Projects and Organizational Strategy
Strategic management – the science of
formulating, implementing and evaluating cross-
functional decisions that enable an
organization to achieve its objectives.
Consists of:
– Developing vision and mission statements
– Formulating, implementing and evaluating
– Making cross functional decisions
– Achieving objectives
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-3
Projects Reflect Strategy
A firm wishing to… may have a project
redevelop products or processes, to reengineer products or processes.
change strategic direction or product
portfolio configuration,
to create new product lines.
improve cross-organizational
communication & efficiency
to install an enterprise IT system.
Projects are stepping stones of corporate strategy
The firm’s strategic development is a driving force
behind project development
Some examples include:
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-4
Relationship of Strategic Elements
Fig 2.1
Mission
Objectives
Goals Programs
Strategy
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-5
Stakeholder Management
Stakeholders are all individuals or groups who have
an active stake in the project and can potentially impact,
either positively or negatively, its development.
Sets of project stakeholders include:
Internal Stakeholders
• Top management
• Accountant
• Other functional managers
• Project team members
External Stakeholders
• Clients
• Competitors
• Suppliers
• Environmental, political, consumer,
and other intervenor groups
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-6
Project Stakeholder Relationships
Clients
Project
Manager
Other
Functional
Managers
External
Environment
Project
Team
Accountant
Top
Management
Parent
Organization
Fig 2.3
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-7
Managing Stakeholders
1. Assess the environment
2. Identify the goals of the principal actors
3. Assess your own capabilities
4. Define the problem
5. Develop solutions
6. Test and refine the solutions
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-8
Project Stakeholder Management Cycle
Fig 2.4
Project
Management Team
Identify
Stakeholders
Gather Information
on Stakeholders
Determine
Stakeholder
Strengths &
Weaknesses
Implement
Stakeholder
Management
Strategy
Identify
Stakeholders’
Mission
Predict
Stakeholder
Behavior
Identify
Stakeholder
Strategy
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-9
Organizational Structure
Consists of three key elements:
1. Designates formal reporting relationships
– number of levels in the hierarchy
– span of control
2. Groupings of:
– individuals into departments
– departments into the total organization
3. Design of systems for
– effective communication
– coordination
– integration across departments
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-10
Forms of Organizational Structure
• Functional organizations – group people
performing similar activities into departments
• Project organizations – group people into
project teams on temporary assignments
• Matrix organizations – create a dual hierarchy in
which functions and projects have equal
prominence
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-11
Functional Structures for Project Management
Strengths Weaknesses
1. Firm’s design maintained
2. Fosters development of in-
depth knowledge
3. Standard career paths
4. Project team members remain
connected with their functional
group
1. Functional siloing
2. Lack of customer focus
3. Projects may take longer
4. Projects may be sub-optimized
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-12
Project Structures for Project Management
Strengths Weaknesses
1. Project manager sole authority
2. Improved communication
3. Effective decision-making
4. Creation of project
management experts
5. Rapid response
1. Expensive to set up and
maintain teams
2. Chance of loyalty to the
project rather than the firm
3. No pool of specific knowledge
4. Workers unassigned at project
end
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-13
Matrix Structures for Project Management
Strengths Weaknesses
1. Suited to dynamic
environments
2. Equal emphasis on project
management and functional
efficiency
3. Promotes coordination across
functional units
4. Maximizes scarce resources
1. Dual hierarchies mean two
bosses
2. Negotiation required in order
to share resources
3. Workers caught between
competing project & functional
demands
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-14
Heavyweight Project Organizations
Organizations can sometimes gain tremendous benefit
from creating a fully-dedicated project organization
Lockheed Corporation’s “Skunkworks”
• Project manager authority expanded
• Functional alignment abandoned in favor of market
opportunism
• Focus on external customer
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-15
Project Management Offices
Centralized units that oversee or improve the
management of projects
Resource centers for:
– Technical details offloaded from manager
– Expertise in project management skills
– Repository of lessons learned, documentation
– Center for project management excellence
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-16
Forms of PMOs
• Weather station – monitoring and tracking
• Control tower – project management is a skill to
be protected and supported
• Resource pool – maintain and provide a cadre of
skilled project professionals
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-17
Organizational Culture
The unwritten rules of behavior, or norms that are used to shape
and guide behavior, is shared by some subset of organization
members and is taught to all new members of the company.
Key factors that affect culture development
– Technology
– Environment
– Geographical location
– Reward systems
– Rules and procedures
– Key organizational members
– Critical incidents
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-18
Cultural Influences
• Technology
• Environment
• Geographical location
• Reward systems
• Rules and procedures
• Key organizational members
• Critical incidents
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-19
Culture Affects Project Management
• Departmental interaction
• Employee commitment to goals
• Project planning
• Performance evaluation
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-20

