1. Curriculum Vitae
Ahmed Bahloul Abdul-Aziz Abdul-Mawla
Address: Althlatheen street, Ardh Elgmeeya Front of D. Amira Pharmacy,
Bader, Albuhara
P. O. Box: 22832
Email Address: ahmedgsf@yahoo.com
Day Phone Number: +2 0453623257 & +201005409822
Evening Phone Number: +2 0453623257
Mobile Phone Number: + 201005409822 & +2 01015154120
Person data:
• Nationality : Egyptian
• Date of Birth : 1st
June 1973
• Gender : Male
• Military service : completed reserve officer
• Marital status : Married
• Number of dependents: 4 personal
Objective:
My advanced degree coupled with total 17 years’ experience which included 14 years
Offshore and 3 years Onshore in drilling and workover oil and gas industry, and included
10 years as a supervisor ( toolpusher, OIM, rig manger, rig superintendent and operation
manager), this experience has provided me to bring a multitude of skills and talents to my
employer, I’m seeking a position within a global petroleum or drilling company as a
drilling well site supervisor or company representative ( Company man or OIM or Rig
Manger or Rig superintendent) requiring long term experience and expertise in
international and multilingual environments, mainly to act as company representative
onboard the Rig or in office ensuring that all will site operations are performed in safe
manner, manage the activity of all client and contractors to ensure that the objectives are
met, meanwhile complying with company and local statutory policies and standards, to
continuously evaluate and support the company operations with a view to identify and
implement methods of improving design, safety and performance.
2. Position Sought:
RIG SUPERINTENDENT / RIG MANGER / OPERATION MANAGER
(Conventional and AMPHON- NOV Rigs ) onshore and offshore
Education:
Bachelor's degree, June 1996
Mechanic Power Engineer, Alexandria University, Egypt, extensive continuing
education and training courses; list available;
CONTINUING PROFESSIONAL DEVEKOPMENT:
• Major Emergency Management at Aberdeen training center (MEM) 30
September 2011
• IADC drilling supervisor well control (Well Cap) , Arabian Drilling Company
Dhahran training center Expire 30th
December 2016 Vanuatu License
• Offshore Installation Manager (OIM License), expired 22 December 2014
• Stuck pipe & Fishing prevention ADC Dhahran Training center on December
2012
• Drilling Practices: Held at Transocean MED Training Center -Cairo: 25th
November2009 Top Set Incident Investigation 3 days at Transocean MED
Training Center- Cairo from 28th
September 2010.
• Well construction course at MED Transocean on 20th
January 2011
• Rig-Site Training & drilling Blind : 26th July 2009
• “basic offshore safety induction Emergency Training " BOSIET “ and hut from
18 to 20 December 2012 Courses held at Saudi as Aramco requirements
• QHSE Mater Class in France from 23rd
-27th
Aug 2010.
• Corporate Marine Support Online Training Course Rack Phase Difference on
14th
Jul 2010.
• Face to face 1 and 2 at Aberdeen training center Transocean Company.
• Comprehensive Stability Hold at MED Training center Cairo Transocean
Company
• BOP Down Time Prevention at Transocean MED Training Center- Cairo on 18th
June 2009.
Page 2
3. • Corporate Marine Support Online Training Course Jack Up Stability on 14th
Jul
2010.
• Pathogen Training on board offshore Unit 15 Feb. 2011
• Medical First aid Dhahran base ADC Saudi May 2013
• Advanced fire Prevention & fire fighting on board offshore Unit at
16/08/2012
• Fire team leader training course 4 days as Aramco requirement 15 /10 /2014
• First Aid: 23-25 March 2004
• Courses held at Arab Academy for Science and Technology and Maritime
Transportation: Personal Survival Techniques, search and rescue on board
offshore units: 8 -8 – 2015
• H2S Basic: 8 /10/ 2014
On Job Training (OJT) modules for:
• Derrick man, Assistant Driller and Driller
• BOP equipment, Scaffold Awareness, Fall Protection, Hands and fingers
campaign, Hazards Awareness, First Aid, Environmental Awareness, Blood
Pathogens, Forklift training, Man Riding, Permit to Work, Confined Space,
Safety on the Job, face to face 1
Summary of Experience:
Operation manager offshore and onshore for pyramid drilling company one year
Rig superintendent Conventional and Amphoin system offshore and on shore three years
“OIM” Offshore installation manager one year and half
Senior Toolpusher and Toolpusher with Transocean and NDC five years
Driller with NDC and Global Santa Fe three years
Assist. Driller, derrick man, floor man, mechanic three years
Page 3
4. Skills & Abilities
Management
· Define the adequate resources and equipment to guarantee high performance in
safe manner.
