1. Cairo, Egypt.
Mobile Phone: +20 1111676832
Ahmed.sewassy@gmail.com
ahmed.elsewassy@schneider-electric.com
Ahmed Mohamed Ali Hassan
Credible Activist – Operational Executor – Culture Steward – Business Ally – Innovation Enabler
Career Summary
Multinational professional with + 7 years of hands-on experience of industrial automation, oil and gas, power plants,
cement industry, and petrochemicals.
I participated in many aspect of the job cycle including technical issues, leading small and medium teams, interfacing
with customer during all project phases, engineering, pre FAT, FAT, SAT, Commissioning, startup activities, and
experience in SIS (Safety Instrumented Systems) TUV certificated ID# 8747/ 14.
ESD (Emergency Shut Down) BMS (Burner Management System)
F&G (Fire And Gas) & (SIL3) systems design Experience in (Compressors ESD)
Oil & Gas and Petrochemicals Cement Industry
DCS (Distributed Control System) SCADA
Experience in Gas & Steam Turbines
Dexterous and expert at handling most of the project activities, Management delivering strategic direction for improved
efficiency and maintenance. Adept at moving into new environments and extrapolate from the existing experience to
quickly adapt to new ways fluently.
Career Objective
With an excellent professional record encompassing entire spectrum of Industrial Automation, currently operating as
Senior Triconex Engineer, position within Multinational Company wherein personal and professional excellence result in
organization’s escalation.
Career Path
Senior Application Engineer
Invensys Operations Management, Cairo, Maadi, Republic of Egypt
(Invensys is a multinational plant automation and process control company)
Application Automation Engineer
ASEC Cement, Cairo, Maadi, Republic of Egypt
Feb 2009 – To Date
September 2007 – Jan
2009
(ASEC Cement is the largest cement manufacturing company in Egypt and the
Middle East USING ALSTOM PLC).
Professional Responsibilities
Invensys – Senior Engineer - Reporting to: Department Manager http://www.invensys.com
Responsible of all Engineering Activities (complete project life cycle), System design, Configuration (HW &
Communication), Hardwareassignment, Software programming, Logic implementation, and Data Base
Manipulation.
2. TMR (Triple-Modular-Redundant) SIL3 safety and critical control systems Design. (TRICON / TRIDENT).
TRICON System HW Installation, Pre-Commissioning, Commissioning, Loop-Checking, Conducting
FAT & SAT (Factory/Site AcceptanceTest), for new as well as revamp projects upgrade.
Logic implementation from Cause & Effect, Flow Chart Diagram & Narrative documentation.
Upgrade MSW Ladder logic to Tristation 1131 (FBD & STL programming Language).
Projects
BED-3 BAPETCO CONTROL AND SAFETY SYSTEM REPLACEMENT – CUREENT PROJECT
ESD, FGS, and DCS
IPS EGYPT onshore facility located in WesternDesert
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
POWER PLANT-YANBU PHASE-3
BURNER MANAGEMENT SYSTEM CONTROL
EPC : ALSTOM
- Design software for BMS using Narrative control documents.
- Testing software with customer using ICLOUD.
KNPC LPG Train 4 Project, Current Project (2014-2015)
ESD, FGS, BMS and HRSG
EPC : Daelim End User : KNPC
Act as Overall ESD LEAD Engineer and Project Support Engineer
-Leading Loop Check teams.
-Site Acceptance Test activities
-Leading Function Test for 7 ESD,BMS,HRSG and FGS systems.
-Support Gas Turbine (GE) Commissioning and Startup.
-Support HRSG Commissioning and startup.
-Support Instrument team during Commissioning.
-Support Commissioning and Startup for 2 BMS Heaters.
-Support Expander Turbo Comperssor.
-Instrument field support.
NIMR-G DEVELOPMENT & KARIM WEST WATER FLOOD PROJECT (2013-2014)
ESD, FGS
EPC : Galfar End User : PDO
Act as Overall ESD LEAD Engineer
-Design data base for (3) Tricon Systems and (2) Trident Systems.
