Table of Contents
Table of Contents 1
Description of Project 2
Executive Summary 2
Original Case Study 3
A.T.B. Team Charter 5
Business Case 10
Infrastructure 14
Scope Management Report 18
Project Plan, Schedule, Budget 24
Risk Management Plan 29
Earned Value and Quality Management Plan 33
Appendices: Microsoft Project Tutorials 42
Alexander Truong
Husky Air Project Charter
Page 2
Description of Project
Husky Air Pilot Angels was in need of a new scheduling system. Not having had a proper
system in place aside from “paper and pencil”. The organization has come to Team A.T.B. and
as consultants we have designed, planned, and evaluated a project for the client to utilize.
Throughout the course of this project the team has come together and worked together utilizing
everyone’s strengths and weaknesses to the best of their businesses spending many busy
nights together and at home to create an optimal system to offer our project sponsor.
Throughout the course of the project has created a team charter to ensure quality work and
efficient work ethic. After having created a team charter Team A.T.B. has assessed a measure
of organizational value (MOV). That the team continues to reflect on as we have worked
towards. As one of the team’s core members I have taken the time to make sure my values
have aligned with the team. Ensuring not only in the team charter, in all meetings,
communications, and on every assignments: accomplishments were shared and egos were left
at the door. Each colleague as well as myself was accountable for the work done. We continued
to strive to learn implementing lessons from the course and the textbook. Committed myself and
teammates to be aligned with the goal of providing quality work. To do and say the right things
so that everyone felt appreciated and understood, even difficult situations arose. And to have an
environment of trust as each group member were not only work colleagues, but friends.
Executive Summary
The project was composed of 8 major assignments/milestones. Kicking off the start of the
project and the first meeting was the coming together of the team charter. This document would
set the expectations of the team and every group member. This opportunity was also the first
chance for group members to know one another work gets done. Throughout the creation of the
project and as each assignment was laid out and finished the team has set the foundation for
the Husky Air scheduling system to take place. Significant aspects of the project that have
attributed to the creation of the project charter has been assessing the MOV, the WBS, quality
management plan, and project risk. The project now needs to be implemented and a prototype
needs to be created for testing. Once the prototype is in place and has been approved, the
scheduling system needs to be programmed for a product to be offered. To ensure that the
team develops a quality project, it is recommended to continue to communicate with the client
and project stakeholders to make sure that product is build effectively, on time, and with
excellence.
Alexander Truong
Husky Air Project Charter
Page 3
Original Case Study
Husky Air - Pilot Angels
Background
Husky Air opened for business in January 2008 when L.T. Scully and several other investors
pooled their life savings and secured a rather large loan from a Chicago Bank.
Located in DeKalb Taylor Municipal Airport (DKB) in DeKalb, Illinois, Husky Air is a fixed
base operator (FBO) facility that offers a full range of services to the growing demands for
business and private aviation. Currently, the company has 23 employees composed of pilots,
mechanics, and office staff.
As a FBO, Husky Air provides:
● Business jet, propjet, helicopter, and propeller aircraft charter
● Refueling
● Airframe, engine, propeller, and avionics maintenance
● Aircraft rental
● Flight instruction
● Pilot supplies
Although FBOs at other airports offer similar services, Husky Air has been receiving
increased attention throughout the Midwest for its charter service, maintenance, and flight
instruction.
Pilot Angels
In addition, Husky Air coordinates a charitable service called Pilot Angels. Working with
hospitals, health-care agencies, and organ banks, Husky Air matches volunteer private pilots,
willing to donate their time and aircraft with need people whose health-care problems require
them to travel to receive diagnostic or treatment services. In addition, Pilot Angels also provides
transportation for donor organs, supplies, and medical personnel. All flights are free of charge,
and costs are paid for by volunteer pilots who use their own aircraft.
The pilots who volunteer for the Pilot Angels program need no medical training and offer
no medical assistance. The planes do not carry any medical equipment and do not have to
accommodate any stretchers. Patients, however, must be medically stable and able to enter
and exit the aircraft with little or no assistance. The Pilot Angels passengers typically travel to or
Alexander Truong
Husky Air Project Charter
Page 4
from a hospital or clinic for diagnosis, surgery, or some other treatment. Travel companions,
such as a relative, friend, or nurse, are common.
Currently, a pool of pilot volunteers is kept in a file folder. If a hospital or person with
medical or financial hardship contacts Husky Air, the name of the traveler, the destination,
date/times, and the number of travel companions are requested. Because of limite weight
restrictions in small aircrafts, the weights of the passengers and their luggage are needed as
well.
After the initial information is provided, Husky Air contacts the volunteer pilots to
determine their availability. Although a volunteer pilot may be willing and available for a Pilot
Angels flight, the plane may not have the range or weight-carrying requirements. This may be
an inefficient use of time since many pilots may have to be contacted until a pilot and suitable
plane can be found.
Project Description
Husky air would like to have a computer-based system to keep track of all its Pilot Angels
volunteers. Basic information about the pilots may include their name, address, phone number,
and so forth, as well as their total hours, certifications, and ratings. Moreover, specific
information about a volunteer’s aircraft would be useful. Such information should include the
type of plane, aircraft identification number (called the N number), whether single or multi-
engine, and its capacity for carrying passengers and cargo. Some pilots own more than one
plane.
Husky Air also wants to know more about the people, hospitals, clinics, and organ banks
that request the Pilots Angels service. In addition, they also would like basic information about
the patients, their passengers, and specific needs to help match volunteers with the request for
transport. Finally, Husky Air wants a list of all the Pilot Angels flights in order to recognize
specific volunteers for their contributions. This would include:
● The pilot who flew the flight
● The passengers onboard
● The plane that was used
● The total time of the flight
● The distance and destination of the flight
● The date and time of the flight
● The total fuel used
Alexander Truong
Husky Air Project Charter
Page 5
A.T.B. Team Charter
TeamInformation Table
Team
Member
Contact Info Strengths Stressors Reactions under
stress
TeamRecovery
Alexander
Truong
703-989-8459
truonga3@vcu.ed
u
Patience, team player,
openness, and
perseverance. Willing
to learn, willing to fail,
and willing to succeed.
Lack of timely
communication,
effort, and care.
Will lose
temper/work
slower.
Give me space
or a solution.
Bidesh
Thapa
(804) 426-7238
thapab2@vcu.edu
Highly motivated,
hardworking, fast
learner, willing to learn
new things, flexible.
Lack of
communication.
Loss of motivation
and creativity.
Apologize,
things can go
wrong
sometimes.
Thabit
Ababneh
(804) 305-8727
ababnehts@vcu.e
du
Coordination,
Communication,
Organization,
Flexibility, Motivated.
Laziness, Lack
of competence.
Over
assertiveness.
ensure to me
that the work
will get done on
schedule.
Abdulrah
man
Almuways
(213) 284-1991
almuwaysaf2@vc
u.edu
My strengths are in
time management,
social networking, and
facilitating work.
Procrastination
and low-quality
work.
Calm and will
assist team
members.
Be calm and
continue to strive
for performance.
Personal Bios
Thabit Ababneh
My major is two fold, accounting and information systems; this is my senior year. Coming out of
college, I hope to pursue a career more focused in the accounting sector. I'm a very extroverted
person and don't shy away from confrontation or contradiction. That being said, I have learned
to try and curb the impulse to contradict or argue things as it often reflects a negative picture of
me. I’m an intellectual and objective. My greatest strength is the ability to organize a strategy
Alexander Truong
Husky Air Project Charter
Page 6
and keep things driven towards a goal. Essentially, I think I am good at getting things done.
Unfortunately, this attitude sometimes leads to a form of tunnel vision and can cause me to
overlook things. My hobbies include, other than arguing of course, drawing, painting, playing
soccer and playing video games. Lately, as a result of busy schedules, I'm much more active on
mobile video games on my phone as well as using a drawing app.
Alexander Truong
Information Systems major, junior year, graduating May of 2019. I’m a student that has
overcome
personal strife, that I would prefer to keep private. I struggle with time management,
organization, and perfectionism. I’m passionate about technology, as well as business. I’ve
made sacrifices to my lifestyle in order to perform to the best of my academic ability. I enjoy
working with people and making the best out of the work that needs to be done. I journal
frequently to stay on track of my visions, goals, and daily tasks. When you get to know me I’m
more talkative and outgoing. I want to say I enjoy presenting and speaking in front of people, but
I still get nervous. I believe hope is necessary and I am motivated by responsibility, duty, and
self-determination. I will do my best to figure out how to work with people and get things done. I
like to have books on the backburner that I occasionally read and acquire information from.
When I have free time I try to exercise, read, or watch tv/ go on the internet, but I’m more
committed to school at the moment. My other interests include boxing, kickboxing, MMA, as well
as self-improvement. I don’t have the prettiest academic transcript or past. I have however
learned to use my failure: to humble myself, learn about what it means to work hard, and how to
continuously improve. I currently have an internship with Infranet Technologies Group, and just
accepted my summer internship at the Federal Reserve. This is a big moment for me and the
ball is just rolling for what I want to do with my life. People claim that I’m bright and charismatic.
My anxiety and negativity tell me otherwise. I was diagnosed with ADHD in college, but I choose
to not take medication or get disability assistance. This is my 6th year in college. Despite these
setbacks, I’ll do what it takes to stand out, work hard, and get things done.
Bidesh
Namaste and good wishes. I am initially from Bhutan, and I came to the US in 2010. I have an
associate’s degree in Computer Science from J. Sargeant Reynolds Community College. Here
at VCU, my current major is Information Systems with a minor in Computer Science. Currently, I
am a full-time student and am looking to gain some experience in the IT field this summer
break. I am a senior and will graduate this December. I am interested in pursuing a database
career. Aside from that, I am a music lover, in my free time I like to edit videos, play soccer, or
go to the gym to burn some extra calories. Due to my busy schedule, my current priority is
focusing on my studies and getting things done.
Abdulrahman
Alexander Truong
Husky Air Project Charter
Page 7
Abdulrahman, I am a Senior at VCU. I’m planning to graduate with a degree in Information
Systems by this upcoming fall semester and then pursue a Master’s in Business Administration.
I really like living in Richmond and enjoying Indian food. I wish everyone a successful semester.
Mission Statement
As Team A.T.B. we strive to be a leader in the creation of effective IT solutions for businesses;
through work performance, growth, and continued learning.
Core Values
1. Timeliness
“We complete work on time if not early”
2. Due Care
“We provide professional quality work and documentation”
3. Respect
“We give equality and equity of treatment to everyone”
