L.E.S.L
COOPLAG GARDEN ESTATE
FOUR MONTH INDUSTRIAL TRAINING
SUBMITEDIN THE FULFILMENT OF THE REQUEST FOR
FOUR MONTH INDUSTIAL TRAINING
AT
LEGRANDE ENGINEERING SERVICES LIMIDED
(FROM 27 AUG 2015 TO 31 NOV 2015)
SUBMITED BY
ABDULRAZAK YUSUF
KPT/C0E/13/5797
CIVIL ENGINEERIG DEPERTMENT
FEDERAL POLYTECHNIC KADUNA
KADUNA STATE
COLLAGE OF ENGINEERING Page 2
ACKNOWLEDGEMENT
It is indeed a great pleasure and privilege to present this report on training at L.E.S.L.
I am extremely grateful to my training and placement officer for issuing a Training
letter, whichmade my training possible at LEGRANDE ENGINEERING SERVICES LTD.
I would like to express my gratitude to ENGR.NNADI UCHE for his invaluable
suggestions, motivation,guidance and support through out the training. His
methodology to startfrom simple ant then deepen through made me to bring out
this projectreportwithoutanxiety.
Thanksto all other L.E.S.L officials, operatorsand all other membersof L.E.S.L, yet
uncounted for their help in completing the SIWES PROGRAM and see the light of
success.
I am very thankfulto friends, colleaguesand all other personswho rendered their
assistance directly or indirectly to complete this projectwork successfully.
I extended my duethanks to DEACON JIDE
DUROJAIY(M/D) who gave mevaluable time and suggestions and
guide me a lot at various stages of my Industrial Training.
Dated-NOVEMBER 2015
COLLAGE OF ENGINEERING Page 3
INDEX
S.NO DESCRIPTION
1.0 GENERAL INFORMATION INTRODUCTION
2.0 INTRODUCTION
3.0 STUDENT INORMATION
4.0 INFORMATION OF PROJECT
5.0 SITE LAYOUT
6.0 STEPS OF CONSTRUCTION WORK
7.0 Methodology Of Work
๏‚ท A) Site Clearance
๏‚ท B) Positioning Of Coordinate
๏‚ท C) Excavation
๏‚ท D) BLINDING
๏‚ท E) Raft Foundation
๏‚ท F) Construction Of Pedestal
๏‚ท G) Construction Of Plinth Beam
๏‚ท H) Column Construction
๏‚ท Beam And Slab
๏‚ท J) Stair And
8.0 ESTERBLISHMENT AT SITE
9.0 INFORMATION ABOUT
10.0 INFORMATION ABOUT TEST
11.0 INFORMATION ABOUT EQUEPMENT
12.0 SAFEFTY MEASURE AND CAPAIGN
13.0 Inspection and Quality Control
14.0 SITE DRAWING
15.0 OVERALL BENEFITS OF TRAINING
16.0 CONCLUTION
17.0 REFRENCES
COLLAGE OF ENGINEERING Page 4
1.0 GENERAL INFORMATION
The Practical Training Conducted By The Engineering And Non Engineering Students At The
Respective Industrial Units Related To Their Subjects Is Termed As "Industrial Training". For
Example A Civil Engineering Student Requires Practical Exposure At The Building Construction
Sites, Road Construction Projects Etc.
The Industry-Institute Interaction Is A Need Of The Hour. No Institute Or Technical Board Could
Ever Boast Of A Perfect Syllabi Scheme Without The Inclusion Of Industrial Training Format. The
Industrial Training Is A Part Of Continuous Learning Process. So This Field Exposure That Uplifts
The Knowledge And Experience Of Students Needs To Be Properly Documented In The Form Of
Report, Which Can Be Termed As โ€œIndustrial Report".
A Properly Prepared Industrial Training Report Can Facilitate The Presentation Of The Field
Experience Is An Orderly, Precise And Interesting Manner, Which Can Off Course Well Serve As
A Guide To The New Entrant Engineers.
The Purpose Of Industrial Training As:-
1) To Provide Field Exposure To The Students.
2) To Have Better Understanding Of Engineering Practices.
3) To Make Them Adapt To Industrial Conditions.
4) To Provide Opportunities To The Students To Handle Tasks Independently.
5) To Help Students To Understand About The Duties Of An Engineer And Other Supervisory
Staff In An Organization.
6) To Make Them Aware With The Common Industrial Problems.
7) To Impart Intensive Training To The Students To Enable Them To Learn And Use Working Of
Latest Field Equipments Machine.
COLLAGE OF ENGINEERING Page 5
2.0 INFORMATION ABOUT COMPANY
About
Legrande Engineering Services Limited is a multi disciplinary engineering construction
company.
The company is involved in the following activities:
Estate development - design, construction & management
Design & construction of roads - urban and rural
Design & construction of drainage works
Water supply & treatments works
Sewage treatment works
COLLAGE OF ENGINEERING Page 6
Bore hole projects - supervision, monitoring and consultancy
Drilling, maintenance and re-activation of bore holes
Pipe laying h- AC, PVC and Ductile
Design and fabrication of storage tanks
Supply and installation of submersible pumps
Mechanical and Electrical installation works
The philosophy of Legrande Engineering Services Limited is to ensure environmentally
friendly and unique solutions to all planned projects. The company identifies that
success requires the development of human resources within a safe environment that
encourages creativity and the enhancement of each employee's personal and
professional standards. Therefore, at Legrande Engineering Services Limited, we
engage extensively, state of the art computer and communications equipment, thereby
enhancing project implementation and delivery.
We believe that in a dynamic and ever evolving world, new methods should be
acquired. Thus, by constant training of our staff, in continued professional development
Programmers, we keep abreast of developments in the industry, ensuring effective and
efficient project delivery standard.
COLLAGE OF ENGINEERING Page 7
3.0 Student Profile
1. Name of the student: YUSUF
2. Father's Name: Mr. ABDULRAZAK
3. College: KADUNA POLYTECHNIC
4. Class: CIVIL ENGINEERING
5.MATRIC NUMBER.: KPT/COE/13/5797
6. Date of Birth: 18/05/1994
7. Session/Year: 2014-15
8. Address ofCommunication: LAGOS STATE
9. Contactno: 07060948126
1O. E-mail Id: Abdulyusuf959@gmail.com
11. Name of organization L.E.S.L Construction
COLLAGE OF ENGINEERING Page 8
12. Period of Training: 27/07/2015to 31/11/2015
4.INFORMATION OF PROJECT
๏€ฑ๏€ฎ๏“๏‰๏”๏…๏€ ๏Œ๏๏ƒ๏๏”๏‰๏๏Ž๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏…๏”๏‰๏€ ๏๏“๏
๏€ ๏Œ๏…๏‹๏‹๏‰๏€ ๏๏Š๏๏ˆ๏€ ๏Œ๏๏‡๏๏“๏€ ๏“๏”๏๏”๏…๏€ 
๏€ 
๏€ 
๏€ฒ๏€ฎ๏๏Œ๏๏”๏€ ๏“๏‰๏š๏…๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ 
๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ 
๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ถ๏€ฎ๏€ด๏ˆ๏…๏ƒ๏”๏…๏’๏“๏€ ๏€ 
COLLAGE OF ENGINEERING Page 9
๏€ณ๏€ฎ๏Ž๏•๏๏…๏’๏“๏€ ๏๏†๏€ ๏‚๏•๏‰๏Œ๏„๏‰๏Ž๏‡๏“๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ 
๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ฑ๏€ท๏€ฐ๏€ ๏‚๏•๏‰๏Œ๏„๏‰๏Ž๏‡
๏“๏€ 
4.TYPES OF BUILDING: TERECES AND SEMI-DITERCH
5.DATEOF START: JUNE-2015
6. STIPULATED DATEOFCOMPLETION: MARCH -2016
7.COMPLETION: (80% Work is Completed)
5.0 SITE LAYOUT
6.0 STEPS OF CONSTRUCTION WORK
These are the steps which are mainly followed for the beginning of construction.
1) Types of building:- The types of building I the site here are semi-detach and
terraces and it divided into 5 sections (A-E)
2) Site Selection: - Site for construction of building can be selected according to the
Space required and whatever the area and the people demands, in accordance with the
Population and bearing in mind the geographical and industrial point of view for Further
development
3) Survey: - By survey we measure all the dimensions and plot the real position or
