SHAW Allan B.
Married Status: Divorced
Date of Birth: 7 April 1939
Nationality: British
Academic Qualifications: G.C.E “O” Levels in :
Mathematics,Chemistry,English Lang,Physics and Art.
O.N.C. in Mechanical Engineering,Applied Heat and Electricity
H.N.C in Mechanical Engineering.1 st Year
Health.Very Good
PLANTS WORKED ON
Gas and Oil separation F.C.C.U
Crude and Vacuum Distillation Rheniforming
Platforming Static and CCR C3 and C4 Dimersol
Sulphur Recovery NPK Fertilizer.
Chlorine Production Gas and Liquid LPG merox
Computerised Water Treatment BBC/Siemens/GE gas Turbines.
HF Alkylation Paraxylene
Visbreaking Isomax.
Phosphoric Acid Production Butamer
Kero and Naphtha Hydrotreating Penex and Molex
Mixed Xylene seperation NH3 production
Classroom Training Sulpholane Production
On the Job Training Acceptance tests
Punchlisting Plants for Mech completion Advisor to clients
Vessel and Tower Inspections Writing operating manuals.
Salt water De-Salination Pand ID reviews
Combined Cycle Heat Recovery Boilers. Inspection of plants and material
Reverse Osmosis Water Treatment. Writing operating manuals
Clients Advisor for commissioning
Hydrogen Production (using the Benfield and Pressure swing Absorption systems)
DCS control systems Siemens,Yokogawa Honeywell.
1955-1961 Leeds Gas Council – Technical Assistant
Tech Asst on all types of coal gas producing plants from Horizontal, Vertical and Water gas Plants.Three
years in Laboratory quality control.
1961-1965 Bahrein Petroleum Co-Arabian Gulf-Refinery Operator
Fully trained by Caltex in Oil refinery Techniques for Crude Distillation and the Fluid Catalytic Cracking
Unit,and all related ancillary equipment.Trained member of the Fire Fighting team.Training of local
operators.
1965-1966 ICI North Tees Aromatics Plant-Shift Supervisor
Start-up of Sulpholane,Unifiner,Platformer,Water treating and Steam raising plants
1966-1968 Constructors John Brown England-Commissioning Engineer
Commissioned experimental Hydrazine for Fisons Widnes.Eight months doing inspection at various
companies in the UK on behalf of CJB.Trained by Kodak UK in X-Ray technology and reading X-
Rays.Wrote the start-up manual for CJB’s Russian client for the ICI process Paraxylene plant.This manual
included all the procedures related to this plant,which was then translated into Russian before presentation to
the client in Moscow.Commissione experimental sewage treating plant in Portsmouth.
GORDON-GILL Co
2
SHAW Allan B.
1968-1968 Commissioning Eng for U.O.P. Des Plaines, Illinois, USA
On hire to UOP as a Commissioning Eng in Jeddah S Arabia for Start-up of a Naphtha
Unifiner.Platformer,Merox.Kerosine Unifiner and Tank Farm.
1968 Commissioning Eng for Snam Progetti in Madras India.
Plant check out,punch listing,Unit flushing, Heater dry outs Crude Vacuum. Kero desulphurization, and
Hydrogen plant start-ups.
1969 Study Assignment Arklow Ireland
Studying a Phosphoric Acid and Fertilizer production plant
1969-1971 Commissioning Eng for Dorr-Oliver, Sabac, Yogoslavia
Commissioning/Senior process operator for Phosphoric Acid production, filtration and evaporation.NPK
fertilizer production.
1971 Comm Eng for Didier Werke (of Essen) in Nevinnimyssk Russia
Start-up of NPK fertilizer plant with Prill towers(Stamicarbon Process).
1971 Homs, Syria for Snam Progetti of Italy.
Commissioning of a Steam/Naphtha Reformer,CO and O2 scrubbing NH3. Production and liquefaction.
1971-1972 Kermanshah Iran for Continental Eng Holland.
Punchlisting,start up programs Field supervisor during final construction. All pre commissioning,dryouts ,
catalyst loading.Start up of Crude, Merox, LPG,Unifiner,Platformer,Kerosine De sulphuriser,Water treating
and Steam raising plants
1971 Homs, Syria for Snam Progetti.
Commissioning of a Steam/Naphtha Reformer, CO and O2 scrubbing. NH3. Production and liquefaction.
1972-1973 BP Baglan Bay Wales UK
Commissioning of a 1000 T/D Chlorine plant. Electrolysis of Brine. Chlorine drying, compression and
liquefaction. Sodium Hypochlorite plant.
1973 Refinera de Meditterranea ,Milazzo Sicily Italy
Start up of a Vacuum and FCCU plant. Gas compression Units.
1973 Liquichimica Augusta Sicily
Start-up of an Hydrogen and OXO unit for Selas Holland
1973 Amoseas Oil Nafoora Libya
Solar Gas Turbine operation for gas production and oil well re-injection
1973 Total Oil Refinery VlissengenHolland for Badger Co Ltd
Pre-commissioning line flushing, catalyst loading heater dry-outs for Hydrobon, Platforming (CCR).Sulphur
recovery and Amine Units
1974 Saras Chimica Sarroch Sardinia for Badger Co Ltd
Pre-Commissioning and Start-up of a Mixed Xylene plant using Partial and Total Decomposers with
Hydroflouric acid and Boron Trifluoride. Process License by Mitsubishi Japan.
1974-1975 6 Months contract for Provincial refining Co Ltd Newfoundland Canada
Area Supervisor on running plants, Naphtha and Distillate Hydrobons, Platformer and Sour water stripping
Units.
1975 Start-up for Badger In W.Germany Wilhelmshaven
Punch listing of the clients refinery process units and offsite facilities for mechanical completion.
1975-1976 Start-Up Eng for Irving Oil New Brunswick,Canada
Start up supervisor for commissioning of a Napha Hydro treater, Rheniformer and Hydro desulphurisation
Unit.
1976-1978 2 year contract with Uhde W. Germany in Brega Libya
GORDON-GILL Co
3
SHAW Allan B.
Commissioning of Fire-Fighting Diesels, Harbour installation, Power Stations, emergency Diesels. Brown
Boveri Gas turbines and Waste heat boilers. Instrument air and fresh water cooling system. Air Liquide
Nitrogen plant. Start-up of Methanol and Ammonia plant. Asst Utilities manager and advisor to client for
technical and operational equipment.
Kirkuk Iraq for Mannesmann W. Germany
Pre commissioning and start-up of a 95.000 BPD gas and Oil separation unit
1978 Start Up for Lummus in Karlsruhe W Germany
Start up of a Sulphur Recovery Unit and witnessing a Vacuum Distillation start up.
1979-1980 Start Up of a Water treatment processing Stations.South Africa.
Fully computerised WT plants for 6X660 MW power plants, at Matla and Duvha. With condensate
polishing and Ammonex injection systems.
1980-1981 Oostvorne Holland for Lummus at BP’s Refinery