4. Open Mindedness
“We strive for every possible solution with a sense of trust and integrity”
How We Communicate
Communication Needs Agreed Mode of Communication Expected Response Time
General Logistics & Coordination Group messages 6 hours (not including 11pm-9am)
Quick Question Group messages 1 day
Urgent Matter Group messages ASAP
Personal Issue/Concern Group messages 1 day
Project Planning Group messages and meeting 1 day
Other Group messages and meeting 1 day
Primary means of communication and contact
A.T.B. members are committed to checking their phones and email within a day and everyday to
stay in contact.
Alexander Truong
Husky Air Project Charter
Page 8
TeamMeetings
A.T.B. members meet during every class period to keep up with the class, content,
assignments, and planned tasks/goals. The team is expected to attend and prepare for the
mandatory meeting at 7 every Thursday.
Teamorganization and formalities
How we share the work:
A.T.B. members work hard, communicate effectively, and are all team players. We know when
to take the lead and when to support one another as a team; therefore:
1. We mutually decide on tasks and volunteer for roles.
2. We complete assignments on time or in advance.
3. We expect each other to step up and keep up with the team.
TeamBehavior Table
Acceptable Behavior Not Acceptable Behavior
Suggesting an alternative to our current strategy or
proposed solution.
Demand that the assignment be done in a certain way
instead.
Point out a deficiency, and provide a solution. Genuinely mock and insult someone for an
unintentional or genuine mistake.
Bringing the team back to the task at hand. Yell that everyone needs to shut up and focus.
Disagreement steps
Process Steps to Be Followed: Who is Accountable for Each Step
1.Contact team member The GroupMe will be used to keep in contact with
team members.
Alexander Truong
Husky Air Project Charter
Page 9
2.Speak with the team Members will attend class as an opportunity to meet
and discuss.
3.Final warning addressed for the team and team
member
The GroupMe/class time will be used as a polite
means to issue warning.
4.Speaking with the Professor Knowledge of professor’s office hours will be made
known and agreed upon for drastic measures
*Resolved disagreements end with a handshake, apology, and continued efforts to perform as a
team and achieve
Roles and Responsibilities
● Team A.T.B. members are expected to show up and attend meetings every Thursday
after 7.
● Team A.T.B. members are expected to attend all classes to keep up with the material
and lecture.
● Team A.T.B. members are expected to research and prepare for class and team
meetings.
● Team A.T.B. are expected not only to contribute to work, but to ask questions.
● Team A.T.B. members are required to treat each other with respect and equality.
● Team A.T.B. members are responsible for each other, and each other’s work.
● Team A.T.B. member will always find a way to submit work early and on time.
● Team A.T.B. members are expected to listen to each other and work with each other.
● Team A.T.B. members know there is no right or wrong way to get things done; only the
right way to behave, treat one another, and contribute to the success of the team.
● Team A.T.B. members are be fair, knowledgeable, and prepared.
Agreement Notice
All team members have read the team charter and agree to the expectations addressed in this
document:
“I have read and understood all the requirements of the team charter, I agree to adhere
to the entailed expectations required of me as a member of Team A.T.B.”
Signed,
Signature Date
Alexander Truong
Husky Air Project Charter
Page 10
Alexander Truong 2.24.2018
Abdulrahman Almuways 2.24.2018
Bidesh Thapa 2.24.2018
Thabit Ababneh 2.24.2018
Business Case
Desired Areas of Impact
Organizational
Value
Description Measurable Metric Time Frame
Strategic Increase the amount
of pilots currently
participating in our
program
Increase pilots
participating by 10%
18 months
Customer Create a more
reliable system for
users to use
Decrease customer
withdrawals by 20%
6 months
Financial Reduce the costs
associated with
scheduling
Reduce costs for
scheduling by 50%
4 months
Operational Decrease the amount
of time customers
need to wait to book
a pilot.
Decrease time to
book a flight by 20%
6 months
Social Increase the amount
of flights booked in
this program
Increase amount of
flights by 10%
12 months
Alexander Truong
Husky Air Project Charter
Page 11
Alternatives
1. Maintain the current system, least effective option (system is poorly managed: all paper,
pencil, and phone calls).
2. Use a packaged solution available on the market called Airplane Manager.
https://airplanemanager.com/. The costs of using the software system and service is
$375/month.
3. Hire a professional office assistant familiar with managing schedules.
4. Build a custom system. This will be done with Oracle Apex. This system will be scalable
that handle more pilots as needed in future. But, to build this system, we will have to hire
a System Developer that will cost $ 45 per hour who will build cloud base system.
Analysis of Alternatives
This section contains the analysis of alternative 1, alternative 2, alternative 3 and
alternative 4 based on total cost and benefits of ownership.
Total Cost of Ownership
Resource Description Alternative 1
(keeping the
old system)
Alternative 2
(purchasing off
the shelf)
Alternative 3
(specialized office
assistant)
Alternative 4
(Developer)
Salary The cost of hiring an
employee/contractor
$57,600 $0 $40,000 $86,400
($45 * 1,920
hours)(hiring
a contractor)
Software The cost of the
software package
$0 $4500 (a year) $0 Google Docs $0
Training Costs for teaching
employees on how to
work the system
$0 $0 (Part of pack) $0 $0
Hardware or
cloud storage
Costs of products
purchased of cloud
service
$0 $20,500
(laptops and
other devices for
24 employees)
$0 $480 a month
Support and
Maintenance
Costs for supporting
the system
$0 $0 (outsourced
to Airplane
manager
$0
Included
Alexander Truong
Husky Air Project Charter
Page 12
support)
Installment Implementing the
system
$0 $10,000 (routers
for people to
access wifi)
$0 $1000
Total Cost of
Project
Cost of the solution $57,600 $35,000 $40,000 $87,880
Total Benefits of Ownership (1-5) Ranking Chart
Benefits Alternative 1 Alternative 2 Alternative 3 Alternative 4
Store Staff
Information
2 4 4 5
Store Customer
Information
1 4 3 5
Store Flight
Details
1 4 2 5
Customer
service
1 3 5 5
Interface
Design
0 5 3 5
Usability 2 5 4 5
Active Directory 0 5 3 5
Security 0 4 4 5
Scalability 0 4 3 5
Sum of
Benefits
7 33 31 50
Benefit
Percentage
14% 66% 62% 100%
Alexander Truong
Husky Air Project Charter
Page 13
Analysis Alternative 2 Alternative 3 Alternative 4
ROI 64.57% 44% 34%
Payback 3.79 yrs 5.7 yrs 12.5 yrs
Break Even Point 18.42 21.05 46.25
Calculation of Investment (ROI)
ROI for Alternative 2:
Project ROI = (57,600 – 35,000) / 26,500
Project ROI = 64.57%
ROI for Alternative 3:
Project ROI = (57,600 – 40,000) / 40,000
Project ROI = 44%
ROI for Alternative 2:
Project ROI = (57,600 – 87,880) / 87,880
Project ROI = -34%
Calculation of “Payback”:
Payback for Alternative 2:
Payback Period = 35,000 / 7000
Payback Period = 5 years
Payback for Alternative 3:
Payback Period = 40,000 / 7000
Payback Period = 5.7 years
Payback for Alternative 4: Payback
Period = 87880/ 7000
Payback Period = 12.5 years
Calculation of “Breakeven”:(The point at which its income cover its expenses)
Break even Analysis for Alternative 2:
Break even point = 35,000/ (2,000 - 100)
Break even point = 18.42
Break even Analysis for Alternative 3:
Alexander Truong
Husky Air Project Charter
Page 14
Break even point = 40,000/ (2,000 - 100)
Break even point = 21.05
Break even Analysis for Alternative 4:
Break even point = 87,880/ (2,000 - 100)
Break even point = 46.25
Recommendation
Our recommendation is for Husky Air to build a custom system and management
solution. In comparing alternatives based on the organizations needed requirements and budget
this is the most viable option. Based on the analysis of alternatives option 3 has the optimal
break even point, relative ROI, and best payback period. This is our recommendation as it
saves money and offers the same value.
Infrastructure
Resource Requirements
People
Resource Name Resource Description
System Programmer The person actually developing the code for
the system and who will be maintaining and
supporting the system. This will be yearly
Project Manager The person coordinating and instructing the
System Programmer and System Architect, to
keep the project on time, within scope, and
within budget. This will last for 6 months; the
project’s schedule constraints.
System Architect The person who is responsible for
determining and creating the physical
infrastructure for the system. This will last for
6 months; the project’s schedule constraints.
Alexander Truong
Husky Air Project Charter
Page 15
Technology
Resource Name Resource Description
Computers Computers, keyboards, mouses, etc for the
programer, architect, and manager
Server A server to be used for developing,
supporting, and maintaining the system
Router A router to be used to facilitate internet
connection for our “people” resources.
Facilities
Resource Name Resource Description
Office space Space to be used to develop the proposed
system
Other
Resource Name Resource Description
System Support User assistance and the fixing of any system
bugs or issues as they arise
Training to use software Training employees to properly use the
installed system
Installation & Implementation Initial installment of the system
System Maintenance Maintaining smooth operation of the system
once it is implemented
Resource CostTable
People
Resource Name Resource Description Source
System Programmer $70,720 yearly (at $34 an
hour)
indeed.com
Project Manager $45,760 (at $44 an hour) indeed.com
Alexander Truong
Husky Air Project Charter
Page 16
System Architect $55,120 (at $53 an hour) indeed.com
Technology
Resource Name Resource Description Source
Computer $1,347 (HP Slimline with
accessories times 3)
Wallmart.com
Server $1,792 (HP Z800 workstation
with 12 core computer, 4TB
HDD, 500 SSD, with 2 X SIX
Core Xeon 3.46 GHz)
newegg.com
Routers $10,000 (ASUS AC2900 wifi
dual band Gigabit routers)
Amazon.com
Facilities
Resource Name Resource Description Source
Office Space Extra office space will be
used so there is no additional
cost
-
Other
Resource Name Resource Description Source
System Support Included in Programmer
Salary
indeed.com
Training to use software Included in Programmers
Salary
indeed.com
Installation & Implementation Included in “people” salaries indeed.com
System Maintenance Included in Programmers
Salary
indeed.com
Contract Payment Method:
In reviewing the resource cost tables. Costs will be paid for by the project sponsor in
increments. Costs will vary depending on fees associated with each phase of the project as well
as the costs associated with setting up the system.
Learning Cycle: Documentation
Alexander Truong
Husky Air Project Charter
Page 17
Learning Cycle Statement:
The team members have carefully understood the given instructions in order to plan
ideas. We have conducted a group meeting to distribute the assignment in parts as per
everyone’s preferences. The schedule of the meetings include deadlines that were also
determined. All means of communication were used to work efficiently and timely. The team
members worked jointly, which lead to completion. Working in teams is a great skill that all of us
have practice it during the assignment.
Learning Cycle Tables
Current Understanding Assumptions made Need to research
Husky Air needs a new
scheduling system
Insufficient due to lack of
infrastructure (everything is in
a file folder)
Best system to implement in
terms of scope, budget, and
time
Decrease time it takes to find
a pilot/plane with the correct
match for the client
Employees used to the filing
system despite inefficiency
A system design and
interface that reflects an
improved version of how
users schedule and
document
Increase Husky Air customer
retention and continued
business growth
Husky Air has services that
stand out amongst their
competition in addition to
their volunteering service
How to design a system that
will accommodate and reflect
Husky Air’s business model.
Personnel Duty Date of Completion
BideshThapa Review/revise executive
summary/introduction/MOVs
Sunday @7
AlexanderTruong Contract Payment Method
Statement and Amend TOPS
Doc
Sunday @7
Thabit Ababneh Resource Cost Tables Sunday @7
Abdulrahman Almuways Learning Cycle statement
and Learning Cycle tables
