SlideShare a Scribd company logo
1 of 6
Over the years I have read all too many project closeout reports, reports from turn-around managers on 
troubled projects, audit reports and project post-mortems. These reports have recurring findings that can be 
used to either guide effective management of a project or serve as a findings checklist for the auditor or 
other manager looking at a troubled project. Clearly an ounce of prevention is the desired course of action. 
While the “findings” that follow are not all encompassing, they serve as a good framework for project 
managers, functional leads and corporate management to assess whether a particular project is suffering 
from or prone to one or more of the findings common to many troubled projects. 
For turnaround manager’s and project auditor’s, it unfortunately will give them a head start in structuring 
their report! 
Findings On A Troubled Project 
1. Failing to Adequately Plan: 
o Poorly defined objectives lead to weak planning 
o Weak planning leads to inefficiency and rework 
o Plan without the end clearly understood 
o Plan not utilized or kept up to date 
2. Weak Communications: 
o Stakeholders not fully defined 
o Communication plan for individual stakeholder groups not fully in place 
o Frequency and completeness of communication does not meet stakeholder’s needs 
o Communication plan and efforts not updated or fail to evolve through project lifecycle 
o Communication approach provides insufficiently for “active listening” 
o Project status not communicated frequently and in detail 
3. Failing to Get Adequate Team Buy-in: 
o Top down planning creates perception of “expediting” 
o Limited team buy-in delays “front line” decisions, acceptance of responsibility and 
constructive suggestions and feedback 
o Lack of required team skills may not be identified early on 
4. Team Skills Don’t Meet Project Needs: 
o Skill gaps not identified 
o “Hope” adapted as a strategy 
o Changed project needs not reflected in plan or team skills mix 
5. No One is Responsible: 
o Roles and responsibilities in project execution not articulated 
o Control of “white spaces” not addressed 
o Support mechanisms not identified or in place
o Penalty for “taking personal risks” outweighs penalty for “failing to take personal risk” 
(retribution vs. reward culture) 
6. Performance Metrics not Effectively Used: 
o “True Condition” of project (or portion) is not known 
o Work performance metrics foster “debate on data” versus focus on performance 
improvement 
o Accountability not linked to performance 
o Communication and collaboration metrics not established for cross functional activities 
o Importance of safety and quality to overall efficiency not addressed by metrics 
7. Team Culture Not Defined, Communicated, Established or Supported: 
o Negative behaviors are tolerated 
o Difficulty of cultural change not appreciated 
o Team building never completed 
o Feedback mechanism to assess “team” performance not in place 
8. Plan Not Sufficiently Developed: 
o Notion that the “devil is in the details” is not heeded 
o Planning not to a level that allows gaps, conflicts or opportunities to become apparent 
o Planning assumptions not stress tested by detailed plan development 
o Productivity, cost, schedule details based on “historical means” versus current or forecast 
“realities” 
9. Failure to Fully Assess and Manage Risks: 
o Quantitative risks not comprehensively assessed 
o Over reliance on “factors” from prior projects without understanding differences between 
projects 
o Event risks not adequately addressed 
o “Known unknowns” not factored into risk analysis 
o Management actions to mitigate or manage risks not developed or articulated 
o Indirect consequences of risks not considered (Project disruption) 
o Contingency planning and provision not vigorously done 
o Plan to manage “unknown unknowns” (crisis planning) not done 
10. Critical Path Not Understood: 
o Project priorities and requirement for achievement not well developed 
o Resources not allocated to clearly support critical path 
o Intermediate milestones not clearly understood or communicated
o Events impacting or potentially impacting critical path not understood or communicated in a 
timely manner 
11. Schedule Does Not Reflect Realities of Project: 
