SlideShare a Scribd company logo
1 of 5
1
N.DELEPHKUMAR.
Email id: deleph.n@gmail.com Mobile: 09176688601.
CAREER OBJECTIVE
An experienced facilities engineer from electrical engineering background,
with invaluable managerial experience.
QUALIFICATION
Bachelor of Engineer: Electrical and Electronics 2008-2011
Engineering.
Theni Kammavar Sangam College of Technology, Theni.
University: Trichy Anna University, Trichy.
EXPERIENCE
Period: July 2015 to Present.
Position: Facility Engineer.
Company: CBRE South Asia pvt, Ltd.
Client: Shell Business Operations at Perungudi. Chennai - 600096.
Job Responsibilities
 Organizing the day-to-day facilities management requirements of the
company, across 3.5lakhs sq.ft.
 Highly organised and able to prioritize tasks.
 Reporting to facility managers on plans and resources.
 Organising soft services and janitorial facilities.
 Contract all outside services that support security, office equipment,
supplies, pest control, waste management, construction, fire code,
archiving, shredding, utilities, and other facilities services.
 Conducting regular facility audits for safety and compliance.
 Proactively managing contractors across multiple locations.
 Providing feedback, training, coaching and guidance to junior staff.
2
 Implementing incident management plans.
 Making recommendations for capital expenditures.
 Organizing the general administrative services of the Places.
Period: April to July 2015.
Position: Facility Engineer.
Company: Cushman & Wakefield Property Management Services India pvt, Ltd.
Client: DLF IT Park at Ramapuram. Chennai - 600089.
Job Responsibilities
 Responsible for day to day operations, spread over across 7 million
sq.ft.
 Managing facilities management teams 33KV/11KV, 11KV/440V
Electrical, Mechanical maintenance of HVAC, lifts and 11KV HT
generators, Types of Treatment Plants & Fire Fighting systems.
 Conducting regular facility audits for safety and compliance.
 Carrying out regular site audits and inspections to identify any areas
that need repairing.
 Coordinating and facilitating work flow.
 On call for security and facility related issues.
 Managing the work of contractors and checking that it is done to the
Highest standards.
 Supporting all activities around diversity and disability awareness
Issues.
 Coached on-site supervisors and technicians in strengthening
maintenance plans and responsiveness through “hands on” efforts.
Period: June 2014 to January 2015.
Position: Facility Engineer.
Company: Sodexo Technical Services India pvt, Ltd.
Client: Ford Business Service Centre at Kandanchavadi. Chennai - 600096.
3
Job Responsibilities
 Ensure the regular facility management operations.
 Planned strategy to ensure efficient management of assets – Managed,
maintained and supported the reliability of the systems, equipment,
properties and assets in the facility.
 Developed detailed renovation scopes of work to accomplish investors’
vision and successfully directed a multitude of value add projects.
 Performed short term and long term planning for the property.
 Planned and implemented internal moves and consolidations.
 Created comprehensive due diligence property condition reports
utilized for contract price negotiations, creation of capital improvement
project lists, and cost-benefit reporting.
 Established detailed budgets for complete renovations and capital
improvement projects. Monitored and reported ongoing budgetary
deviations for review by management.
 Introduced changes in existing projects without disturbing the ongoing
process, thus increasing output and reducing operating costs.
 Continually provide a troubleshooting based instructional solution
program for on-site maintenance personnel.
Period: June 2013 to June 2014(1 Year).
Position: Technical Supervisor.
Company: Roto Power Project pvt, Ltd.
Client: Amazon Development Centre at Kandanchavadi. Chennai - 600096.
Job Responsibilities
 Developed and Maintained Positive Relationship with Clients.
 Respond to problems in a delicate and expedient manner.
 Monitor and record PM schedules for utilities.
 Working with vendors for AMC related issues and PM.
 Documentation and maintenance of all parameters for analyzing and
proactive actions.
 To prepare the Monthly power consumption report and provide the
proper justification if increase or decrease the cost.
4
 Operation and maintenance of AHU’S, UPS and Types of AC Units.
 Responsible for the delivery in accordance with the maintenance
 Strategy in-house and soft facilities management services to the
Standards directed.
Period: June 2011 to June 2013 (2Years).
Position: Multi – Technician.
Company: Vipul facility management pvt, Ltd.
Client: Cognizant Technology Solutions at MEPZ Tambaram. Chennai - 600045.
Job Responsibilities
Maintenances of 33KV/440VIndoor Substation, H.T & L.T Panels,
Transformers, UPS, Chillers and DG set all equipment’s.
 Operation and maintenance of 33KV/433V substation in Cognizant
Technology Solutions at Tambaram.
 Transformers (2500KVA*1), (2000KVA*4), (1750KVA*4) and
(750KVA *1) Dry type.
 Up to 630AVacuum circuit breakers and 5000A Air circuit breakers.
 Up to 300KVA UPS.
 Diesel Generators (2000KVA*1), (1500KVA*8) and (625KVA*2).
 Chillers (385 TR*11), (65TR*2), (70TR*2), (180TR*2), (90TR*4) and
AHU’s, PAHU’s, VAHU’s.
 Chiller water pump-20HP/15KW=13 No’s & 50HP/37KW=13 No’s
with VFD Control.
 Fire fitting pumps 2 No’s 150HP Sprinkler, Hydrant and jockey pump
50HP, diesel pump150HP.
 DG Scrubber 4 No’s with motorized valve & dosing pump system.
 HT/LT Panels, APFC Panels, UDB, PDB, LDB, ELDB and Street light
fittings etc.
5
STRENGTHS
 Positive attitude & Time Management.
 Hard work.
HOBBIES
 Playing Chess.
 Listening Songs.
PERSONAL PROFILE
Father’s name : Mr.Nanthagopal.N
Date of Birth : 07th May 1987
Age : 27
Gender : Male
Marital Status : Single
Nationality : Indian
Permanent address : S/o, Mr.Nanthagopal.N,
1/19, Vellalar street,
Siluvampatty (po),
Namakkal (DT),
Pin: 637003.
DECLARATION
I hereby declare that the information furnished above is true to the best of my
knowledge.
Place: Chennai. Delephkumar N