More Related Content

What's hot

Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...JustAcademy
 
Project management planning
Project management planningProject management planning
Project management planningAlvin Niere
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection MethodsManikandan M
 
Project Management
Project ManagementProject Management
Project ManagementWarawut
 
Operation mangement vs project management
Operation mangement vs project managementOperation mangement vs project management
Operation mangement vs project managementJeet Manojit
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Planproject management
 
Project management chapter 2
Project management chapter 2Project management chapter 2
Project management chapter 2Dauda Jamada
 
Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerEarl Tongol
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosettidrosetti
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsNishant Munjal
 
PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)Mohammad Mohammadi
 

What's hot (20)

Chap008
Chap008Chap008
Chap008
 
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
 
Project management planning
Project management planningProject management planning
Project management planning
 
Project Selection Methods
Project Selection MethodsProject Selection Methods
Project Selection Methods
 
PMP
PMPPMP
PMP
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
 
Project Management
Project ManagementProject Management
Project Management
 
Operation mangement vs project management
Operation mangement vs project managementOperation mangement vs project management
Operation mangement vs project management
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Project management chapter 2
Project management chapter 2Project management chapter 2
Project management chapter 2
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
Project management
Project managementProject management
Project management
 
Leadership: Being an Effective Project Manager
Leadership: Being an Effective Project ManagerLeadership: Being an Effective Project Manager
Leadership: Being an Effective Project Manager
 
Project management
Project managementProject management
Project management
 
Chap003
Chap003Chap003
Chap003
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosetti
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)PMBOK(Project Management Body of Knowledge)
PMBOK(Project Management Body of Knowledge)
 

Similar to Pinto pm2 ch02

C2 -the_organizational_context_-_strategy_structure_and_culture
C2  -the_organizational_context_-_strategy_structure_and_cultureC2  -the_organizational_context_-_strategy_structure_and_culture
C2 -the_organizational_context_-_strategy_structure_and_cultureIzah Asmadi
 
Design a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceDesign a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceErica Toelle
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional DesignersKimberly Kaye
 
Chapter 4(1) system development life .ppt
Chapter 4(1) system development life .pptChapter 4(1) system development life .ppt
Chapter 4(1) system development life .pptDoaaRezk5
 
Project management - Indian Business Academy
Project management - Indian Business AcademyProject management - Indian Business Academy
Project management - Indian Business AcademyGajjala vivekananda
 
Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)GPMS
 
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITPMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITChief Innovation
 
Software project management
Software project managementSoftware project management
Software project managementnil65
 
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and ImplementationCISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and ImplementationInfosecTrain
 
Week 7 Github - SI- Architecture.pptx
Week 7 Github - SI-  Architecture.pptxWeek 7 Github - SI-  Architecture.pptx
Week 7 Github - SI- Architecture.pptxArjayBalberan1
 
Project Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfProject Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfFaisalAziz831398
 
10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffingPavan Kumar
 
SharePoint Governance PlanCompany NamePrepared forDate &.docx
SharePoint Governance PlanCompany NamePrepared forDate &.docxSharePoint Governance PlanCompany NamePrepared forDate &.docx
SharePoint Governance PlanCompany NamePrepared forDate &.docxlesleyryder69361
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational StructureBhuWan Khadka
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkHossam Maghrabi
 
