DEFINATION
Operator maintenance is the necessary, routine, recurring maintenance work
performed by the operators to keep the equipment in such condition that it may be used continuously, at
its original or designed capacity and efficiency for its intended purpose. The operator is actually the
most important member of the maintenance team. A well-informed and responsible operator can do the
following:
1. Keep equipment in service for maximum periods of time.
2. Detect any flaws so equipment can be removed from service in time to prevent serious damages.
3. Perform minor repairs on equipment removed from service to minimize outage time.
PLANT START UP & SHUT DOWN
Proper start up, loading, load changing procedures and shut down, this procedure gain importance
when undergo frequent starting and loading cycle.
Start-Up and Shut-Down
Start-up and shut-down of a thermal power plant comprises starting, running, and stopping of pumps,
fans, blowers, compressors, etc., and charging, filling, warming, isolating of the miscellaneous piping
systems. In this chapter start-up and shut-down of major equipment such as steam generator, steam turbine,
gas turbine, and diesel engine are addressed. There are four types of start-up – cold, warm, hot, and very hot.
There are two types of shut-downs: normal and emergency shutdown. Start-up and (normal) shut-down of a
unit involve huge number of parallel activities that are realized through multiple actions by operators.
Limitation
• Thermal stresses
• Vibration
• Rotor and Shell differential expansion
• An of these limitation may be introduced by subjecting the turbine metal to steam excessive
temperature mismatch and / or rate of temperature change.
Terms used in cold start up procedure
• Turbine pre warming
• Heat Soaking
• Chest Warming
Start up Modes
Turbine start up procedure depends up on the modes of turbine start-up which depends upon the
thermal condition o turbine that is, the meal temperature of critical part of turbine.
• Ambient Cold Start
• Overhaul Cold Start
• Cold Start
• Warm Start
• Hot Start
• Very Hot Start
Pre conditions of Turbine Start Up
• Condensate system should be in service.
• Circulation water system should be in service.
• Feed water system should be in service.
• All turbine instrument and controls in working condition.
• Boiler fired for steam generation and steam of desired parameters available for start up process.
• All turbine sub systems such as oil system turning gear system gland seal system condenser, lp
turbine exhaust hood system should be ready.
START UP
• Warm Start Up: boiler fire and steam of 80 bars.
• Hot Start Up: boiler fire and steam of 100 bars.
• Nary Hot Start Up: boiler fire and steam of 140 bars.
CORRECTIVE MAINTENANCE
SHUTDOWN MAINTENANCE
PREVENTIVE MAINTENANCE
PREVENTIVE MAINTENANCE
PREVENTIVE MAINTENANCE
TIME BASE
MAINTANANCE
CONDITION BASE
MAINTANANCE
TYPES OF MAINTANANCE
PURPOSE OF MAINTANANCE
ATTEMPT TO MAXIMIZE PERFORMANCE OF PRODUCT EQUIPMENT
EFFICIENTLY AND REGULARLY. PREVENT REAK DOWN
OR FAILURES.MINIMIZE PRODUCTION LOSS FROM FAILURES. INCREASE
RELIABILITY OF THE OPERATING SYSTEM
Maintenance Objectives
The main objective of maintenance is to achieve product quality
and customer satisfaction through adjusted and service equipment.
• Must be consist with the goal of production(cost, quality, delivery, safety)
• Must be comprehensive and include specific responsibilities.
• Must be in time repairs and troubleshoots.
• Must be zero repetitive failures.
PREVENTIVE MAINTENANCE
Preventive maintenance inspection (PMI) is a system of routine inspections of
equipment recorded for future reference on some type of inspection record. The purpose of
PMI is to anticipate and prevent possible equipment failures by making periodic inspections
and minor repairs in advance of major operating difficulties.
WORK PERMIT SYSTEM
Type of Work Permits
• Limited work permit
• Permit to work
• Confined space permit
• Hot work permit
• Restoration of power supply
Safe Work Permits
the company requires evaluation of very hazardous, non-routine jobs for which there is no safe job
procedures or approved job safety plans.
GOALS AND OBJECTIVE OF WORK PERMIT
At the end of this session you will be familiar with jobs requiring safe work permits.be generally
familiar with the safe work permit system.
There are currently three documents which are called “safe work permits”
• Hot work permit
• Confined space entry permit
• Safe work permit system
SAFETY FIRST BEFORE START ANY WORK
THANK YOU

