The Unifier 10.1 release in conjunction with the P6 8.4 release introduces a more complete cost and schedule integration. Discover how the integration of these two products provides the enormous value to customers that utilizing both of these products. Learn how to: • Take a resource loaded P6 Project and assign costs to these resources within Unifier in order to create a cost loaded schedule. • Compare top-down estimates and budgets in Unifier to bottom-up costs from P6 within the Unifier Cost Sheet and Cash Flow. • Compare not only the current P6 Project but even the project baselines in order to see a historical impact on the project. • Use the data from P6 Projects and Baselines to track the Earned Value within Unifier.