-Design HW (DLD,DOD and EPDG) for cabinets.
-Establish all ILD and IWD DWGs.
-Implement Peer to Peer Logic for NRPS MOS Panel switches
-IFAT activities.
-FAT activities
SAFANIYAH SUBSTATION-20 PLANT-369 ESD UPGRADE-ARAMCO (2013)
ESD
EPC : N/A End User : Aramco
Act as Overall ESD LEAD Engineer
-Ladder diagram Translation (MSW Upgrade)
-Software package FAT activities.
3. KHUFF GAS Project – ARAMCO (100 Cabinets)-KSA (2012)
ESD
EPC : N/A End User : Aramco
-Design data base for the existing system.
-Design HW (DLD& DOD) for cabinets.
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-Submit with ARAMCO NMR601 and NMR602.
IBN ZAHR (MTBE-I) – SABIC “LSTK project”-KSA(2011-2012)
Petrochemical
LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Two Existing relay logic of Reactor Interlock Systems
MTBE_I and for Three MTBE Reactors with latest TRICON system.
Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and
Printing, and DCS Hard Wired and Soft Communications.
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-IFAT & FAT activities.
-Clearing all technical queries
-Submit all phases Documents(30%,60%,90% and ASBUILT)
Site Phase
-Establish all Cabinets according to DWG
-Loop Check
-SAT activities
-Function Test for the reactors sequence
-Commissioning & startup
IBN ZAHR (MTBE-II) – SABIC “LSTK project”-KSA (2011-2012)
LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Existing relay logic of Reactor Interlock Systems
MTBE_II and for Five MTBE Reactors with latest TRICON system.
Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and
Printing, and DCS Hard Wired and Soft Communications.
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-IFAT & FAT activities for the system
-Clearing all technical queries
-Submit all phases Documents(30%,60%,90% and ASBUILT)
Site Phase
-Establish all Cabinets according to DWG
-Loop Check
-SAT activities
-Function Test for the reactors sequence
-Commissioning & startup
4. KCO( Kazakhstan) 2010
EPC : Petrofac
-Kashagan Onshore (SIS-1 & SIS-2 Tranche-1 & Tranche-2), UK – Engineering & FAT. F&GLead SIS-1, SIS-2, SIS-
4
-Kashagan Offshore (ITRD &IRMG), UK – Engineering & FAT.
Saudi Kayan (EC &DMC & EOEG) plants: Invensys Saudi Arabia 2009-2010
-Loop check
-SAT Activities
-Function test
-Commissioning & startup
ASEC Cement – Automation Engineer http://www.asecement.com
Programming & Engineering Activities using Alstom PLC with ALspa software.
Sequence & detailed flow sheets.
General function specification.
Logic diagrams.
Loop controls
FAT test.
Commissioning.
Start-up and Troubleshooting
Projects
Elshamal cement plant (ATBRA) 2007-2008 – ALSTOM PLC
-IFAT & SAT Activities.
-Building 2 cabinets in the site, installing the chassis and powering them up .
-Implementing new modification packs in the site including adding of new chassis , new cards and
new hardwired signals , supervising technicians in pulling the system cables between all system.
-SAT actvities
-Startup and Commissioning Support.
Education
Bachelor of Engineering – Electrical Power & Machines – Grade “Very Good”
Cairo University, Egypt.
2002 – 2007
Trainings Attended
FS Eng (TÜV Rheinland) Functional Safety Engineer (TÜV Rheinland), ID# # 8747/ 14
5. 8902 Triconex Maintenance
Foxboro DCS (IACC & ICC)
Triconex Hardware Design
Trident Hardware Design
Auto Cad Fundamental
Personal Details
Date Of Birth 2nd
September 1985
Marital Status Married
Languages Known
Military
English, Arabic
Exempted
Nationality
Gender
Egyptian
Male