o “Political” dates bear no resemblance to project approach or resource loading 
o Morale impact of unrealistic dates and intermediate milestones not appreciated 
o Project sequencing and decision time frames not understood 
o External schedule drivers and constraints not adequately considered 
o Interdependences not adequately reflected in project schedule 
12. Quality Management Culture Not Built Into Project: 
o Quality Plan not developed at outset of project 
o Quality activities not flowed down into all project elements 
o Quality requirements not extended throughout supply chain 
o Timely identification of quality affecting issues does not occur 
o Corrective action plans not developed or effectively implemented 
13. Inadequate Project Management Skills: 
o Required skills not clearly understood at outset of project 
o Skill gaps not identified 
o Inadequate training to close skills gaps 
o Inadequate ongoing performance assessment of management skills 
14. Dysfunctional Project Organization: 
o No clear lines of authority 
o Lack of empowerment 
o Silos impede project performance 
o Lack of timely information sharing 
o Poor interpersonal relationships or lack of trust 
15. Project Management Framework Systems Not in Place or Appropriately Utilized 
o Necessary systems and tools not put in place at outset of project 
o Framework systems are not adequately integrated and do not provide timely and 
comprehensive “view” of the project. 
o Framework systems are not being utilized and local tools contain unintegrated information 
important to management of project and assessment of performance 
16. Project Execution Lacks Rigor: 
o Individual WBS elements or activities have not been rigorously planned 
o Early and late start scenarios not considered
o Pre-conditions to undertaking an activity not well understood 
o Decisions not made in a timely fashion 
o “Paralysis by analysis” is accepted as substitute for informed risk taking 
o Changes and their inevitable disruption are not managed 
o Priorities “float” or no process for re-prioritization of project exists 
o Resource allocation does not match stated priorities 
o Resource hoarding tolerated 
o Organizational or process silos not broken down 
17. Project Execution Bottlenecks not Aggressively Addressed: 
o Telltale signs of people, process or physical bottlenecks not recognized or ignored 
o Unwillingness to deal with difficult people or change or failed processes 
o Team member concerns have no effective channel to management level where they can be 
addressed 
o Information is funneled or hoarded 
18. Project Reporting Does Not Support Project Delivery 
o Project reports focus on quantity of information versus quality of information 
o Project reports do not track open item status and commitments at an appropriate level of 
detail 
o Cross cutting project trends and issues not readily identified 
19. Audit Process Not Used to Support Project Execution: 
o Focused on playing “gotcha” instead of supporting project improvement 
o Project team not involved in defining areas of audit, frequency, and areas of focus at outset 
of project to support their needs 
o Not seen as valuable tool by project team 
o Frequency of audits inadequate to provide input for timely course correction 
o Expertise of audit team inadequate or not respected by project team 
20. Training Not Viewed as an Ongoing Activity: 
o Work Process implemented on ad hoc basis 
o No consistency of approach 
o No feedback loops to capture lessons learned or train best practices into team activities 
o Evolution of skills and associated training needs over project life cycle not recognized 
21. Inadequate Project Closeout: 
o Lack of closeout plan and checklist 
o Commissioning requirements not comprehensively addressed
o Financial closeout process and requirements not agreed to 
22. Lessons Not Learned: 
o Prior project post mortems not reviewed 
o Lessons learned and best practices encountered during project execution not captured or 
communicated 
o Inadequate attention to conducting a project post mortem
o Financial closeout process and requirements not agreed to 
22. Lessons Not Learned: 
o Prior project post mortems not reviewed 
o Lessons learned and best practices encountered during project execution not captured or 
communicated 
o Inadequate attention to conducting a project post mortem