place wherever we want to construct our structure.
COLLAGE OF ENGINEERING Page 10
4) Site Investigation: -By this we investigate about the type of the soil, bearing capacity
Of the soil, nature of the bed, the topographical feature of the area, which in turn helps
the structural engineer to design the foundation suitable for structure.
5) Architectural Drawings: - Architectural drawings are the heart to the project, which
Is the master document or the copy with which we have to stick completely and do
Accordingly; these drawings have all the plans and construction details about the
Particular project.
6) Structure Design: - Structural plan is the drawing that shows the reinforcement
details which gives stability to the structures. It suggests the type of foundation,
columns, beams and slabs etc. which are needed for the construction and also provides
the amount of steel and reinforcement arrangement and its size.
7) Construction: - After all these steps, Construction of the proposed project starts.
The construction is done at the site in which different section is divided like Civil,
Electrical and Mechanical work.
7.0 Methodology of Work
a) Site Clearance: - The very first step is site clearance which involves removal of
grass /stump /trees and vegetation along with any other objections which might be there
in the site location.
b) Positioning of Central coordinate and layout: - The centre point was marked with
The help of a TOTAL STATION thread and plumb bob as per the grid drawing. With
Respect to this centre point, all the other points of columns were to be decided so its
exact Position is very critical.
c) Excavation: - Excavation was carried out both manually as well as mechanically.
Adequate precautions are taken to see that the excavation operations do not damage
the adjoining structures. Excavation is carried out providing adequate side slopes and
Dressing of excavation bottom. The soil present beneath the surface was too clayey so
it was dumped and was not used for back filling. The filling is done in layer not
exceeding 20 cm layer and then itโ€™s compacted. Depth of excavation was 2.0 meter
from Ground Level. There are some points which should be kept in mind at the time of
excavation:-
1. Upon identifying warning tape of any service, mechanical excavation shall be stopped
and manual excavation shall be done.
2. In areas where the trench is close to the buildings, depending on the type of
Foundation of the building, shoring shall be done by planking, strutting or trench
Sheets.
3. In other areas it will be stepped open excavation with battered slopes.
4. Dewatering system shall continue to run until backfilling is completed up to the level
of the natural water table.
5. Bottom of the trench shall be cleaned, free of loose material; rock projections and the
surface will be levelled and moistened uniformly before commencing compaction.
Levelled bottom surface shall be compacted as per the specification.
d) Blinding: - After the process of excavation, placing of plain cement concrete
(blinding) is done. A layer of 100mm with projection was made in such a manner that it
COLLAGE OF ENGINEERING Page 11
was not mixed with the soil. It provides a solid base for the raft foundation and a mix of
1:4:8 that is, 1 bag of cement to 4 parts of sand and 8 parts of coarse aggregates by
weight were used in it. Plain concrete is vibrated to achieve full compaction. Concrete
placed below ground should be protected from falling earth during and after placing.
When joint in a layer of concrete are unavoidable, and end is sloped at an angle of 30
and junctions of different layers break joint in laying upper layer of concrete. The lower
surface is made rough and clean watered before upper layer is laid.
e) Raft Foundation: - Raft foundations are used to distribute the load from a
Structure over a large area. Normally raft foundation is used
Arrangement of reinforcement bars.
COLLAGE OF ENGINEERING Page 12
f) Raft Foundation Formwork:-
This is a structure, usually temporary, used to contain poured concrete and to mould it
to the required dimensions and support unit is able to support itself.
*Bars used--- 12mm for the Beams
10mm for Rings/stirrups
g) Casting Of Raft Foundation Beam
Mix Ratio 1:4:8
COLLAGE OF ENGINEERING Page 13
h) Filling Of The Raft Foundation
i) Compaction:-
This the process of applying energy to loose soil to consolidate it and remove any any
voids, thereby increasing the density and consequently its load-bearing capacity.
Benefit of Compaction
*Increase Load-bearing capacity
*Prevents soil settlement (Better Stability)
*Reduce water seepage
*Reduce shrinkage and others
j)Blinding:-
After the process of filling, laying of plain cement concrete that is blinding is done. A
layer of 100mm with projection was made in such a manner that it was not mixed with
the soil. It provides a solid base for the raft foundation slab and a mix of 1:4:8 that is, 1
bag of cement to 4 parts of sand and 8 parts of coarse aggregates by weight were used
in it. Plain concrete is vibrated to achieve full compaction. Concrete placed below
ground should be protected from falling earth during and after placing. When joint in a
layer of concrete are unavoidable, and end is sloped at an angle of 30 and junctions of
different layers break joint in laying upper layer of concrete. The lower surface is made
rough and clean watered before upper layer is laid
.
COLLAGE OF ENGINEERING Page 14
k)Ground Floor Slab Reinforcement :-
This the arrangement of steel bars that reinforces the columns and it transfer load to
the foundation.
Process
Using of 12mm steel bars as top bars and retune bars.
And use of binding wire to tie them together.
Mechanical and Electrical pipes
Casting of the Slab
COLLAGE OF ENGINEERING Page 15
l) Column: - A column is an important component of RCC structure. It is a vertical
Member which is used to transfer the load of super structure such as super structure,
floor, balconies, slab etc.
The method of construction of column is follow:-
I. Placing vertical steel of columns: - As according to structural drawing (column
Schedule) vertical bars were placed through top reinforcement of raft on the
Position marked earlier (6.5) above the bottom reinforcement of raft.
II. Layout of columns: - After casting of raft again the layout of column is done in
order to check the actual position of vertical bars of columns. The layout is also
helpful to place the shuttering on actual position, so that the column should be in
proper position according to drawing (Column layout drawing).
III. Bar binding and column starter: - Shear reinforcement was tied as according to
structural drawing (column schedule) up to the height determined from framing
plan. At bottom instead of making column starter a T shaped bar was weld with
vertical steel on the layout of column so the shuttering can be fixed on desired
accurate position.
IV. Kickers:- This are the low plinth at the base of a column that alow the formwork to be
fix easily
Formwork and a casted Kicker
COLLAGE OF ENGINEERING Page 16
Formwork:-
This is a structure, usually temporary, used to contain poured concrete and to mould it