Punchlisting, line checking, line test witnessing,pre-commissioning and start up of the FCCU Unit. This unit
had a waste gas turbo blower (for regen air) coupled to a steam turbine, and generation set.Operating training
given.
1981-1982 Bourgas Bulgaria for KTI and Krupp Koppers.
Start up of a Hydrogen Plant with a four bed PSA system. Sole advisor to client for the safe running and
training of the clients personnel.
1982 QUAPCO Refinery,Quatar.
Training local and Egyptian personnel how to operate a 50T/day Sulphur Unit with Pelletizing plant.
1982-1983 Abidjan West Africa for KTI.
Start up of a Hydrogen plant with a 10 bed PSA unit. Training of locals mandatory.
1983-1985 Teaching Saudi Arabian Students in Latina Italy.
9 months classroom training given in Maths.Physics, Chemistry and Mathematics of Refinery Processes and
operational techniques .Use of Autodynamics Simulator for hands on . An additional 1 year actual “On the
Job” training at Irom refinery Venice.
1985 Petromin Refinery Riyadh Saudi Arabia
Writing operating manuals and training cards for process operators and supervisory staff,for start up and
running,shutdown, normal and emergency. Preparation for maintenance. Unit concerned, Isomax, Oxidiser,
Atmospheric distillation,Water treatment (using membrane system) Centrifugal and reciprocating gas
compressors.
1985-1987 Hellenic Aspropogus Refinery (HAR)Greece
Preparations of training programs,giving technical assistance for theoretical and “On the Job Training”.
Evaluating and preparing test papers, to process 250 new refinery operators. This was followed by training
and preparing HAR,s process engineers to “Butt List” all piping and mechanical equipment in the units. Co-
ordinate with all the various contractors and solve piping and piping problems that arose. Training of all
personnel (HAR’s) to witness all hydraulic and pneumatic testing. This was followed by being an advisor to
HAR for all precomissioning and commissioning activities.
1987 Nigerian National Pet CO Warri NIGERIA
Three months classroom training given to senior process and operating personnel in the twelve major process
units of NNPC’s Port Harcourt Refinery expansion in Nigeria. Plus an additional short course in vessel and
tower inspection techniques. punch listing procedures and material specification. All pre-commissioning and
commissioning activities.
1988-1989 Training of Nigerian Personnel at HAR’s Refinery in Greece
In depth training on HAR’s C3 Dimersol plant.Training in use of Yokogawas DCS
1989-1990 Q8 Refinery Oostvorne Holland for Braun Transworld USA.
Pre-commissioning and commissioning and start up of a UOP Platformer, Unifiner, Penex and Molex units
1990 Chongqing China.
Combined cycle heat recovery plant for HIPDC.Site representative for Standard Fasel Lentjes (SFL)
Holland.Responsible for pre/commissioning of 3X 65 T/Hr HRSG’s generating 41 barg with DCS control.
GORDON-GILL Co
4
SHAW Allan B.
1990 Hyvinkaa Finland
District water heating system for IVD Finland.Commissioning of SFL boiler with a 4900 MW hot water
storage. DCS control system.
1990 Chongquing China
SFL representative for performance testing of a combined cycle.
1991 Gubei Power Station Shengli Oil field China
Combined Cycle heat recovery plant for CNTIC.Site representative for Standard Fasel Lentjes of
Holland.responsible for commissioning 2 X 66 T/Hr at 40 barg Boilers.
1991 Liao He Power station China
HRSG’s for CNTIC commissioning of 2 X 60 T/Hr at 40 barg steam generating boilers.
1991 Guiness Brewery Dublin Eire.
Start up and test run of a corner tube gas and oil fired boiler 35 T/Hr
1991 RRB States of Jersey Channel Islands.
Advisor to Von Roll (Suisse) for start up of one incinerator powered boiler. 35 T/Hr with condensing sets
and Deareator.
1992 Estfahan Iran for NPC
3 X 80 T/Hr gas and oil fired boilers precommisssioning and commissioning SFL Holland.
1992 Shell refinery Coryton UK (Vendor SFL)
Précommisssioning and commissioning of a 1 X 130 T/Hr Waste Heat recovery. Boiler with supplementary
gas firing. Heat source a frame 5 GT.
1992 Estfahan Iran for NPC (Vendor SFL)
Pre-commissioning and commissioning of the clients third boiler. Optimising the BMS system and controls.
1992 Extraction of salt from L.Faiyum Egypt for MAN W.Germany
Process co-ordinator for the operation of Utilities. Water treatment, clarification, demin plant Boilers Steam
turbine and Cooling water systems.
1993 Thai Oil Pattaya Thailand (Vendor SFL)
Pre-commissioning and commissioning of a waste heat recovery boiler for Chiyoda Japan (110 barg at 140
barg). Alkaline boil out carried out.
1994 BNFL Sellafield for NNC in the UK
Precommissioning and commissioning of a 35T/Hr Gas and oil fired Boiler using low NOX burners with a
Peabody Burner management system.
1995 FINA Antwerp, Fuel Oil upgrading plant
Precommissioning and commissioning Flare, cooling water and fuel oil upgrading Unit using the Chevron
process.
1995-1996 Nan-Pu Power station Kaohsiung Taiwan
Commissioning of six HP and LP HRSG Steam Boilers heat sources 6 x 110 MW Siemens gas and oil fired
GT’s. All precommissioning and commissioning carried out. Including Acid cleaning, steam blowing of
boilers and loop checking. Identifying of problems and correcting process problems. Witnessing and
optimization of boilers for performance testing. Training of locals mandatory.
1997 Gevudo refuse plant Dordrecht Holland
City waste disposal unit utilizing activated carbon and a DeNOx unit with ammonia injection.
1997-1999 Hsinta Power Station in Kaohsiung Taiwan
Advisor to Taiwan Power Company for the pre-commissioning and start up of 15 Boilers in a combined
cycle operation. I was responsible for the safe start ups, precommissioning, liase with the Siemens software
engineers for program changes that ensure smooth startups. I also represented NEM the boiler
manufacturers Interests. Each of the 15 boilers had a LP steam production of 6.0 kg/sec at 5 barg. The HP
steam production was 48 kg/sec at 70 barg and 538 celcius. The units had a heat recovery rate of 55
GORDON-GILL Co
5
SHAW Allan B.
MW/boiler and were fully automatic in start-up. I had in the last six months to carry out all warranty items
on the boilers and pumps. This included the supervision of contract labour and design changes to ensure