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Wayne Tarken, CSM, SPHR
 

Similar to Pinto pm2 ch02 (20)

C2 -the_organizational_context_-_strategy_structure_and_culture
C2  -the_organizational_context_-_strategy_structure_and_cultureC2  -the_organizational_context_-_strategy_structure_and_culture
C2 -the_organizational_context_-_strategy_structure_and_culture
 
4.pptx
4.pptx4.pptx
4.pptx
 
Design a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational ExcellenceDesign a SharePoint Program for Ongoing Operational Excellence
Design a SharePoint Program for Ongoing Operational Excellence
 
Project management for Instructional Designers
Project management for Instructional DesignersProject management for Instructional Designers
Project management for Instructional Designers
 
Chapter 4(1) system development life .ppt
Chapter 4(1) system development life .pptChapter 4(1) system development life .ppt
Chapter 4(1) system development life .ppt
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
Project management - Indian Business Academy
Project management - Indian Business AcademyProject management - Indian Business Academy
Project management - Indian Business Academy
 
Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)Project Management Office (Anna Maria Felici)
Project Management Office (Anna Maria Felici)
 
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-ITPMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
PMO for Supply Chain - Setting Up a Project Mangement Office for Non-IT
 
Software project management
Software project managementSoftware project management
Software project management
 
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and ImplementationCISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
 
Cisa domain 3
Cisa domain 3Cisa domain 3
Cisa domain 3
 
Week 7 Github - SI- Architecture.pptx
Week 7 Github - SI-  Architecture.pptxWeek 7 Github - SI-  Architecture.pptx
Week 7 Github - SI- Architecture.pptx
 
Project Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdfProject Management Methodology_rFmAt0BhU0dwihA.pdf
Project Management Methodology_rFmAt0BhU0dwihA.pdf
 
10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing10 me667 chap3 organizing and staffing
10 me667 chap3 organizing and staffing
 
SharePoint Governance PlanCompany NamePrepared forDate &.docx
SharePoint Governance PlanCompany NamePrepared forDate &.docxSharePoint Governance PlanCompany NamePrepared forDate &.docx
SharePoint Governance PlanCompany NamePrepared forDate &.docx
 
05. Project And Organizational Structure
05. Project And Organizational Structure05. Project And Organizational Structure
05. Project And Organizational Structure
 
PMBOK_5th_Project Management Framework
PMBOK_5th_Project Management FrameworkPMBOK_5th_Project Management Framework
PMBOK_5th_Project Management Framework
 
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
Integrated Approach to Developing and Executing a HR 2020 Transformation Stra...
 
Project management structures
Project management structuresProject management structures
Project management structures
 

More from 691966

ch05. Political Legal Environments
ch05. Political Legal Environmentsch05. Political Legal Environments
ch05. Political Legal Environments691966
 
ch04. Cultural Issues & Buying Behavior
ch04. Cultural Issues & Buying Behaviorch04. Cultural Issues & Buying Behavior
ch04. Cultural Issues & Buying Behavior691966
 
ch03.ppt
ch03.pptch03.ppt
ch03.ppt691966
 
ch02.ppt
ch02.pptch02.ppt
ch02.ppt691966
 
ch01.ppt Globalization
ch01.ppt Globalizationch01.ppt Globalization
ch01.ppt Globalization691966
 
Dessler_hrm14_ ppt_18.pptx
Dessler_hrm14_ ppt_18.pptxDessler_hrm14_ ppt_18.pptx
Dessler_hrm14_ ppt_18.pptx691966
 
Dessler_hrm14_ ppt_03.pptx
Dessler_hrm14_ ppt_03.pptxDessler_hrm14_ ppt_03.pptx
Dessler_hrm14_ ppt_03.pptx691966
 
Dessler_hrm14_ ppt_02.pptx
Dessler_hrm14_ ppt_02.pptxDessler_hrm14_ ppt_02.pptx
Dessler_hrm14_ ppt_02.pptx691966
 
