Development Project 
Planning 
Overview of this session 
ī¯ What is Development Planning? 
ī¯ Project Cycle Management 
ī¯ Planning Tools 
o STAKEHOLDER ANALYSIS 
o LOGICAL FRAMEWORK ANALYSIS 
o MONITORING & EVALUATION 
ī¯ Comments on Project Planning 
“If you don’t know where you 
are going, any road will get 
you there” 
Development Planning Theory 
Some of the principles 
ī¯ What ‘just happens’ vs. intentional acts 
ī¯ Development as Vision 
ī¯ Positive or Negative 
ī¯ Development Administration/Management 
o Structure 
o Agency and Agencies 
o Institutions 
ī¯ Trusteeship 
ī¯ Reductionism: power and capacity 
Plans, Programmes, Projects 
ī¯ Plan: a statement of forward looking 
decisions, how they work together and the 
criteria used in making them 
ī¯ Programme: usually a long-term series of 
interventions, sometimes with no defined 
end point 
ī¯ Project: a discrete activity aimed at a 
specific objective with a defined budget and 
limited timeframe 
Aspects of 
Project Cycle Management 
ī¯ Credibility 
ī¯ “Ownership” 
ī¯ Efficiency 
ī¯ Monitoring and control 
ī¯ Formal contingency planning 
ī¯ Despite talkâ€Ļthe approach requires 
some form of “blueprint” to ensure 
adherence to budgets and timeframes 
‘Reductionist’ Project 
Approach 
ī¯ Scientific Management 
o Simplifies and reduces management to a series of 
inter-related and quantifiable components 
ī° Inputs 
ī°Outputs 
ī°Outcomes 
ī°Defined processes and relationships 
ī¯ Has serious flaws, 
but used in all development work 
Generic Project Cycle 
Identification 
Appraisal 
Evaluation 
Implementation & 
Monitoring 
Negotiation and Approval
Generic Project Cycle 
Exercise: Who does each stage? 
Identification 
Appraisal 
Evaluation 
Implementation & 
Monitoring 
Negotiation and Approval 
Logical Framework Approach 
ī¯ ZOPP (Zielorientierte Projektplanung) 
o GOPP- Goal Oriented Project Planning 
ī¯ Planning, by a participatory process, 
ī¯ aimed at the needs of target groups, 
ī¯ the key parts of a project are agreed with 
those concerned 
Logical Framework Approach 
ī¯ Use a planning matrix – the logical 
framework – which: 
o summarises the main parts of a project, and 
o highlights logical linkages between 
ī° intended inputs, 
ī° planned activities and 
ī° expected results. 
ZOPP and the Project Cycle 
GTZ - 5 ZOPP Stages 
1. Pre-project planning 
2. Starting Appraisal 
3. Partner Negotiation 
4. Plan Finalization 
5. Implementation and Monitoring 
6. Evaluation 
1. Pre Project Planning: 
ī¯ Identification 
ī¯ Problem Analysis 
o Stakeholder consultations 
ī¯ Preliminary feasibility study 
o Identification of funding agencies 
o Consideration of possible approaches 
o Site consultation 
ī¯ Possible outputs 
o Concept note/paper 
o Proposal 
o Preliminary feasibility report 
Pre-project planning 
ī¯ In-house exercise by agency 
ī¯ Situation Analysis 
o Problem Identification: Problem Tree 
o Stakeholder Analysis 
o Objectives Analysis 
o Alternatives Analysis
Problem Tree May be upside down 
(Start with effects at top) 
Becomes: Objective Tree 
Funds Best Practice Water 
Administration 
Low Rate Disease 
Low Infant 
Mortality 
All Houses 
Connected 
High Productivity 
Incomes 
Adequate Clean 
WATER 
Sufficient Funds 
Good Water 
System 
Best Practice Water 
Administration 
Low Rate of 
Disease 
Low Infant Mortality High Productivity 
High Incomes 
MEANS 
DESIRABLE STATE 
ENDS 
If necessary, revise statements, delete 
objectives that appear unrealistic and add 
new objectives. 
Stakeholder Analysis 
1. Consider appropriate level for analysis 
2. Identify key stakeholders 
3. Analyse interests characteristics, 
circumstances 
4. Identify patterns of interaction between 
stakeholders 
5. Assess power (influence) and potential 
(importance)
Stakeholder Analysis 
Primary 
Secondary 
Influence Participation 
on project 
Importance to 
Project 
Key 
Interests 
Stakeholders 
Stakeholder Analysis 
Influential stakeholders but with 
less importance for achieving 
project purpose and outputs. 
They affect outcome of activities 
and need careful management 
The interests of these 
stakeholders should be 
