3. Locations Of Solar Power
Resources in Pakistan
• Pakistan is building solar power plants in
Pakistani Kashmir, Punjab, Sindh and
Balochistan. The program is under
development by the
International Renewable Energy Agency,
China, and Pakistani private sector energy
companies.
Map Of Solar Power Resources In Pakistan
8. Advantages and Disadvantages OfAdvantages and Disadvantages Of
Solar PowerSolar Power
• As oil prices spike, people are looking forAs oil prices spike, people are looking for
alternative energy sources to save money. Herealternative energy sources to save money. Here
are solar energy advantages and disadvantages,are solar energy advantages and disadvantages,
with advantages definitely winning out.with advantages definitely winning out.
•
Solar energy can be defined rather simply asSolar energy can be defined rather simply as
the conversion of sunlight into usable energy.the conversion of sunlight into usable energy.
Currently, solar energy is used to provideCurrently, solar energy is used to provide
electricity to homes, businesses, schools,electricity to homes, businesses, schools,
universities and space vehicles used by NASA. Asuniversities and space vehicles used by NASA. As
traditional energy prices rise, solar energy use istraditional energy prices rise, solar energy use is
growing at a rate of 25 percent a year.growing at a rate of 25 percent a year.
9. Advantages Of Solar PowerAdvantages Of Solar Power
• The power source of the sun is absolutely free.
• The production of solar energy produces no pollution.
• The technological advancements in solar energy systems have
made them extremely cost effective.
• Most systems do not require any maintenance during their
lifespan, which means you never have to put money into them.
• Most systems have a life span of 30 to 40 years.
• Most systems carry a full warranty for 20 to 30 years or more.
• Unlike traditional monstrous panel systems, many modern
systems are sleeker such as Uni-Solar rolls that lay directly on
the roof like regular roofing materials.
• In 35 states, solar energy can be fed back to the utilities to
eliminate the need for a storage system as well as eliminating or
dramatically reducing your electric bills.
• Solar energy systems are now designed for particular needs.
For instance, you can convert your outdoor lighting to solar. The
solar cells are directly on the lights and can’t be seen by
anyone. At the same time, you eliminate all costs associated
with running your outdoor lighting.
10. Disadvantages Of Solar PowerDisadvantages Of Solar Power
• Solar energy can only be harnessed when it is daytime and sunny.
• Solar collectors, panels and cells are relatively expensive to
manufacture although prices are falling rapidly.
• Solar power stations can be built but they do not match the
power output of similar sized conventional power stations. They
are also very expensive.
• In countries such as the UK, the unreliable climate means that
solar energy is also unreliable as a source of energy. Cloudy skies
reduce its effectiveness.
• Large areas of land are required to capture the suns energy.
Collectors are usually arranged together especially when
electricity is to be produced and used in the same location.
Solar power is used to charge batteries so that solar powered
devices can be used at night. However, the batteries are large
and heavy and need storage space. They also need replacing from
time to time.
11. Future Solar Projects In PakistanFuture Solar Projects In Pakistan
• Islamabad—Asian Development Bank (ADB) will launch the Asia
Accelerated Solar Energy Development Fund with $2.25 billion
as it targets solar power projects in countries including China,
India, Pakistan, Uzbekistan and Thailand to add another 1,000
megawatts next year and 1,500MW in 2013, said a statement of
the ADB.
• The Punjab government, in collaboration with German
companies, has launched a solar power project for Cholistan.
The power generated by these solar projects would be added to
the national grid from where the federal and Punjab
governments under the set ratio of sixty and forty per cent
could get electricity for their consumers. A consortium of three
companies had been formed to set up this mega solar power
project which would cost one billion dollar and is expected to be
completed by next year. Half million solar panels would be used
to generate about seven hundred MW.
•
12. • On grid installed capacity
• On May 29, 2012 Pakistan has stepped ahead by inaugurating the
first ever solar power on-grid power plant in Islamabad. The
Project titled "Introduction of Clean Energy by Solar Electricity
Generation System" is a special grant aid project of Japan
International Cooperation Agency (JICA) under Cool Earth
Partnership. This project includes the installation of 178.08
kW Photovoltaic (PV) Solar Systems each at the premises of
Planning Commission and Pakistan Engineering Council,
Islamabad which would cater to the needs of both, the Planning
Commission (P Block), Pak Secretariat and Pakistan Engineering
Council Buildings. Combining the generation capacity of both
the PV systems, a total of 356.16 kW of electricity can be
generated by the entire setup.
• This is the first on-grid solar PV project which has the
arrangement of net-metering thereby allowing the beneficiaries
to sell the surplus electricity to Islamabad Electric Supply
Company (IESCO), the electricity distribution company
of Islamabad Division. The Project is executed with the grant
assistance worth 480 million Yen (approx. 553.63 million
Pakistani Rupees) in three years of time commencing from 2010.
13. • 50 to 100 MW of photovoltaics is expected to be installed in
2013, and at least 300 MW in 2014.
• Government policy
• Raja Pervaiz Ashraf, then Federal Minister of Water & Power
has announced on July 2, 2009 that 7,000 villages will be
electrified using solar energy in the next five years Chief
Minister’s senior advisor Sardar Zulfiqar Khosa has also stated
that the Punjab government will begin new projects aimed at
power production through coal, solar energy and wind
power; this would generate additional resources.
• The Government of Pakistan has allowed the provincial
government of Sindh to conduct research on the feasibility of
solar power. The government is planning to install a water
filtration plant to make the seawater sweet through solar
energy, said Sindh Minister for Environment and Alternative
Energy, Askari Taqvi.
•