More Related Content

What's hot

Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th DecAnish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
Anish pandey
 
Tamilselvan Resume
Tamilselvan Resume  Tamilselvan Resume
Tamilselvan Resume
TAMIL SELVAN
 
Resume_Kiran_Shete. (2)
Resume_Kiran_Shete. (2)Resume_Kiran_Shete. (2)
Resume_Kiran_Shete. (2)
Kiran Shete
 

What's hot (20)

NEW RESUME JB
NEW RESUME JBNEW RESUME JB
NEW RESUME JB
 
resume
resumeresume
resume
 
Amit cv
Amit cvAmit cv
Amit cv
 
sasi resume
sasi resumesasi resume
sasi resume
 
Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th DecAnish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
Anish Pandey_ B.Tech-EE _6yrs_AM-PIL and Electrical Maintenance Kolkata 5th Dec
 
shash resume new (1)
shash resume new (1)shash resume new (1)
shash resume new (1)
 
Resume
ResumeResume
Resume
 
Ravi Resume (1)
Ravi Resume (1)Ravi Resume (1)
Ravi Resume (1)
 
anil
anilanil
anil
 
Resume
ResumeResume
Resume
 
santanu sasmal
santanu sasmalsantanu sasmal
santanu sasmal
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Tamilselvan Resume
Tamilselvan Resume  Tamilselvan Resume
Tamilselvan Resume
 
DEEPAK
DEEPAKDEEPAK
DEEPAK
 
Bs CV -
Bs CV -Bs CV -
Bs CV -
 
Resume_Kiran_Shete. (2)
Resume_Kiran_Shete. (2)Resume_Kiran_Shete. (2)
Resume_Kiran_Shete. (2)
 
Ion presentation ver1
Ion presentation ver1Ion presentation ver1
Ion presentation ver1
 
Callibration
CallibrationCallibration
Callibration
 
navroon2
navroon2navroon2
navroon2
 
Harshad Mirkar CV
Harshad Mirkar CVHarshad Mirkar CV
Harshad Mirkar CV
 

Similar to Resume.

IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.
Ijaz Mohammed
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
jose varun
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
 
Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)
vardhan pvs
 
10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
M jawahar jawahar
 

Similar to Resume. (20)

Jail_Singh_CV
Jail_Singh_CVJail_Singh_CV
Jail_Singh_CV
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.IJAZ MOHAMMED - Facilities Manager.
IJAZ MOHAMMED - Facilities Manager.
 
Sushil-Resume
Sushil-ResumeSushil-Resume
Sushil-Resume
 
Suresh V Resume
Suresh V ResumeSuresh V Resume
Suresh V Resume
 
Pramod Chand Chaturvedi
Pramod Chand ChaturvediPramod Chand Chaturvedi
Pramod Chand Chaturvedi
 
Raj Gandhi
Raj GandhiRaj Gandhi
Raj Gandhi
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
Resume_sdy-4-1
Resume_sdy-4-1Resume_sdy-4-1
Resume_sdy-4-1
 
Detailed CV 11 Nov 15
Detailed CV 11 Nov 15Detailed CV 11 Nov 15
Detailed CV 11 Nov 15
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
Facilities maintenance _manager_resume
Facilities maintenance _manager_resumeFacilities maintenance _manager_resume
Facilities maintenance _manager_resume
 
Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)Vardhan Electrical_resume (2)
Vardhan Electrical_resume (2)
 
resume
resumeresume
resume
 
Mithun Kumar Electrical
Mithun Kumar ElectricalMithun Kumar Electrical
Mithun Kumar Electrical
 
Muthuselvan Bio
Muthuselvan BioMuthuselvan Bio
Muthuselvan Bio
 
10. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.201610. Jawahar CV latest on 10.06.2016
10. Jawahar CV latest on 10.06.2016
 
Cv kavi arasu shummugam sept 2019
Cv   kavi  arasu  shummugam sept  2019Cv   kavi  arasu  shummugam sept  2019
Cv kavi arasu shummugam sept 2019
 

Resume.

