SlideShare a Scribd company logo
1 of 5
Cairo, Egypt.
Mobile Phone: +20 1111676832
Ahmed.sewassy@gmail.com
ahmed.elsewassy@schneider-electric.com
Ahmed Mohamed Ali Hassan
Credible Activist – Operational Executor – Culture Steward – Business Ally – Innovation Enabler
Career Summary
Multinational professional with + 7 years of hands-on experience of industrial automation, oil and gas, power plants,
cement industry, and petrochemicals.
I participated in many aspect of the job cycle including technical issues, leading small and medium teams, interfacing
with customer during all project phases, engineering, pre FAT, FAT, SAT, Commissioning, startup activities, and
experience in SIS (Safety Instrumented Systems) TUV certificated ID# 8747/ 14.
ESD (Emergency Shut Down) BMS (Burner Management System)
F&G (Fire And Gas) & (SIL3) systems design Experience in (Compressors ESD)
Oil & Gas and Petrochemicals Cement Industry
DCS (Distributed Control System) SCADA
Experience in Gas & Steam Turbines
Dexterous and expert at handling most of the project activities, Management delivering strategic direction for improved
efficiency and maintenance. Adept at moving into new environments and extrapolate from the existing experience to
quickly adapt to new ways fluently.
Career Objective
With an excellent professional record encompassing entire spectrum of Industrial Automation, currently operating as
Senior Triconex Engineer, position within Multinational Company wherein personal and professional excellence result in
organization’s escalation.
Career Path
Senior Application Engineer
Invensys Operations Management, Cairo, Maadi, Republic of Egypt
(Invensys is a multinational plant automation and process control company)
Application Automation Engineer
ASEC Cement, Cairo, Maadi, Republic of Egypt
Feb 2009 – To Date
September 2007 – Jan
2009
(ASEC Cement is the largest cement manufacturing company in Egypt and the
Middle East USING ALSTOM PLC).
Professional Responsibilities
Invensys – Senior Engineer - Reporting to: Department Manager http://www.invensys.com
 Responsible of all Engineering Activities (complete project life cycle), System design, Configuration (HW &
Communication), Hardwareassignment, Software programming, Logic implementation, and Data Base
Manipulation.
 TMR (Triple-Modular-Redundant) SIL3 safety and critical control systems Design. (TRICON / TRIDENT).
 TRICON System HW Installation, Pre-Commissioning, Commissioning, Loop-Checking, Conducting
 FAT & SAT (Factory/Site AcceptanceTest), for new as well as revamp projects upgrade.
 Logic implementation from Cause & Effect, Flow Chart Diagram & Narrative documentation.
 Upgrade MSW Ladder logic to Tristation 1131 (FBD & STL programming Language).
Projects
 BED-3 BAPETCO CONTROL AND SAFETY SYSTEM REPLACEMENT – CUREENT PROJECT
ESD, FGS, and DCS
IPS EGYPT onshore facility located in WesternDesert
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
 POWER PLANT-YANBU PHASE-3
BURNER MANAGEMENT SYSTEM CONTROL
EPC : ALSTOM
- Design software for BMS using Narrative control documents.
- Testing software with customer using ICLOUD.
 KNPC LPG Train 4 Project, Current Project (2014-2015)
ESD, FGS, BMS and HRSG
EPC : Daelim End User : KNPC
Act as Overall ESD LEAD Engineer and Project Support Engineer
-Leading Loop Check teams.
-Site Acceptance Test activities
-Leading Function Test for 7 ESD,BMS,HRSG and FGS systems.
-Support Gas Turbine (GE) Commissioning and Startup.
-Support HRSG Commissioning and startup.
-Support Instrument team during Commissioning.
-Support Commissioning and Startup for 2 BMS Heaters.
-Support Expander Turbo Comperssor.
-Instrument field support.
 NIMR-G DEVELOPMENT & KARIM WEST WATER FLOOD PROJECT (2013-2014)
ESD, FGS
EPC : Galfar End User : PDO
