WET UTILITIES DESIGN WORK
STAGES
HIP – Sharjah / Water & Power
Business Group
Infrastructure Project – Wet Utilities Work
CONTENTS
• Brief Introduction
• Stages of the Design Work
• Open Discussion and Questions
Infrastructure Project – Wet Utilities Work
INTRODUCTION
• Infrastructure development projects refer to development
of new or upgrading the existing development projects
comprising of one or more of the land use types like
residential, commercial, recreational and industrial etc.
Infrastructure Project – Wet Utilities Work
Airport Plot Development – Abu Dhabi
Infrastructure Project – Wet Utilities Work
Land Development
Survey & Investigation
Master Planning
Grading Plans &
Earth Work Design
Roads Design
Design of Utilities
Dry Utilities
Wet Utilities
Power Telecom Street Lighting
Water Supply Foul Drainage Storm Water Irrigation Fire Fighting
Infrastructure Project – Wet Utilities Work
Master Planning Support & Data Collection
Concept Design
Preliminary Design
Detail Design
Tender
Construction, Supervision, Commissioning
and Handing over (not covered)
Review & Approval from
Client and related
Authorities
Infrastructure development project comprise of the following stages
Infrastructure Project – Wet Utilities Work
STAGE 1: Master Planning Support and Data Collection
• Collection and review of all the available data including topographic
maps, geological maps, existing land use, climatic data and existing
utilities etc.
• Preparation of existing utilities inventory including (data collection,
review and site appraisal, utility authority liaison - RFI’s)
• Assessment for the condition and loads on the existing facilities and
identify requirements for upgrade, diversion, protection…etc
• Demands assessment for the new development under consideration.
• Preparation and submission of an Inception Report for client review
and approval
Infrastructure Project – Wet Utilities Work
Survey Data
Land Use Layout
Infrastructure Project – Wet Utilities Work
Infrastructure Project – Wet Utilities Work
Land Use Summery Tables
Infrastructure Project – Wet Utilities Work
Existing Irrigation System from Agriculture Dept
Infrastructure Project – Wet Utilities Work
STAGE 2: Concept Design
• Development of design strategy and options.
• Evaluation of alternatives and cost estimate analysis.
• Setting up the Utilities Design Standards and Criteria.
• Fixing of the utility corridors for different ROWs of roads as per the
services authorities requirements.
• Preparation of utilities concept design drawings including the
preliminary size and locations of the primary infrastructure
(reservoirs, pumping stations, RO and STP plants, sub stations etc)
and concept network layouts
• Preparation and submission of Concept Design Report
Infrastructure Project – Wet Utilities Work
Utilities Corridors
Infrastructure Project – Wet Utilities Work
Concept Layout for SW Network
Infrastructure Project – Wet Utilities Work
STAGE 3: Preliminary Design
• Firming up the systems layout plans.
• Hydraulic design and sizing of systems (usually by means computer
programs for hydraulic design and analysis).
• Preliminary civil, M&E and structural design of primary structures like
reservoirs, pumping stations etc and setting up the design parameters
for RO plants and STP.
• Preparation of preliminary drawings (Layouts and Details)
• Quantity survey and preliminary cost estimates.
• Preparation of Preliminary Design Report
Infrastructure Project – Wet Utilities Work
Preliminary Layout for Foul Network
Infrastructure Project – Wet Utilities Work
STAGE 4: Detail Design
• Finalization of the layout in exact corridor
• Conflict resolution with other services
• Final hydraulic design and systems sizing
• Preparation of manhole schedules and profiles
• Detailed civil, M&E and structural designs for LS, PS, tanks and
Reservoir.
• Preparation of final detailed drawings
• Preparation of a Detailed Design Report
Infrastructure Project – Wet Utilities Work
Manhole Schedule
Infrastructure Project – Wet Utilities Work
Longitude Profile
Infrastructure Project – Wet Utilities Work
STAGE 5: Tender
• Quantity surveys and preparation of Bill of Quantities.
• Preparation of technical specifications.
• Specialty equipments or items, such as packaged STP or RO plants
• Preparation of Tender Documents.
• Invitation for Tenders
Infrastructure Project – Wet Utilities Work
BOQs Example
Infrastructure Project – Wet Utilities Work
Invitation to Tenderers Example
Infrastructure Project – Wet Utilities Work
Open Discussion and Questions

More Related Content

What's hot

Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014
Freddy Gonzales
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
Douglas Tobin
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011
Adam Cohen
 

What's hot (15)

Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014
 
Maaden Exp.
Maaden Exp.Maaden Exp.
Maaden Exp.
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
 
Session 10
Session 10Session 10
Session 10
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
March 09 Planning Commission
March 09 Planning CommissionMarch 09 Planning Commission
March 09 Planning Commission
 
ART Resume
ART Resume ART Resume
ART Resume
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Process
 
Te assignment by hemant
Te assignment by hemantTe assignment by hemant
Te assignment by hemant
 
City Council November 20, 2012 Finance
City Council November 20, 2012 FinanceCity Council November 20, 2012 Finance
City Council November 20, 2012 Finance
 
Building plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in BangaloreBuilding plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in Bangalore
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 
Summary of previous projects
Summary of previous projectsSummary of previous projects
Summary of previous projects
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011
 

Similar to Infrastructure projects

hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
Hamed Elawady
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
Juber Loharia
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV.
Peter Etim
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul A'mal Mohd Hanafiah
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
baraa Mohammad
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
NADY BOKTOR
 

Similar to Infrastructure projects (20)

Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
Masterplan.pptx
Masterplan.pptxMasterplan.pptx
Masterplan.pptx
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
ramCV
ramCVramCV
ramCV
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopement
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV.
 
agile constructsim overview
agile constructsim overviewagile constructsim overview
agile constructsim overview
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Process & power plants
Process & power plantsProcess & power plants
Process & power plants
 

More from AHMED NADIM JILANI

More from AHMED NADIM JILANI (20)

Scaffolding by vn prabhu source facebook group survey & engineering de...
Scaffolding  by  vn prabhu source facebook group survey  & engineering de...Scaffolding  by  vn prabhu source facebook group survey  & engineering de...
Scaffolding by vn prabhu source facebook group survey & engineering de...
 
