Ahmed Mansour has 11 years of experience in chemical and petrochemical industries. He has spent the past 7 years as the Mechanical Maintenance Manager at SOLVAY Alexandria Sodium carbonate Co. Prior to that, he worked for 2 years as the Senior Rotating Equipment maintenance and condition monitoring engineer and 2 years as a junior mechanical Engineer at Alexandria Fiber Co. His responsibilities include applying safety rules, planning and overseeing maintenance programs, conducting condition monitoring, implementing reliability projects, planning shutdown activities, troubleshooting problems, and supervising maintenance personnel.
1. Dear Sir/Madam
My enclosed resume will give you a summary of my 11 years working experience
- Chemicals industries in SOLVAY Alexandria Sodium carbonate Co. (SASC)
Current time as a Mechanical Maintenance Manager (7 years)
- Petrochemicals and acrylic industries in Alexandria fiber Co. (AFCO)
2 years working as Senior Rotating Equipment maintenance and condition monitoring
engineer in Alexandria Fiber plant.
2 years working as junior mechanical Engineer and condition Alexandria Fiber plant.
With the following duty and responsibilities:
Apply all safety rules and safe work permits system (life safety rules, risk assessment, safety leadership,
5S, and………..)
Apply Scheduled planned maintenance programs and ensure that they are carried out in time and
efficiently, direct day to day maintenance and repair work including preventive and repair rotary machinery,
centrifugal, vacuum and positive displacement pumps, centrifugal, reciprocating and screw compressors,
steamturbines , cooling towers, fans, gearboxes and blowers
following condition monitoring for all rotating equipment (vibration and oil analysis)
Applying long and short termreliability (DMAIC)
Leader for SOLMAX project CO2 Gas Compressor reliability (cost reduction and plant stability )
Leader for world class factory project WCF convert packing seal pumps to mechanical seal (cost
reduction and plant zero leakage)
Plan, apply shutdown activities, duration and manpower estimating, prepare material, special tool and
work procedure (shutdown defects, modifications, overhauling)
One of the team responsible for renovation and the development of the factory in SASC
Building up PM in SASC for all rotating equipment and apply PM activity and over hauling by
scheduling
Eliminate repeated problems and do root cause failure analysis.
Troubleshooting maintenance problems and solve the urgent trouble and tasks requested by process,
Supervising and control mechanical maintenance activities of assigned personnel/ contractors including,
Determining priorities, Allocating work, setting work schedules, checking completed work as per weekly plan.
Best regards,
Ahmed Mansour