  • 1. 1 N.DELEPHKUMAR. Email id: deleph.n@gmail.com Mobile: 09176688601. CAREER OBJECTIVE An experienced facilities engineer from electrical engineering background, with invaluable managerial experience. QUALIFICATION Bachelor of Engineer: Electrical and Electronics 2008-2011 Engineering. Theni Kammavar Sangam College of Technology, Theni. University: Trichy Anna University, Trichy. EXPERIENCE Period: July 2015 to Present. Position: Facility Engineer. Company: CBRE South Asia pvt, Ltd. Client: Shell Business Operations at Perungudi. Chennai - 600096. Job Responsibilities  Organizing the day-to-day facilities management requirements of the company, across 3.5lakhs sq.ft.  Highly organised and able to prioritize tasks.  Reporting to facility managers on plans and resources.  Organising soft services and janitorial facilities.  Contract all outside services that support security, office equipment, supplies, pest control, waste management, construction, fire code, archiving, shredding, utilities, and other facilities services.  Conducting regular facility audits for safety and compliance.  Proactively managing contractors across multiple locations.  Providing feedback, training, coaching and guidance to junior staff.
  • 2. 2  Implementing incident management plans.  Making recommendations for capital expenditures.  Organizing the general administrative services of the Places. Period: April to July 2015. Position: Facility Engineer. Company: Cushman & Wakefield Property Management Services India pvt, Ltd. Client: DLF IT Park at Ramapuram. Chennai - 600089. Job Responsibilities  Responsible for day to day operations, spread over across 7 million sq.ft.  Managing facilities management teams 33KV/11KV, 11KV/440V Electrical, Mechanical maintenance of HVAC, lifts and 11KV HT generators, Types of Treatment Plants & Fire Fighting systems.  Conducting regular facility audits for safety and compliance.  Carrying out regular site audits and inspections to identify any areas that need repairing.  Coordinating and facilitating work flow.  On call for security and facility related issues.  Managing the work of contractors and checking that it is done to the Highest standards.  Supporting all activities around diversity and disability awareness Issues.  Coached on-site supervisors and technicians in strengthening maintenance plans and responsiveness through “hands on” efforts. Period: June 2014 to January 2015. Position: Facility Engineer. Company: Sodexo Technical Services India pvt, Ltd. Client: Ford Business Service Centre at Kandanchavadi. Chennai - 600096.
  • 3. 3 Job Responsibilities  Ensure the regular facility management operations.  Planned strategy to ensure efficient management of assets – Managed, maintained and supported the reliability of the systems, equipment, properties and assets in the facility.  Developed detailed renovation scopes of work to accomplish investors’ vision and successfully directed a multitude of value add projects.  Performed short term and long term planning for the property.  Planned and implemented internal moves and consolidations.  Created comprehensive due diligence property condition reports utilized for contract price negotiations, creation of capital improvement project lists, and cost-benefit reporting.  Established detailed budgets for complete renovations and capital improvement projects. Monitored and reported ongoing budgetary deviations for review by management.  Introduced changes in existing projects without disturbing the ongoing process, thus increasing output and reducing operating costs.  Continually provide a troubleshooting based instructional solution program for on-site maintenance personnel. Period: June 2013 to June 2014(1 Year). Position: Technical Supervisor. Company: Roto Power Project pvt, Ltd. Client: Amazon Development Centre at Kandanchavadi. Chennai - 600096. Job Responsibilities  Developed and Maintained Positive Relationship with Clients.  Respond to problems in a delicate and expedient manner.  Monitor and record PM schedules for utilities.  Working with vendors for AMC related issues and PM.  Documentation and maintenance of all parameters for analyzing and proactive actions.  To prepare the Monthly power consumption report and provide the proper justification if increase or decrease the cost.
  • 4. 4  Operation and maintenance of AHU’S, UPS and Types of AC Units.  Responsible for the delivery in accordance with the maintenance  Strategy in-house and soft facilities management services to the Standards directed. Period: June 2011 to June 2013 (2Years). Position: Multi – Technician. Company: Vipul facility management pvt, Ltd. Client: Cognizant Technology Solutions at MEPZ Tambaram. Chennai - 600045. Job Responsibilities Maintenances of 33KV/440VIndoor Substation, H.T & L.T Panels, Transformers, UPS, Chillers and DG set all equipment’s.  Operation and maintenance of 33KV/433V substation in Cognizant Technology Solutions at Tambaram.  Transformers (2500KVA*1), (2000KVA*4), (1750KVA*4) and (750KVA *1) Dry type.  Up to 630AVacuum circuit breakers and 5000A Air circuit breakers.  Up to 300KVA UPS.  Diesel Generators (2000KVA*1), (1500KVA*8) and (625KVA*2).  Chillers (385 TR*11), (65TR*2), (70TR*2), (180TR*2), (90TR*4) and AHU’s, PAHU’s, VAHU’s.  Chiller water pump-20HP/15KW=13 No’s & 50HP/37KW=13 No’s with VFD Control.  Fire fitting pumps 2 No’s 150HP Sprinkler, Hydrant and jockey pump 50HP, diesel pump150HP.  DG Scrubber 4 No’s with motorized valve & dosing pump system.  HT/LT Panels, APFC Panels, UDB, PDB, LDB, ELDB and Street light fittings etc.
  • 5. 5 STRENGTHS  Positive attitude & Time Management.  Hard work. HOBBIES  Playing Chess.  Listening Songs. PERSONAL PROFILE Father’s name : Mr.Nanthagopal.N Date of Birth : 07th May 1987 Age : 27 Gender : Male Marital Status : Single Nationality : Indian Permanent address : S/o, Mr.Nanthagopal.N, 1/19, Vellalar street, Siluvampatty (po), Namakkal (DT), Pin: 637003. DECLARATION I hereby declare that the information furnished above is true to the best of my knowledge. Place: Chennai. Delephkumar N