· Ensure vendors compliance with contractual obligations in the execution of
services and propose potential optimize
· Ensure the follow up of operations related to logistic and anticipated needs
· Guarantee that adequate supervision is maintained on site
· Contribute in process of evaluating and optimize the activity on site
· Ensure correct invoicing, cost evaluation and update accordingly invoice database
· Ensure food and safe service delivery by the vendors and correct report
· Manage daily overall drilling and work-over operation
· Review the programs for the fluids, cements and treatment of discharge
produced by to drilling / well operations; write up operating procedures
· Conduct technical and operation syntheses
· Ensure the follow up of the fluid, cement and treatment of discharge.
· Conduct performance improvement studies
· Optimize the activities of information providers and assess their performance
· Manage the dally overall drilling and work over operations Support the Rig crew
and his function and ensure a strong working relationships with colleagues and
Operator representatives, Ensure the effective management of the rig crews,
· Review and approve Requisition Purchase Orders for equipment or parts
necessary to keep the drilling operation free of downtime as required and as
necessary according to the annual budget.
· Assist in ensuring sufficient stock of parts and materials are maintained,
· Assist in the planning, organization and supervision of rig move operations,
· Manage and control all inventory levels.
Communication
· Good relationship with all departments, rig crews, third party personnel and Client
Representatives , Ensure subordinates understand and apply guidelines of the Company QHSE
manual and rig specific procedures, Assist in training to ensure all personnel are competent to
perform their allocated job
Leadership
Page 4
5. · Guide and lead as example, planed, discussion and control, corporate all people,
work as one team, Manages company's interest at the rig site in respect to the clients,
Responsible for the well Program (Onshore/ Offshore),Personnel (including sub-
contractors)/ Management and administrations, Ensure preventive maintenance
program in place, Assets protection and management, Supervises and coordinates
activities of workers
Experience:
JOB TITLE : OPERATION MANGER
COMPANY NAME : PYRAMID DRILLING COPMANY
FROM : NOVAMBER 2015 TO: SEPTEMBER 2016
EMPLLOYER COUNTRY : EYGEPT
• Work as Operation Manager with Pyramid Drilling Company drilling for GUPCO and BP and
PERTOBEL, Plan and Perform Drilling Program daily Rig conference Call to review all the rig
performance and maintenance.
• Change out the cutting separated system SH/SH, Mud cleaner, dissenter and deciliter with
DERRICK HYERPOOL SH/SH
• Complete overhaul top drive and Draw-work (hoisting system) within two weeks
• Perform Drilling program for October and Morgan Field I had to work on Load out list and
wellhead BOP configuration. Kick Tolerance calculation. Perform weekly conference
meeting with all 3th parties involved in the Drilling in order to track all the rest of items
pending including the client. Perform some work which will add to the Drilling Program as
Kick Tolerance sheet & List of equipment needs on each section & Wellhead BOP table
configuration to be added on each section & make recommendation on BHA design for each
section Perform Rig Specification which will be added to the Drilling Program. Perform the
Time breakdown table which has to fit with the TVD Curve and it should be in the program
to help the Drilling Supervisor and OIM to check on the time and drilling performance
• Manage and control all inventory levels.
• Ensure all planned maintenance and repairs of rig equipment are carried out within a
timely manner and of a high standard Maintain a safe working environment for offshore
and onshore colleagues, ensuring the ongoing development and on-the-job training for all
news and reporting staff Ensure the efficient and productive use of company resources,
equipment and personnel, verify all well control calculations (i.e. Kick Tolerance, Minimum
Barite/ cement required for well control, mud weight increase, initial and final circulating
pressures, number of strokes, Kill sheets etc.).
JOB TITLE : Rig SUPERINTENDENT (Conventional and AMPHON- NOV) onshore and offshore
COMPANY NAME : ARABIAN DRILLING COMPANY (ADC)
Page 5
6. FROM : NOVAMBER 2012 TO: JUNE 2015
EMPLLOYER COUNTRY : SAUDI ARABIAN
• Supervision the commission and start up for 6 land rig and one Offshore
• Work as Rig superintendent for 200 and 3000 HP Rigs exploration and Gas wells, My duty
is to manage daily operation and organize logistic and review the material stock conditions
plus make sure the maintenance plan, drills and safety meeting in place in order to service
Rig Equipment , train my crew on any expected kick or any type of accidents. Drilling Phone
meeting every day with senior Toolpusher for any news and asking for help and support if
needed. Monitor and observe Rig Performance and executed the job on the excellent
operation principal. Perform meeting with Rig crew to sort out any trouble and improve
the Rig performance in order to locate their camp on the best direction as this is an
exploration well
• Perform drilling program for Mazalige and Odalya fields for HPHT wells of 4800m
(15744ft) with surface CSG 36”, 24” and intermediate CSG from 18 5/8” and 9.5/8” and 2
liner 7” and 5”. Drilling through salt zone and HPHT zone almost 60c deg.
• Recommend adjustments to drilling parameters as necessary so as to improve the overall
• Manage the overall drilling and work over operations, ensure a strong working
relationships with colleagues and Operator representatives, Ensure the effective
management of the rig crews, senior tool pusher, Tour pushers, Tool pushers and all
departments heads, ensure all planned maintenance and repairs of rig equipment are
carried out within a timely manner and of a high standard Maintain a safe working
environment for Rig crew colleagues, ensuring the ongoing development and on-the-job
training for all new and reporting staff Ensure the efficient and productive use of company
resources, equipment and personnel.
