CONTEXT
TITLE PAGE
 Introduction
 Site Analysis
 Concept
 Master Plan
 Planting Plan
 Costing
 Construction Details
 Maintenance Plan
3
4 - 5
6 - 7
8
9
10 - 12
13 - 14
15 - 16
Introduction
The selected site is located at Block E, Level 7’s balcony. Originally, in this
site there is nothing but an empty balcony with little to no aesthetic value. However,
this site has raw potential as it contains a beautiful view of the; surrounding campus,
greenery along the roads and car parks and view of the town. This site is supposed
to be an appropriate location for students or staff members to take a break and visit
the balcony for leisure time but due to the nature of the unused location, there is
nothing there but a simple balcony. Therefore, not many people would bother to
travel all the way up to the 7th
floor to use the balcony.
View from Block E, Level 7’s balcony
Block E, Level 7’s balcony
Site Analysis
After analysing the site , we found out that the strength of wind is cooling enough to
cool the entire site. The wind comes in two directions which makes the site cooling.
Due to the roof existing at the site, it has created enough shade from the sunlight at
various directions and time. This has made the site a more suitable and comfortable
place to rest and leisure at all time.
Sun Orientation
Wind Orientation
Furthermore, students often face stress in studies and prefer to have a walk or find a
relaxing place to have a short gateway to release some stress. Followed by this
activity of the student, this site is needed for students who need to take a break from
work because it has a beautiful view of the surrounding campus, greenery along the
roads and view of the town. It is a suitable place for students to take a break in the
site. Besides that, classes and labs are located next to the site. Thus it is easier for
students to go there.
Concept
The concept for this project is to create another new green space in the campus
which is transforming the simple balcony into a fresh and relaxing green area.
Besides creating a new green space, we intend to abandon the usage of usual-
looking mainstream gardens and replace it with modernism and originality.
Collaborating with the design we made up, the concept of this project can be called
as MOR-DEN ELEVATED (Modern garden that is elevated) due to the elevated
slope on the planning site.
The purpose of this project is to fully utilise the open spaces around the campus
which is making use of the simple and empty balcony and transforming it into a
modern green space. With the implementation of the concept, users can visit the
balcony to take a rest and relax by lingering around, enjoying the scenery and
experiencing fresh air. Moreover, students can also observe the Sun rise and set in
the morning and evening, and stargazing during the night at the balcony.
Master Plan
LOCATION PLAN
SELECTED SITE
Jasminum Sambac
Zoysia Artificial Grass Cedar Wood Walkway
Solar Walkway
Light
Ligustrum
Jonandrum
White Gravel
Solar Lamp Post
Concrete
Planter Box
Planting Plan
KEY COMMON NAME BOTANICAL NAME QUANTITY
1 Jasmine Shrub Jasminum Sambac 106
2 Lollipop Tree Ligustrum Jonandrum 1
3 Zoysia Artificial Grass - 27
HORIZONTAL LAYER OF PLANTS
1
2
3
Construction Details
i. CONSTRUCTION DETAIL FOR BROADWALK
(SCALE 1:10)
ii. CONSTRUCTION DETAIL FOR THE SLOPE
(SCALE 1:20)
Maintenance Plan
Lingustrum Jonandrum
- This plant requires regular watering three times a week. Feel
the soil and make sure it is damp to the touch, not sodden and
not tinder dry. This type of watering needs little and often,
rather than large quantities of water in one go.
Jasminum Sambac
- This plant likes full sun to partial shade. It
requires average watering. Watering is not
required if the soil is moist.
Zoysia Artificial Grass
- Every year, weed killer or special herbicide treatment
will be used to prevent weeds or moss. Any vegetation
can then be conveniently pulled out or swept off the turf.

More Related Content

What's hot

ICI final project
ICI final projectICI final project
ICI final projectMarco Leong
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - IndiaShubh Cheema
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTLucasssong
 
ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docxFoo Zhi Fung
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)Chandan kumar
 
Community Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisCommunity Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisKim Mitchell
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioJonathan Lim
 
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Facto estudio
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projectsDhanya Pravin
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Christopher Fortin
 

What's hot (17)

Landscape
LandscapeLandscape
Landscape
 
ICI final project
ICI final projectICI final project
ICI final project
 
A Framework for campus planning - Case Study - India
A  Framework  for  campus  planning - Case Study - IndiaA  Framework  for  campus  planning - Case Study - India
A Framework for campus planning - Case Study - India
 