Act as Overall ESD LEAD Engineer
-Design data base for (3) Tricon Systems and (2) Trident Systems.
-Design HW (DLD,DOD and EPDG) for cabinets.
-Establish all ILD and IWD DWGs.
-Implement Peer to Peer Logic for NRPS MOS Panel switches
-IFAT activities.
-FAT activities
 SAFANIYAH SUBSTATION-20 PLANT-369 ESD UPGRADE-ARAMCO (2013)
ESD
EPC : N/A End User : Aramco
Act as Overall ESD LEAD Engineer
-Ladder diagram Translation (MSW Upgrade)
-Software package FAT activities.
 KHUFF GAS Project – ARAMCO (100 Cabinets)-KSA (2012)
ESD
EPC : N/A End User : Aramco
-Design data base for the existing system.
-Design HW (DLD& DOD) for cabinets.
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-Submit with ARAMCO NMR601 and NMR602.
 IBN ZAHR (MTBE-I) – SABIC “LSTK project”-KSA(2011-2012)
Petrochemical
LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Two Existing relay logic of Reactor Interlock Systems
MTBE_I and for Three MTBE Reactors with latest TRICON system.
Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and
Printing, and DCS Hard Wired and Soft Communications.
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-IFAT & FAT activities.
-Clearing all technical queries
-Submit all phases Documents(30%,60%,90% and ASBUILT)
Site Phase
-Establish all Cabinets according to DWG
-Loop Check
-SAT activities
-Function Test for the reactors sequence
-Commissioning & startup
 IBN ZAHR (MTBE-II) – SABIC “LSTK project”-KSA (2011-2012)
LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Existing relay logic of Reactor Interlock Systems
MTBE_II and for Five MTBE Reactors with latest TRICON system.
Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and
Printing, and DCS Hard Wired and Soft Communications.
Engineering Phase
-Design data base for the existing system
-Design logic diagram for the existing system
-Design HW (DLD& DOD) for the existing cabinets and for new cabinets
-Establish all ILD and IWD DWGs.
-Integrating the system cabinets at ISE.
-IFAT & FAT activities for the system
-Clearing all technical queries
-Submit all phases Documents(30%,60%,90% and ASBUILT)
Site Phase
-Establish all Cabinets according to DWG
-Loop Check
-SAT activities
-Function Test for the reactors sequence
-Commissioning & startup
 KCO( Kazakhstan) 2010
EPC : Petrofac
-Kashagan Onshore (SIS-1 & SIS-2 Tranche-1 & Tranche-2), UK – Engineering & FAT. F&GLead SIS-1, SIS-2, SIS-
4
-Kashagan Offshore (ITRD &IRMG), UK – Engineering & FAT.
 Saudi Kayan (EC &DMC & EOEG) plants: Invensys Saudi Arabia 2009-2010
-Loop check
-SAT Activities
-Function test
-Commissioning & startup
ASEC Cement – Automation Engineer http://www.asecement.com
 Programming & Engineering Activities using Alstom PLC with ALspa software.
 Sequence & detailed flow sheets.
 General function specification.
 Logic diagrams.
 Loop controls
 FAT test.
 Commissioning.
 Start-up and Troubleshooting
Projects
Elshamal cement plant (ATBRA) 2007-2008 – ALSTOM PLC
-IFAT & SAT Activities.
-Building 2 cabinets in the site, installing the chassis and powering them up .
-Implementing new modification packs in the site including adding of new chassis , new cards and
new hardwired signals , supervising technicians in pulling the system cables between all system.
-SAT actvities
-Startup and Commissioning Support.
Education
Bachelor of Engineering – Electrical Power & Machines – Grade “Very Good”
Cairo University, Egypt.
2002 – 2007
Trainings Attended
 FS Eng (TÜV Rheinland) Functional Safety Engineer (TÜV Rheinland), ID# # 8747/ 14
 8902 Triconex Maintenance
 Foxboro DCS (IACC & ICC)
 Triconex Hardware Design
 Trident Hardware Design
 Auto Cad Fundamental
Personal Details
Date Of Birth 2nd
September 1985
Marital Status Married
Languages Known
Military
English, Arabic
Exempted
Nationality
Gender
Egyptian
Male