Sunday @7
Alexander Truong
Husky Air Project Charter
Page 18
Scope Management Report
Deliverable Structure Chart
Alexander Truong
Husky Air Project Charter
Page 19
Use-Case Diagram
Alexander Truong
Husky Air Project Charter
Page 20
Work Breakdown Task and Resource List
Alexander Truong
Husky Air Project Charter
Page 21
Work Breakdown Task Timeline
Alexander Truong
Husky Air Project Charter
Page 22
Estimated Project Cost
Scope Change Request Form
Alexander Truong
Husky Air Project Charter
Page 23
Scope change request form
Request name: __________________ Request date: ___/___/______
Request title: ____________________ Request number: __________
Request description:
Justification:
Possible alternatives:
Impacts Alternative 1 Alternative 2 Alternative 3
Scope
Schedule
Resources required
Cost
Recommendation:
Authorized by:
Date:
__________________________________________ ____/_____/________
Scope Change Request log
Alexander Truong
Husky Air Project Charter
Page 24
Request Number Request
Title
Date of
Request
Requested
by
Priority
(L, M, H)
Authority to
Approve
Request
Expected
Response
Date
Scope Change
Approved?
(Y/N)
Project Plan, Schedule, Budget
Cost Overview Table
Alexander Truong
Husky Air Project Charter
Page 25
Resource Rate
Project Manager $44.00/hr
System Programmer $34.00/hr
System Architect $53.00/hr
Work Breakdown Structure
Alexander Truong
Husky Air Project Charter
Page 26
Network Diagram
Alexander Truong
Husky Air Project Charter
Page 27
Alexander Truong
Husky Air Project Charter
Page 28
Project Budget and Schedule Summary Questions
What are beginning (use May 23) and end dates for your project? How many days will it take to
complete the project?
● The begin date is May 23, 2018 and the end date is July 8, 2018. It will take about 33
days to finish the project .
Does your project have a single critical path or multiple critical paths? What is the importance of
the critical path?
● The Project has 1 critical path. It’s importance is defining the mission essential tasks
towards the completion of the project. There is no slack in the critical path.
What is the initial total project baseline cost of the project?
● The baseline cost is $15,557.33
Does your project have any over allocated resources? If so, be sure to level your resources.
● No, the tasks have been ensured to not have any allocated resources and the majority of
the tasks are finish-to-start tasks, and each resource is carefully assigned to the
appropriate task.
Alexander Truong
Husky Air Project Charter
Page 29
Risk Management Plan
Revised Work Breakdown Task List and Resources
Alexander Truong
Husky Air Project Charter
Page 30
Revised Work Breakdown Timeline
Revised Resource Table
Alexander Truong
Husky Air Project Charter
Page 31
Risk Analysis Table
Phase Defining project
goal
Project
Planning
Execute and
Control
Project Close Project
Evaluation
Risk Difficulty in not
completely
understanding
what the best
solutions are.
That the defined
goals do not
create the best
value for the
organization and
do not fit the
requirements
Project Plan is
too
Conservative,
and The
project actually
takes less time
to implement
and evaluate.
The system is
too complicated
and difficult for
user to
navigate. In this
case, the
project will
need to
evaluate and
will take longer
days.
Incorrect
summary
reports of the
project are
created
Initially we have
allocated one day
to evaluate the
whole project. If
project managers
fails to work on
the evaluation of
project or
something other
critical needs to
do on the same
day, then project
evaluation will get
longer than one
Alexander Truong
Husky Air Project Charter
Page 32
day or will
complete in next
day.
Probability 10% 15% 5% 2% 5%
Pay Off (Loss) (7,000) 2,000 (10,000) (10,000) (500)
Net
Consequence
(Prob * Payoff)
(700) 300 (500) (200) (25)
Strategy The project
manager
communicates
with Husky Air to
clarify what the
goals and
specific
requirements are
Encourage
Employees to
come in under
time and
budget.
The project
manager have
to revise the
mov and make
sure it is
matching with
the user
requirements.
Accept Risk The project
manager, himself
have to mark the
date and work on
it accordingly.
Impact On
MOV
If this the goals
are not specific
enough they will
not provide
value to the
company
This risk has
no impact on
MOV as it
would mean
that the project
would end
earlier than
expected, but it
does not affect
what the
project delivers
but would
simply deliver it
sooner.
This risk have a
devastatingly
negative impact
on the project
MOV as the
project will not
do what the
organisation
needs it to do.
This risk would
not impact our
MOV. It would
however cause
the organisation
to have this
MOV
misevaluated
and which may
cause some
inappropriate
decisions in the
future to be
made
This will lead to
the extension of
one more day
and might
increase the
overall MOV time
frame.
Risk Owner Project
Manager, Husky
Airlines
Husky Airlines Project
Manager,
Husky Airlines
Project
Manager,
Husky Airlines
Project Manager,
Husky Airlines
Source of Risk
Project
People/Product People People,
Technology
Process,
Technology,
People
People
Internal or
External
Internal Internal Internal Internal Internal
Nature of the
Risk
Unknown-
Unknown
Unknown-
Unknown
Known-
Unknown
Unknown-
Unknown
Unknown - known
Alexander Truong
Husky Air Project Charter
Page 33
Earned Value and Quality Management Plan
Part I, Earned Value Analysis
Earned Value Report
Alexander Truong
Husky Air Project Charter
Page 34
Alexander Truong
Husky Air Project Charter
Page 35
Table with Tasks (for context)
Alexander Truong
Husky Air Project Charter
Page 36
Tracked Gantt Chart (for context)
Analysis of Earned Value
Budget at Completion (BAC) $ 14,040
Planned Value (PV) $ 13,336
Actual Cost (AC) $ 12,580
Earned Value (EV) $ 9,810
Schedule Variance (SV) ($ 3,526)
Cost Variance (CV) ($ 2,770)
Schedule Performance Index (SPI) 0.735603
Cost Performance Index (CPI) 0.779809
Estimate at Completion (EAC) for both SPI and CPI $ 18,004.40
Estimate to Complete (ETC) $ 5,424.40
Alexander Truong
Husky Air Project Charter
Page 37
Variance at Completion (VAC) $ 8,615.60
To Completion Performance Index (TCPI) for BAC 2.89726
To Completion Performance Index (TCPI) for EAC 0.779809
The CPI and SPI are both significantly below 1 meaning that the testing phase is both
behind schedule and over budget. As the testing phase is about 3 quarters finished with, and
these differences have been consistent throughout the project, we have decided to treat these
variances as typical, and so the EAC takes into account only the CPI. With an estimate of $
18,004.40 to be spent in total on the testing phase, we expect to incur costs of 5424.40 to
complete it. As our TCPI for our BAC is extremely high, it would be very difficult to complete this
project within the parameters set by the BAC. However, When adjusted for the EAC, the project
is much more feasible with a TCPI of about .78.
Conclusions
With the progress that the testing phase has already gone through there is little we can
do to correct this project all the way back to our original BAC. This variance in actual costs to
expected costs is due largely in part to the sophistication of the system that is being tested. That
is to say, we simply did not properly estimate the costs to begin with. With that in mind, It is
appropriate to revisit our budget to completion, and reflect this fact in it. These estimates were
however given to us from bug busters, and so going forward I would recommend that we either
rely on our own estimates when outsourcing to this organization, outsourcing to a more reliable
company, or locking in costs via a contract that holds bug busters to the estimate they provided
when it comes to cost (meaning that any additional expense due to prolonged task is out of
their pocket, not ours).
Alexander Truong
Husky Air Project Charter
Page 38
Alexander Truong
Husky Air Project Charter
Page 39
Part II. Quality Management Plan
TeamA.T.B’s Focus on Quality
As a team we have come together as individuals who not only strive to work hard and
provide quality work. But we ensure that our work commits to a set of standards and
expectations. Each individual strives for work excellence and we take measures to ensure that
the systems and products we design meet customer needs but we take the time to make sure
that the process is excellent as well. This is to make sure that the quality is built into the system
not after the system is made.
Our core philosophies and principles:
1. We focus on customer satisfaction.
2. We prevent mistakes before we make mistakes.
3. We’ve improve the process to improve our products.
4. We make sure that quality is everyone’s responsibility.
5. We work from experience and facts.
Quality Based Metrics
Team A.T.B adheres to a set of standards, processes and metrics. These are standards
that the team has agreed upon to meet specifications and criteria over years of experience.
Alexander Truong
Husky Air Project Charter
Page 40
● Process Quality: Process metrics are used to improve product development and the
maintenance processes. Our process metrics focus on the effectiveness of identifying
and removing defects and bugs.
● Product Quality: Process metrics are used to measure the intrinsic quality of the
deliverables and that satisfaction is met with these deliverables measured
.
● Project Quality: Our project management processes is used to ensure that the project
meets its overall goals that the scope, schedule, and budget objectives are managed
effectively.
Type Metric Description
Process
➔ Defects by phases
➔ Response time to fix
the problems
The number of defects found
during the each phase of the
project.
The average time to solve the
problem in the process.
Product
➔ Customer found
defects
➔ Customer satisfaction
The number of defects items
received by the customer
An index to evaluate how
satisfied the customer is.
(e.g. scale from 1 (very
unsatisfied) to 10 (very
satisfied)
Project
➔ Scope changed
approvals
➔ Over allocated
Resources
The number of modification
that they were approved
The number of resources
assigned to more than one
task
TeamA.T.B Quality Assurance
Team A.T.B. ensures quality assurance. We provide a means of auditing the project to ensure
that we follow standards, processes, and metrics that are documented. In doing so we
continually deliver a system that meets our project customer’s needs and expectations. Done
through a series of our verification and validation activities for every product delivered.
The Verification Activities: To meet system requirements before final testing
Alexander Truong
Husky Air Project Charter
Page 41
Task: Activity: Result:
Data
Inspections
Make sure the data are within the
system that are not duplicated or has
any null values.
Ensures that the information
contained in the scheduling system
is ready for delivery.
Code Reviews Making sure the code is compiling
properly and giving the output as it is
required.
Ensures that during the coding
process the code works before
moving onto the next phase.
Specification
Reviews
Making sure it is meeting the
requirements as we go through.
Makes sure that the product will
perform and meet the
requirements the client needs for
their Air Charter business.
The Validation activities: Testing the product
Task: Activity: Result:
User
Acceptance
Testing
Final testing where a sample user
similar to the customer and client
interacts with the product.
Customer will be satisfied as the
product will work based on how
the user will interact with the
system and interface.
Requirement
Testing
Thorough testing to remove possible
errors and bug issues as each aspect
of the scheduling system is exercised.
This is done before user testing to
make sure the system will perform
based on the set of requirements
given
System Testing Runs the scheduling system once to
make sure it activates and that the
user can interact with it
Pretesting to make sure the
system will work.
Alexander Truong
Husky Air Project Charter
Page 42
Appendices: Microsoft Project Tutorials
Alexander Truong
Husky Air Project Charter
Page 43
Alexander Truong
Husky Air Project Charter
Page 44
Alexander Truong
Husky Air Project Charter
Page 45
Alexander Truong
Husky Air Project Charter
Page 46
Alexander Truong
Husky Air Project Charter
Page 47
Alexander Truong
Husky Air Project Charter
Page 48
Alexander Truong
Husky Air Project Charter
Page 49
Alexander Truong
Husky Air Project Charter
Page 50
Alexander Truong
Husky Air Project Charter
Page 51
Alexander Truong
Husky Air Project Charter
Page 52
Alexander Truong
Husky Air Project Charter
Page 53
Alexander Truong
Husky Air Project Charter
Page 54