More Related Content

Viewers also liked

Design analysis and Commissioning Of High Mast Lighting Poles
Design analysis and Commissioning Of High Mast Lighting PolesDesign analysis and Commissioning Of High Mast Lighting Poles
Design analysis and Commissioning Of High Mast Lighting Poles
IOSR Journals
 
Commissioning Testing And Maintenance (M'sia) - Arifin
Commissioning Testing And Maintenance (M'sia) - ArifinCommissioning Testing And Maintenance (M'sia) - Arifin
Commissioning Testing And Maintenance (M'sia) - Arifin
Md Arifin
 

Viewers also liked (20)

Knowledge of negotiation techniques
Knowledge of negotiation techniques Knowledge of negotiation techniques
Knowledge of negotiation techniques
 
Design analysis and Commissioning Of High Mast Lighting Poles
Design analysis and Commissioning Of High Mast Lighting PolesDesign analysis and Commissioning Of High Mast Lighting Poles
Design analysis and Commissioning Of High Mast Lighting Poles
 
Led underwater lighting
Led underwater lightingLed underwater lighting
Led underwater lighting
 
Design Checklist_Electrical
Design Checklist_Electrical Design Checklist_Electrical
Design Checklist_Electrical
 
How to manage the performance of direct reports
How to manage the performance of direct reportsHow to manage the performance of direct reports
How to manage the performance of direct reports
 
Negotiation strategies
Negotiation strategies Negotiation strategies
Negotiation strategies
 
Coach and Motivate Direct Reports
Coach and Motivate Direct ReportsCoach and Motivate Direct Reports
Coach and Motivate Direct Reports
 
B011130918
B011130918B011130918
B011130918
 
bala.1
bala.1bala.1
bala.1
 
Wheelchair Tennis Courts Building Brief
Wheelchair Tennis Courts Building BriefWheelchair Tennis Courts Building Brief
Wheelchair Tennis Courts Building Brief
 
Investigation of the Role of Bulkhead and Crack Stopper Strap in the Fail-Saf...
Investigation of the Role of Bulkhead and Crack Stopper Strap in the Fail-Saf...Investigation of the Role of Bulkhead and Crack Stopper Strap in the Fail-Saf...
Investigation of the Role of Bulkhead and Crack Stopper Strap in the Fail-Saf...
 
Project management _ cheat sheet _no1
Project management _ cheat sheet _no1Project management _ cheat sheet _no1
Project management _ cheat sheet _no1
 
Stahl 6788 Bulkhead Light Fitting - ATEX Zone 1 Zone 2 Hazardous Area Lighting
Stahl 6788 Bulkhead Light Fitting - ATEX Zone 1 Zone 2 Hazardous Area LightingStahl 6788 Bulkhead Light Fitting - ATEX Zone 1 Zone 2 Hazardous Area Lighting
Stahl 6788 Bulkhead Light Fitting - ATEX Zone 1 Zone 2 Hazardous Area Lighting
 
Change management roles
Change management rolesChange management roles
Change management roles
 
Engineering management performance management techniques
Engineering management performance management techniquesEngineering management performance management techniques
Engineering management performance management techniques
 
Control System - execution plan
Control System - execution planControl System - execution plan
Control System - execution plan
 
Planning For Engineering
Planning For EngineeringPlanning For Engineering
Planning For Engineering
 
Commissioning Testing And Maintenance (M'sia) - Arifin
Commissioning Testing And Maintenance (M'sia) - ArifinCommissioning Testing And Maintenance (M'sia) - Arifin
Commissioning Testing And Maintenance (M'sia) - Arifin
 
Milestone checklist
Milestone checklist   Milestone checklist
Milestone checklist
 
Engineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivationEngineering Management : knowledge techniques for motivation
Engineering Management : knowledge techniques for motivation
 

Similar to Typical findings on a troubled project

SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
PMI Indonesia Chapter
 

Similar to Typical findings on a troubled project (20)

Project closure and audit
Project closure and auditProject closure and audit
Project closure and audit
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer Mitter
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management Mistakes
 
project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
 
Andy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factorAndy Abu Bakar - Risk Management: the human factor
Andy Abu Bakar - Risk Management: the human factor
 
Are you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesAre you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakes
 
Project Planning module 5 Handout
Project Planning module 5 HandoutProject Planning module 5 Handout
Project Planning module 5 Handout
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
 
PROJECT MANAGEMENT_Framework.pdf
PROJECT MANAGEMENT_Framework.pdfPROJECT MANAGEMENT_Framework.pdf
PROJECT MANAGEMENT_Framework.pdf
 
Project management
Project managementProject management
Project management
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & HeroSymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
SymEx 2015 - Troubled Project Recovery, The Story of Firefighter & Hero
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder Management
 
Project management
Project managementProject management
Project management
 
Introduction to Project Management for Researchers
Introduction to Project Management for ResearchersIntroduction to Project Management for Researchers
Introduction to Project Management for Researchers
 
Getting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptxGetting Really Good at Projects with Salesforce!.pptx
Getting Really Good at Projects with Salesforce!.pptx
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Chap014
Chap014Chap014
Chap014
 

More from Stephanus Roux C Eng , IntPE(uk) , FIET

More from Stephanus Roux C Eng , IntPE(uk) , FIET (20)

Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 
Control System - support capabilities
Control System - support capabilitiesControl System - support capabilities
Control System - support capabilities
 