More Related Content

What's hot

Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen Barkwitch
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Kiran Y V N Rao
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM R & D Pvt. Ltd.
 
ESD System upgrade
ESD System upgradeESD System upgrade
ESD System upgradeHasnain Ali
 
Ali Mahmoud Automation Projects
Ali Mahmoud Automation ProjectsAli Mahmoud Automation Projects
Ali Mahmoud Automation ProjectsAli Mahmoud
 
RAF Tabtronics LLC Overview 2013
RAF Tabtronics LLC Overview 2013RAF Tabtronics LLC Overview 2013
RAF Tabtronics LLC Overview 2013RAF Tabtronics LLC
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15Mahboob Iqbal
 
Global space congress 2017 - German Orbital Systems Presentation
Global space congress 2017 - German Orbital Systems PresentationGlobal space congress 2017 - German Orbital Systems Presentation
Global space congress 2017 - German Orbital Systems PresentationIKosenkov
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
Fuzzy System Approach for TCSC Based Controller Design
Fuzzy System Approach for TCSC Based Controller DesignFuzzy System Approach for TCSC Based Controller Design
Fuzzy System Approach for TCSC Based Controller DesignIRJET Journal
 

What's hot (20)

CV asad updated on 14.01.2017
CV asad updated on 14.01.2017CV asad updated on 14.01.2017
CV asad updated on 14.01.2017
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
Resume Haris
Resume HarisResume Haris
Resume Haris
 
Ismail Ramadan
Ismail RamadanIsmail Ramadan
Ismail Ramadan
 
Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)Electrical and Instrumentation Engineer (Offshore/Onshore)
Electrical and Instrumentation Engineer (Offshore/Onshore)
 
CV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD EngineerCV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD Engineer
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 
ProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sectorProSIM engineering consultancy offerings to nuclear power sector
ProSIM engineering consultancy offerings to nuclear power sector
 
ESD System upgrade
ESD System upgradeESD System upgrade
ESD System upgrade
 
Ali Mahmoud Automation Projects
Ali Mahmoud Automation ProjectsAli Mahmoud Automation Projects
Ali Mahmoud Automation Projects
 
RAF Tabtronics LLC Overview 2013
RAF Tabtronics LLC Overview 2013RAF Tabtronics LLC Overview 2013
RAF Tabtronics LLC Overview 2013
 
ind brochure
ind brochureind brochure
ind brochure
 
Mohamed ElGazzar Egypt
Mohamed ElGazzar EgyptMohamed ElGazzar Egypt
Mohamed ElGazzar Egypt
 
CV Mahboob Updated 24.10.15
CV Mahboob Updated  24.10.15CV Mahboob Updated  24.10.15
CV Mahboob Updated 24.10.15
 
Global space congress 2017 - German Orbital Systems Presentation
Global space congress 2017 - German Orbital Systems PresentationGlobal space congress 2017 - German Orbital Systems Presentation
Global space congress 2017 - German Orbital Systems Presentation
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Fuzzy System Approach for TCSC Based Controller Design
Fuzzy System Approach for TCSC Based Controller DesignFuzzy System Approach for TCSC Based Controller Design
Fuzzy System Approach for TCSC Based Controller Design
 

Viewers also liked (13)

mohamed elkamash cv
mohamed elkamash cvmohamed elkamash cv
mohamed elkamash cv
 
CV_M. Khaled Abdelaziz Hussein_2016
CV_M. Khaled Abdelaziz Hussein_2016CV_M. Khaled Abdelaziz Hussein_2016
CV_M. Khaled Abdelaziz Hussein_2016
 