More Related Content

What's hot

Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeTheodore Van Patten, Jr.
 
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...Wesley Brown
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyTimothy Cochran
 
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
PMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHICPMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHIC
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHICJonathan Donado
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review TemplateEdmond Cheng
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaEdureka!
 
site design project charter
site design project chartersite design project charter
site design project charterAmr Zoair
 
Project communication management
Project communication  managementProject communication  management
Project communication managementyouness jabbar
 
Project Management Definitions
Project Management DefinitionsProject Management Definitions
Project Management DefinitionsTURKI , PMP
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)owaishazara
 
Social Media Project Charter Template
Social Media Project Charter TemplateSocial Media Project Charter Template
Social Media Project Charter TemplateDemand Metric
 

What's hot (20)

Project Charter 461
Project Charter 461Project Charter 461
Project Charter 461
 
Project Charter
Project CharterProject Charter
Project Charter
 
PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...
INFO 461 AS08 Project Charter, Implementation Strategy Plan & Change Manageme...
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the Company
 
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
PMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHICPMP Knowledge Areas  - PMBOK 6  (PMI)   INFOGRAPHIC
PMP Knowledge Areas - PMBOK 6 (PMI) INFOGRAPHIC
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
 
Project charter-template
Project charter-templateProject charter-template
Project charter-template
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
site design project charter
site design project chartersite design project charter
site design project charter
 
Project communication management
Project communication  managementProject communication  management
Project communication management
 
PMP_Project Time Management
PMP_Project Time ManagementPMP_Project Time Management
PMP_Project Time Management
 
Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01Loading cost in primavera schedule using resources and expenses r01
Loading cost in primavera schedule using resources and expenses r01
 
PMBOK PROCESS FLOW.pdf
PMBOK PROCESS FLOW.pdfPMBOK PROCESS FLOW.pdf
PMBOK PROCESS FLOW.pdf
 
Project Management Definitions
Project Management DefinitionsProject Management Definitions
Project Management Definitions
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 
3.time management
3.time management3.time management
3.time management
 
Social Media Project Charter Template
Social Media Project Charter TemplateSocial Media Project Charter Template
Social Media Project Charter Template
 

Similar to Husky Air Pilot Angels Scheduling System Project

AS08_ProjectCharter_Cross
AS08_ProjectCharter_CrossAS08_ProjectCharter_Cross
AS08_ProjectCharter_CrossCorey Cross
 
RMacwan 461 Project Charter
RMacwan 461 Project CharterRMacwan 461 Project Charter
RMacwan 461 Project CharterRolphy Macwan
 
Shaswat khatiwada Project Charter
Shaswat khatiwada Project CharterShaswat khatiwada Project Charter
Shaswat khatiwada Project CharterShaswat Khatiwada
 
Ease Power Point Presentation
Ease Power Point PresentationEase Power Point Presentation
Ease Power Point PresentationEASE
 
How To Write A Synthesis Paper
How To Write A Synthesis PaperHow To Write A Synthesis Paper
How To Write A Synthesis PaperAllison Schade
 
Peter Nakhili - An Overview of the Job of a Flight Coordinator
Peter Nakhili - An Overview of the Job of a Flight CoordinatorPeter Nakhili - An Overview of the Job of a Flight Coordinator
Peter Nakhili - An Overview of the Job of a Flight CoordinatorPeter Nakhili
 
Org 535 org535 org 535 education for service uopstudy.com
Org 535 org535 org 535 education for service   uopstudy.comOrg 535 org535 org 535 education for service   uopstudy.com
Org 535 org535 org 535 education for service uopstudy.comUOPCourseHelp
 
Org 535 wk 4 apply signature assignment recruitment
Org 535 wk 4   apply signature assignment recruitmentOrg 535 wk 4   apply signature assignment recruitment
Org 535 wk 4 apply signature assignment recruitmentNewUOPCourse
 