to the required dimensions and support unit is able to support itself.
Plumb and Line were used to check the alignments
Casting of the column
j) Beams and Slab: - A structural member which supports lateral load and
Resist bending is known as beam. Slabs are plane structural member whose thickness
is quite small as compared to its other dimension. Slab support mainly transverse loads
and transfer them to end supports by bending action in one or more directions.
The steps which are followed for the construction of column are written as below:-
I. Fixing Beam bottom and slab formwork: -
Beam bottoms are fixed along with the vertical reinforcement of columns using a
specially made arrangement called โ€œBEAM SUPPORTERโ€.
Then sides of beams are fixed and then main slabโ€™s shuttering is laid according to
architectural drawing (framing plan). The gaps are filled and uniform horizontal platform
is made to support the slab. Generally, beam bottom and slabโ€™s shuttering is made of
plywood (marine board) and rests on vertical steel pipe arrangement called โ€œprobesโ€.
Note: All the sunken portions and sections according to co-ordinate framing plan should
be taken into consideration while fixing the beam bottoms and slabโ€™s shuttering.
II. Placing of reinforcement of beams and slab: - First of all reinforcement of primary
Beams is laid and then secondary beams on a certain height above the shuttering
according to structural drawing (beam detail). After all beams are tied and are placed on
COLLAGE OF ENGINEERING Page 17
their respective position slab reinforcement is laid according to structural drawing (slab
reinforcement detail) and bar bending schedule. Cover blocks are placed in between
shuttering and slabs reinforcement. Note: All the section should read carefully and
dowel required for any section or staircase should be placed before casting.
III. Leveling of slab: - To check exact level of slab (both bottom and top) a certain level
is marked above the finished floor level on columns bars as convenient. A thread is tied
throughout that mark on the column bars at the marked level and level of slab (bottom
and top) is measured by measuring the perpendicular length from thread level to the top
level of slab by the help of measuring tape or a graduated bar.
g) Construction of Stair
Properties of a flight
Stair: This is a series of steps that link from one level to anoder.
Staircase: - A flight steps include landings rails stringers posts newel posts and
balustrade.
Form Work
COLLAGE OF ENGINEERING Page 18
Bar binding and Bending
8.0 Establishment at Site
Establishment refers to recruitment of permanent or temporary work force in the
department of engineer, office staff, skilled and unskilled for carrying out works.
Construction industry can only function steadily and satisfactory if there is a good
rapport and co-operative relationship between the construction workers and their
employers.
Permanent establishment
Permanent establishment constitutes employee working against the sanctioned
permanent posts in the department, drawing the regular pay bill without any time limit.
The permanent establishment include:-
Assistant General Manager
Accountant
Project Manager
Site Engineers
Store keeper
. Lab technologist
Temporary Establishment
Temporary establishment are the employees recruited directly for the actual execution
of a specific work and whose pay is directly charged to the work for which they are
employed.
The temporary establishment include:-
Supervisor
Bar benders
Electricians
Labourers
. Plumber
COLLAGE OF ENGINEERING Page 19
9.0 Information about Material
The various materials used for construction and supporting the building are termed as
Building Materials. The different building materials include cement, coarse aggregate
(gravel) fine aggregate (sand) and high yield bars are to be tested before using them in
building construction. The materials which are used at site as below:-
a) Cement: - Cement is a binding material that has cohesive and adhesive property in
the presence of water. The brands of cement used are Elephant (Portland cement) and
Dangote 42.5 grade Portland cement.
b) Brick: - An artificial masonry unit in the form of rectangular block of prepared is
Called a brick. The main constituents of brick are 9โ€ and 6โ€
225x225x450 and 150x225x450
c) Sand: - Sand is a filling material which is used in concrete, mortar and plastering.
Sand is basically consisting of small grains of silica which is formed by the
decomposition of sandstones due to various effects of weather. The coarse gain is
sharp, angular and certainly free from salt etc which is employed in concreting.
d) Aggregate: Is the inert material which forms the bulk of cement concrete. The
aggregate are bound together by mean of cement. The size of aggregate which is used
at the site is 10mm and 20mm.
e) Admixture: - Admixture is the materials which are used to improve the quality of
Concrete. The admixture which is used at the casting of column is coming from Dr. Fix
Limited company. The capacity of one drum is 20litres. This admixture is helps to
increase the setting time and maintains the strength of concrete.
F) Miscellaneous: - Miscellaneous materials are those which are also important except
basic materials. There are numbers of materials which are used for construction at site
which are:-
1) Plastic pipes 2) G.I. pipes
3) Electric Wires 4) Fiber Sheets
5) Bitumen 6) Water proofing
7) Termite proofing 8) Fire resistance
9) Paint and Varnish 10) Glass
11) Wooden Doors 12) Chips
13) Marble 14) POP
COLLAGE OF ENGINEERING Page 20
10.0 Information about Test
There are number of tests which are performed at the site on different material. The
tests which we have performed at the site are below:-
a) Compressive Test: - The compressive strength of a cube is an indication of the
strength of concrete. With the help of this we can check the characteristics strength of
concrete. The size of cube is taken as 15cm3. At least three specimen should be made
for
testing which is to be performed at 7, 21, 28 days.
Observation and calculations:-
Proportion of concrete = M25
Cross-section Area = 15x15=225 cm3
Breaking Load = 770 KN
Compressive strength after 28 days = 34.2 KN/mm2
Result:- Compressive Strength of concrete sample after 28 days is 34.2N/mm2
. Whereas Strength requirement is 25 N/mm2
, hence tested sample is safe.
b) Silt Content: - Silt is a material of particle sizes between 0.002mm to 0.06mm. It is
Usually found in sands obtained from natural sources such as river bed. If it is present
in excess quantity then is preventing a bond between cement and aggregate. Silt value
is to be increase more than 6% by volume. This test is to be easily performed in beaker
of size 250ml.
C) Weight of Steel: - This is a field test which is performed on steel to check wt. meter
length because there are number of impurities will be added in the materials due to
Temperature variations so that its wt. will vary from the standard value. There is a
Chance of corrosion and rusting over steel bar
Observation and Calculation:-