Standards and protocols instrumentation ( typical)
Standards and protocols   instrumentation ( typical)Standards and protocols   instrumentation ( typical)
Standards and protocols instrumentation ( typical)
 
Design Checklist Process
Design Checklist ProcessDesign Checklist Process
Design Checklist Process
 
Design Checklist Civil & Structural
Design Checklist Civil & StructuralDesign Checklist Civil & Structural
Design Checklist Civil & Structural
 
Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)Design checklist instrumentation_17.01.15 (1)
Design checklist instrumentation_17.01.15 (1)
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
Change management process 17.01.15
Change management process 17.01.15Change management process 17.01.15
Change management process 17.01.15
 
Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)Design Checklist-Instrumentation & Control Systems (typical / guideline)
Design Checklist-Instrumentation & Control Systems (typical / guideline)
 
Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )Technical Spec : DCS ( overview / checklist )
Technical Spec : DCS ( overview / checklist )
 
Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)Standard Process Design Criteria ( typical outline)
Standard Process Design Criteria ( typical outline)
 
Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)Commissioning Procedures for Conveyors (Typical)
Commissioning Procedures for Conveyors (Typical)
 
Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)Deciding Factors ; Control Systems (typical)
Deciding Factors ; Control Systems (typical)
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
Knowledge of Team Dynamics
Knowledge of Team DynamicsKnowledge of Team Dynamics
Knowledge of Team Dynamics
 
Typical Instrument Standards
Typical Instrument StandardsTypical Instrument Standards
Typical Instrument Standards
 
Stephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project ManagerStephanus Roux_Senior Project Manager
Stephanus Roux_Senior Project Manager
 
Basic engineering_Checklist
Basic engineering_ChecklistBasic engineering_Checklist
Basic engineering_Checklist
 
Project closeoutprocess
Project closeoutprocessProject closeoutprocess
Project closeoutprocess
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

