The document outlines the safe isolation procedure which involves identifying the point of isolation, locking it off with a warning label, testing with approved equipment to ensure no voltage is present, retesting equipment, and isolating secondary energy sources. It recommends seeking permission first if vital services could be interrupted. Key steps include locking isolation points, applying warning labels, thoroughly testing for voltage absence, and isolating backup power sources.