long life, of the boilers. I was also responsible for the performance testing of each boiler.
1999-1999 Te Rapa Hamilton New Zealand for Anchor Dairies
On loan to Evans Deakin of Brisbane Australia, from Nem to start their HRSG and Auxiliary Boilers and
Balance of plants. The steam was required for the continuous production of powdered milk from 5 million
litres /day of milk. Plant consisted of a EGT 40 MW, gas turbine, HRSG with supplementary firing, with HP
and LP steam. Demin plant and CW systems.
1999 TPC Kaohsiung Taiwan for repairing and modifying Divertors.
Identifying and modifying divertors Unit 20 and 30, for good operation.
1999-2000 Commissioning Manager for NEM Holland in Surabaya Indonesia
Responsible for all Nem’s subcontractors and Nem’s equipment, at the Emdeki Calcium Carbide plant.
Commissioning of the HRSG,cooling water, Demin plant, 9MW Solar gas turbine, Siemens 7 MW steam
turbine and boilers with supplementary burners.
2000-2001 Mitsubishi Heavy Industries,Damhead Creek UK.
Technical advisor to MHI for Nem’s, two HRSG boilers. HRSG’s consisted of HP/IP/LP steam, total plant
output 800 MW’s
2001- Oct 01 Siemens Netherlands at Ataer Izmir Turkey.
Commissioning of Balance of plants. Including Air Cooled Condenser, HRSG, closed cooling water
systems. Responsible for the commissioning and pre-commissioning. Alkaline boil-out and steam blowing,
and safe startup and handover to the client
Nov 01-Oct 04 Siemens Netherlands at Adana Turkey.
Commissioning Manager responsible for the co-ordination and start-up of the combined cycle plants at
IZMIR, CANAKKALE, ADANA and MERSIN (Turkey). Balance of Plant included, reducing stations,
HRSG’s, cooling water systems, air, etc …. Steam blowing and bringing plants ready for start-up.
Reliability runs and performance testing.
Completed all four plants in Turkey,including performance tests etc.
Jan 05 – BP Hythe UK
Commissioning Manager for Siemens Netherlands and Erlangen for the CHP plant. Presently in our
reliability run and performance test program..Responsible for start up and running of the plants for the clients
acceptance
Jan -July 05 Working in the SNL office on the finalization of the Turkey projects and procedures for the
Mymensingh,Bangladesh combined cycle power plant of 76 MW,s
07/05 – 07/06 Mymensingh Bangladesh as Commissioning Manager for Siemens and Site manager for a short period.
Responsible for planning and coordinating the steam blowing procedures and designing blow routing. All
chemical dosing and chemical control commissioned. Test runs and performance testing carried out.
Solving and troubleshooting the plant.
Siemens PCS 7 software used.
09/06 – 09/07 Siemens Bangladesh Completion of hand-over to client. Initiated a training program for all the clients
personnel. Classroom and in the field training given.
Compiled and structured a examination and testing procedure for final
Evaluation for the client.
12/07 – 10/08 Working in MOERDIJK, Holland for SIEMENS AG as Commissioning Leader.
10/08 – 2010 Working in Dubai for NEM as Commissioning Leader / TFA for Hyundai Eng Korea.
3 years on the Commissioning and Technical Advising for 4 x HRSG,s and 1 x Gas /Oil fired Auxiliary
Boiler.Repeat visits up to 2011 for troubleshooting and resolving problems.
12/2010 Commissioning an HRSG 1 (with CO burners) modification in Sohar Refinery Qatar for NEM (1 month)
06 /2011 Commissioning Rasgas Refinery Ras Laffan Boiler Qatar 1 retrofit for lowering NOX levels.
GORDON-GILL Co
6
SHAW Allan B.
08-09/2011 Petkim Rrefinery Aliaga Turkey
Commissioning of Heater Upgrades, including Air Pre-Heaters,Gas and Oil fired burners.Heater dry outs
and commissioning for Heurtey France (1 month).Technical advisor to Petkim also.
10/2011 Qatar RASGAS Refinery Ras Laffan
Boiler 2 retrofit with FGR (Flue gas recirculation) for Low NOX improvement.Gas fired Boiler for NEM.
12/11-01/12 NUR Power Plant Kulim,Penang Malaysia
Technical field advisor for construction modifications and upgrades for four HRSG,s
05-07/12 Occidental,s Mukhaizna Oil fields Muscat Oman for NEM Hengelo Holland
TFA (Technical field advisor ) for construction modifications for a Once through HRSG.Also NEM TFA for
the commissioning.
08/12 NEM – Denizli, Turkey power station steam blowing
09/12 NEM – Oman – modifying HRSG 1 & 2
12/12-02/13 NEM – Denizli, Turkey power plant + Oman
02/13 NEM – Oman – 2 weeks in Mukhainza again for modifying & starting up HRSG 1
02-02/13 Denizli Turkey,HRSG,s (2) on a triple pressure boilers on combined cycle with 2x Siemens GT,s 280MW,s
two HRSG,s and on 1 x Siemens steam turbine.Total output around 800 MW,s.Steam blowing and ACC
cleaning and bringing boilers online.
04/13 Mukhainza oil fields The Oman modifying a once through HRSG for steam injection into the wells.
06/13 Denizli commissioning and testing for final handover to client.
GORDON-GILL Co
7
SHAW Allan B.
08-09/2011 Petkim Rrefinery Aliaga Turkey
Commissioning of Heater Upgrades, including Air Pre-Heaters,Gas and Oil fired burners.Heater dry outs
and commissioning for Heurtey France (1 month).Technical advisor to Petkim also.
10/2011 Qatar RASGAS Refinery Ras Laffan
Boiler 2 retrofit with FGR (Flue gas recirculation) for Low NOX improvement.Gas fired Boiler for NEM.
12/11-01/12 NUR Power Plant Kulim,Penang Malaysia
Technical field advisor for construction modifications and upgrades for four HRSG,s
05-07/12 Occidental,s Mukhaizna Oil fields Muscat Oman for NEM Hengelo Holland
TFA (Technical field advisor ) for construction modifications for a Once through HRSG.Also NEM TFA for
the commissioning.
08/12 NEM – Denizli, Turkey power station steam blowing
09/12 NEM – Oman – modifying HRSG 1 & 2
12/12-02/13 NEM – Denizli, Turkey power plant + Oman
02/13 NEM – Oman – 2 weeks in Mukhainza again for modifying & starting up HRSG 1
02-02/13 Denizli Turkey,HRSG,s (2) on a triple pressure boilers on combined cycle with 2x Siemens GT,s 280MW,s
two HRSG,s and on 1 x Siemens steam turbine.Total output around 800 MW,s.Steam blowing and ACC
cleaning and bringing boilers online.
04/13 Mukhainza oil fields The Oman modifying a once through HRSG for steam injection into the wells.
06/13 Denizli commissioning and testing for final handover to client.
GORDON-GILL Co
7