monitored to ensure that they 
are not adversely affected 
Project Managers will need to 
develop good working 
relationships with these 
stakeholders to ensure effective 
mobilization of support for 
project activities 
May need special project 
initiatives if interests are to be 
projected. The Target Group 
should be in this category 
Low Influence 
High Influence 
High Potential/Significance/Importance 
Low Potential/Significance/Importance 
Exercise: Problem Tree 
& Stakeholder Analysis 
â€ĸ Choose a problem in Ratanakiri 
â€ĸ Divide in 2 groups 
1. Do a problem tree 
2. Do a stakeholder analysis 
2. Starting Appraisal: 
ī¯ Appraisal (ex-ante) 
o Full feasibility study 
o Baseline study, needs assessment 
ī¯ Possible outputs 
o Needs assessment report 
o Baseline data 
o Detailed set of indicators 
o Amended proposal 
o Project plan, Gantt chart etc. 
o Project Planning Matrix - Logframe 
Gantt Chart 
Project Planning Matrix (PPM) 
ī¯ Logframe, Logical Framework (Analysis), 
LFA 
ī¯ 4x4 matrix 
o Ensures clear statement of objectives 
(distinction between purpose and objectives) 
o Introduces indicators of progress 
o Focuses attention on the assumptions and 
risks involved 
Logframe 
Purpose 
Outputs 
Activities Milestones 
(Inputs) 
Assumptions 
Risks 
MOVs 
Means of 
Verification 
OVIs 
Objectively Verifiable 
Indicators 
Goal 
More detail in the Logframe session
3. Partner Negotiation: 
ī¯ Negotiation with finance provider 
ī¯ Possible outputs 
o Project memorandum 
o Signed contract 
4. Plan Finalisation: 
ī¯ work plans, 
ī¯ staff structures, ToR’s 
ī¯ budgets 
5. Implementation and 
Monitoring : 
ī¯ Team selection and startup 
o Person specification/job allocation 
o Interviews and selection 
o Terms of engagement 
o Lines of responsibility 
o Briefing 
5. Implementation and 
Monitoring : 
ī¯ Do the work 
o Implementation of project management 
regime 
o Regular reports, meetings, workshops 
o Monitoring: systematic documentation of 
performance - indicating whether project is 
performing as intended 
Monitoring 
(Performance Measurement ) 
ī¯ Monitoring 
o Inputs 
o Outputs 
o Outcomes (Results Based Management ) 
o Logical framework approach 
ī¯ Tools: 
o Progress reports 
o Team meetings, team briefing reports 
o Mid term review 
Monitoring 
(Performance Measurement ) 
ī¯ Levels of Indicators 
o Strategic 
o Sustainability 
o Attainment 
o Performance 
Quality, Quantity, Time 
6. Evaluation and Closure: 
ī¯ Obtain “sign off” from project participants 
ī¯ Project evaluation (Ex-post ) 
o When possible to assess full effects 
o External evaluator may be 
necessary/appropriate 
o Record lessons learned 
o Formulate recommendations for next phase 
ī¯ Submission of completion report and evaluation 
o Donors may reserve right to demand concluding 
activities 
Evaluation: 
Impact Assessment 
ī¯ Approach 
o Baseline and End of Project 
o Impact from beneficiaries’ point of view 
o What do they think is significant? 
o To whom is it important? 
ī¯ Criteria 
o Efficiency – relate inputs to outputs 
o Effectiveness- extent to which achieved objectives 
o Consistency- methods/approaches with objectives 
o Impact – change to lives/environment 
Evaluation: Feedback 
ī¯ Lessons Learned 
o Used to replan the project 
o Used to plan the next project 
ī¯ Most useful in development of LFA 
Limits to Rational Planning 
and Systematic Management 
Trade Offs: Too much project 
planning? 
Amount of planning 
Cost
Things that Limit using the 
process 
ī¯ Costly and ineffective analysis 
ī¯ Full planning vs. flexible interaction 
ī¯ Inflexibility and unnecessary constraints on managers, 
ī¯ Delegation to experts and inappropriate intervention 
ī¯ No involvement of intended beneficiaries in planning 
and management 
ī¯ Reluctance to engage in evaluation and error detection 
Constraints 
(that limit effectiveness) 
ī¯ Difficulty in precise definition of objectives 
and goals 
ī¯ Lack of appropriate or adequate data 
ī¯ Not understand social and cultural activities 
ī¯ Weak ways to guide behaviour 
ī¯ Low administrative capacity
3 proj plan handouts