Height of sample = 150ml
Height of silt after 3 hours = 6ml
Percentage of Silt = 4%
Result:- Its value does not increase more than 6% by volume.
1 10mm 620gm 620gm
2 12mm 890gm 890gm
3 16mm 1580gm 1550gm
COLLAGE OF ENGINEERING Page 21
11.0 Information about Equipmen
1) Tilted Drum Mixer: A concrete mixer (also commonly called a cement mixer) is a
device that homogeneously combines cement, aggregate such as sand or gravel, and
water to form concrete. For smaller volume works portable concrete mixers are often
used so that the concrete can be made at the construction site, giving the workers
ample time to use the concrete before it hardens. The entire drum rotates around its
axis as metals are loaded through a charge chute at one end of the drum and exit
through a discharge chute at the opposite end of the drum. Mixing blades are mounted
on the inside surface of the drum and as the drum rotates the blades mix by lifting and
dropping the materials during each rotation. Once the materials are sufficiently mixed
the rotation of the drum is reversed and the blade arrangement pushes the concrete
through to the discharge end of the mixer.
2) Needle Vibrator: The Needle Vibrator, also known as immersion or poker vibrator
have a power unit and long flexible tube at the end of which a vibrating head is
attached.
Wherever compaction is to be done, the vibrating head is inserted in the concrete.
Concrete vibrators consolidate freshly poured concrete so that trapped air and excess
water are released and the concrete settles firmly in place in the formwork. Improper
consolidation of concrete can cause product defects, compromise the concrete strength,
and produce surface blemishes such as bug holes and honeycombing. An internal
Concrete vibrator is a steel cylinder about the size of the handle of a baseball bat, with a
Hose or electrical cord attached to one end. The vibrator head is immersed in the wet
Concrete.
COLLAGE OF ENGINEERING Page 22
3. JCB Excavator: Excavators are heavy construction equipment consisting of a boom,
stick, bucket and cab on a rotating platform (known as the "house"). The house sits atop
an undercarriage with tracks or wheels. A cable-operated excavator uses winches and
steel ropes to accomplish the movements. They are a natural progression from the
steam shovels and often called power shovels.
4.Rammers are used for compacting small areas by providing impact load to the
soil. This equipment is light and can be hand or machine operated. The base
size of rammers can be 15cm x 15cm or 20cm x 20cm or more.
COLLAGE OF ENGINEERING Page 23
5. Vibrating smooth wheeled rollers
In case of vibrating smooth wheeled rollers, the drums are made to vibrate by
employing rotating or reciprocating mass.
These rollers helpful from several considerations like:-
(i) Higher compaction level can be achieved with maximum work
(ii) Compaction can be done up to greater depths
COLLAGE OF ENGINEERING Page 24
12.0 Safety Measure and Campaign
a) In Civil engineering construction project, accidents cannot be avoided. An event
can happen any time and unexpectedly during construction. About 80 percent of
accidents are mainly caused due to unsafe practices and shear negligence of the
workers. Safety measures are required to be built properly to motivate and
encourage the workers to work at the given site or industry without any fear,
tension or worry in mind about his security of life. Good safety measures are
essential to increase the output of work by generating safety free environmental
sense of contentment among the workers. Safety measure can be efficiently handled by
properly educating and training workers about the safe rules and their importance. It is
the foremost duty of construction management to appoint separate safety engineer to
undertake safety measure and to prevent the occurrence of accidents. The causes of
accidents should be properly investigated and suitable measures should be adopted to
control these accidents.
Thus, safety measures prevent:
1. Reduced workersโ€™ compensation claims
2. Reduced expenses related to injuries and illnesses
3. Reduced absenteeism and Lower employee complaints
4. Loss of Life and Increased productivity
5. Improved employee morale and satisfaction
6. Reduction of hidden cost and reduced insurance cost
b) Personal Safety
Wear protective equipment. Always wear safety helmet, safety vast and safety foot
wear at construction site.
Do not drink or take drugs while working.
Pay attention to personal hygiene.
Do not play in the workplace.
Report to your supervisor immediately if you notice any unsafe condition
c) Public Safety
Pay attention to public safety
. Members of the public are often unaware of or do not understand the work carried out
on construction sites and the hazards involved.
Take great care to prevent the fall of materials from height.
Do not stack materials on floor edges or on scaffolds.
d) Safety Campaign
An organized movement launched by an enterprise or construction firm to advocate the
safety rules and regulations among its workers to reduce the number of accidents is
termed as safety campaign. The following points should be kept in mind for launching
safety campaign.
1. The safety campaign must be placed under the charge of a very competent,
experienced and able manager, who may be termed as safety Director.
2. The worker should be frequently addressed in a small group in their language or
COLLAGE OF ENGINEERING Page 25
easy accessible language to explain about safety rules.
3. Doโ€™s and Donโ€™ts during construction work should be displayed in bold letter along
with diagram on chart paper
4. Advertisement films, Documentaries and CD should be shown to the workers on
off days, explaining about the need for safety measures.
5. Safety Slogans and safety Quotations should be made an integral part of safety
campaign to educate the illiterate and poor workers.
6. Training in first-aid should be provided to workers and supervisors for trating
minor cuts and injuries.
7. Safety journals should be brought about by the concerned management and
distributed free of cost to the workers.
13.0 Inspection and Quality Control
a) Inspection is the process of carrying out vigilant checks during the construction of
COLLAGE OF ENGINEERING Page 26
project against any serious defect or lack of progress. Inspection of work is
carried from beginning of work up to the completion of project at various stages
or levels by competent authority. Quality control is the comparison of materials,
construction techniques and finishing products etc. with the laid down standards.
The quality control and inspection should ensure that the quality of work is the
accordance with the prescribed specification.
i) Stages of construction:
a) Layout stage: It is the first stage of work to be inspected when the layout of
building is carried out. The layout should be properly checked for right angles and
dimensions must be measured as per plan.
b) Earthwork completion stage: At this stage, quality inspectors check the
adequate depth and width of excavation trench to ensure desired the depth of
foundation.