Typical findings on a troubled project

  • 1. Over the years I have read all too many project closeout reports, reports from turn-around managers on troubled projects, audit reports and project post-mortems. These reports have recurring findings that can be used to either guide effective management of a project or serve as a findings checklist for the auditor or other manager looking at a troubled project. Clearly an ounce of prevention is the desired course of action. While the “findings” that follow are not all encompassing, they serve as a good framework for project managers, functional leads and corporate management to assess whether a particular project is suffering from or prone to one or more of the findings common to many troubled projects. For turnaround manager’s and project auditor’s, it unfortunately will give them a head start in structuring their report! Findings On A Troubled Project 1. Failing to Adequately Plan: o Poorly defined objectives lead to weak planning o Weak planning leads to inefficiency and rework o Plan without the end clearly understood o Plan not utilized or kept up to date 2. Weak Communications: o Stakeholders not fully defined o Communication plan for individual stakeholder groups not fully in place o Frequency and completeness of communication does not meet stakeholder’s needs o Communication plan and efforts not updated or fail to evolve through project lifecycle o Communication approach provides insufficiently for “active listening” o Project status not communicated frequently and in detail 3. Failing to Get Adequate Team Buy-in: o Top down planning creates perception of “expediting” o Limited team buy-in delays “front line” decisions, acceptance of responsibility and constructive suggestions and feedback o Lack of required team skills may not be identified early on 4. Team Skills Don’t Meet Project Needs: o Skill gaps not identified o “Hope” adapted as a strategy o Changed project needs not reflected in plan or team skills mix 5. No One is Responsible: o Roles and responsibilities in project execution not articulated o Control of “white spaces” not addressed o Support mechanisms not identified or in place
  • 2. o Penalty for “taking personal risks” outweighs penalty for “failing to take personal risk” (retribution vs. reward culture) 6. Performance Metrics not Effectively Used: o “True Condition” of project (or portion) is not known o Work performance metrics foster “debate on data” versus focus on performance improvement o Accountability not linked to performance o Communication and collaboration metrics not established for cross functional activities o Importance of safety and quality to overall efficiency not addressed by metrics 7. Team Culture Not Defined, Communicated, Established or Supported: o Negative behaviors are tolerated o Difficulty of cultural change not appreciated o Team building never completed o Feedback mechanism to assess “team” performance not in place 8. Plan Not Sufficiently Developed: o Notion that the “devil is in the details” is not heeded o Planning not to a level that allows gaps, conflicts or opportunities to become apparent o Planning assumptions not stress tested by detailed plan development o Productivity, cost, schedule details based on “historical means” versus current or forecast “realities” 9. Failure to Fully Assess and Manage Risks: o Quantitative risks not comprehensively assessed o Over reliance on “factors” from prior projects without understanding differences between projects o Event risks not adequately addressed o “Known unknowns” not factored into risk analysis o Management actions to mitigate or manage risks not developed or articulated o Indirect consequences of risks not considered (Project disruption) o Contingency planning and provision not vigorously done o Plan to manage “unknown unknowns” (crisis planning) not done 10. Critical Path Not Understood: o Project priorities and requirement for achievement not well developed o Resources not allocated to clearly support critical path o Intermediate milestones not clearly understood or communicated
  • 3. o Events impacting or potentially impacting critical path not understood or communicated in a timely manner 11. Schedule Does Not Reflect Realities of Project: o “Political” dates bear no resemblance to project approach or resource loading o Morale impact of unrealistic dates and intermediate milestones not appreciated o Project sequencing and decision time frames not understood o External schedule drivers and constraints not adequately considered o Interdependences not adequately reflected in project schedule 12. Quality Management Culture Not Built Into Project: o Quality Plan not developed at outset of project o Quality activities not flowed down into all project elements o Quality requirements not extended throughout supply chain o Timely identification of quality affecting issues does not occur o Corrective action plans not developed or effectively implemented 13. Inadequate Project Management Skills: o Required skills not clearly understood at outset of project o Skill gaps not identified o Inadequate training to close skills gaps o Inadequate ongoing performance assessment of management skills 14. Dysfunctional Project Organization: o No clear lines of authority o Lack of empowerment o Silos impede project performance o Lack of timely information sharing o Poor interpersonal relationships or lack of trust 15. Project Management Framework Systems Not in Place or Appropriately Utilized o Necessary systems and tools not put in place at outset of project o Framework systems are not adequately integrated and do not provide timely and comprehensive “view” of the project. o Framework systems are not being utilized and local tools contain unintegrated information important to management of project and assessment of performance 16. Project Execution Lacks Rigor: o Individual WBS elements or activities have not been rigorously planned o Early and late start scenarios not considered
  • 4. o Pre-conditions to undertaking an activity not well understood o Decisions not made in a timely fashion o “Paralysis by analysis” is accepted as substitute for informed risk taking o Changes and their inevitable disruption are not managed o Priorities “float” or no process for re-prioritization of project exists o Resource allocation does not match stated priorities o Resource hoarding tolerated o Organizational or process silos not broken down 17. Project Execution Bottlenecks not Aggressively Addressed: o Telltale signs of people, process or physical bottlenecks not recognized or ignored o Unwillingness to deal with difficult people or change or failed processes o Team member concerns have no effective channel to management level where they can be addressed o Information is funneled or hoarded 18. Project Reporting Does Not Support Project Delivery o Project reports focus on quantity of information versus quality of information o Project reports do not track open item status and commitments at an appropriate level of detail o Cross cutting project trends and issues not readily identified 19. Audit Process Not Used to Support Project Execution: o Focused on playing “gotcha” instead of supporting project improvement o Project team not involved in defining areas of audit, frequency, and areas of focus at outset of project to support their needs o Not seen as valuable tool by project team o Frequency of audits inadequate to provide input for timely course correction o Expertise of audit team inadequate or not respected by project team 20. Training Not Viewed as an Ongoing Activity: o Work Process implemented on ad hoc basis o No consistency of approach o No feedback loops to capture lessons learned or train best practices into team activities o Evolution of skills and associated training needs over project life cycle not recognized 21. Inadequate Project Closeout: o Lack of closeout plan and checklist o Commissioning requirements not comprehensively addressed
  • 5. o Financial closeout process and requirements not agreed to 22. Lessons Not Learned: o Prior project post mortems not reviewed o Lessons learned and best practices encountered during project execution not captured or communicated o Inadequate attention to conducting a project post mortem
  • 6. o Financial closeout process and requirements not agreed to 22. Lessons Not Learned: o Prior project post mortems not reviewed o Lessons learned and best practices encountered during project execution not captured or communicated o Inadequate attention to conducting a project post mortem