More Related Content

What's hot

Log frame-analysis
Log frame-analysisLog frame-analysis
Log frame-analysisBhim Upadhyaya
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
VoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal PresentationVoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal Presentationbrianbish10795
 
Drafting a project proposal
Drafting a project proposalDrafting a project proposal
Drafting a project proposalVidyavinutha
 
Planning Effective Linkages
Planning Effective LinkagesPlanning Effective Linkages
Planning Effective LinkagesGhulam Qadir
 
Progress Reporting - notes
Progress Reporting - notesProgress Reporting - notes
Progress Reporting - notesTony
 
Project management
Project managementProject management
Project managementAshok Pandey
 
Project proposal
Project proposalProject proposal
Project proposalShefa Idrees
 
Ten rules of project risk management
Ten rules of project risk managementTen rules of project risk management
Ten rules of project risk managementTony
 
Proposal for NGO Capacity
Proposal for NGO CapacityProposal for NGO Capacity
Proposal for NGO CapacityConsultant
 
Project rationale
Project rationaleProject rationale
Project rationaleNader Jarmooz
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)ocasiconference
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)rexcris
 
National project competition proposal template
National project competition proposal templateNational project competition proposal template
National project competition proposal templateFathuruun
 
Project Proposal Basics [JUNE 2006]
Project Proposal Basics [JUNE 2006]Project Proposal Basics [JUNE 2006]
Project Proposal Basics [JUNE 2006]Fahad Mahmud Mirza
 

What's hot (19)

Log frame-analysis
Log frame-analysisLog frame-analysis
Log frame-analysis
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
VoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal PresentationVoIP Project Request For Proposal Presentation
VoIP Project Request For Proposal Presentation
 
Drafting a project proposal
Drafting a project proposalDrafting a project proposal
Drafting a project proposal
 
Planning Effective Linkages
Planning Effective LinkagesPlanning Effective Linkages
Planning Effective Linkages
 
Progress Reporting - notes
Progress Reporting - notesProgress Reporting - notes
Progress Reporting - notes
 
Project management
Project managementProject management
Project management
 
Project proposal
Project proposalProject proposal
Project proposal
 
Ten rules of project risk management
Ten rules of project risk managementTen rules of project risk management
Ten rules of project risk management
 
Proposal for NGO Capacity
Proposal for NGO CapacityProposal for NGO Capacity
Proposal for NGO Capacity
 
Project rationale
Project rationaleProject rationale
Project rationale
 
Project Proposal
Project ProposalProject Proposal
Project Proposal
 
10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
 
Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)Beginners Guide To Logical Framework Approach (BOND)
Beginners Guide To Logical Framework Approach (BOND)
 
Lfa approach on project planning
Lfa approach on project planningLfa approach on project planning
Lfa approach on project planning
 
National project competition proposal template
National project competition proposal templateNational project competition proposal template
National project competition proposal template
 
Project Proposal Basics [JUNE 2006]
Project Proposal Basics [JUNE 2006]Project Proposal Basics [JUNE 2006]
Project Proposal Basics [JUNE 2006]
 
Proposal writing
Proposal writingProposal writing
Proposal writing
 

Similar to 3 proj plan handouts

Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notesTony
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.pptShafayetHossain30
 
Tools of project planning and desgn
Tools of project planning and desgnTools of project planning and desgn
Tools of project planning and desgnMORTUZATOHAN
 