c) Foundation laying stage: At this stage, the quality engineer mainly inspects the
material reached at the site, such as quality of cement, sand, bricks and aggregate
to be used in foundations. The materials must be of the same quality as has been
inspected at the supplierโ€™s premises. In general, a contractor always tries to use
over burnt or jhama bricks for the foundation for the foundation work which
should be objected.
d) D.P.C. laying stage: It is the one of the critical stage, which must be inspected by
the quality engineer. It is the completion of foundation stage, when damp proofing
course is laid at the top of foundation layer to protect the building from moisture.
At this stage, once again layout of building should be exactly checked as per the
building plan to ensure proper internal dimensions of rooms and its component.
e) Formwork erecting stage: Erecting formwork is one of the major stage of the
construction work, which must be given due attention by the quality inspectors.
The shape, strength and finishing surfaces of concrete in beams, column and slabs
mainly depend upon type of form work. For large project, only steel form work
should be used. For concrete construction forms or shuttering in the forms of
wooden planks or steel plates are used for keeping the green concrete in position
till it hardens. This helps in giving the desired shapes to different components of
the structure
ii)Removal of formwork
For columns = 24 to 48 hours
For slab up to 4.5 m span = 7 days
For slab more than 4.5m span = 14 days
For beams up to 6m span = 14 days
For beams above 6m span = 21 days
iii) The good formwork should satisfy the following requirements:-
1. The material of the formwork should be practically water proof so that it canโ€™t
absorb water from concrete.
2. It should be strong enough to withstand the pressure or the load of the fresh
concrete, live load of the worker coming on it.
3. The formwork should be so made that it can be removed easily without causing
the least injury to the surface of nearly constructed concrete members.
4. The inside surface of formwork should be smooth so as to give good appearance
COLLAGE OF ENGINEERING Page 27
to the resulting newly constructed concrete members.
f) Reinforcement laying stage: The strength of the structure member like beams,
column and slab depends upon the reinforcement provided. So, when the
reinforcement stage is laid over the formwork erected, it is right time for quality
engineers to inspect the work for identification of any defect with respect to
inadequate reinforcement
14.0 Site Drawings
a) Column Drawing
15.0verall Benefits of Training
a) Internship is a class healed at site to provide an enhanced understanding of the
outside working environment before the student graduate. Student like civil and
urban engineering and other fields also take this practice. The main aim of this
Practice (internship) is that to teach students communication with different
COLLAGE OF ENGINEERING Page 28
Workers or employees, to improve practical skill what they learned at class, up
grading the theoretical knowledge in addition to the class, improve their
leadership skill, team playing skill and etc. I have acquired much knowledge in
different tasks as explained below in different section. That different knowledge
gets me a good performance in the internship period and I gain an experience that
helps me after the graduation in the upcoming working era of mine.
b) Improving practical skill
i) The aim of the internship is to address more practical knowledge for student. So, I
found a practical knowledge at the site as much possible within the four month.
The knowledge we have learn in the class is helpful to get those practical or real
work in the site and totally different from the actual knowledge gained from the
class. Thus I found some knowledge in the site which helps me to work with the
site environment or site peoples.
ii) Some of the practical knowledge I gain from the internship class was:
Construction of formwork and false work for some reinforced concrete structure.
In any construction work the first stage before casting of concrete is designing
and constructing of form work. As I explained in the work procedure the
formwork and false work must be stiff and must resist the fresh concrete till the
concrete gain its strength. Thus the construction stage of form work was new to
me since Iโ€˜m new for the practical world now I gain practical knowledge about
how it is worked and erected.
Bar bending, positioning, splicing and tying, according the specified drawing.
After the formwork and false work is ready the bar bending, positioning and tying
work goes next. This work is done based on the working drawing provided in the
working drawings (structural drawing) by the design team of that specified
structure. In most case it was new for me to see such work since it is a practical
work only performed at the site.
Surveying on building construction. We conduct the surveying class in the field
for its lab session of the course in the normal class. But we donโ€˜t know about how
it is going to be in building construction in particular and in which particular stage
of the construction work it used either the super structure or sub structure.
Concrete is a vital material in any construction of reinforced concrete and is the
main constituent or ingredient of any reinforced concrete structure. Thus it is
mandatory to know this material in practice including how it is treated, placed
(poured), mixed and the equipment used for those work. I got the practical
knowledge in terms of those listed aspects of concrete.
Different construction equipment (machines) and their use in construction site.
Many of great structures before are a product of numerous human power and
countless days inspired by great powers. Machines are capable of handling tough
work which may be beyond the scope of human labour to be performed. They can
be expected to work with fair degree of effectiveness even under adverse weather,
climate or topographical conditions. I generally know how equipmentโ€˜s are used
in the site including their specific purpose.
c) Upgrading the theoretical knowledge
i) The internship class is not only depending on the practical aspect but it also help
students to upgrade or increase knowledge on already that they have. I try to
COLLAGE OF ENGINEERING Page 29
integrate the practical knowledge with that of the theory learned in the class in
different place in order to get more knowledge than the theory we learned on the
class. I got the internship class very interesting in terms of upgrading a theoretical
knowledge and I learned from the site some theories that we havenโ€˜t learn in the
class room by searching different related literature. Some of this is:
Quantity surveying
Structural design of shear wall and its advantage
Construction equipment
Report writing
ii) I learned those things in exclusive cause it is hard to read and understand
everything from books and asking some peoples at site to those things ashamed
me. Generally I change myself alit bit after the internship period in my knowledge