Wall house
Wall houseWall house
Wall house
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECT
 
ICI Final Project.docx
ICI Final Project.docxICI Final Project.docx
ICI Final Project.docx
 
Architecture Design Portfolio 2020
Architecture Design Portfolio 2020Architecture Design Portfolio 2020
Architecture Design Portfolio 2020
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)
 
Community Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design AnalysisCommunity Renewal Diagrams And Design Analysis
Community Renewal Diagrams And Design Analysis
 
Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
ICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolioICI Introduction to construction industry portfolio
ICI Introduction to construction industry portfolio
 
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
Ana elviravelezlorenzocastro jardinbotanicomedellin_2006
 
InternationalOct
InternationalOctInternationalOct
InternationalOct
 
Auroville Architecture
Auroville ArchitectureAuroville Architecture
Auroville Architecture
 
Landscape in housing projects
Landscape in housing projectsLandscape in housing projects
Landscape in housing projects
 
CONSCIOUS URBANISM
CONSCIOUS  URBANISMCONSCIOUS  URBANISM
CONSCIOUS URBANISM
 
Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)Fortin Portfolio (Online) (Compressed)
Fortin Portfolio (Online) (Compressed)
 

Viewers also liked

Final site a analysis
Final site a analysisFinal site a analysis
Final site a analysisNge Chen
 
English 1 assignment one
English 1 assignment oneEnglish 1 assignment one
English 1 assignment oneNge Chen
 
Business presentation- Intro to Biz
Business presentation- Intro to BizBusiness presentation- Intro to Biz
Business presentation- Intro to BizNge Chen
 
Psych comic strip
Psych comic strip Psych comic strip
Psych comic strip Nge Chen
 
Psych report
Psych reportPsych report
Psych reportNge Chen
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industryNge Chen
 
Final report- Business Charity Drive
Final report- Business Charity DriveFinal report- Business Charity Drive
Final report- Business Charity DriveNge Chen
 
English 2 compare_and_contrast_essay
English 2 compare_and_contrast_essayEnglish 2 compare_and_contrast_essay
English 2 compare_and_contrast_essayNge Chen
 
Selfie culture
Selfie cultureSelfie culture
Selfie cultureNge Chen
 
Social psychology assignment 1 (journal entries)
Social psychology assignment 1 (journal entries)Social psychology assignment 1 (journal entries)
Social psychology assignment 1 (journal entries)Nge Chen
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateNge Chen
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report templateNge Chen
 
Bukit cina site analysis
Bukit cina site analysisBukit cina site analysis
Bukit cina site analysisNge Chen
 
Hagia Sophia Precedent Study & Analysis Sketch & Report
Hagia Sophia Precedent Study & Analysis Sketch & ReportHagia Sophia Precedent Study & Analysis Sketch & Report
Hagia Sophia Precedent Study & Analysis Sketch & ReportNge Chen
 

Viewers also liked (18)

GROPIUS
GROPIUSGROPIUS
GROPIUS
 
Final site a analysis
Final site a analysisFinal site a analysis
Final site a analysis
 
English 1 assignment one
English 1 assignment oneEnglish 1 assignment one
English 1 assignment one
 
Business presentation- Intro to Biz
Business presentation- Intro to BizBusiness presentation- Intro to Biz
Business presentation- Intro to Biz
 
Psych comic strip
Psych comic strip Psych comic strip
Psych comic strip
 
Psych report
Psych reportPsych report
Psych report
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industry
 
Final report- Business Charity Drive
Final report- Business Charity DriveFinal report- Business Charity Drive
Final report- Business Charity Drive
 
English 2 compare_and_contrast_essay
English 2 compare_and_contrast_essayEnglish 2 compare_and_contrast_essay
English 2 compare_and_contrast_essay
 
Selfie culture
Selfie cultureSelfie culture
Selfie culture
 
Culture
Culture Culture
Culture
 
Social psychology assignment 1 (journal entries)
Social psychology assignment 1 (journal entries)Social psychology assignment 1 (journal entries)
Social psychology assignment 1 (journal entries)
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Fp part a - report template
Fp   part a - report templateFp   part a - report template
Fp part a - report template
 
Bukit cina site analysis
Bukit cina site analysisBukit cina site analysis
Bukit cina site analysis
 