More Related Content

What's hot

Tool cleaning, storage, and maintenance
Tool cleaning, storage, and maintenanceTool cleaning, storage, and maintenance
Tool cleaning, storage, and maintenanceMichael Dirago
 
IRJET- Risks Prioritization using FMEA Method -A Case Study
IRJET-  	  Risks Prioritization using FMEA Method -A Case StudyIRJET-  	  Risks Prioritization using FMEA Method -A Case Study
IRJET- Risks Prioritization using FMEA Method -A Case StudyIRJET Journal
 
Atlas copco compressors aircraft engineering
Atlas copco compressors aircraft engineeringAtlas copco compressors aircraft engineering
Atlas copco compressors aircraft engineeringAtlasCopcoCompressors
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resumebalaram panda
 
Compressed air manual hand book
Compressed air manual   hand bookCompressed air manual   hand book
Compressed air manual hand bookSugestive
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyDesign World
 
Mechanical Component and Maintenance
Mechanical Component and MaintenanceMechanical Component and Maintenance
Mechanical Component and MaintenanceAsraf Malik
 
Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2VidyaIA
 
Type of work undertaken
Type of work undertakenType of work undertaken
Type of work undertakenPaul Doughty
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Bhavesh Shukla
 
Types of Process control system
Types of Process control systemTypes of Process control system
Types of Process control systemArul Kumar
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type suresh tusia
 
Engine Friction Measurements
Engine Friction MeasurementsEngine Friction Measurements
Engine Friction MeasurementsBrian Trimboli
 
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)davidpdx
 

What's hot (20)

Control Systems
Control SystemsControl Systems
Control Systems
 
CV3
CV3CV3
CV3
 
Instruments - Part 2
Instruments - Part 2Instruments - Part 2
Instruments - Part 2
 
Tool cleaning, storage, and maintenance
Tool cleaning, storage, and maintenanceTool cleaning, storage, and maintenance
Tool cleaning, storage, and maintenance
 
IRJET- Risks Prioritization using FMEA Method -A Case Study
IRJET-  	  Risks Prioritization using FMEA Method -A Case StudyIRJET-  	  Risks Prioritization using FMEA Method -A Case Study
IRJET- Risks Prioritization using FMEA Method -A Case Study
 
Plannedmaintenance
PlannedmaintenancePlannedmaintenance
Plannedmaintenance
 
Atlas copco compressors aircraft engineering
Atlas copco compressors aircraft engineeringAtlas copco compressors aircraft engineering
Atlas copco compressors aircraft engineering
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
Compressed air manual hand book
Compressed air manual   hand bookCompressed air manual   hand book
Compressed air manual hand book
 
5546
55465546
5546
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
Mechanical Component and Maintenance
Mechanical Component and MaintenanceMechanical Component and Maintenance
Mechanical Component and Maintenance
 
Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2Session 06 - Instruments - Part 2
Session 06 - Instruments - Part 2
 
Type of work undertaken
Type of work undertakenType of work undertaken
Type of work undertaken
 
Engine maintenance guide
Engine maintenance guideEngine maintenance guide
Engine maintenance guide
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Types of Process control system
Types of Process control systemTypes of Process control system
Types of Process control system
 
Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type  Types of maintenance, maintenance in plant ,maintenance type
Types of maintenance, maintenance in plant ,maintenance type
 
Engine Friction Measurements
Engine Friction MeasurementsEngine Friction Measurements
Engine Friction Measurements
 
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
 

Similar to Operation and maintanance

Similar to Operation and maintanance (20)

Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
 
LARRY CV
LARRY CVLARRY CV
LARRY CV
 
LECTURE 01.pptx
LECTURE 01.pptxLECTURE 01.pptx
LECTURE 01.pptx
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
CV-ATO-3 (1)
CV-ATO-3 (1)CV-ATO-3 (1)
CV-ATO-3 (1)
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 
Lockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsLockout Minor Servicing Exceptions
Lockout Minor Servicing Exceptions
 
resume-4-1.docx (1)
resume-4-1.docx (1)resume-4-1.docx (1)
resume-4-1.docx (1)
 
Qudrat Ullah Resume
Qudrat Ullah ResumeQudrat Ullah Resume
Qudrat Ullah Resume
 
Hydro Power Plant Auxaleries
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
lemirandacv
lemirandacvlemirandacv
lemirandacv
 
Oil production3
Oil production3Oil production3
Oil production3
 
maintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptmaintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.ppt
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Maintenance Department of Hotels
Maintenance Department of HotelsMaintenance Department of Hotels
Maintenance Department of Hotels
 
maintenance-management.ppt
maintenance-management.pptmaintenance-management.ppt
maintenance-management.ppt
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Operation and maintanance