than before I took it.
d)Upgrading interpersonal communication skill
i) Communication is sharing or exchanging information or ideas with others in order
to get some messages and knowledge. The communications systems within the
building design and construction enterprise has taken on a large role in the
achievement of profitability and efficiency. A basic understanding of
communication systems is beneficial to all building professionals and trades, as
they all play a part in the success of the construction. Construction is one of the
places that ask a good communication skill either managing every trade of work
or asking what is gowning on over there. So, communication is an important way
of learning, which can be defined formally as the act, process, or experience of
gaining knowledge or skills and sharing what we know. Cool communication is
important in the real constructions world and it can appear in different forms as
speaking, writing, and listening. In the site the most things I gain is due to
communication with other workers like engineers, skilled and non-skilled
workers, Forman etc. in some place/case it is very difficult to talk workers and ask
them what we want because of that they underestimate us and sometimes they are
not eager to tell.
e) Improving team playing skill
i) Team playing skill for construction work Team works, especially for engineers,
involve in every piece of task and achieving good team playing skill is essential
for Effective completion of tasks and Increasing productivity. This skill already
exists in my personality in the campus due to different assignment and project
works that I work together with student. But this skill is more than this in the
construction site. In the construction site the work is already a team work and it
needs more closeness of workers to solve problems arise in different aspects,
misunderstanding in the drawing or working methodology and consult every
work. We the student at the site also works together as a team to get more
understanding and share ideas. More or less I improve my team work status by
working together with different professionals, student and workers as a whole in
the civil engineering works and consulting.
f) Improving leadership skill
i) Leadership is the process of influencing individuals or groups to accomplish an
organizational goal or mission. I have seen how each worker is controlled and
COLLAGE OF ENGINEERING Page 30
organized to perform its day to day activities. Among all other managements i
have seen that human resource management is the most important one. i have
actually observed the method of controlling the working time and amount of work
done by each worker so that the work proceeds according to the work plan
(schedule).Leadership is a skill to guide, control and monitor peoples. For
effective leadership i understood that personal values like confidence, effective
communication and devotion are very important.
bm) In order to be good Leadership the following criteria should be fulfilled.
bn) Those are:-
Be technically proficient (skilled with different knowledgeโ€˜s).
Seek responsibility and take responsibility for your actions.
Make sound and timely decisions.
Know your people and look out for their well-being.
Keep your workers informed.
Develop a sense of responsibility in your workers.
Ensure that tasks are understood, supervised, and accomplished.
Use the full capabilities of your organization.
Listening to others.
Being organized.
Able to communicate clearly and efficiently.
ii) In the site it was impossible to us to lead anything because we go to the site to
learn about the site work and we donโ€˜t have enough ability to handle such works
in such short time but we have learned how to become a good leader and the main
signal of a good leader.
iii) Finally what I take hold of is Becoming a leader isnโ€˜t easy because it takes a
conscious commitment and consistent effort to develop oneโ€˜s leadership skills
g)Work ethics and related issues
i) The concept of work ethics may be summarized as the overall quality in oneโ€˜s
behavior towards appreciating the process of work flow and performing rather
well on the job so that this work flow will not be jeopardized in the long run.
During my internship program, I could say that I have managed to do my side of
the job description with a high spirit and enthusiasm so that there was a smooth
flow of activities both in the office and on construction site. Work ethics involve
such characteristics as honesty, responsibility, reliability, accountability and etc.
ii) Punctuality is one of the major issues that could be raised when talking about
work ethics and on my side I tried meet this criteria by attending to my working
station in time so that there will not be any delay on the activities planned for that
day. The behavior that one shows towards his peers and colleagues is also one
manifestation of the concept of work ethics. Personally, I always respected and
gave priority the employers of the company.
Elements of work ethics that worth mentioning are:-
punctuality, honesty, reliability, office discipline, corporation and responsibility.
ii) We as a student should follow the rules and regulations set by the company and
avoid complaining any work load, activity or assignment that may arise on the site
or office. It is a pleasure of supervisors if we have a good work ethics and we are
COLLAGE OF ENGINEERING Page 31
responsible for any given tasks. Since the aim of internship is to let students know
the outside environment pertinent to their field, which includes of such the above
dealt qualities, I was with the great interest that I tried to meet my responsibilities
and work ethics that I suppose to be fulfil by my side.
16.0 Conclusion
1) The entire period of Industrial Training has given me good & important
practical exposure of construction work. At the end of the Industrial Training
under LEGRANDE ENINEERING SERVICES Limited, LAGOS STATE, I feel myself
better equipped and ready to face the field problems related to Civil Engineering works.
In these four& half months, I have learnt how to deal with Authorities and
workers under supervision and I have become familiar with the fact that the field
work is much difficult from theoretical knowledge. But until you donโ€™t have the
theoretical knowledge, the practical work is very difficult to carry-out and understand.
2) Working with experienced engineers has enhanced my technical skills to a
great extent for which I am grateful to them. Their professional approach towards work
is appreciable.
3) The training has provided me with much needed field exposure to shape
up my thinking in a better way as a professional making me a lot more capable to face
the challenges of life.
17.0 References and Bibliography
๏‚ท .Drawings shown above are made on AUTO CAD
๏‚ท . Images shown in the report are self-clicked images at various locations
๏‚ท .Calculation mentioned above are carried out in the daily dairy
๏‚ท . Civil Construction Books
๏‚ท .Drawings provided at the site
๏‚ท .COMPANY WEBSITE-(lesl.awardspace.com)