• Perform Full CAT (Schlumberger) Audit for all offshore and onshore rigs working in Saudi
Arabia under ADC umbrella (Aramco and KJO) contracted ADC Company for compliance the
contract and the company’s manuals.
JOB TITLE : OFFSHORE INSTLLATION MANGER (OIM)
COMPANY NAME: TRANSOCEAN OFFSHORE (SANTA-FE)
FROM : FEBRUARY 2011 TO: NOVEMBER 2012
EMPLLOYER COUNTRY: EGYPT
• Perform change out 35 ton of steel while the Rig on pay roll, mange the steel project and
the rig operation in same time neither LIT nor down time for 6 months
• Manage the overall drilling and work over operations Support the Rig Manger and his
function and ensure a strong working relationships with colleagues and Operator
representatives, Ensure the effective management of the rig crews, senior tool pusher, Tour
pushers, Tool pushers and all departments heads, ensure all planned maintenance and
Page 6
7. repairs of rig equipment are carried out within a timely manner and of a high standard
Maintain a safe working environment for offshore and onshore colleagues, ensuring the
ongoing development and on-the-job training for all news and reporting staff Ensure the
efficient and productive use of company resources, equipment and personnel, verify all well
control calculations (i.e. Kick Tolerance, Minimum Barite/ cement required for well control,
mud weight increase, initial and final circulating pressures, number of strokes, Kill sheets
etc.)
• Review the daily drilling operations report for accuracy and approve accordingly, Prepare
Requisition Purchase Orders for equipment or parts necessary to keep the drilling
operation free of downtime as required and as necessary according to the annual budget.
Assist in ensuring sufficient stock of parts and materials are maintained, Assist in the
planning, organization and supervision of rig move operations, Recommend adjustments to
drilling parameters as necessary so as to improve the overall drilling operation’s
performance, Promote and maintain an effective working.
JOB TITLE : SENIOR TOOL-PUSHER AND TOOL-PUSHER
COMPANY NAME: TRANSOCEAN OFFSHORE (SANTA-FE)
FROM : JUNE 2008 TO: FEBRUARY 2011
EMPLLOYER COUNTRY: EGYPT
· Manage the overall drilling and work over operations Support the Rig Manger and OIM in their
function and ensure a strong working relationships with colleagues and Operator representatives,
Ensure the effective management of the drill crews, Tour pushers and all departments heads,
ensure all planned maintenance and repairs of drilling equipment are carried out within a timely
manner and of a high standard Maintain a safe working environment for offshore colleagues.
JOB TITLE : TOOL-PUSHER AND DRILLER
COMPANY NAME: NATIONAL DRILLING COMPANY (NDC)
FROM : JUNE 2004 TO: JUNE 2008
EMPLLOYER COUNTRY: EUA (ABU DHABI)
· Manage the overall drilling and work over operations Support the tool-pusher function and
ensure a strong working relationships with colleagues and Operator representatives, Ensure the
effective management of the drill crew and all departments heads, ensure all planned
maintenance and repairs of drilling equipment are carried out within a timely manner and of a
high standard Maintain a safe working environment for offshore colleagues.
JOB TITLE : DRILLER ASSISTANT DRILLER
Page 7
8. COMPANY NAME: SANTA-FE AND GLOBAL SANTA-FE
FROM : MAY 2003 TO: JUNE 2004
EMPLLOYER COUNTRY: EGYPT
Manage the overall drilling and work over operations Support the tool-pusher function and ensure
a strong working relationships with colleagues and Operator representatives, Ensure the effective
management of the drill crew and all departments heads, ensure all planned maintenance and
repairs of drilling equipment are carried out within a timely manner and of a high standard
Maintain a safe working environment for offshore colleagues, supervising the pipe deck and
control.
JOB TITLE : DERRICK MAN
COMPANY NAME: SANTA-FE
FROM : MAY 2001 TO MAY 2003
EMPLLOYER COUNTRY: EGYPT
Mange all mixing operation and mud circulating system operation, maintenance rig pump as
planned, and repair (National, oil well 1300HP, 1600 HP, 200 HP and Emsco mud pumps)
JOB TITLE : FLOOR MAN
COMPANY NAME : SANTA-FE
FROM : JANUARY 2001 TO: MAY 2001
EMPLLOYER COUNTRY : EGYPT
Mange mud circulating system (SH/SH) and rig floor operation
JOB TITLE : MOTOR-MAN AND TOUR MECHANIC
COMPANY NAME: SANTA-FE
FROM : NOVEMBER 1999 TO: JANUARY 2001
EMPLLOYER COUNTRY: EGYPT
Mange, maintenance and lubricating all rig equipment and repair engines, draw works, mud pumps,
top-drive………
Page 8