Bcon 1
Bcon 1Bcon 1
Bcon 1
 
Hagia Sophia Precedent Study & Analysis Sketch & Report
Hagia Sophia Precedent Study & Analysis Sketch & ReportHagia Sophia Precedent Study & Analysis Sketch & Report
Hagia Sophia Precedent Study & Analysis Sketch & Report
 
Rock
RockRock
Rock
 

Similar to 1. cl report

Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3wyinsam
 
CL Final Project: Report
CL Final Project: ReportCL Final Project: Report
CL Final Project: ReportNatalieKi
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project Ryan Kerry Jy
 
Ici final project
Ici final projectIci final project
Ici final projecttfkc1212
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryHwei Ying Saw
 
Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Ici project brief
Ici project briefIci project brief
Ici project briefJian Leo
 
Theresa thia and group
Theresa thia and groupTheresa thia and group
Theresa thia and groupTheresa Thia
 
the project brief
the project briefthe project brief
the project briefJoyce Wee
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final ProjectBolin Loong
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportWinnie Ang
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Lwj Welson
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciYong Sy
 

Similar to 1. cl report (20)

Ici
IciIci
Ici
 
Introduction
IntroductionIntroduction
Introduction
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3
 
CL Final Project: Report
CL Final Project: ReportCL Final Project: Report
CL Final Project: Report
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
 
Ici final project
Ici final projectIci final project
Ici final project
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industry
 
Ici final group
Ici final groupIci final group
Ici final group
 
Cl
ClCl
Cl
 
Ici project brief
Ici project briefIci project brief
Ici project brief
 
Theresa thia and group
Theresa thia and groupTheresa thia and group
Theresa thia and group
 
CL Report
CL ReportCL Report
CL Report
 
Cl report
Cl reportCl report
Cl report
 
the project brief
the project briefthe project brief
the project brief
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
 
Cl
ClCl
Cl
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for ici
 

More from Nge Chen

Adp design report
Adp design reportAdp design report
Adp design reportNge Chen
 
Project information
Project informationProject information
Project informationNge Chen
 
Final report
Final reportFinal report
Final reportNge Chen
 
Urban synopsis 2
Urban synopsis 2Urban synopsis 2
Urban synopsis 2Nge Chen
 
Comparative analysis project 2
Comparative analysis project 2Comparative analysis project 2
Comparative analysis project 2Nge Chen
 
DESIGN STUDIO V- PROJECT 1: SITE ANALYSIS
DESIGN STUDIO V- PROJECT 1: SITE ANALYSISDESIGN STUDIO V- PROJECT 1: SITE ANALYSIS
DESIGN STUDIO V- PROJECT 1: SITE ANALYSISNge Chen
 
Final bsc report full
Final bsc report fullFinal bsc report full
Final bsc report fullNge Chen
 
School of architecture
School of architectureSchool of architecture
School of architectureNge Chen
 
Report hs lee
Report hs leeReport hs lee
Report hs leeNge Chen
 
Tales of 3 cities malacca
Tales of 3 cities malaccaTales of 3 cities malacca
Tales of 3 cities malaccaNge Chen
 
Csi final proposal
Csi final proposalCsi final proposal
Csi final proposalNge Chen
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Nge Chen
 
B structure-report (3)
B structure-report (3)B structure-report (3)
B structure-report (3)Nge Chen
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2Nge Chen
 

More from Nge Chen (16)

Adp design report
Adp design reportAdp design report
Adp design report
 
Project information
Project informationProject information
Project information
 
Final report
Final reportFinal report
Final report
 
Urban synopsis 2
Urban synopsis 2Urban synopsis 2
Urban synopsis 2
 
Comparative analysis project 2
Comparative analysis project 2Comparative analysis project 2
Comparative analysis project 2
 
DESIGN STUDIO V- PROJECT 1: SITE ANALYSIS
DESIGN STUDIO V- PROJECT 1: SITE ANALYSISDESIGN STUDIO V- PROJECT 1: SITE ANALYSIS
DESIGN STUDIO V- PROJECT 1: SITE ANALYSIS
 
Final bsc report full
Final bsc report fullFinal bsc report full
Final bsc report full
 
School of architecture
School of architectureSchool of architecture
School of architecture
 
Report hs lee
Report hs leeReport hs lee
Report hs lee
 
Tales of 3 cities malacca
Tales of 3 cities malaccaTales of 3 cities malacca
Tales of 3 cities malacca
 
Csi final proposal
Csi final proposalCsi final proposal
Csi final proposal
 
Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738Arc2625 report file ngejiachen0317738
Arc2625 report file ngejiachen0317738
 