M&E.ppt
M&E.pptM&E.ppt
M&E.pptselam49
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
pmi project management principles.pptx
pmi project management principles.pptxpmi project management principles.pptx
pmi project management principles.pptxssusere01f83
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxGeorgeKabongah2
 
Logical framework
Logical  frameworkLogical  framework
Logical frameworkVaidehi Malvi
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraSandra Guevara
 
Project management
Project managementProject management
Project managementJaya Velagapudi
 
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...AntoineAbdelMassih2
 
Project management
Project managementProject management
Project managementManish Runthala
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project managementMohamed Ahmed Said
 
Lec 06 planning
Lec 06 planningLec 06 planning
Lec 06 planningSAJID ALI RUK
 
It Project Management
It Project ManagementIt Project Management
It Project ManagementTJ Rains
 

Similar to 3 proj plan handouts (20)

Project Planning module 5 presenter notes
Project Planning module 5 presenter notesProject Planning module 5 presenter notes
Project Planning module 5 presenter notes
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
Tools of project planning and desgn
Tools of project planning and desgnTools of project planning and desgn
Tools of project planning and desgn
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
pmi project management principles.pptx
pmi project management principles.pptxpmi project management principles.pptx
pmi project management principles.pptx
 
Project Management Skills
Project Management SkillsProject Management Skills
Project Management Skills
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptxFinal Class Presentation on Direct Problem-solving Intervention Projects.pptx
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
 
Logframe brainstormers
Logframe brainstormersLogframe brainstormers
Logframe brainstormers
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
 
Collaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandraCollaborative 2 ingrid margarita and sandra
Collaborative 2 ingrid margarita and sandra
 
Project management
Project managementProject management
Project management
 
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
Training-on-Logical-Framework-Approach-Monitoring-and-Evaluation-Framework-an...
 
Project management
Project managementProject management
Project management
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Lec 06 planning
Lec 06 planningLec 06 planning
Lec 06 planning
 
It Project Management
It Project ManagementIt Project Management
It Project Management
 

More from Tony

Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Tony
 
Rights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsRights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsTony
 
Remote solar project Ecogeneration Magazine
Remote solar project  Ecogeneration MagazineRemote solar project  Ecogeneration Magazine
Remote solar project Ecogeneration MagazineTony
 
Population Indicators Handout
Population Indicators Handout  Population Indicators Handout
Population Indicators Handout Tony
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposalTony
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notesTony
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8Tony
 
Exercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksExercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksTony
 
Exercise cards - logframe components
Exercise cards - logframe componentsExercise cards - logframe components
Exercise cards - logframe componentsTony
 
Issues Risklog
Issues RisklogIssues Risklog
Issues RisklogTony
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisTony
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder AnalysisTony
 
Project Planning module 5 Handout
Project Planning module 5 HandoutProject Planning module 5 Handout
Project Planning module 5 HandoutTony
 
Project management terms
Project management termsProject management terms
Project management termsTony
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: IndicatorsTony
 
11 Problem Solving
11 Problem Solving11 Problem Solving
11 Problem SolvingTony
 
8 M&E: Data Sources
8 M&E: Data Sources8 M&E: Data Sources
8 M&E: Data SourcesTony
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid ProjectsTony
 
4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder AnalysisTony
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)Tony
 

More from Tony (20)

Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)Policy & Procedure Manual (sample)
Policy & Procedure Manual (sample)
 
Rights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange newsRights Advocacy in Ratanakiri - health exchange news
Rights Advocacy in Ratanakiri - health exchange news
 
Remote solar project Ecogeneration Magazine
Remote solar project  Ecogeneration MagazineRemote solar project  Ecogeneration Magazine
Remote solar project Ecogeneration Magazine
 
Population Indicators Handout
Population Indicators Handout  Population Indicators Handout
Population Indicators Handout
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposal
 
Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notes
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8
 
Exercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanksExercise: Watsan logframe with blanks
Exercise: Watsan logframe with blanks
 
Exercise cards - logframe components
Exercise cards - logframe componentsExercise cards - logframe components
Exercise cards - logframe components
 