7Th Grade Essay Outline Template. 7Th Grade Outlini
7Th Grade Essay Outline Template. 7Th Grade Outlini7Th Grade Essay Outline Template. 7Th Grade Outlini
7Th Grade Essay Outline Template. 7Th Grade OutliniAna Morgan
 
From Greasley, P. (2008) Structure of your final researc.docx
From Greasley, P. (2008) Structure of your final researc.docxFrom Greasley, P. (2008) Structure of your final researc.docx
From Greasley, P. (2008) Structure of your final researc.docxhanneloremccaffery
 
Southeast airlines
Southeast airlinesSoutheast airlines
Southeast airlinesDao Hoa
 
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docxlorainedeserre
 
1 Australian Institute of Higher Education CRICOS Prov.docx
1 Australian Institute of Higher Education CRICOS Prov.docx1 Australian Institute of Higher Education CRICOS Prov.docx
1 Australian Institute of Higher Education CRICOS Prov.docxkarisariddell
 
Writing Submission Funding.docx
Writing Submission Funding.docxWriting Submission Funding.docx
Writing Submission Funding.docxCPA Australia
 
Expository Essay Reflective Essay Topics For Grade 8
Expository Essay Reflective Essay Topics For Grade 8Expository Essay Reflective Essay Topics For Grade 8
Expository Essay Reflective Essay Topics For Grade 8Alicia Stoddard
 
Southwest airlines Organizational Development13.docx
Southwest airlines Organizational Development13.docxSouthwest airlines Organizational Development13.docx
Southwest airlines Organizational Development13.docxwhitneyleman54422
 

Similar to Husky Air Pilot Angels Scheduling System Project (20)

AS08_ProjectCharter_Cross
AS08_ProjectCharter_CrossAS08_ProjectCharter_Cross
AS08_ProjectCharter_Cross
 
RMacwan 461 Project Charter
RMacwan 461 Project CharterRMacwan 461 Project Charter
RMacwan 461 Project Charter
 
Shaswat khatiwada Project Charter
Shaswat khatiwada Project CharterShaswat khatiwada Project Charter
Shaswat khatiwada Project Charter
 
FinalReport.docx
FinalReport.docxFinalReport.docx
FinalReport.docx
 
Ease Power Point Presentation
Ease Power Point PresentationEase Power Point Presentation
Ease Power Point Presentation
 
How To Write A Synthesis Paper
How To Write A Synthesis PaperHow To Write A Synthesis Paper
How To Write A Synthesis Paper
 
Inten report
Inten reportInten report
Inten report
 
Peter Nakhili - An Overview of the Job of a Flight Coordinator
Peter Nakhili - An Overview of the Job of a Flight CoordinatorPeter Nakhili - An Overview of the Job of a Flight Coordinator
Peter Nakhili - An Overview of the Job of a Flight Coordinator
 
Takeoffs, Landings and Aircraft Control
Takeoffs, Landings and Aircraft ControlTakeoffs, Landings and Aircraft Control
Takeoffs, Landings and Aircraft Control
 
Org 535 org535 org 535 education for service uopstudy.com
Org 535 org535 org 535 education for service   uopstudy.comOrg 535 org535 org 535 education for service   uopstudy.com
Org 535 org535 org 535 education for service uopstudy.com
 
Org 535 wk 4 apply signature assignment recruitment
Org 535 wk 4   apply signature assignment recruitmentOrg 535 wk 4   apply signature assignment recruitment
Org 535 wk 4 apply signature assignment recruitment
 
7Th Grade Essay Outline Template. 7Th Grade Outlini
7Th Grade Essay Outline Template. 7Th Grade Outlini7Th Grade Essay Outline Template. 7Th Grade Outlini
7Th Grade Essay Outline Template. 7Th Grade Outlini
 
From Greasley, P. (2008) Structure of your final researc.docx
From Greasley, P. (2008) Structure of your final researc.docxFrom Greasley, P. (2008) Structure of your final researc.docx
From Greasley, P. (2008) Structure of your final researc.docx
 
Southeast airlines
Southeast airlinesSoutheast airlines
Southeast airlines
 
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx
2JUS-515 Topic 8 – Budget Detail Planner WorksheetDi.docx
 
1 Australian Institute of Higher Education CRICOS Prov.docx
1 Australian Institute of Higher Education CRICOS Prov.docx1 Australian Institute of Higher Education CRICOS Prov.docx
1 Australian Institute of Higher Education CRICOS Prov.docx
 
Writing Submission Funding.docx
Writing Submission Funding.docxWriting Submission Funding.docx
Writing Submission Funding.docx
 
Expository Essay Reflective Essay Topics For Grade 8
Expository Essay Reflective Essay Topics For Grade 8Expository Essay Reflective Essay Topics For Grade 8
Expository Essay Reflective Essay Topics For Grade 8
 
Southwest airlines Organizational Development13.docx
Southwest airlines Organizational Development13.docxSouthwest airlines Organizational Development13.docx
Southwest airlines Organizational Development13.docx
 
Business plan for boeing v3
Business plan for boeing v3Business plan for boeing v3
Business plan for boeing v3
 

Recently uploaded

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 

Recently uploaded (13)