  • 1. PREPARED BY ANAS MIRZA APPRENTICE ENGINEER BQPS-1 31-03-2020
  • 2. DEFINATION Operator maintenance is the necessary, routine, recurring maintenance work performed by the operators to keep the equipment in such condition that it may be used continuously, at its original or designed capacity and efficiency for its intended purpose. The operator is actually the most important member of the maintenance team. A well-informed and responsible operator can do the following: 1. Keep equipment in service for maximum periods of time. 2. Detect any flaws so equipment can be removed from service in time to prevent serious damages. 3. Perform minor repairs on equipment removed from service to minimize outage time.
  • 3. PLANT START UP & SHUT DOWN Proper start up, loading, load changing procedures and shut down, this procedure gain importance when undergo frequent starting and loading cycle. Start-Up and Shut-Down Start-up and shut-down of a thermal power plant comprises starting, running, and stopping of pumps, fans, blowers, compressors, etc., and charging, filling, warming, isolating of the miscellaneous piping systems. In this chapter start-up and shut-down of major equipment such as steam generator, steam turbine, gas turbine, and diesel engine are addressed. There are four types of start-up – cold, warm, hot, and very hot. There are two types of shut-downs: normal and emergency shutdown. Start-up and (normal) shut-down of a unit involve huge number of parallel activities that are realized through multiple actions by operators.
  • 4. Limitation • Thermal stresses • Vibration • Rotor and Shell differential expansion • An of these limitation may be introduced by subjecting the turbine metal to steam excessive temperature mismatch and / or rate of temperature change. Terms used in cold start up procedure • Turbine pre warming • Heat Soaking • Chest Warming Start up Modes Turbine start up procedure depends up on the modes of turbine start-up which depends upon the thermal condition o turbine that is, the meal temperature of critical part of turbine. • Ambient Cold Start • Overhaul Cold Start • Cold Start • Warm Start • Hot Start • Very Hot Start
  • 5. Pre conditions of Turbine Start Up • Condensate system should be in service. • Circulation water system should be in service. • Feed water system should be in service. • All turbine instrument and controls in working condition. • Boiler fired for steam generation and steam of desired parameters available for start up process. • All turbine sub systems such as oil system turning gear system gland seal system condenser, lp turbine exhaust hood system should be ready. START UP • Warm Start Up: boiler fire and steam of 80 bars. • Hot Start Up: boiler fire and steam of 100 bars. • Nary Hot Start Up: boiler fire and steam of 140 bars.
  • 6. CORRECTIVE MAINTENANCE SHUTDOWN MAINTENANCE PREVENTIVE MAINTENANCE PREVENTIVE MAINTENANCE PREVENTIVE MAINTENANCE TIME BASE MAINTANANCE CONDITION BASE MAINTANANCE TYPES OF MAINTANANCE
  • 7. PURPOSE OF MAINTANANCE ATTEMPT TO MAXIMIZE PERFORMANCE OF PRODUCT EQUIPMENT EFFICIENTLY AND REGULARLY. PREVENT REAK DOWN OR FAILURES.MINIMIZE PRODUCTION LOSS FROM FAILURES. INCREASE RELIABILITY OF THE OPERATING SYSTEM Maintenance Objectives The main objective of maintenance is to achieve product quality and customer satisfaction through adjusted and service equipment. • Must be consist with the goal of production(cost, quality, delivery, safety) • Must be comprehensive and include specific responsibilities. • Must be in time repairs and troubleshoots. • Must be zero repetitive failures. PREVENTIVE MAINTENANCE Preventive maintenance inspection (PMI) is a system of routine inspections of equipment recorded for future reference on some type of inspection record. The purpose of PMI is to anticipate and prevent possible equipment failures by making periodic inspections and minor repairs in advance of major operating difficulties.
  • 8. WORK PERMIT SYSTEM Type of Work Permits • Limited work permit • Permit to work • Confined space permit • Hot work permit • Restoration of power supply Safe Work Permits the company requires evaluation of very hazardous, non-routine jobs for which there is no safe job procedures or approved job safety plans. GOALS AND OBJECTIVE OF WORK PERMIT At the end of this session you will be familiar with jobs requiring safe work permits.be generally familiar with the safe work permit system. There are currently three documents which are called “safe work permits” • Hot work permit • Confined space entry permit • Safe work permit system
  • 9. SAFETY FIRST BEFORE START ANY WORK