Chapter 1 The Revolutionary Impact of Entrepreneurship
Chapter 1 The Revolutionary Impact of EntrepreneurshipChapter 1 The Revolutionary Impact of Entrepreneurship
Chapter 1 The Revolutionary Impact of Entrepreneurship691966
 
Pinto pm2 ch01
Pinto pm2 ch01Pinto pm2 ch01
Pinto pm2 ch01691966
 
Working in Groups ppt 5ed
Working in Groups ppt 5edWorking in Groups ppt 5ed
Working in Groups ppt 5ed691966
 
Global Marketing Management, 5th ed
Global Marketing Management, 5th edGlobal Marketing Management, 5th ed
Global Marketing Management, 5th ed691966
 
Case Study: Cisco
Case Study: CiscoCase Study: Cisco
Case Study: Cisco691966
 
Listening in Groups
Listening in GroupsListening in Groups
Listening in Groups691966
 

More from 691966 (14)

ch05. Political Legal Environments
ch05. Political Legal Environmentsch05. Political Legal Environments
ch05. Political Legal Environments
 
ch04. Cultural Issues & Buying Behavior
ch04. Cultural Issues & Buying Behaviorch04. Cultural Issues & Buying Behavior
ch04. Cultural Issues & Buying Behavior
 
ch03.ppt
ch03.pptch03.ppt
ch03.ppt
 
ch02.ppt
ch02.pptch02.ppt
ch02.ppt
 
ch01.ppt Globalization
ch01.ppt Globalizationch01.ppt Globalization
ch01.ppt Globalization
 
Dessler_hrm14_ ppt_18.pptx
Dessler_hrm14_ ppt_18.pptxDessler_hrm14_ ppt_18.pptx
Dessler_hrm14_ ppt_18.pptx
 
Dessler_hrm14_ ppt_03.pptx
Dessler_hrm14_ ppt_03.pptxDessler_hrm14_ ppt_03.pptx
Dessler_hrm14_ ppt_03.pptx
 
Dessler_hrm14_ ppt_02.pptx
Dessler_hrm14_ ppt_02.pptxDessler_hrm14_ ppt_02.pptx
Dessler_hrm14_ ppt_02.pptx
 
Chapter 1 The Revolutionary Impact of Entrepreneurship
Chapter 1 The Revolutionary Impact of EntrepreneurshipChapter 1 The Revolutionary Impact of Entrepreneurship
Chapter 1 The Revolutionary Impact of Entrepreneurship
 
Pinto pm2 ch01
Pinto pm2 ch01Pinto pm2 ch01
Pinto pm2 ch01
 
Working in Groups ppt 5ed
Working in Groups ppt 5edWorking in Groups ppt 5ed
Working in Groups ppt 5ed
 
Global Marketing Management, 5th ed
Global Marketing Management, 5th edGlobal Marketing Management, 5th ed
Global Marketing Management, 5th ed
 
Case Study: Cisco
Case Study: CiscoCase Study: Cisco
Case Study: Cisco
 
Listening in Groups
Listening in GroupsListening in Groups
Listening in Groups
 

Recently uploaded

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 

Recently uploaded (18)

