Salient features of the Project site:
NTPC Ltd. has placed an order on M/s BHEL for the work of Replacement of LP Heaters
(06 nos.) under R&M of FGUTPP Stage-I (2x210 MW).
NTPC Ltd., a public limited company, incorporated under the company’s act 1956 and
having its registered office at NTPC Bhawan, Core-7, Scope Complex, Institutional Area,
Lodhi Road, New Delhi- 110003
Other details are as follows:-
1. Site Location: State- Uttar Pradesh, site is Approx .35 km from Raebareli.
2. Approach – NTPC Unchahar is approximately 35 km from Raebareli.
Nearest railway station are,
a) Unchahar – 5 km Approx
b) Raebareli - 35 km Approx
c) Allahbad – 90km Approx.
Nearest Airport is Lucknow 120 km Approx.
3. Capacity of Unit – 2x210 MW (Stage I)
The tenderers are however, advised to acquaint themselves with the site conditions,
before submitting their offer. No complaints whatsoever, on account of non- familiarization
with the site conditions, will be entertained.
BHEL Scope of Work- BHEL scope of work shall include design, engineering,
manufacturing, inspection of materials for New LP Heaters, its packing & forwarding to
site including loading & unloading, pre-assembly, assembly, dismantling, erection,
supervision, pre-commissioning, trial operation, commissioning and performance &
guarantee testing of the equipment/system.
For the purpose of erection of these projects, BHEL engages sub-contractors of high
competence level and proven capability. Selection of major sub-contractor is done with a
stringent system involving BHEL’s client. All construction activities are carried out strictly
in accordance with field quality plan approved by client. Client is also very actively
involved during execution of the work at site with the well-experienced team of BHEL
specialists.
As a result of consistent good practices and being an ISO 9000 (Quality Mgmt
system), ISO 14001 (Environmental Mgmt. system) and OHSAS 18001 (Occupational
Health & Safety system) certified organization, BHEL has achieved remarkable result in
this field and also committed to achieve better in times to come.
BRIEF SCOPE OF WORK BY BHEL:
The risk Coverage shall include receipt, unloading of material at site, storage of item at
site, dismantling of existing structure at site, storage of dismantled item at site,
handling/shifting of goods/consignments for the purpose of assembly, erection, testing
and commissioning and until completion of erection, testing, commissioning trial operation
and performance test of all connected systems in respect of equipment covered including
extended warranty period for work of ‘Replacement of LP Heaters (06 nos.) under R&M
of FGUTPP Stage-I (2x210 mw).’’
MILESTONE DATES
SL.NO MILESTONE ACTIVITY TENTATIVE DATES
1. START OF ERECTION As per shutdown taken by NTPC
2. COMMISSIONING & HANDING
OVER OF LAST UNIT
JULY 2022

More Related Content

What's hot

Changes to Professional Services GSA Schedules
Changes to Professional Services GSA SchedulesChanges to Professional Services GSA Schedules
Changes to Professional Services GSA SchedulesWinvale
 
EPMS5397 Elite Expansion Project Summary
EPMS5397 Elite Expansion Project SummaryEPMS5397 Elite Expansion Project Summary
EPMS5397 Elite Expansion Project SummaryEvan Montgomery
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen Music
 

What's hot (9)

Changes to Professional Services GSA Schedules
Changes to Professional Services GSA SchedulesChanges to Professional Services GSA Schedules
Changes to Professional Services GSA Schedules
 
RS_HFZ_V2
RS_HFZ_V2RS_HFZ_V2
RS_HFZ_V2
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
EPMS5397 Elite Expansion Project Summary
EPMS5397 Elite Expansion Project SummaryEPMS5397 Elite Expansion Project Summary
EPMS5397 Elite Expansion Project Summary
 
Stephen music resume seeking new opportunities
Stephen music resume seeking new opportunitiesStephen music resume seeking new opportunities
Stephen music resume seeking new opportunities
 
VISHNU CV
VISHNU CVVISHNU CV
VISHNU CV
 
Gaylor Electric
Gaylor ElectricGaylor Electric
Gaylor Electric
 
ABCCOM Profile1
ABCCOM Profile1ABCCOM Profile1
ABCCOM Profile1
 
MEPpdf.PDF
MEPpdf.PDFMEPpdf.PDF
MEPpdf.PDF
 

Similar to Project information

Project&Site Experience
Project&Site ExperienceProject&Site Experience
Project&Site ExperienceShrikant Badhe
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdfKSLDESIGN
 