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 

Husky Air Pilot Angels Scheduling System Project

  • 1. Husky Air: Pilot Angels Scheduling System Project Charter Information System Planning and Project Management INFO 461-001-Spring 2018 Alexander Truong May 1, 2018
  • 2. Alexander Truong Husky Air Project Charter Page 1 Table of Contents Table of Contents 1 Description of Project 2 Executive Summary 2 Original Case Study 3 A.T.B. Team Charter 5 Business Case 10 Infrastructure 14 Scope Management Report 18 Project Plan, Schedule, Budget 24 Risk Management Plan 29 Earned Value and Quality Management Plan 33 Appendices: Microsoft Project Tutorials 42
  • 3. Alexander Truong Husky Air Project Charter Page 2 Description of Project Husky Air Pilot Angels was in need of a new scheduling system. Not having had a proper system in place aside from “paper and pencil”. The organization has come to Team A.T.B. and as consultants we have designed, planned, and evaluated a project for the client to utilize. Throughout the course of this project the team has come together and worked together utilizing everyone’s strengths and weaknesses to the best of their businesses spending many busy nights together and at home to create an optimal system to offer our project sponsor. Throughout the course of the project has created a team charter to ensure quality work and efficient work ethic. After having created a team charter Team A.T.B. has assessed a measure of organizational value (MOV). That the team continues to reflect on as we have worked towards. As one of the team’s core members I have taken the time to make sure my values have aligned with the team. Ensuring not only in the team charter, in all meetings, communications, and on every assignments: accomplishments were shared and egos were left at the door. Each colleague as well as myself was accountable for the work done. We continued to strive to learn implementing lessons from the course and the textbook. Committed myself and teammates to be aligned with the goal of providing quality work. To do and say the right things so that everyone felt appreciated and understood, even difficult situations arose. And to have an environment of trust as each group member were not only work colleagues, but friends. Executive Summary The project was composed of 8 major assignments/milestones. Kicking off the start of the project and the first meeting was the coming together of the team charter. This document would set the expectations of the team and every group member. This opportunity was also the first chance for group members to know one another work gets done. Throughout the creation of the project and as each assignment was laid out and finished the team has set the foundation for the Husky Air scheduling system to take place. Significant aspects of the project that have attributed to the creation of the project charter has been assessing the MOV, the WBS, quality management plan, and project risk. The project now needs to be implemented and a prototype needs to be created for testing. Once the prototype is in place and has been approved, the scheduling system needs to be programmed for a product to be offered. To ensure that the team develops a quality project, it is recommended to continue to communicate with the client and project stakeholders to make sure that product is build effectively, on time, and with excellence.
  • 4. Alexander Truong Husky Air Project Charter Page 3 Original Case Study Husky Air - Pilot Angels Background Husky Air opened for business in January 2008 when L.T. Scully and several other investors pooled their life savings and secured a rather large loan from a Chicago Bank. Located in DeKalb Taylor Municipal Airport (DKB) in DeKalb, Illinois, Husky Air is a fixed base operator (FBO) facility that offers a full range of services to the growing demands for business and private aviation. Currently, the company has 23 employees composed of pilots, mechanics, and office staff. As a FBO, Husky Air provides: ● Business jet, propjet, helicopter, and propeller aircraft charter ● Refueling ● Airframe, engine, propeller, and avionics maintenance ● Aircraft rental ● Flight instruction ● Pilot supplies Although FBOs at other airports offer similar services, Husky Air has been receiving increased attention throughout the Midwest for its charter service, maintenance, and flight instruction. Pilot Angels In addition, Husky Air coordinates a charitable service called Pilot Angels. Working with hospitals, health-care agencies, and organ banks, Husky Air matches volunteer private pilots, willing to donate their time and aircraft with need people whose health-care problems require them to travel to receive diagnostic or treatment services. In addition, Pilot Angels also provides transportation for donor organs, supplies, and medical personnel. All flights are free of charge, and costs are paid for by volunteer pilots who use their own aircraft. The pilots who volunteer for the Pilot Angels program need no medical training and offer no medical assistance. The planes do not carry any medical equipment and do not have to accommodate any stretchers. Patients, however, must be medically stable and able to enter and exit the aircraft with little or no assistance. The Pilot Angels passengers typically travel to or
  • 5. Alexander Truong Husky Air Project Charter Page 4 from a hospital or clinic for diagnosis, surgery, or some other treatment. Travel companions, such as a relative, friend, or nurse, are common. Currently, a pool of pilot volunteers is kept in a file folder. If a hospital or person with medical or financial hardship contacts Husky Air, the name of the traveler, the destination, date/times, and the number of travel companions are requested. Because of limite weight restrictions in small aircrafts, the weights of the passengers and their luggage are needed as well. After the initial information is provided, Husky Air contacts the volunteer pilots to determine their availability. Although a volunteer pilot may be willing and available for a Pilot Angels flight, the plane may not have the range or weight-carrying requirements. This may be an inefficient use of time since many pilots may have to be contacted until a pilot and suitable plane can be found. Project Description Husky air would like to have a computer-based system to keep track of all its Pilot Angels volunteers. Basic information about the pilots may include their name, address, phone number, and so forth, as well as their total hours, certifications, and ratings. Moreover, specific information about a volunteer’s aircraft would be useful. Such information should include the type of plane, aircraft identification number (called the N number), whether single or multi- engine, and its capacity for carrying passengers and cargo. Some pilots own more than one plane. Husky Air also wants to know more about the people, hospitals, clinics, and organ banks that request the Pilots Angels service. In addition, they also would like basic information about the patients, their passengers, and specific needs to help match volunteers with the request for transport. Finally, Husky Air wants a list of all the Pilot Angels flights in order to recognize specific volunteers for their contributions. This would include: ● The pilot who flew the flight ● The passengers onboard ● The plane that was used ● The total time of the flight ● The distance and destination of the flight ● The date and time of the flight ● The total fuel used
  • 6. Alexander Truong Husky Air Project Charter Page 5 A.T.B. Team Charter TeamInformation Table Team Member Contact Info Strengths Stressors Reactions under stress TeamRecovery Alexander Truong 703-989-8459 truonga3@vcu.ed u Patience, team player, openness, and perseverance. Willing to learn, willing to fail, and willing to succeed. Lack of timely communication, effort, and care. Will lose temper/work slower. Give me space or a solution. Bidesh Thapa (804) 426-7238 thapab2@vcu.edu Highly motivated, hardworking, fast learner, willing to learn new things, flexible. Lack of communication. Loss of motivation and creativity. Apologize, things can go wrong sometimes. Thabit Ababneh (804) 305-8727 ababnehts@vcu.e du Coordination, Communication, Organization, Flexibility, Motivated. Laziness, Lack of competence. Over assertiveness. ensure to me that the work will get done on schedule. Abdulrah man Almuways (213) 284-1991 almuwaysaf2@vc u.edu My strengths are in time management, social networking, and facilitating work. Procrastination and low-quality work. Calm and will assist team members. Be calm and continue to strive for performance. Personal Bios Thabit Ababneh My major is two fold, accounting and information systems; this is my senior year. Coming out of college, I hope to pursue a career more focused in the accounting sector. I'm a very extroverted person and don't shy away from confrontation or contradiction. That being said, I have learned to try and curb the impulse to contradict or argue things as it often reflects a negative picture of me. I’m an intellectual and objective. My greatest strength is the ability to organize a strategy
  • 7. Alexander Truong Husky Air Project Charter Page 6 and keep things driven towards a goal. Essentially, I think I am good at getting things done. Unfortunately, this attitude sometimes leads to a form of tunnel vision and can cause me to overlook things. My hobbies include, other than arguing of course, drawing, painting, playing soccer and playing video games. Lately, as a result of busy schedules, I'm much more active on mobile video games on my phone as well as using a drawing app. Alexander Truong Information Systems major, junior year, graduating May of 2019. I’m a student that has overcome personal strife, that I would prefer to keep private. I struggle with time management, organization, and perfectionism. I’m passionate about technology, as well as business. I’ve made sacrifices to my lifestyle in order to perform to the best of my academic ability. I enjoy working with people and making the best out of the work that needs to be done. I journal frequently to stay on track of my visions, goals, and daily tasks. When you get to know me I’m more talkative and outgoing. I want to say I enjoy presenting and speaking in front of people, but I still get nervous. I believe hope is necessary and I am motivated by responsibility, duty, and self-determination. I will do my best to figure out how to work with people and get things done. I like to have books on the backburner that I occasionally read and acquire information from. When I have free time I try to exercise, read, or watch tv/ go on the internet, but I’m more committed to school at the moment. My other interests include boxing, kickboxing, MMA, as well as self-improvement. I don’t have the prettiest academic transcript or past. I have however learned to use my failure: to humble myself, learn about what it means to work hard, and how to continuously improve. I currently have an internship with Infranet Technologies Group, and just accepted my summer internship at the Federal Reserve. This is a big moment for me and the ball is just rolling for what I want to do with my life. People claim that I’m bright and charismatic. My anxiety and negativity tell me otherwise. I was diagnosed with ADHD in college, but I choose to not take medication or get disability assistance. This is my 6th year in college. Despite these setbacks, I’ll do what it takes to stand out, work hard, and get things done. Bidesh Namaste and good wishes. I am initially from Bhutan, and I came to the US in 2010. I have an associate’s degree in Computer Science from J. Sargeant Reynolds Community College. Here at VCU, my current major is Information Systems with a minor in Computer Science. Currently, I am a full-time student and am looking to gain some experience in the IT field this summer break. I am a senior and will graduate this December. I am interested in pursuing a database career. Aside from that, I am a music lover, in my free time I like to edit videos, play soccer, or go to the gym to burn some extra calories. Due to my busy schedule, my current priority is focusing on my studies and getting things done. Abdulrahman