Haggag C.V
Haggag C.VHaggag C.V
Haggag C.V
 
Ahmad Mokhtar CV
Ahmad Mokhtar CVAhmad Mokhtar CV
Ahmad Mokhtar CV
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
MOSTAFA SALEH RASHWAN_CEM
MOSTAFA SALEH RASHWAN_CEMMOSTAFA SALEH RASHWAN_CEM
MOSTAFA SALEH RASHWAN_CEM
 
Sameh Mohamed CV-2017
Sameh Mohamed CV-2017Sameh Mohamed CV-2017
Sameh Mohamed CV-2017
 
Marketing Plan For Katameya Gardens Club
Marketing Plan For Katameya Gardens ClubMarketing Plan For Katameya Gardens Club
Marketing Plan For Katameya Gardens Club
 
sameh c.v
sameh c.vsameh c.v
sameh c.v
 
CV Ali Abas Nasser - May 2015
CV Ali Abas Nasser - May 2015CV Ali Abas Nasser - May 2015
CV Ali Abas Nasser - May 2015
 
M.Abdelkader CV
M.Abdelkader  CVM.Abdelkader  CV
M.Abdelkader CV
 
Abdelfatah.
Abdelfatah.Abdelfatah.
Abdelfatah.
 
Ahmed Farouk CV - June 2016
Ahmed Farouk CV - June 2016Ahmed Farouk CV - June 2016
Ahmed Farouk CV - June 2016
 

Similar to Mr. Ahmed ElSewassy

Similar to Mr. Ahmed ElSewassy (20)

Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016Sondus Ahmed - CV - 2016
Sondus Ahmed - CV - 2016
 
My Profile - SHI
My Profile - SHIMy Profile - SHI
My Profile - SHI
 
Mehmet CICEK - CV - 181114
Mehmet CICEK - CV - 181114Mehmet CICEK - CV - 181114
Mehmet CICEK - CV - 181114
 
Yazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTSYazan Al-Najjar MAJOR PROJECTS
Yazan Al-Najjar MAJOR PROJECTS
 
Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 
Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
CV-Bokarica
CV-BokaricaCV-Bokarica
CV-Bokarica
 
byteLAKE's Alveo FPGA Solutions
byteLAKE's Alveo FPGA SolutionsbyteLAKE's Alveo FPGA Solutions
byteLAKE's Alveo FPGA Solutions
 
63089_SEKAR_01_12_14
63089_SEKAR_01_12_1463089_SEKAR_01_12_14
63089_SEKAR_01_12_14
 
Anindam_Resume
Anindam_ResumeAnindam_Resume
Anindam_Resume
 
Resume
ResumeResume
Resume
 
Mahmoud_CV
Mahmoud_CVMahmoud_CV
Mahmoud_CV
 
C.V._GouriShankar
C.V._GouriShankarC.V._GouriShankar
C.V._GouriShankar
 
Ahmed Elsayed Salem CV
Ahmed Elsayed Salem CVAhmed Elsayed Salem CV
Ahmed Elsayed Salem CV
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)CV_GAAFAR sherif(10 mar 2014)
CV_GAAFAR sherif(10 mar 2014)
 
HADY_CV
HADY_CVHADY_CV
HADY_CV
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 