More Related Content

What's hot

What's hot (9)

JESEDLOPECCV042017
JESEDLOPECCV042017JESEDLOPECCV042017
JESEDLOPECCV042017
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Jose Sanchez_Resume
Jose Sanchez_ResumeJose Sanchez_Resume
Jose Sanchez_Resume
 
CV timothy o'donoghue 2016
CV timothy o'donoghue 2016CV timothy o'donoghue 2016
CV timothy o'donoghue 2016
 
Trebble CV 2016
Trebble CV 2016Trebble CV 2016
Trebble CV 2016
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
Resume - Imane Mansouri
Resume - Imane MansouriResume - Imane Mansouri
Resume - Imane Mansouri
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016Tommy Muldoon CV April 2016
Tommy Muldoon CV April 2016
 

Similar to CV SHAW Allan B. 2013_04 (1)

Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Apolinario Fontiveros
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New ResumeManoj Patel
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...SURENDRASINGH87542
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...LalitGoyal27
 
uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12Ahmed Omran
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)Phillip Evans
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAjith Kumar
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resumeMayur Amin
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaFidan Aliyeva
 
Introduction to Petroleum Engineering
Introduction to Petroleum EngineeringIntroduction to Petroleum Engineering
Introduction to Petroleum EngineeringAmey Perry
 
Iocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_reportIocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_reportAfzal Reza
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CVRashid Iqbal
 

Similar to CV SHAW Allan B. 2013_04 (1) (20)

HAREESH PILLAI S
HAREESH PILLAI SHAREESH PILLAI S
HAREESH PILLAI S
 
TK.CV15
TK.CV15TK.CV15
TK.CV15
 
Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-
 
Bikic CV
Bikic CVBikic CV
Bikic CV
 
Manoj New Resume
Manoj New ResumeManoj New Resume
Manoj New Resume
 
ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...ONGC_ internship _ report please don't edit directly make a copy of this file...
ONGC_ internship _ report please don't edit directly make a copy of this file...
 
ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...ongc summer internship project report,ongc report,ongc summer internship proj...
ongc summer internship project report,ongc report,ongc summer internship proj...
 
uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
AJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production OperatorAJITHKUMAR -Lead Production Operator
AJITHKUMAR -Lead Production Operator
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Operation Refinery - Mayur resume
Operation Refinery - Mayur resumeOperation Refinery - Mayur resume
Operation Refinery - Mayur resume
 
SHAHID SATTAR
SHAHID SATTARSHAHID SATTAR
SHAHID SATTAR
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
 
Introduction to Petroleum Engineering
Introduction to Petroleum EngineeringIntroduction to Petroleum Engineering
Introduction to Petroleum Engineering
 
Iocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_reportIocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_report
 
Process Engr_Rashid CV
Process Engr_Rashid CVProcess Engr_Rashid CV
Process Engr_Rashid CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CTM
CTMCTM
CTM
 

CV SHAW Allan B. 2013_04 (1)

  • 1. SHAW Allan B. Married Status: Divorced Date of Birth: 7 April 1939 Nationality: British Academic Qualifications: G.C.E “O” Levels in : Mathematics,Chemistry,English Lang,Physics and Art. O.N.C. in Mechanical Engineering,Applied Heat and Electricity H.N.C in Mechanical Engineering.1 st Year Health.Very Good PLANTS WORKED ON Gas and Oil separation F.C.C.U Crude and Vacuum Distillation Rheniforming Platforming Static and CCR C3 and C4 Dimersol Sulphur Recovery NPK Fertilizer. Chlorine Production Gas and Liquid LPG merox Computerised Water Treatment BBC/Siemens/GE gas Turbines. HF Alkylation Paraxylene Visbreaking Isomax. Phosphoric Acid Production Butamer Kero and Naphtha Hydrotreating Penex and Molex Mixed Xylene seperation NH3 production Classroom Training Sulpholane Production On the Job Training Acceptance tests Punchlisting Plants for Mech completion Advisor to clients Vessel and Tower Inspections Writing operating manuals. Salt water De-Salination Pand ID reviews Combined Cycle Heat Recovery Boilers. Inspection of plants and material Reverse Osmosis Water Treatment. Writing operating manuals Clients Advisor for commissioning Hydrogen Production (using the Benfield and Pressure swing Absorption systems) DCS control systems Siemens,Yokogawa Honeywell. 1955-1961 Leeds Gas Council – Technical Assistant Tech Asst on all types of coal gas producing plants from Horizontal, Vertical and Water gas Plants.Three years in Laboratory quality control. 1961-1965 Bahrein Petroleum Co-Arabian Gulf-Refinery Operator Fully trained by Caltex in Oil refinery Techniques for Crude Distillation and the Fluid Catalytic Cracking Unit,and all related ancillary equipment.Trained member of the Fire Fighting team.Training of local operators. 1965-1966 ICI North Tees Aromatics Plant-Shift Supervisor Start-up of Sulpholane,Unifiner,Platformer,Water treating and Steam raising plants 1966-1968 Constructors John Brown England-Commissioning Engineer Commissioned experimental Hydrazine for Fisons Widnes.Eight months doing inspection at various companies in the UK on behalf of CJB.Trained by Kodak UK in X-Ray technology and reading X- Rays.Wrote the start-up manual for CJB’s Russian client for the ICI process Paraxylene plant.This manual included all the procedures related to this plant,which was then translated into Russian before presentation to the client in Moscow.Commissione experimental sewage treating plant in Portsmouth. GORDON-GILL Co 2
  • 2. SHAW Allan B. 1968-1968 Commissioning Eng for U.O.P. Des Plaines, Illinois, USA On hire to UOP as a Commissioning Eng in Jeddah S Arabia for Start-up of a Naphtha Unifiner.Platformer,Merox.Kerosine Unifiner and Tank Farm. 1968 Commissioning Eng for Snam Progetti in Madras India. Plant check out,punch listing,Unit flushing, Heater dry outs Crude Vacuum. Kero desulphurization, and Hydrogen plant start-ups. 1969 Study Assignment Arklow Ireland Studying a Phosphoric Acid and Fertilizer production plant 1969-1971 Commissioning Eng for Dorr-Oliver, Sabac, Yogoslavia Commissioning/Senior process operator for Phosphoric Acid production, filtration and evaporation.NPK fertilizer production. 1971 Comm Eng for Didier Werke (of Essen) in Nevinnimyssk Russia Start-up of NPK fertilizer plant with Prill towers(Stamicarbon Process). 1971 Homs, Syria for Snam Progetti of Italy. Commissioning of a Steam/Naphtha Reformer,CO and O2 scrubbing NH3. Production and liquefaction. 1971-1972 Kermanshah Iran for Continental Eng Holland. Punchlisting,start up programs Field supervisor during final construction. All pre commissioning,dryouts , catalyst loading.Start up of Crude, Merox, LPG,Unifiner,Platformer,Kerosine De sulphuriser,Water treating and Steam raising plants 1971 Homs, Syria for Snam Progetti. Commissioning of a Steam/Naphtha Reformer, CO and O2 scrubbing. NH3. Production and liquefaction. 