Nanotechnology in civil engineering0
Nanotechnology in civil engineering0Nanotechnology in civil engineering0
Nanotechnology in civil engineering0
 
Staadpresentation1 159
Staadpresentation1 159Staadpresentation1 159
Staadpresentation1 159
 
Pres staadpro
Pres staadproPres staadpro
Pres staadpro
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day4
Ccna day4Ccna day4
Ccna day4
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna day2
Ccna day2Ccna day2
Ccna day2
 
Ccna day1
Ccna day1Ccna day1
Ccna day1
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Carbon nanotubes
Carbon nanotubesCarbon nanotubes
Carbon nanotubes
 
Nanotechnology in civil engineering
Nanotechnology in civil engineeringNanotechnology in civil engineering
Nanotechnology in civil engineering
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Infrastructure projects

  • 1. INFRASTRUCTURE PROJECTS OCTOBER 2009 Prepared By: Sura Al Shami WET UTILITIES DESIGN WORK STAGES HIP – Sharjah / Water & Power Business Group
  • 2. Infrastructure Project – Wet Utilities Work CONTENTS • Brief Introduction • Stages of the Design Work • Open Discussion and Questions
  • 3. Infrastructure Project – Wet Utilities Work INTRODUCTION • Infrastructure development projects refer to development of new or upgrading the existing development projects comprising of one or more of the land use types like residential, commercial, recreational and industrial etc.
  • 4. Infrastructure Project – Wet Utilities Work Airport Plot Development – Abu Dhabi
  • 5. Infrastructure Project – Wet Utilities Work Land Development Survey & Investigation Master Planning Grading Plans & Earth Work Design Roads Design Design of Utilities Dry Utilities Wet Utilities Power Telecom Street Lighting Water Supply Foul Drainage Storm Water Irrigation Fire Fighting
  • 6. Infrastructure Project – Wet Utilities Work Master Planning Support & Data Collection Concept Design Preliminary Design Detail Design Tender Construction, Supervision, Commissioning and Handing over (not covered) Review & Approval from Client and related Authorities Infrastructure development project comprise of the following stages
  • 7. Infrastructure Project – Wet Utilities Work STAGE 1: Master Planning Support and Data Collection • Collection and review of all the available data including topographic maps, geological maps, existing land use, climatic data and existing utilities etc. • Preparation of existing utilities inventory including (data collection, review and site appraisal, utility authority liaison - RFI’s) • Assessment for the condition and loads on the existing facilities and identify requirements for upgrade, diversion, protection…etc • Demands assessment for the new development under consideration. • Preparation and submission of an Inception Report for client review and approval
  • 8. Infrastructure Project – Wet Utilities Work Survey Data
  • 9. Land Use Layout Infrastructure Project – Wet Utilities Work
  • 10. Infrastructure Project – Wet Utilities Work Land Use Summery Tables
  • 11. Infrastructure Project – Wet Utilities Work Existing Irrigation System from Agriculture Dept
  • 12. Infrastructure Project – Wet Utilities Work STAGE 2: Concept Design • Development of design strategy and options. • Evaluation of alternatives and cost estimate analysis. • Setting up the Utilities Design Standards and Criteria. • Fixing of the utility corridors for different ROWs of roads as per the services authorities requirements. • Preparation of utilities concept design drawings including the preliminary size and locations of the primary infrastructure (reservoirs, pumping stations, RO and STP plants, sub stations etc) and concept network layouts • Preparation and submission of Concept Design Report
  • 13. Infrastructure Project – Wet Utilities Work Utilities Corridors
  • 14. Infrastructure Project – Wet Utilities Work Concept Layout for SW Network
  • 15. Infrastructure Project – Wet Utilities Work STAGE 3: Preliminary Design • Firming up the systems layout plans. • Hydraulic design and sizing of systems (usually by means computer programs for hydraulic design and analysis). • Preliminary civil, M&E and structural design of primary structures like reservoirs, pumping stations etc and setting up the design parameters for RO plants and STP. • Preparation of preliminary drawings (Layouts and Details) • Quantity survey and preliminary cost estimates. • Preparation of Preliminary Design Report
  • 16. Infrastructure Project – Wet Utilities Work Preliminary Layout for Foul Network
  • 17. Infrastructure Project – Wet Utilities Work STAGE 4: Detail Design • Finalization of the layout in exact corridor • Conflict resolution with other services • Final hydraulic design and systems sizing • Preparation of manhole schedules and profiles • Detailed civil, M&E and structural designs for LS, PS, tanks and Reservoir. • Preparation of final detailed drawings • Preparation of a Detailed Design Report
  • 18. Infrastructure Project – Wet Utilities Work Manhole Schedule
  • 19. Infrastructure Project – Wet Utilities Work Longitude Profile
  • 20. Infrastructure Project – Wet Utilities Work STAGE 5: Tender • Quantity surveys and preparation of Bill of Quantities. • Preparation of technical specifications. • Specialty equipments or items, such as packaged STP or RO plants • Preparation of Tender Documents. • Invitation for Tenders
  • 21. Infrastructure Project – Wet Utilities Work BOQs Example
  • 22. Infrastructure Project – Wet Utilities Work Invitation to Tenderers Example
  • 23. Infrastructure Project – Wet Utilities Work Open Discussion and Questions