Mr. Ahmed ElSewassy

  • 1. Cairo, Egypt. Mobile Phone: +20 1111676832 Ahmed.sewassy@gmail.com ahmed.elsewassy@schneider-electric.com Ahmed Mohamed Ali Hassan Credible Activist – Operational Executor – Culture Steward – Business Ally – Innovation Enabler Career Summary Multinational professional with + 7 years of hands-on experience of industrial automation, oil and gas, power plants, cement industry, and petrochemicals. I participated in many aspect of the job cycle including technical issues, leading small and medium teams, interfacing with customer during all project phases, engineering, pre FAT, FAT, SAT, Commissioning, startup activities, and experience in SIS (Safety Instrumented Systems) TUV certificated ID# 8747/ 14. ESD (Emergency Shut Down) BMS (Burner Management System) F&G (Fire And Gas) & (SIL3) systems design Experience in (Compressors ESD) Oil & Gas and Petrochemicals Cement Industry DCS (Distributed Control System) SCADA Experience in Gas & Steam Turbines Dexterous and expert at handling most of the project activities, Management delivering strategic direction for improved efficiency and maintenance. Adept at moving into new environments and extrapolate from the existing experience to quickly adapt to new ways fluently. Career Objective With an excellent professional record encompassing entire spectrum of Industrial Automation, currently operating as Senior Triconex Engineer, position within Multinational Company wherein personal and professional excellence result in organization’s escalation. Career Path Senior Application Engineer Invensys Operations Management, Cairo, Maadi, Republic of Egypt (Invensys is a multinational plant automation and process control company) Application Automation Engineer ASEC Cement, Cairo, Maadi, Republic of Egypt Feb 2009 – To Date September 2007 – Jan 2009 (ASEC Cement is the largest cement manufacturing company in Egypt and the Middle East USING ALSTOM PLC). Professional Responsibilities Invensys – Senior Engineer - Reporting to: Department Manager http://www.invensys.com  Responsible of all Engineering Activities (complete project life cycle), System design, Configuration (HW & Communication), Hardwareassignment, Software programming, Logic implementation, and Data Base Manipulation.
  • 2.  TMR (Triple-Modular-Redundant) SIL3 safety and critical control systems Design. (TRICON / TRIDENT).  TRICON System HW Installation, Pre-Commissioning, Commissioning, Loop-Checking, Conducting  FAT & SAT (Factory/Site AcceptanceTest), for new as well as revamp projects upgrade.  Logic implementation from Cause & Effect, Flow Chart Diagram & Narrative documentation.  Upgrade MSW Ladder logic to Tristation 1131 (FBD & STL programming Language). Projects  BED-3 BAPETCO CONTROL AND SAFETY SYSTEM REPLACEMENT – CUREENT PROJECT ESD, FGS, and DCS IPS EGYPT onshore facility located in WesternDesert Engineering Phase -Design data base for the existing system -Design logic diagram for the existing system -Design HW (DLD& DOD) for the existing cabinets and for new cabinets -Establish all ILD and IWD DWGs.  POWER PLANT-YANBU PHASE-3 BURNER MANAGEMENT SYSTEM CONTROL EPC : ALSTOM - Design software for BMS using Narrative control documents. - Testing software with customer using ICLOUD.  KNPC LPG Train 4 Project, Current Project (2014-2015) ESD, FGS, BMS and HRSG EPC : Daelim End User : KNPC Act as Overall ESD LEAD Engineer and Project Support Engineer -Leading Loop Check teams. -Site Acceptance Test activities -Leading Function Test for 7 ESD,BMS,HRSG and FGS systems. -Support Gas Turbine (GE) Commissioning and Startup. -Support HRSG Commissioning and startup. -Support Instrument team during Commissioning. -Support Commissioning and Startup for 2 BMS Heaters. -Support Expander Turbo Comperssor. -Instrument field support.  NIMR-G DEVELOPMENT & KARIM WEST WATER FLOOD PROJECT (2013-2014) ESD, FGS EPC : Galfar End User : PDO Act as Overall ESD LEAD Engineer -Design data base for (3) Tricon Systems and (2) Trident Systems. -Design HW (DLD,DOD and EPDG) for cabinets. -Establish all ILD and IWD DWGs. -Implement Peer to Peer Logic for NRPS MOS Panel switches -IFAT activities. -FAT activities  SAFANIYAH SUBSTATION-20 PLANT-369 ESD UPGRADE-ARAMCO (2013) ESD EPC : N/A End User : Aramco Act as Overall ESD LEAD Engineer -Ladder diagram Translation (MSW Upgrade) -Software package FAT activities.