1972-1973 BP Baglan Bay Wales UK Commissioning of a 1000 T/D Chlorine plant. Electrolysis of Brine. Chlorine drying, compression and liquefaction. Sodium Hypochlorite plant. 1973 Refinera de Meditterranea ,Milazzo Sicily Italy Start up of a Vacuum and FCCU plant. Gas compression Units. 1973 Liquichimica Augusta Sicily Start-up of an Hydrogen and OXO unit for Selas Holland 1973 Amoseas Oil Nafoora Libya Solar Gas Turbine operation for gas production and oil well re-injection 1973 Total Oil Refinery VlissengenHolland for Badger Co Ltd Pre-commissioning line flushing, catalyst loading heater dry-outs for Hydrobon, Platforming (CCR).Sulphur recovery and Amine Units 1974 Saras Chimica Sarroch Sardinia for Badger Co Ltd Pre-Commissioning and Start-up of a Mixed Xylene plant using Partial and Total Decomposers with Hydroflouric acid and Boron Trifluoride. Process License by Mitsubishi Japan. 1974-1975 6 Months contract for Provincial refining Co Ltd Newfoundland Canada Area Supervisor on running plants, Naphtha and Distillate Hydrobons, Platformer and Sour water stripping Units. 1975 Start-up for Badger In W.Germany Wilhelmshaven Punch listing of the clients refinery process units and offsite facilities for mechanical completion. 1975-1976 Start-Up Eng for Irving Oil New Brunswick,Canada Start up supervisor for commissioning of a Napha Hydro treater, Rheniformer and Hydro desulphurisation Unit. 1976-1978 2 year contract with Uhde W. Germany in Brega Libya GORDON-GILL Co 3
  • 3. SHAW Allan B. Commissioning of Fire-Fighting Diesels, Harbour installation, Power Stations, emergency Diesels. Brown Boveri Gas turbines and Waste heat boilers. Instrument air and fresh water cooling system. Air Liquide Nitrogen plant. Start-up of Methanol and Ammonia plant. Asst Utilities manager and advisor to client for technical and operational equipment. Kirkuk Iraq for Mannesmann W. Germany Pre commissioning and start-up of a 95.000 BPD gas and Oil separation unit 1978 Start Up for Lummus in Karlsruhe W Germany Start up of a Sulphur Recovery Unit and witnessing a Vacuum Distillation start up. 1979-1980 Start Up of a Water treatment processing Stations.South Africa. Fully computerised WT plants for 6X660 MW power plants, at Matla and Duvha. With condensate polishing and Ammonex injection systems. 1980-1981 Oostvorne Holland for Lummus at BP’s Refinery Punchlisting, line checking, line test witnessing,pre-commissioning and start up of the FCCU Unit. This unit had a waste gas turbo blower (for regen air) coupled to a steam turbine, and generation set.Operating training given. 1981-1982 Bourgas Bulgaria for KTI and Krupp Koppers. Start up of a Hydrogen Plant with a four bed PSA system. Sole advisor to client for the safe running and training of the clients personnel. 1982 QUAPCO Refinery,Quatar. Training local and Egyptian personnel how to operate a 50T/day Sulphur Unit with Pelletizing plant. 1982-1983 Abidjan West Africa for KTI. Start up of a Hydrogen plant with a 10 bed PSA unit. Training of locals mandatory. 1983-1985 Teaching Saudi Arabian Students in Latina Italy. 9 months classroom training given in Maths.Physics, Chemistry and Mathematics of Refinery Processes and operational techniques .Use of Autodynamics Simulator for hands on . An additional 1 year actual “On the Job” training at Irom refinery Venice. 1985 Petromin Refinery Riyadh Saudi Arabia Writing operating manuals and training cards for process operators and supervisory staff,for start up and running,shutdown, normal and emergency. Preparation for maintenance. Unit concerned, Isomax, Oxidiser, Atmospheric distillation,Water treatment (using membrane system) Centrifugal and reciprocating gas compressors. 1985-1987 Hellenic Aspropogus Refinery (HAR)Greece Preparations of training programs,giving technical assistance for theoretical and “On the Job Training”. Evaluating and preparing test papers, to process 250 new refinery operators. This was followed by training and preparing HAR,s process engineers to “Butt List” all piping and mechanical equipment in the units. Co- ordinate with all the various contractors and solve piping and piping problems that arose. Training of all personnel (HAR’s) to witness all hydraulic and pneumatic testing. This was followed by being an advisor to HAR for all precomissioning and commissioning activities. 1987 Nigerian National Pet CO Warri NIGERIA Three months classroom training given to senior process and operating personnel in the twelve major process units of NNPC’s Port Harcourt Refinery expansion in Nigeria. Plus an additional short course in vessel and tower inspection techniques. punch listing procedures and material specification. All pre-commissioning and commissioning activities. 1988-1989 Training of Nigerian Personnel at HAR’s Refinery in Greece In depth training on HAR’s C3 Dimersol plant.Training in use of Yokogawas DCS 1989-1990 Q8 Refinery Oostvorne Holland for Braun Transworld USA. Pre-commissioning and commissioning and start up of a UOP Platformer, Unifiner, Penex and Molex units 1990 Chongqing China. Combined cycle heat recovery plant for HIPDC.Site representative for Standard Fasel Lentjes (SFL) Holland.Responsible for pre/commissioning of 3X 65 T/Hr HRSG’s generating 41 barg with DCS control. GORDON-GILL Co 4
