1. Parvin Sharma
H.No. 169,Sector 39 Gurgaon
Mobile: 08800152386,09017384070
Email: parvinritwal.90@gmail.com
Seeking a position in challenging environment and a professionally managed
organization, this nurtures professional growth, integrity & hard work, by making
use of my skills. I believe in commitment to work, team spirit as well as co-operation
and am eager to learn and am quick to grasp new ideas & techniques.
Total Experience:-4 years and Degree in Electrical, Computer Knowledge
CORE COMPETENCIES
Ability to work under strict deadlines and pressure.
Punctuality and strong determination to succeed.
Enthusiastic, ability to adapt new environment and grasp work quickly.
Self- motivated and Result-oriented.
Good Inter-personal relationship skill.
Positive & Realistic approach towards work & ability to work in a team.
Disciplined, dedicated, hard working, energetic and organized.
Leadership skills.
Working Profile
• MANAGEMENT OF MANPOWER AND OTHER CONSTRUCTION AND MAINTENANCE RESOURCES.
• MAINTENANCE AND OPERATION OF ALL EQUIPMENT FITTED AT THE SITE AND HOUSEKEEPING, SECURITY
HANDLING ON THE SITE.
• MANAGING `AMC’S FOR EQUIPMENT/MACHINERY IN THE UTILITY MANAGING ASSETS IDENTIFICATION FOR
VALUATION AND RISK.
• ERECTION, COMMISSIONING, OPERATION & MAINTENANCE OF H.T. & L.T. PANEL, D.G-SEAT, TRANSFORMER,
HVAC, A.H.U.,C.F.U., COOLING TOWER, W.T.P.WITH PLUMING AND FIRE SYSTEM.
• INSTALLATION & COMMISSIONING OF BUS DUCT, H.T. & L.T. CABLES LYING, INTERNAL & EXTERNAL WIRING.
• PREPARE LOAD CALCULATION OF TOWERS, COMMERCIAL SHOPS AND COMMON AREA LIGHTS, PUMP ROOM, FIRE
SYSTEM AND LIFTS.
• RESPONSIBLE FOR CHALKING OUT PLAN FOR VARIOUS ELECTRICAL /HVAC, A.H.U., F.C.U. COOLING TOWER
AND SPLIT AND WINDOW UNITS MAINTENANCE BE UNDERTAKEN ANNUALLY AND PREPARATION OF SLD FOR
VARIOUS INFRASTRUCTURE.
• IMPLEMENTATION OF PROCESS LIKE PPM, SOP, HISTORY CARDS UTILITY ESSENTIALS AND OTHER MACHINERY
ETC.
• MANAGING HELP-DESK AND MAIL ROOM OPERATIONS AFFECTIVITY.
• GENERATE DAILY, WEEKLY, MONTHLY, ANNUAL AND OTHER REPORTS.
• ENSURING ESSENTIAL SPARE PARTS ARE AVAILABLE ON STOCK ON PERCENTAGE CONSUMPTION BASIS.
• ASSOCIATING NEW VENDORS AND COORDINATING WITH THEM FOR ACCOMPLISHING THE DESIRED SUPPLIES.
• LIASONING WITH EXTERNAL AGENCIES AND GOVT –DEPARTMENTS FOR OPERATIONS.
• VERIFYING AND PROCESSING OF PAYMENTS OF THE OUTSOURCED/CONTRACTORS JOBS.
• OVERSEEING REGULAR PREVENTIVE MAINTENANCE FOR ALL ELECTRO-MECHANICAL SYSTEMS.
• PUTTING FORWARD THE SUGGESTIONS AND DEVELOP MODIFICATION REQUESTS AS NECESSARY TO IMPROVE,
PLANT/EQUIPMENT EFFICIENCY/SAFETY OPERATIONS.
• MAINTAINS AND UPDATE THE DATABASE VENDOR RECORDS AND REPORTS.
2. ORGANISATIONAL DETAILS
Global Foyer Mall October 2013 to till
date
Facility Manager
Round the clock Operation & maintenance Service this includes........
• 11KV/440 HT/LT Substation 2000+2000+2000 KVA Three Transformers.
• Operate 2 DG- 1500 KVA & 2 DG 1250 KVA Auto and manually
• Preparing PPM Schedule for the site equipment.
• Documentation of Preventive Maintenance done at site.
• Prepare MIS,MMR & KPI Reports .
• Generating movement of materials report
• Handling Customer Queries.
• Handling WTP Plant ,STP Plant
• Handling HVAC Ciller plant 450TR Etc.
• Prepare Energy Conservation Plans For power Saving
• Various Licensing Works Related To Fire N.O.C. Lift N.O.C, Pollution Noc, DG,
Transformer N.O.C,etc
Maintenance Operation:-
• Check all the Maintenance Section of plant which is related to production
• Maintenance of all of electrical Instruments.
• Maintenance of 1500 KVA DG.
• Maintaining daily power Consumption report.
• Maintaining daily DG, & AC Log book.
• Fault sensing and Rectification.
• HVAC AHU Plant
Round the clock Operation & maintenance Service this includes........
• 11KV/440 HT/LT Substation 2000+2000+2000 KVA Three Transformers.
• Operate 2 DG- 1500 KVA & 2 DG 1250 KVA Auto and manually
• Preparing PPM Schedule for the site equipment.
• Documentation of Preventive Maintenance done at site.
• Prepare MIS,MMR & KPI Reports .
• Generating movement of materials report
• Handling Customer Queries.
• Handling WTP Plant ,STP Plant
• Handling HVAC Ciller plant 450TR Etc.
Maintenance Operation:-
Global Foyer Mall January 2013 to
October 2013
Senior Facility Engineer
3. • Check all the Maintenance Section of plant which is related to production
• Maintenance of all of electrical Instruments.
• Maintenance of 1500 KVA DG.
• Maintaining daily power Consumption report.
• Maintaining daily DG, & AC Log book.
• Fault sensing and Rectification.HVAC AHU Plant
ORGANISATIONAL DETAILS
Unitech SEZ on behalf of ICON FACILITIES 01 April 2012 to January
2013
Tech. Supervisor
Round the clock Operation & maintenance Service this includes........
• 11KV/440 HT/LT Substation 1500 KVA Transformer.
• Operate Gen Set 1000 KVA ,1500 KVA Auto and manually
• Work with 160 KVA UPS.
• Preparing PPM Schedule for the site equipment.
• Documentation of Preventive Maintenance done at site.
• Maintaining the records of the data entered
• Generating movement of materials report
• Handling Customer Queries.
Expertise:-
• Throughout knowledge of MCB, MCCB,A.C.B.V.C.B. & Isolator, Transformer HT panel ,LT panel ,
DG ,
Wiring & Maintenance of LT panel in Manual & HVAC
QUALIFICATIONS
EDUCATIONAL QUALIFICATION
4. TECHNICAL QUALIFICATION
• B.Tech. in Electrical branch from K.U.K with 73%
INTEREST AND HOBBIES
Travelling, Playing cricket & Reading Knowledge Base Books.
PERSONAL PROFILE
Name : Parvin Sharma
Father’s Name : Rajender Singh
Date of birth : 03 July, 1990
Sex : Male
Religion : Hindu
Marital status : Single
Disst : Hissar
State : Haryana
Nationality : Indian
(Parvin Sharma)
Qualification Board/University Year of Completion
B Tech Kurukeshtra University 2012
Intermediate Haryana Board School Education 2008
High School Haryana Board of School Education 2006