  • 3.  KHUFF GAS Project – ARAMCO (100 Cabinets)-KSA (2012) ESD EPC : N/A End User : Aramco -Design data base for the existing system. -Design HW (DLD& DOD) for cabinets. -Establish all ILD and IWD DWGs. -Integrating the system cabinets at ISE. -Submit with ARAMCO NMR601 and NMR602.  IBN ZAHR (MTBE-I) – SABIC “LSTK project”-KSA(2011-2012) Petrochemical LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Two Existing relay logic of Reactor Interlock Systems MTBE_I and for Three MTBE Reactors with latest TRICON system. Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and Printing, and DCS Hard Wired and Soft Communications. Engineering Phase -Design data base for the existing system -Design logic diagram for the existing system -Design HW (DLD& DOD) for the existing cabinets and for new cabinets -Establish all ILD and IWD DWGs. -Integrating the system cabinets at ISE. -IFAT & FAT activities. -Clearing all technical queries -Submit all phases Documents(30%,60%,90% and ASBUILT) Site Phase -Establish all Cabinets according to DWG -Loop Check -SAT activities -Function Test for the reactors sequence -Commissioning & startup  IBN ZAHR (MTBE-II) – SABIC “LSTK project”-KSA (2011-2012) LSTK Full Scope Revamp project at SABIC/IBN-ZAHR replacing Existing relay logic of Reactor Interlock Systems MTBE_II and for Five MTBE Reactors with latest TRICON system. Scope includes Design Engineering, New Cabinets, Site Construction Activities, InTouch HMI, Alarm Historian and Printing, and DCS Hard Wired and Soft Communications. Engineering Phase -Design data base for the existing system -Design logic diagram for the existing system -Design HW (DLD& DOD) for the existing cabinets and for new cabinets -Establish all ILD and IWD DWGs. -Integrating the system cabinets at ISE. -IFAT & FAT activities for the system -Clearing all technical queries -Submit all phases Documents(30%,60%,90% and ASBUILT) Site Phase -Establish all Cabinets according to DWG -Loop Check -SAT activities -Function Test for the reactors sequence -Commissioning & startup
  • 4.  KCO( Kazakhstan) 2010 EPC : Petrofac -Kashagan Onshore (SIS-1 & SIS-2 Tranche-1 & Tranche-2), UK – Engineering & FAT. F&GLead SIS-1, SIS-2, SIS- 4 -Kashagan Offshore (ITRD &IRMG), UK – Engineering & FAT.  Saudi Kayan (EC &DMC & EOEG) plants: Invensys Saudi Arabia 2009-2010 -Loop check -SAT Activities -Function test -Commissioning & startup ASEC Cement – Automation Engineer http://www.asecement.com  Programming & Engineering Activities using Alstom PLC with ALspa software.  Sequence & detailed flow sheets.  General function specification.  Logic diagrams.  Loop controls  FAT test.  Commissioning.  Start-up and Troubleshooting Projects Elshamal cement plant (ATBRA) 2007-2008 – ALSTOM PLC -IFAT & SAT Activities. -Building 2 cabinets in the site, installing the chassis and powering them up . -Implementing new modification packs in the site including adding of new chassis , new cards and new hardwired signals , supervising technicians in pulling the system cables between all system. -SAT actvities -Startup and Commissioning Support. Education Bachelor of Engineering – Electrical Power & Machines – Grade “Very Good” Cairo University, Egypt. 2002 – 2007 Trainings Attended  FS Eng (TÜV Rheinland) Functional Safety Engineer (TÜV Rheinland), ID# # 8747/ 14
  • 5.  8902 Triconex Maintenance  Foxboro DCS (IACC & ICC)  Triconex Hardware Design  Trident Hardware Design  Auto Cad Fundamental Personal Details Date Of Birth 2nd September 1985 Marital Status Married Languages Known Military English, Arabic Exempted Nationality Gender Egyptian Male