  • 4. SHAW Allan B. 1990 Hyvinkaa Finland District water heating system for IVD Finland.Commissioning of SFL boiler with a 4900 MW hot water storage. DCS control system. 1990 Chongquing China SFL representative for performance testing of a combined cycle. 1991 Gubei Power Station Shengli Oil field China Combined Cycle heat recovery plant for CNTIC.Site representative for Standard Fasel Lentjes of Holland.responsible for commissioning 2 X 66 T/Hr at 40 barg Boilers. 1991 Liao He Power station China HRSG’s for CNTIC commissioning of 2 X 60 T/Hr at 40 barg steam generating boilers. 1991 Guiness Brewery Dublin Eire. Start up and test run of a corner tube gas and oil fired boiler 35 T/Hr 1991 RRB States of Jersey Channel Islands. Advisor to Von Roll (Suisse) for start up of one incinerator powered boiler. 35 T/Hr with condensing sets and Deareator. 1992 Estfahan Iran for NPC 3 X 80 T/Hr gas and oil fired boilers precommisssioning and commissioning SFL Holland. 1992 Shell refinery Coryton UK (Vendor SFL) Précommisssioning and commissioning of a 1 X 130 T/Hr Waste Heat recovery. Boiler with supplementary gas firing. Heat source a frame 5 GT. 1992 Estfahan Iran for NPC (Vendor SFL) Pre-commissioning and commissioning of the clients third boiler. Optimising the BMS system and controls. 1992 Extraction of salt from L.Faiyum Egypt for MAN W.Germany Process co-ordinator for the operation of Utilities. Water treatment, clarification, demin plant Boilers Steam turbine and Cooling water systems. 1993 Thai Oil Pattaya Thailand (Vendor SFL) Pre-commissioning and commissioning of a waste heat recovery boiler for Chiyoda Japan (110 barg at 140 barg). Alkaline boil out carried out. 1994 BNFL Sellafield for NNC in the UK Precommissioning and commissioning of a 35T/Hr Gas and oil fired Boiler using low NOX burners with a Peabody Burner management system. 1995 FINA Antwerp, Fuel Oil upgrading plant Precommissioning and commissioning Flare, cooling water and fuel oil upgrading Unit using the Chevron process. 1995-1996 Nan-Pu Power station Kaohsiung Taiwan Commissioning of six HP and LP HRSG Steam Boilers heat sources 6 x 110 MW Siemens gas and oil fired GT’s. All precommissioning and commissioning carried out. Including Acid cleaning, steam blowing of boilers and loop checking. Identifying of problems and correcting process problems. Witnessing and optimization of boilers for performance testing. Training of locals mandatory. 1997 Gevudo refuse plant Dordrecht Holland City waste disposal unit utilizing activated carbon and a DeNOx unit with ammonia injection. 1997-1999 Hsinta Power Station in Kaohsiung Taiwan Advisor to Taiwan Power Company for the pre-commissioning and start up of 15 Boilers in a combined cycle operation. I was responsible for the safe start ups, precommissioning, liase with the Siemens software engineers for program changes that ensure smooth startups. I also represented NEM the boiler manufacturers Interests. Each of the 15 boilers had a LP steam production of 6.0 kg/sec at 5 barg. The HP steam production was 48 kg/sec at 70 barg and 538 celcius. The units had a heat recovery rate of 55 GORDON-GILL Co 5
  • 5. SHAW Allan B. MW/boiler and were fully automatic in start-up. I had in the last six months to carry out all warranty items on the boilers and pumps. This included the supervision of contract labour and design changes to ensure long life, of the boilers. I was also responsible for the performance testing of each boiler. 1999-1999 Te Rapa Hamilton New Zealand for Anchor Dairies On loan to Evans Deakin of Brisbane Australia, from Nem to start their HRSG and Auxiliary Boilers and Balance of plants. The steam was required for the continuous production of powdered milk from 5 million litres /day of milk. Plant consisted of a EGT 40 MW, gas turbine, HRSG with supplementary firing, with HP and LP steam. Demin plant and CW systems. 1999 TPC Kaohsiung Taiwan for repairing and modifying Divertors. Identifying and modifying divertors Unit 20 and 30, for good operation. 1999-2000 Commissioning Manager for NEM Holland in Surabaya Indonesia Responsible for all Nem’s subcontractors and Nem’s equipment, at the Emdeki Calcium Carbide plant. Commissioning of the HRSG,cooling water, Demin plant, 9MW Solar gas turbine, Siemens 7 MW steam turbine and boilers with supplementary burners. 