B structure-report (3)
B structure-report (3)B structure-report (3)
B structure-report (3)
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2
 
Aa report
Aa reportAa report
Aa report
 
Coverpage
CoverpageCoverpage
Coverpage
 

Recently uploaded

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Recently uploaded (20)

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

1. cl report

  • 1. CONSTRUCTED LANDSCAPE [ARC 3343] PROJECT 2 - LANDSCAPE PROJECT REPORT COMPILATION Group Member : Khairul Jefri (0318414) Joshua Yim (0317945) Khor Hao Xiang (0318065) Khor Yen Min (0318149) Nge Jia Chen (0317738) Wong Zhen Fai (0317890) Intake : FNBE0214 Lecturer : Mr. Fariz Hilmi
  • 2. CONTEXT TITLE PAGE  Introduction  Site Analysis  Concept  Master Plan  Planting Plan  Costing  Construction Details  Maintenance Plan 3 4 - 5 6 - 7 8 9 10 - 12 13 - 14 15 - 16
  • 3. Introduction The selected site is located at Block E, Level 7’s balcony. Originally, in this site there is nothing but an empty balcony with little to no aesthetic value. However, this site has raw potential as it contains a beautiful view of the; surrounding campus, greenery along the roads and car parks and view of the town. This site is supposed to be an appropriate location for students or staff members to take a break and visit the balcony for leisure time but due to the nature of the unused location, there is nothing there but a simple balcony. Therefore, not many people would bother to travel all the way up to the 7th floor to use the balcony. View from Block E, Level 7’s balcony Block E, Level 7’s balcony
  • 4. Site Analysis After analysing the site , we found out that the strength of wind is cooling enough to cool the entire site. The wind comes in two directions which makes the site cooling. Due to the roof existing at the site, it has created enough shade from the sunlight at various directions and time. This has made the site a more suitable and comfortable place to rest and leisure at all time. Sun Orientation Wind Orientation
  • 5. Furthermore, students often face stress in studies and prefer to have a walk or find a relaxing place to have a short gateway to release some stress. Followed by this activity of the student, this site is needed for students who need to take a break from work because it has a beautiful view of the surrounding campus, greenery along the roads and view of the town. It is a suitable place for students to take a break in the site. Besides that, classes and labs are located next to the site. Thus it is easier for students to go there.
  • 6. Concept The concept for this project is to create another new green space in the campus which is transforming the simple balcony into a fresh and relaxing green area. Besides creating a new green space, we intend to abandon the usage of usual- looking mainstream gardens and replace it with modernism and originality. Collaborating with the design we made up, the concept of this project can be called as MOR-DEN ELEVATED (Modern garden that is elevated) due to the elevated slope on the planning site. The purpose of this project is to fully utilise the open spaces around the campus which is making use of the simple and empty balcony and transforming it into a modern green space. With the implementation of the concept, users can visit the balcony to take a rest and relax by lingering around, enjoying the scenery and experiencing fresh air. Moreover, students can also observe the Sun rise and set in the morning and evening, and stargazing during the night at the balcony.
  • 7. Master Plan LOCATION PLAN SELECTED SITE Jasminum Sambac Zoysia Artificial Grass Cedar Wood Walkway Solar Walkway Light Ligustrum Jonandrum White Gravel Solar Lamp Post Concrete Planter Box
  • 8. Planting Plan KEY COMMON NAME BOTANICAL NAME QUANTITY 1 Jasmine Shrub Jasminum Sambac 106 2 Lollipop Tree Ligustrum Jonandrum 1 3 Zoysia Artificial Grass - 27 HORIZONTAL LAYER OF PLANTS 1 2 3
  • 9. Construction Details i. CONSTRUCTION DETAIL FOR BROADWALK (SCALE 1:10)
  • 10. ii. CONSTRUCTION DETAIL FOR THE SLOPE (SCALE 1:20)
  • 11. Maintenance Plan Lingustrum Jonandrum - This plant requires regular watering three times a week. Feel the soil and make sure it is damp to the touch, not sodden and not tinder dry. This type of watering needs little and often, rather than large quantities of water in one go. Jasminum Sambac - This plant likes full sun to partial shade. It requires average watering. Watering is not required if the soil is moist. Zoysia Artificial Grass - Every year, weed killer or special herbicide treatment will be used to prevent weeds or moss. Any vegetation can then be conveniently pulled out or swept off the turf.