Presentation Sample KAAU
Presentation Sample KAAUPresentation Sample KAAU
Presentation Sample KAAUAbdullah Bakhsh
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCkhursheed aiam
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...yusuf699644
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFAAhmedAttia136
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016Avtar Singh
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspectorWael Mahmoud alkilany
 

Similar to Project information (20)

Project&Site Experience
Project&Site ExperienceProject&Site Experience
Project&Site Experience
 
Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00Rihan Height Project Execution Plan-Rev00
Rihan Height Project Execution Plan-Rev00
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
 
RESUME-Sijin
RESUME-SijinRESUME-Sijin
RESUME-Sijin
 
110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf110KV Substation spec with AnnexuresR.pdf
110KV Substation spec with AnnexuresR.pdf
 
QC
QCQC
QC
 
Presentation Sample KAAU
Presentation Sample KAAUPresentation Sample KAAU
Presentation Sample KAAU
 
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLCUpdated-Mohammed Khursheed -CV -Alam, VELOSI LLC
Updated-Mohammed Khursheed -CV -Alam, VELOSI LLC
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
Lead HRSG Commissioning TFA
Lead HRSG Commissioning TFALead HRSG Commissioning TFA
Lead HRSG Commissioning TFA
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Cv 15 sep2016
Cv 15 sep2016Cv 15 sep2016
Cv 15 sep2016
 
Avtar_singh CV 2016
Avtar_singh  CV 2016Avtar_singh  CV 2016
Avtar_singh CV 2016
 
Summer traning report
Summer traning reportSummer traning report
Summer traning report
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspectorQa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi  welding inspector
Qa qc mechanical engineer ,api 510,api 570 ,api 653 & cwi welding inspector
 

Recently uploaded

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Recently uploaded (20)

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

Project information

  • 1. PROJECT INFORMATION Salient features of the Project site: NTPC Ltd. has placed an order on M/s BHEL for the work of Replacement of LP Heaters (06 nos.) under R&M of FGUTPP Stage-I (2x210 MW). NTPC Ltd., a public limited company, incorporated under the company’s act 1956 and having its registered office at NTPC Bhawan, Core-7, Scope Complex, Institutional Area, Lodhi Road, New Delhi- 110003 Other details are as follows:- 1. Site Location: State- Uttar Pradesh, site is Approx .35 km from Raebareli. 2. Approach – NTPC Unchahar is approximately 35 km from Raebareli. Nearest railway station are, a) Unchahar – 5 km Approx b) Raebareli - 35 km Approx c) Allahbad – 90km Approx. Nearest Airport is Lucknow 120 km Approx. 3. Capacity of Unit – 2x210 MW (Stage I) The tenderers are however, advised to acquaint themselves with the site conditions, before submitting their offer. No complaints whatsoever, on account of non- familiarization with the site conditions, will be entertained. BHEL Scope of Work- BHEL scope of work shall include design, engineering, manufacturing, inspection of materials for New LP Heaters, its packing & forwarding to site including loading & unloading, pre-assembly, assembly, dismantling, erection, supervision, pre-commissioning, trial operation, commissioning and performance & guarantee testing of the equipment/system. For the purpose of erection of these projects, BHEL engages sub-contractors of high competence level and proven capability. Selection of major sub-contractor is done with a stringent system involving BHEL’s client. All construction activities are carried out strictly in accordance with field quality plan approved by client. Client is also very actively involved during execution of the work at site with the well-experienced team of BHEL specialists. As a result of consistent good practices and being an ISO 9000 (Quality Mgmt system), ISO 14001 (Environmental Mgmt. system) and OHSAS 18001 (Occupational Health & Safety system) certified organization, BHEL has achieved remarkable result in this field and also committed to achieve better in times to come.
  • 2. BRIEF SCOPE OF WORK BY BHEL: The risk Coverage shall include receipt, unloading of material at site, storage of item at site, dismantling of existing structure at site, storage of dismantled item at site, handling/shifting of goods/consignments for the purpose of assembly, erection, testing and commissioning and until completion of erection, testing, commissioning trial operation and performance test of all connected systems in respect of equipment covered including extended warranty period for work of ‘Replacement of LP Heaters (06 nos.) under R&M of FGUTPP Stage-I (2x210 mw).’’ MILESTONE DATES SL.NO MILESTONE ACTIVITY TENTATIVE DATES 1. START OF ERECTION As per shutdown taken by NTPC 2. COMMISSIONING & HANDING OVER OF LAST UNIT JULY 2022