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 

Pinto pm2 ch02

  • 1. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-1 The Organizational Context: Strategy, Structure, and Culture Chapter 2
  • 2. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-2 Projects and Organizational Strategy Strategic management – the science of formulating, implementing and evaluating cross- functional decisions that enable an organization to achieve its objectives. Consists of: – Developing vision and mission statements – Formulating, implementing and evaluating – Making cross functional decisions – Achieving objectives
  • 3. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-3 Projects Reflect Strategy A firm wishing to… may have a project redevelop products or processes, to reengineer products or processes. change strategic direction or product portfolio configuration, to create new product lines. improve cross-organizational communication & efficiency to install an enterprise IT system. Projects are stepping stones of corporate strategy The firm’s strategic development is a driving force behind project development Some examples include:
  • 4. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-4 Relationship of Strategic Elements Fig 2.1 Mission Objectives Goals Programs Strategy
  • 5. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-5 Stakeholder Management Stakeholders are all individuals or groups who have an active stake in the project and can potentially impact, either positively or negatively, its development. Sets of project stakeholders include: Internal Stakeholders • Top management • Accountant • Other functional managers • Project team members External Stakeholders • Clients • Competitors • Suppliers • Environmental, political, consumer, and other intervenor groups
  • 6. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-6 Project Stakeholder Relationships Clients Project Manager Other Functional Managers External Environment Project Team Accountant Top Management Parent Organization Fig 2.3
  • 7. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-7 Managing Stakeholders 1. Assess the environment 2. Identify the goals of the principal actors 3. Assess your own capabilities 4. Define the problem 5. Develop solutions 6. Test and refine the solutions
  • 8. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-8 Project Stakeholder Management Cycle Fig 2.4 Project Management Team Identify Stakeholders Gather Information on Stakeholders Determine Stakeholder Strengths & Weaknesses Implement Stakeholder Management Strategy Identify Stakeholders’ Mission Predict Stakeholder Behavior Identify Stakeholder Strategy
  • 9. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-9 Organizational Structure Consists of three key elements: 1. Designates formal reporting relationships – number of levels in the hierarchy – span of control 2. Groupings of: – individuals into departments – departments into the total organization 3. Design of systems for – effective communication – coordination – integration across departments
  • 10. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-10 Forms of Organizational Structure • Functional organizations – group people performing similar activities into departments • Project organizations – group people into project teams on temporary assignments • Matrix organizations – create a dual hierarchy in which functions and projects have equal prominence
  • 11. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-11 Functional Structures for Project Management Strengths Weaknesses 1. Firm’s design maintained 2. Fosters development of in- depth knowledge 3. Standard career paths 4. Project team members remain connected with their functional group 1. Functional siloing 2. Lack of customer focus 3. Projects may take longer 4. Projects may be sub-optimized
  • 12. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-12 Project Structures for Project Management Strengths Weaknesses 1. Project manager sole authority 2. Improved communication 3. Effective decision-making 4. Creation of project management experts 5. Rapid response 1. Expensive to set up and maintain teams 2. Chance of loyalty to the project rather than the firm 3. No pool of specific knowledge 4. Workers unassigned at project end
  • 13. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-13 Matrix Structures for Project Management Strengths Weaknesses 1. Suited to dynamic environments 2. Equal emphasis on project management and functional efficiency 3. Promotes coordination across functional units 4. Maximizes scarce resources 1. Dual hierarchies mean two bosses 2. Negotiation required in order to share resources 3. Workers caught between competing project & functional demands
  • 14. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-14 Heavyweight Project Organizations Organizations can sometimes gain tremendous benefit from creating a fully-dedicated project organization Lockheed Corporation’s “Skunkworks” • Project manager authority expanded • Functional alignment abandoned in favor of market opportunism • Focus on external customer
  • 15. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-15 Project Management Offices Centralized units that oversee or improve the management of projects Resource centers for: – Technical details offloaded from manager – Expertise in project management skills – Repository of lessons learned, documentation – Center for project management excellence
  • 16. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-16 Forms of PMOs • Weather station – monitoring and tracking • Control tower – project management is a skill to be protected and supported • Resource pool – maintain and provide a cadre of skilled project professionals
  • 17. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-17 Organizational Culture The unwritten rules of behavior, or norms that are used to shape and guide behavior, is shared by some subset of organization members and is taught to all new members of the company. Key factors that affect culture development – Technology – Environment – Geographical location – Reward systems – Rules and procedures – Key organizational members – Critical incidents
  • 18. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-18 Cultural Influences • Technology • Environment • Geographical location • Reward systems • Rules and procedures • Key organizational members • Critical incidents
  • 19. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-19 Culture Affects Project Management • Departmental interaction • Employee commitment to goals • Project planning • Performance evaluation
  • 20. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 2-20