  • 8. Alexander Truong Husky Air Project Charter Page 7 Abdulrahman, I am a Senior at VCU. I’m planning to graduate with a degree in Information Systems by this upcoming fall semester and then pursue a Master’s in Business Administration. I really like living in Richmond and enjoying Indian food. I wish everyone a successful semester. Mission Statement As Team A.T.B. we strive to be a leader in the creation of effective IT solutions for businesses; through work performance, growth, and continued learning. Core Values 1. Timeliness “We complete work on time if not early” 2. Due Care “We provide professional quality work and documentation” 3. Respect “We give equality and equity of treatment to everyone” 4. Open Mindedness “We strive for every possible solution with a sense of trust and integrity” How We Communicate Communication Needs Agreed Mode of Communication Expected Response Time General Logistics & Coordination Group messages 6 hours (not including 11pm-9am) Quick Question Group messages 1 day Urgent Matter Group messages ASAP Personal Issue/Concern Group messages 1 day Project Planning Group messages and meeting 1 day Other Group messages and meeting 1 day Primary means of communication and contact A.T.B. members are committed to checking their phones and email within a day and everyday to stay in contact.
  • 9. Alexander Truong Husky Air Project Charter Page 8 TeamMeetings A.T.B. members meet during every class period to keep up with the class, content, assignments, and planned tasks/goals. The team is expected to attend and prepare for the mandatory meeting at 7 every Thursday. Teamorganization and formalities How we share the work: A.T.B. members work hard, communicate effectively, and are all team players. We know when to take the lead and when to support one another as a team; therefore: 1. We mutually decide on tasks and volunteer for roles. 2. We complete assignments on time or in advance. 3. We expect each other to step up and keep up with the team. TeamBehavior Table Acceptable Behavior Not Acceptable Behavior Suggesting an alternative to our current strategy or proposed solution. Demand that the assignment be done in a certain way instead. Point out a deficiency, and provide a solution. Genuinely mock and insult someone for an unintentional or genuine mistake. Bringing the team back to the task at hand. Yell that everyone needs to shut up and focus. Disagreement steps Process Steps to Be Followed: Who is Accountable for Each Step 1.Contact team member The GroupMe will be used to keep in contact with team members.
  • 10. Alexander Truong Husky Air Project Charter Page 9 2.Speak with the team Members will attend class as an opportunity to meet and discuss. 3.Final warning addressed for the team and team member The GroupMe/class time will be used as a polite means to issue warning. 4.Speaking with the Professor Knowledge of professor’s office hours will be made known and agreed upon for drastic measures *Resolved disagreements end with a handshake, apology, and continued efforts to perform as a team and achieve Roles and Responsibilities ● Team A.T.B. members are expected to show up and attend meetings every Thursday after 7. ● Team A.T.B. members are expected to attend all classes to keep up with the material and lecture. ● Team A.T.B. members are expected to research and prepare for class and team meetings. ● Team A.T.B. are expected not only to contribute to work, but to ask questions. ● Team A.T.B. members are required to treat each other with respect and equality. ● Team A.T.B. members are responsible for each other, and each other’s work. ● Team A.T.B. member will always find a way to submit work early and on time. ● Team A.T.B. members are expected to listen to each other and work with each other. ● Team A.T.B. members know there is no right or wrong way to get things done; only the right way to behave, treat one another, and contribute to the success of the team. ● Team A.T.B. members are be fair, knowledgeable, and prepared. Agreement Notice All team members have read the team charter and agree to the expectations addressed in this document: “I have read and understood all the requirements of the team charter, I agree to adhere to the entailed expectations required of me as a member of Team A.T.B.” Signed, Signature Date
  • 11. Alexander Truong Husky Air Project Charter Page 10 Alexander Truong 2.24.2018 Abdulrahman Almuways 2.24.2018 Bidesh Thapa 2.24.2018 Thabit Ababneh 2.24.2018 Business Case Desired Areas of Impact Organizational Value Description Measurable Metric Time Frame Strategic Increase the amount of pilots currently participating in our program Increase pilots participating by 10% 18 months Customer Create a more reliable system for users to use Decrease customer withdrawals by 20% 6 months Financial Reduce the costs associated with scheduling Reduce costs for scheduling by 50% 4 months Operational Decrease the amount of time customers need to wait to book a pilot. Decrease time to book a flight by 20% 6 months Social Increase the amount of flights booked in this program Increase amount of flights by 10% 12 months
  • 12. Alexander Truong Husky Air Project Charter Page 11 Alternatives 1. Maintain the current system, least effective option (system is poorly managed: all paper, pencil, and phone calls). 2. Use a packaged solution available on the market called Airplane Manager. https://airplanemanager.com/. The costs of using the software system and service is $375/month. 3. Hire a professional office assistant familiar with managing schedules. 4. Build a custom system. This will be done with Oracle Apex. This system will be scalable that handle more pilots as needed in future. But, to build this system, we will have to hire a System Developer that will cost $ 45 per hour who will build cloud base system. Analysis of Alternatives This section contains the analysis of alternative 1, alternative 2, alternative 3 and alternative 4 based on total cost and benefits of ownership. Total Cost of Ownership Resource Description Alternative 1 (keeping the old system) Alternative 2 (purchasing off the shelf) Alternative 3 (specialized office assistant) Alternative 4 (Developer) Salary The cost of hiring an employee/contractor $57,600 $0 $40,000 $86,400 ($45 * 1,920 hours)(hiring a contractor) Software The cost of the software package $0 $4500 (a year) $0 Google Docs $0 Training Costs for teaching employees on how to work the system $0 $0 (Part of pack) $0 $0 Hardware or cloud storage Costs of products purchased of cloud service $0 $20,500 (laptops and other devices for 24 employees) $0 $480 a month Support and Maintenance Costs for supporting the system $0 $0 (outsourced to Airplane manager $0 Included
  • 13. Alexander Truong Husky Air Project Charter Page 12 support) Installment Implementing the system $0 $10,000 (routers for people to access wifi) $0 $1000 Total Cost of Project Cost of the solution $57,600 $35,000 $40,000 $87,880 Total Benefits of Ownership (1-5) Ranking Chart Benefits Alternative 1 Alternative 2 Alternative 3 Alternative 4 Store Staff Information 2 4 4 5 Store Customer Information 1 4 3 5 Store Flight Details 1 4 2 5 Customer service 1 3 5 5 Interface Design 0 5 3 5 Usability 2 5 4 5 Active Directory 0 5 3 5 Security 0 4 4 5 Scalability 0 4 3 5 Sum of Benefits 7 33 31 50 Benefit Percentage 14% 66% 62% 100%
  • 14. Alexander Truong Husky Air Project Charter Page 13 Analysis Alternative 2 Alternative 3 Alternative 4 ROI 64.57% 44% 34% Payback 3.79 yrs 5.7 yrs 12.5 yrs Break Even Point 18.42 21.05 46.25 Calculation of Investment (ROI) ROI for Alternative 2: Project ROI = (57,600 – 35,000) / 26,500 Project ROI = 64.57% ROI for Alternative 3: Project ROI = (57,600 – 40,000) / 40,000 Project ROI = 44% ROI for Alternative 2: Project ROI = (57,600 – 87,880) / 87,880 Project ROI = -34% Calculation of “Payback”: Payback for Alternative 2: Payback Period = 35,000 / 7000 Payback Period = 5 years Payback for Alternative 3: Payback Period = 40,000 / 7000 Payback Period = 5.7 years Payback for Alternative 4: Payback Period = 87880/ 7000 Payback Period = 12.5 years Calculation of “Breakeven”:(The point at which its income cover its expenses) Break even Analysis for Alternative 2: Break even point = 35,000/ (2,000 - 100) Break even point = 18.42 Break even Analysis for Alternative 3:
  • 15. Alexander Truong Husky Air Project Charter Page 14 Break even point = 40,000/ (2,000 - 100) Break even point = 21.05 Break even Analysis for Alternative 4: Break even point = 87,880/ (2,000 - 100) Break even point = 46.25 Recommendation Our recommendation is for Husky Air to build a custom system and management solution. In comparing alternatives based on the organizations needed requirements and budget this is the most viable option. Based on the analysis of alternatives option 3 has the optimal break even point, relative ROI, and best payback period. This is our recommendation as it saves money and offers the same value. Infrastructure Resource Requirements People Resource Name Resource Description System Programmer The person actually developing the code for the system and who will be maintaining and supporting the system. This will be yearly Project Manager The person coordinating and instructing the System Programmer and System Architect, to keep the project on time, within scope, and within budget. This will last for 6 months; the project’s schedule constraints. System Architect The person who is responsible for determining and creating the physical infrastructure for the system. This will last for 6 months; the project’s schedule constraints.
  • 16. Alexander Truong Husky Air Project Charter Page 15 Technology Resource Name Resource Description Computers Computers, keyboards, mouses, etc for the programer, architect, and manager Server A server to be used for developing, supporting, and maintaining the system Router A router to be used to facilitate internet connection for our “people” resources. Facilities Resource Name Resource Description Office space Space to be used to develop the proposed system Other Resource Name Resource Description System Support User assistance and the fixing of any system bugs or issues as they arise Training to use software Training employees to properly use the installed system Installation & Implementation Initial installment of the system System Maintenance Maintaining smooth operation of the system once it is implemented Resource CostTable People Resource Name Resource Description Source System Programmer $70,720 yearly (at $34 an hour) indeed.com Project Manager $45,760 (at $44 an hour) indeed.com
  • 17. Alexander Truong Husky Air Project Charter Page 16 System Architect $55,120 (at $53 an hour) indeed.com Technology Resource Name Resource Description Source Computer $1,347 (HP Slimline with accessories times 3) Wallmart.com Server $1,792 (HP Z800 workstation with 12 core computer, 4TB HDD, 500 SSD, with 2 X SIX Core Xeon 3.46 GHz) newegg.com Routers $10,000 (ASUS AC2900 wifi dual band Gigabit routers) Amazon.com Facilities Resource Name Resource Description Source Office Space Extra office space will be used so there is no additional cost - Other Resource Name Resource Description Source System Support Included in Programmer Salary indeed.com Training to use software Included in Programmers Salary indeed.com Installation & Implementation Included in “people” salaries indeed.com System Maintenance Included in Programmers Salary indeed.com Contract Payment Method: In reviewing the resource cost tables. Costs will be paid for by the project sponsor in increments. Costs will vary depending on fees associated with each phase of the project as well as the costs associated with setting up the system. Learning Cycle: Documentation
  • 18. Alexander Truong Husky Air Project Charter Page 17 Learning Cycle Statement: The team members have carefully understood the given instructions in order to plan ideas. We have conducted a group meeting to distribute the assignment in parts as per everyone’s preferences. The schedule of the meetings include deadlines that were also determined. All means of communication were used to work efficiently and timely. The team members worked jointly, which lead to completion. Working in teams is a great skill that all of us have practice it during the assignment. Learning Cycle Tables Current Understanding Assumptions made Need to research Husky Air needs a new scheduling system Insufficient due to lack of infrastructure (everything is in a file folder) Best system to implement in terms of scope, budget, and time Decrease time it takes to find a pilot/plane with the correct match for the client Employees used to the filing system despite inefficiency A system design and interface that reflects an improved version of how users schedule and document Increase Husky Air customer retention and continued business growth Husky Air has services that stand out amongst their competition in addition to their volunteering service How to design a system that will accommodate and reflect Husky Air’s business model. Personnel Duty Date of Completion BideshThapa Review/revise executive summary/introduction/MOVs Sunday @7 AlexanderTruong Contract Payment Method Statement and Amend TOPS Doc Sunday @7 Thabit Ababneh Resource Cost Tables Sunday @7 Abdulrahman Almuways Learning Cycle statement and Learning Cycle tables Sunday @7
