT TO WORK.& ETC. 9. RELIANCE INDUSTRIES LTD (I.P.C.L) –VADODARA DURATION : - 15-09-2003TO 14-09-2004 DESIGNATION :- INSTRUMENT TECHNCIAN COMPANY : - ALTOP INDUSTRIES PVT LTD. – VADODARA WORK DESCRIPTION :- ( MAINTENANCEJOB & PROJECT WORK –PETROCHEMICAL PLANT ) RESPONSIBILITY :- MAINTENANCEJOB& PROJECT WORKOF H.D.P.E PLANT , INSTALLATION & CLAILBRATION OFALL TYPE INSTUREMNT ,STARTUP ACTIVITY,SHUT DOWN ACTIVITY, SERVICINGOFCONTROL VALVE,REGULATORS , PRESSURE GUGE ,PNEUMATICPOSITIONER, PNEUMATIC RELAY , SMART INSTUREMNT , LOOP CHEKCING , PERMIT TO WORK PRACTICE ,SAFEWORK PARACTICE.&ETC. Thanking you …………………… ALPESH SUTHAR +966 - 571147234