2000-2001 Mitsubishi Heavy Industries,Damhead Creek UK. Technical advisor to MHI for Nem’s, two HRSG boilers. HRSG’s consisted of HP/IP/LP steam, total plant output 800 MW’s 2001- Oct 01 Siemens Netherlands at Ataer Izmir Turkey. Commissioning of Balance of plants. Including Air Cooled Condenser, HRSG, closed cooling water systems. Responsible for the commissioning and pre-commissioning. Alkaline boil-out and steam blowing, and safe startup and handover to the client Nov 01-Oct 04 Siemens Netherlands at Adana Turkey. Commissioning Manager responsible for the co-ordination and start-up of the combined cycle plants at IZMIR, CANAKKALE, ADANA and MERSIN (Turkey). Balance of Plant included, reducing stations, HRSG’s, cooling water systems, air, etc …. Steam blowing and bringing plants ready for start-up. Reliability runs and performance testing. Completed all four plants in Turkey,including performance tests etc. Jan 05 – BP Hythe UK Commissioning Manager for Siemens Netherlands and Erlangen for the CHP plant. Presently in our reliability run and performance test program..Responsible for start up and running of the plants for the clients acceptance Jan -July 05 Working in the SNL office on the finalization of the Turkey projects and procedures for the Mymensingh,Bangladesh combined cycle power plant of 76 MW,s 07/05 – 07/06 Mymensingh Bangladesh as Commissioning Manager for Siemens and Site manager for a short period. Responsible for planning and coordinating the steam blowing procedures and designing blow routing. All chemical dosing and chemical control commissioned. Test runs and performance testing carried out. Solving and troubleshooting the plant. Siemens PCS 7 software used. 09/06 – 09/07 Siemens Bangladesh Completion of hand-over to client. Initiated a training program for all the clients personnel. Classroom and in the field training given. Compiled and structured a examination and testing procedure for final Evaluation for the client. 12/07 – 10/08 Working in MOERDIJK, Holland for SIEMENS AG as Commissioning Leader. 10/08 – 2010 Working in Dubai for NEM as Commissioning Leader / TFA for Hyundai Eng Korea. 3 years on the Commissioning and Technical Advising for 4 x HRSG,s and 1 x Gas /Oil fired Auxiliary Boiler.Repeat visits up to 2011 for troubleshooting and resolving problems. 12/2010 Commissioning an HRSG 1 (with CO burners) modification in Sohar Refinery Qatar for NEM (1 month) 06 /2011 Commissioning Rasgas Refinery Ras Laffan Boiler Qatar 1 retrofit for lowering NOX levels. GORDON-GILL Co 6
  • 6. SHAW Allan B. 08-09/2011 Petkim Rrefinery Aliaga Turkey Commissioning of Heater Upgrades, including Air Pre-Heaters,Gas and Oil fired burners.Heater dry outs and commissioning for Heurtey France (1 month).Technical advisor to Petkim also. 10/2011 Qatar RASGAS Refinery Ras Laffan Boiler 2 retrofit with FGR (Flue gas recirculation) for Low NOX improvement.Gas fired Boiler for NEM. 12/11-01/12 NUR Power Plant Kulim,Penang Malaysia Technical field advisor for construction modifications and upgrades for four HRSG,s 05-07/12 Occidental,s Mukhaizna Oil fields Muscat Oman for NEM Hengelo Holland TFA (Technical field advisor ) for construction modifications for a Once through HRSG.Also NEM TFA for the commissioning. 08/12 NEM – Denizli, Turkey power station steam blowing 09/12 NEM – Oman – modifying HRSG 1 & 2 12/12-02/13 NEM – Denizli, Turkey power plant + Oman 02/13 NEM – Oman – 2 weeks in Mukhainza again for modifying & starting up HRSG 1 02-02/13 Denizli Turkey,HRSG,s (2) on a triple pressure boilers on combined cycle with 2x Siemens GT,s 280MW,s two HRSG,s and on 1 x Siemens steam turbine.Total output around 800 MW,s.Steam blowing and ACC cleaning and bringing boilers online. 04/13 Mukhainza oil fields The Oman modifying a once through HRSG for steam injection into the wells. 06/13 Denizli commissioning and testing for final handover to client. GORDON-GILL Co 7
  • 7. SHAW Allan B. 08-09/2011 Petkim Rrefinery Aliaga Turkey Commissioning of Heater Upgrades, including Air Pre-Heaters,Gas and Oil fired burners.Heater dry outs and commissioning for Heurtey France (1 month).Technical advisor to Petkim also. 10/2011 Qatar RASGAS Refinery Ras Laffan Boiler 2 retrofit with FGR (Flue gas recirculation) for Low NOX improvement.Gas fired Boiler for NEM. 12/11-01/12 NUR Power Plant Kulim,Penang Malaysia Technical field advisor for construction modifications and upgrades for four HRSG,s 05-07/12 Occidental,s Mukhaizna Oil fields Muscat Oman for NEM Hengelo Holland TFA (Technical field advisor ) for construction modifications for a Once through HRSG.Also NEM TFA for the commissioning. 08/12 NEM – Denizli, Turkey power station steam blowing 09/12 NEM – Oman – modifying HRSG 1 & 2 12/12-02/13 NEM – Denizli, Turkey power plant + Oman 02/13 NEM – Oman – 2 weeks in Mukhainza again for modifying & starting up HRSG 1 02-02/13 Denizli Turkey,HRSG,s (2) on a triple pressure boilers on combined cycle with 2x Siemens GT,s 280MW,s two HRSG,s and on 1 x Siemens steam turbine.Total output around 800 MW,s.Steam blowing and ACC cleaning and bringing boilers online. 04/13 Mukhainza oil fields The Oman modifying a once through HRSG for steam injection into the wells. 06/13 Denizli commissioning and testing for final handover to client. GORDON-GILL Co 7