Issues Risklog
Issues RisklogIssues Risklog
Issues Risklog
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework Analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Project Planning module 5 Handout
Project Planning module 5 HandoutProject Planning module 5 Handout
Project Planning module 5 Handout
 
Project management terms
Project management termsProject management terms
Project management terms
 
7 M&E: Indicators
7 M&E: Indicators7 M&E: Indicators
7 M&E: Indicators
 
11 Problem Solving
11 Problem Solving11 Problem Solving
11 Problem Solving
 
8 M&E: Data Sources
8 M&E: Data Sources8 M&E: Data Sources
8 M&E: Data Sources
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects
 
4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis
 
3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)
 

3 proj plan handouts

  • 1. Development Project Planning Overview of this session ī¯ What is Development Planning? ī¯ Project Cycle Management ī¯ Planning Tools o STAKEHOLDER ANALYSIS o LOGICAL FRAMEWORK ANALYSIS o MONITORING & EVALUATION ī¯ Comments on Project Planning “If you don’t know where you are going, any road will get you there” Development Planning Theory Some of the principles ī¯ What ‘just happens’ vs. intentional acts ī¯ Development as Vision ī¯ Positive or Negative ī¯ Development Administration/Management o Structure o Agency and Agencies o Institutions ī¯ Trusteeship ī¯ Reductionism: power and capacity Plans, Programmes, Projects ī¯ Plan: a statement of forward looking decisions, how they work together and the criteria used in making them ī¯ Programme: usually a long-term series of interventions, sometimes with no defined end point ī¯ Project: a discrete activity aimed at a specific objective with a defined budget and limited timeframe Aspects of Project Cycle Management ī¯ Credibility ī¯ “Ownership” ī¯ Efficiency ī¯ Monitoring and control ī¯ Formal contingency planning ī¯ Despite talkâ€Ļthe approach requires some form of “blueprint” to ensure adherence to budgets and timeframes ‘Reductionist’ Project Approach ī¯ Scientific Management o Simplifies and reduces management to a series of inter-related and quantifiable components ī° Inputs ī°Outputs ī°Outcomes ī°Defined processes and relationships ī¯ Has serious flaws, but used in all development work Generic Project Cycle Identification Appraisal Evaluation Implementation & Monitoring Negotiation and Approval
  • 2. Generic Project Cycle Exercise: Who does each stage? Identification Appraisal Evaluation Implementation & Monitoring Negotiation and Approval Logical Framework Approach ī¯ ZOPP (Zielorientierte Projektplanung) o GOPP- Goal Oriented Project Planning ī¯ Planning, by a participatory process, ī¯ aimed at the needs of target groups, ī¯ the key parts of a project are agreed with those concerned Logical Framework Approach ī¯ Use a planning matrix – the logical framework – which: o summarises the main parts of a project, and o highlights logical linkages between ī° intended inputs, ī° planned activities and ī° expected results. ZOPP and the Project Cycle GTZ - 5 ZOPP Stages 1. Pre-project planning 2. Starting Appraisal 3. Partner Negotiation 4. Plan Finalization 5. Implementation and Monitoring 6. Evaluation 1. Pre Project Planning: ī¯ Identification ī¯ Problem Analysis o Stakeholder consultations ī¯ Preliminary feasibility study o Identification of funding agencies o Consideration of possible approaches o Site consultation ī¯ Possible outputs o Concept note/paper o Proposal o Preliminary feasibility report Pre-project planning ī¯ In-house exercise by agency ī¯ Situation Analysis o Problem Identification: Problem Tree o Stakeholder Analysis o Objectives Analysis o Alternatives Analysis
  • 3. Problem Tree May be upside down (Start with effects at top) Becomes: Objective Tree Funds Best Practice Water Administration Low Rate Disease Low Infant Mortality All Houses Connected High Productivity Incomes Adequate Clean WATER Sufficient Funds Good Water System Best Practice Water Administration Low Rate of Disease Low Infant Mortality High Productivity High Incomes MEANS DESIRABLE STATE ENDS If necessary, revise statements, delete objectives that appear unrealistic and add new objectives. Stakeholder Analysis 1. Consider appropriate level for analysis 2. Identify key stakeholders 3. Analyse interests characteristics, circumstances 4. Identify patterns of interaction between stakeholders 5. Assess power (influence) and potential (importance)