More Related Content

What's hot

Megally Rig Mechanic CV new 2015
Megally Rig Mechanic CV new 2015Megally Rig Mechanic CV new 2015
Megally Rig Mechanic CV new 2015
megally gerges
ย 
Siwes it report
Siwes it reportSiwes it report
Siwes it report
Michael Olafusi
ย 
MY SIWES REPORT
MY SIWES REPORTMY SIWES REPORT
MY SIWES REPORT
Ayo Odomo mtn
ย 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
Ankit Gautam
ย 

What's hot (20)

Megally Rig Mechanic CV new 2015
Megally Rig Mechanic CV new 2015Megally Rig Mechanic CV new 2015
Megally Rig Mechanic CV new 2015
ย 
SIWES Report
SIWES ReportSIWES Report
SIWES Report
ย 
Siwes it report
Siwes it reportSiwes it report
Siwes it report
ย 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
ย 
Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...
ย 
SIWES INDUSTRIAL TRAINING AT FORESTRY RESEARCH INSTITUTE OF NIGERIA,JERICHO,I...
SIWES INDUSTRIAL TRAINING AT FORESTRY RESEARCH INSTITUTE OF NIGERIA,JERICHO,I...SIWES INDUSTRIAL TRAINING AT FORESTRY RESEARCH INSTITUTE OF NIGERIA,JERICHO,I...
SIWES INDUSTRIAL TRAINING AT FORESTRY RESEARCH INSTITUTE OF NIGERIA,JERICHO,I...
ย 
Siwes report
Siwes reportSiwes report
Siwes report
ย 
Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YAB...
Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YAB...Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YAB...
Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YAB...
ย 
My report
My reportMy report
My report
ย 
MY SIWES REPORT
MY SIWES REPORTMY SIWES REPORT
MY SIWES REPORT
ย 
Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
ย 
Siwes report by mukhtar salisu
Siwes report by mukhtar salisuSiwes report by mukhtar salisu
Siwes report by mukhtar salisu
ย 
Sample of SIWES REPORT
Sample of SIWES REPORTSample of SIWES REPORT
Sample of SIWES REPORT
ย 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
ย 
AbleMoJah's IT Report
AbleMoJah's IT ReportAbleMoJah's IT Report
AbleMoJah's IT Report
ย 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
ย 
Wapda internship report
Wapda internship reportWapda internship report
Wapda internship report
ย 
CONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGECONSTRUCTION OF OVERHEAD BRIDGE
CONSTRUCTION OF OVERHEAD BRIDGE
ย 
Swep report
Swep reportSwep report
Swep report
ย 
VTU Internship Report.[Peekay Steel Castings]
VTU Internship Report.[Peekay Steel Castings]VTU Internship Report.[Peekay Steel Castings]
VTU Internship Report.[Peekay Steel Castings]
ย 

Viewers also liked

Introduction P2 Group
Introduction P2 GroupIntroduction P2 Group
Introduction P2 Group
shanghai45
ย 
JANICE SNOWBOARDING SLIDE
JANICE SNOWBOARDING SLIDEJANICE SNOWBOARDING SLIDE
JANICE SNOWBOARDING SLIDE
Janiceilles
ย 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill Lafer
John Glenning
ย 

Viewers also liked (17)

Introduction P2 Group
Introduction P2 GroupIntroduction P2 Group
Introduction P2 Group
ย 
20151031ใƒฏใƒผใ‚ฏใ‚ทใƒงใƒƒใƒ—4็ญ ๅœฐๅŸŸใฎไบบๆ
20151031ใƒฏใƒผใ‚ฏใ‚ทใƒงใƒƒใƒ—4็ญ ๅœฐๅŸŸใฎไบบๆ20151031ใƒฏใƒผใ‚ฏใ‚ทใƒงใƒƒใƒ—4็ญ ๅœฐๅŸŸใฎไบบๆ
20151031ใƒฏใƒผใ‚ฏใ‚ทใƒงใƒƒใƒ—4็ญ ๅœฐๅŸŸใฎไบบๆ
ย 
JANICE SNOWBOARDING SLIDE
JANICE SNOWBOARDING SLIDEJANICE SNOWBOARDING SLIDE
JANICE SNOWBOARDING SLIDE
ย 
BIRZIKLAPENAREN ALDE ILUNA
BIRZIKLAPENAREN ALDE ILUNABIRZIKLAPENAREN ALDE ILUNA
BIRZIKLAPENAREN ALDE ILUNA
ย 
Comacchio Drilling Equipment
Comacchio Drilling EquipmentComacchio Drilling Equipment
Comacchio Drilling Equipment
ย 
Janna fassaert cv16
Janna fassaert cv16Janna fassaert cv16
Janna fassaert cv16
ย 
Latihan Power Point Semester 1 Politeknik Negeri Medan
Latihan Power Point Semester 1 Politeknik Negeri MedanLatihan Power Point Semester 1 Politeknik Negeri Medan
Latihan Power Point Semester 1 Politeknik Negeri Medan
ย 
Welsh
WelshWelsh
Welsh
ย 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill Lafer
ย 
Eskin
EskinEskin
Eskin
ย 
Osteopathic manipulative therapy (om th) revisited 2014 extremities
Osteopathic manipulative therapy (om th) revisited 2014 extremitiesOsteopathic manipulative therapy (om th) revisited 2014 extremities
Osteopathic manipulative therapy (om th) revisited 2014 extremities
ย 
Cindy
CindyCindy
Cindy
ย 
Cano
CanoCano
Cano
ย 
1 Introducciรณn a la radiologรญa general Quiroprรกctica
1 Introducciรณn a la radiologรญa general Quiroprรกctica1 Introducciรณn a la radiologรญa general Quiroprรกctica
1 Introducciรณn a la radiologรญa general Quiroprรกctica
ย 
Jake
JakeJake
Jake
ย 
Gingras
GingrasGingras
Gingras
ย 
Reanimaciรณn Cardiopulmonar RCP Avanzada. Taller
Reanimaciรณn Cardiopulmonar RCP Avanzada. TallerReanimaciรณn Cardiopulmonar RCP Avanzada. Taller
Reanimaciรณn Cardiopulmonar RCP Avanzada. Taller
ย 