  • 19. Alexander Truong Husky Air Project Charter Page 18 Scope Management Report Deliverable Structure Chart
  • 20. Alexander Truong Husky Air Project Charter Page 19 Use-Case Diagram
  • 21. Alexander Truong Husky Air Project Charter Page 20 Work Breakdown Task and Resource List
  • 22. Alexander Truong Husky Air Project Charter Page 21 Work Breakdown Task Timeline
  • 23. Alexander Truong Husky Air Project Charter Page 22 Estimated Project Cost Scope Change Request Form
  • 24. Alexander Truong Husky Air Project Charter Page 23 Scope change request form Request name: __________________ Request date: ___/___/______ Request title: ____________________ Request number: __________ Request description: Justification: Possible alternatives: Impacts Alternative 1 Alternative 2 Alternative 3 Scope Schedule Resources required Cost Recommendation: Authorized by: Date: __________________________________________ ____/_____/________ Scope Change Request log
  • 25. Alexander Truong Husky Air Project Charter Page 24 Request Number Request Title Date of Request Requested by Priority (L, M, H) Authority to Approve Request Expected Response Date Scope Change Approved? (Y/N) Project Plan, Schedule, Budget Cost Overview Table
  • 26. Alexander Truong Husky Air Project Charter Page 25 Resource Rate Project Manager $44.00/hr System Programmer $34.00/hr System Architect $53.00/hr Work Breakdown Structure
  • 27. Alexander Truong Husky Air Project Charter Page 26 Network Diagram
  • 28. Alexander Truong Husky Air Project Charter Page 27
  • 29. Alexander Truong Husky Air Project Charter Page 28 Project Budget and Schedule Summary Questions What are beginning (use May 23) and end dates for your project? How many days will it take to complete the project? ● The begin date is May 23, 2018 and the end date is July 8, 2018. It will take about 33 days to finish the project . Does your project have a single critical path or multiple critical paths? What is the importance of the critical path? ● The Project has 1 critical path. It’s importance is defining the mission essential tasks towards the completion of the project. There is no slack in the critical path. What is the initial total project baseline cost of the project? ● The baseline cost is $15,557.33 Does your project have any over allocated resources? If so, be sure to level your resources. ● No, the tasks have been ensured to not have any allocated resources and the majority of the tasks are finish-to-start tasks, and each resource is carefully assigned to the appropriate task.
  • 30. Alexander Truong Husky Air Project Charter Page 29 Risk Management Plan Revised Work Breakdown Task List and Resources
  • 31. Alexander Truong Husky Air Project Charter Page 30 Revised Work Breakdown Timeline Revised Resource Table
  • 32. Alexander Truong Husky Air Project Charter Page 31 Risk Analysis Table Phase Defining project goal Project Planning Execute and Control Project Close Project Evaluation Risk Difficulty in not completely understanding what the best solutions are. That the defined goals do not create the best value for the organization and do not fit the requirements Project Plan is too Conservative, and The project actually takes less time to implement and evaluate. The system is too complicated and difficult for user to navigate. In this case, the project will need to evaluate and will take longer days. Incorrect summary reports of the project are created Initially we have allocated one day to evaluate the whole project. If project managers fails to work on the evaluation of project or something other critical needs to do on the same day, then project evaluation will get longer than one
  • 33. Alexander Truong Husky Air Project Charter Page 32 day or will complete in next day. Probability 10% 15% 5% 2% 5% Pay Off (Loss) (7,000) 2,000 (10,000) (10,000) (500) Net Consequence (Prob * Payoff) (700) 300 (500) (200) (25) Strategy The project manager communicates with Husky Air to clarify what the goals and specific requirements are Encourage Employees to come in under time and budget. The project manager have to revise the mov and make sure it is matching with the user requirements. Accept Risk The project manager, himself have to mark the date and work on it accordingly. Impact On MOV If this the goals are not specific enough they will not provide value to the company This risk has no impact on MOV as it would mean that the project would end earlier than expected, but it does not affect what the project delivers but would simply deliver it sooner. This risk have a devastatingly negative impact on the project MOV as the project will not do what the organisation needs it to do. This risk would not impact our MOV. It would however cause the organisation to have this MOV misevaluated and which may cause some inappropriate decisions in the future to be made This will lead to the extension of one more day and might increase the overall MOV time frame. Risk Owner Project Manager, Husky Airlines Husky Airlines Project Manager, Husky Airlines Project Manager, Husky Airlines Project Manager, Husky Airlines Source of Risk Project People/Product People People, Technology Process, Technology, People People Internal or External Internal Internal Internal Internal Internal Nature of the Risk Unknown- Unknown Unknown- Unknown Known- Unknown Unknown- Unknown Unknown - known
  • 34. Alexander Truong Husky Air Project Charter Page 33 Earned Value and Quality Management Plan Part I, Earned Value Analysis Earned Value Report
  • 35. Alexander Truong Husky Air Project Charter Page 34
  • 36. Alexander Truong Husky Air Project Charter Page 35 Table with Tasks (for context)
  • 37. Alexander Truong Husky Air Project Charter Page 36 Tracked Gantt Chart (for context) Analysis of Earned Value Budget at Completion (BAC) $ 14,040 Planned Value (PV) $ 13,336 Actual Cost (AC) $ 12,580 Earned Value (EV) $ 9,810 Schedule Variance (SV) ($ 3,526) Cost Variance (CV) ($ 2,770) Schedule Performance Index (SPI) 0.735603 Cost Performance Index (CPI) 0.779809 Estimate at Completion (EAC) for both SPI and CPI $ 18,004.40 Estimate to Complete (ETC) $ 5,424.40
  • 38. Alexander Truong Husky Air Project Charter Page 37 Variance at Completion (VAC) $ 8,615.60 To Completion Performance Index (TCPI) for BAC 2.89726 To Completion Performance Index (TCPI) for EAC 0.779809 The CPI and SPI are both significantly below 1 meaning that the testing phase is both behind schedule and over budget. As the testing phase is about 3 quarters finished with, and these differences have been consistent throughout the project, we have decided to treat these variances as typical, and so the EAC takes into account only the CPI. With an estimate of $ 18,004.40 to be spent in total on the testing phase, we expect to incur costs of 5424.40 to complete it. As our TCPI for our BAC is extremely high, it would be very difficult to complete this project within the parameters set by the BAC. However, When adjusted for the EAC, the project is much more feasible with a TCPI of about .78. Conclusions With the progress that the testing phase has already gone through there is little we can do to correct this project all the way back to our original BAC. This variance in actual costs to expected costs is due largely in part to the sophistication of the system that is being tested. That is to say, we simply did not properly estimate the costs to begin with. With that in mind, It is appropriate to revisit our budget to completion, and reflect this fact in it. These estimates were however given to us from bug busters, and so going forward I would recommend that we either rely on our own estimates when outsourcing to this organization, outsourcing to a more reliable company, or locking in costs via a contract that holds bug busters to the estimate they provided when it comes to cost (meaning that any additional expense due to prolonged task is out of their pocket, not ours).
  • 39. Alexander Truong Husky Air Project Charter Page 38
  • 40. Alexander Truong Husky Air Project Charter Page 39 Part II. Quality Management Plan TeamA.T.B’s Focus on Quality As a team we have come together as individuals who not only strive to work hard and provide quality work. But we ensure that our work commits to a set of standards and expectations. Each individual strives for work excellence and we take measures to ensure that the systems and products we design meet customer needs but we take the time to make sure that the process is excellent as well. This is to make sure that the quality is built into the system not after the system is made. Our core philosophies and principles: 1. We focus on customer satisfaction. 2. We prevent mistakes before we make mistakes. 3. We’ve improve the process to improve our products. 4. We make sure that quality is everyone’s responsibility. 5. We work from experience and facts. Quality Based Metrics Team A.T.B adheres to a set of standards, processes and metrics. These are standards that the team has agreed upon to meet specifications and criteria over years of experience.
  • 41. Alexander Truong Husky Air Project Charter Page 40 ● Process Quality: Process metrics are used to improve product development and the maintenance processes. Our process metrics focus on the effectiveness of identifying and removing defects and bugs. ● Product Quality: Process metrics are used to measure the intrinsic quality of the deliverables and that satisfaction is met with these deliverables measured . ● Project Quality: Our project management processes is used to ensure that the project meets its overall goals that the scope, schedule, and budget objectives are managed effectively. Type Metric Description Process ➔ Defects by phases ➔ Response time to fix the problems The number of defects found during the each phase of the project. The average time to solve the problem in the process. Product ➔ Customer found defects ➔ Customer satisfaction The number of defects items received by the customer An index to evaluate how satisfied the customer is. (e.g. scale from 1 (very unsatisfied) to 10 (very satisfied) Project ➔ Scope changed approvals ➔ Over allocated Resources The number of modification that they were approved The number of resources assigned to more than one task TeamA.T.B Quality Assurance Team A.T.B. ensures quality assurance. We provide a means of auditing the project to ensure that we follow standards, processes, and metrics that are documented. In doing so we continually deliver a system that meets our project customer’s needs and expectations. Done through a series of our verification and validation activities for every product delivered. The Verification Activities: To meet system requirements before final testing
  • 42. Alexander Truong Husky Air Project Charter Page 41 Task: Activity: Result: Data Inspections Make sure the data are within the system that are not duplicated or has any null values. Ensures that the information contained in the scheduling system is ready for delivery. Code Reviews Making sure the code is compiling properly and giving the output as it is required. Ensures that during the coding process the code works before moving onto the next phase. Specification Reviews Making sure it is meeting the requirements as we go through. Makes sure that the product will perform and meet the requirements the client needs for their Air Charter business. The Validation activities: Testing the product Task: Activity: Result: User Acceptance Testing Final testing where a sample user similar to the customer and client interacts with the product. Customer will be satisfied as the product will work based on how the user will interact with the system and interface. Requirement Testing Thorough testing to remove possible errors and bug issues as each aspect of the scheduling system is exercised. This is done before user testing to make sure the system will perform based on the set of requirements given System Testing Runs the scheduling system once to make sure it activates and that the user can interact with it Pretesting to make sure the system will work.
  • 43. Alexander Truong Husky Air Project Charter Page 42 Appendices: Microsoft Project Tutorials
  • 44. Alexander Truong Husky Air Project Charter Page 43
  • 45. Alexander Truong Husky Air Project Charter Page 44
  • 46. Alexander Truong Husky Air Project Charter Page 45
  • 47. Alexander Truong Husky Air Project Charter Page 46
  • 48. Alexander Truong Husky Air Project Charter Page 47
  • 49. Alexander Truong Husky Air Project Charter Page 48
  • 50. Alexander Truong Husky Air Project Charter Page 49
  • 51. Alexander Truong Husky Air Project Charter Page 50
  • 52. Alexander Truong Husky Air Project Charter Page 51
  • 53. Alexander Truong Husky Air Project Charter Page 52
  • 54. Alexander Truong Husky Air Project Charter Page 53
  • 55. Alexander Truong Husky Air Project Charter Page 54