  • 4. Stakeholder Analysis Primary Secondary Influence Participation on project Importance to Project Key Interests Stakeholders Stakeholder Analysis Influential stakeholders but with less importance for achieving project purpose and outputs. They affect outcome of activities and need careful management The interests of these stakeholders should be monitored to ensure that they are not adversely affected Project Managers will need to develop good working relationships with these stakeholders to ensure effective mobilization of support for project activities May need special project initiatives if interests are to be projected. The Target Group should be in this category Low Influence High Influence High Potential/Significance/Importance Low Potential/Significance/Importance Exercise: Problem Tree & Stakeholder Analysis â€ĸ Choose a problem in Ratanakiri â€ĸ Divide in 2 groups 1. Do a problem tree 2. Do a stakeholder analysis 2. Starting Appraisal: ī¯ Appraisal (ex-ante) o Full feasibility study o Baseline study, needs assessment ī¯ Possible outputs o Needs assessment report o Baseline data o Detailed set of indicators o Amended proposal o Project plan, Gantt chart etc. o Project Planning Matrix - Logframe Gantt Chart Project Planning Matrix (PPM) ī¯ Logframe, Logical Framework (Analysis), LFA ī¯ 4x4 matrix o Ensures clear statement of objectives (distinction between purpose and objectives) o Introduces indicators of progress o Focuses attention on the assumptions and risks involved Logframe Purpose Outputs Activities Milestones (Inputs) Assumptions Risks MOVs Means of Verification OVIs Objectively Verifiable Indicators Goal More detail in the Logframe session
  • 5. 3. Partner Negotiation: ī¯ Negotiation with finance provider ī¯ Possible outputs o Project memorandum o Signed contract 4. Plan Finalisation: ī¯ work plans, ī¯ staff structures, ToR’s ī¯ budgets 5. Implementation and Monitoring : ī¯ Team selection and startup o Person specification/job allocation o Interviews and selection o Terms of engagement o Lines of responsibility o Briefing 5. Implementation and Monitoring : ī¯ Do the work o Implementation of project management regime o Regular reports, meetings, workshops o Monitoring: systematic documentation of performance - indicating whether project is performing as intended Monitoring (Performance Measurement ) ī¯ Monitoring o Inputs o Outputs o Outcomes (Results Based Management ) o Logical framework approach ī¯ Tools: o Progress reports o Team meetings, team briefing reports o Mid term review Monitoring (Performance Measurement ) ī¯ Levels of Indicators o Strategic o Sustainability o Attainment o Performance Quality, Quantity, Time 6. Evaluation and Closure: ī¯ Obtain “sign off” from project participants ī¯ Project evaluation (Ex-post ) o When possible to assess full effects o External evaluator may be necessary/appropriate o Record lessons learned o Formulate recommendations for next phase ī¯ Submission of completion report and evaluation o Donors may reserve right to demand concluding activities Evaluation: Impact Assessment ī¯ Approach o Baseline and End of Project o Impact from beneficiaries’ point of view o What do they think is significant? o To whom is it important? ī¯ Criteria o Efficiency – relate inputs to outputs o Effectiveness- extent to which achieved objectives o Consistency- methods/approaches with objectives o Impact – change to lives/environment Evaluation: Feedback ī¯ Lessons Learned o Used to replan the project o Used to plan the next project ī¯ Most useful in development of LFA Limits to Rational Planning and Systematic Management Trade Offs: Too much project planning? Amount of planning Cost
  • 6. Things that Limit using the process ī¯ Costly and ineffective analysis ī¯ Full planning vs. flexible interaction ī¯ Inflexibility and unnecessary constraints on managers, ī¯ Delegation to experts and inappropriate intervention ī¯ No involvement of intended beneficiaries in planning and management ī¯ Reluctance to engage in evaluation and error detection Constraints (that limit effectiveness) ī¯ Difficulty in precise definition of objectives and goals ī¯ Lack of appropriate or adequate data ī¯ Not understand social and cultural activities ī¯ Weak ways to guide behaviour ī¯ Low administrative capacity