Similar to induarial trainin report

Whole Report (2)
Whole Report (2)Whole Report (2)
Whole Report (2)
Rubyat Rabbi
ย 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for college
indrajeet kumar
ย 
TOM'S report
TOM'S reportTOM'S report
TOM'S report
Sello Matsepe
ย 
Sunil resume
Sunil resumeSunil resume
Sunil resume
Sunil Kumawat
ย 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
Tawfig Adham
ย 
Ici final project
Ici final projectIci final project
Ici final project
kongzc
ย 

Similar to induarial trainin report (20)

Whole Report (2)
Whole Report (2)Whole Report (2)
Whole Report (2)
ย 
Training Report
Training ReportTraining Report
Training Report
ย 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
ย 
Anis rahman khokan's internship paper
Anis rahman khokan's internship paperAnis rahman khokan's internship paper
Anis rahman khokan's internship paper
ย 
most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for college
ย 
TOM'S report
TOM'S reportTOM'S report
TOM'S report
ย 
Sunil resume
Sunil resumeSunil resume
Sunil resume
ย 
Final Project
Final ProjectFinal Project
Final Project
ย 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and Technology
ย 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
ย 
Ici final project
Ici final projectIci final project
Ici final project
ย 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
ย 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
ย 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
ย 
Resume
ResumeResume
Resume
ย 
Civil Engineering Practicum Report
Civil Engineering Practicum ReportCivil Engineering Practicum Report
Civil Engineering Practicum Report
ย 
Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"
ย 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
ย 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
ย 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
ย 

Recently uploaded

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 

Recently uploaded (20)

Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 

induarial trainin report

  • 1. L.E.S.L COOPLAG GARDEN ESTATE FOUR MONTH INDUSTRIAL TRAINING SUBMITEDIN THE FULFILMENT OF THE REQUEST FOR FOUR MONTH INDUSTIAL TRAINING AT LEGRANDE ENGINEERING SERVICES LIMIDED (FROM 27 AUG 2015 TO 31 NOV 2015) SUBMITED BY ABDULRAZAK YUSUF KPT/C0E/13/5797 CIVIL ENGINEERIG DEPERTMENT FEDERAL POLYTECHNIC KADUNA KADUNA STATE
  • 2. COLLAGE OF ENGINEERING Page 2 ACKNOWLEDGEMENT It is indeed a great pleasure and privilege to present this report on training at L.E.S.L. I am extremely grateful to my training and placement officer for issuing a Training letter, whichmade my training possible at LEGRANDE ENGINEERING SERVICES LTD. I would like to express my gratitude to ENGR.NNADI UCHE for his invaluable suggestions, motivation,guidance and support through out the training. His methodology to startfrom simple ant then deepen through made me to bring out this projectreportwithoutanxiety. Thanksto all other L.E.S.L officials, operatorsand all other membersof L.E.S.L, yet uncounted for their help in completing the SIWES PROGRAM and see the light of success. I am very thankfulto friends, colleaguesand all other personswho rendered their assistance directly or indirectly to complete this projectwork successfully. I extended my duethanks to DEACON JIDE DUROJAIY(M/D) who gave mevaluable time and suggestions and guide me a lot at various stages of my Industrial Training. Dated-NOVEMBER 2015
  • 3. COLLAGE OF ENGINEERING Page 3 INDEX S.NO DESCRIPTION 1.0 GENERAL INFORMATION INTRODUCTION 2.0 INTRODUCTION 3.0 STUDENT INORMATION 4.0 INFORMATION OF PROJECT 5.0 SITE LAYOUT 6.0 STEPS OF CONSTRUCTION WORK 7.0 Methodology Of Work ๏‚ท A) Site Clearance ๏‚ท B) Positioning Of Coordinate ๏‚ท C) Excavation ๏‚ท D) BLINDING ๏‚ท E) Raft Foundation ๏‚ท F) Construction Of Pedestal ๏‚ท G) Construction Of Plinth Beam ๏‚ท H) Column Construction ๏‚ท Beam And Slab ๏‚ท J) Stair And 8.0 ESTERBLISHMENT AT SITE 9.0 INFORMATION ABOUT 10.0 INFORMATION ABOUT TEST 11.0 INFORMATION ABOUT EQUEPMENT 12.0 SAFEFTY MEASURE AND CAPAIGN 13.0 Inspection and Quality Control 14.0 SITE DRAWING 15.0 OVERALL BENEFITS OF TRAINING 16.0 CONCLUTION 17.0 REFRENCES
  • 4. COLLAGE OF ENGINEERING Page 4 1.0 GENERAL INFORMATION The Practical Training Conducted By The Engineering And Non Engineering Students At The Respective Industrial Units Related To Their Subjects Is Termed As "Industrial Training". For Example A Civil Engineering Student Requires Practical Exposure At The Building Construction Sites, Road Construction Projects Etc. The Industry-Institute Interaction Is A Need Of The Hour. No Institute Or Technical Board Could Ever Boast Of A Perfect Syllabi Scheme Without The Inclusion Of Industrial Training Format. The Industrial Training Is A Part Of Continuous Learning Process. So This Field Exposure That Uplifts The Knowledge And Experience Of Students Needs To Be Properly Documented In The Form Of Report, Which Can Be Termed As โ€œIndustrial Report". A Properly Prepared Industrial Training Report Can Facilitate The Presentation Of The Field Experience Is An Orderly, Precise And Interesting Manner, Which Can Off Course Well Serve As A Guide To The New Entrant Engineers. The Purpose Of Industrial Training As:- 1) To Provide Field Exposure To The Students. 2) To Have Better Understanding Of Engineering Practices. 3) To Make Them Adapt To Industrial Conditions. 4) To Provide Opportunities To The Students To Handle Tasks Independently. 5) To Help Students To Understand About The Duties Of An Engineer And Other Supervisory Staff In An Organization. 6) To Make Them Aware With The Common Industrial Problems. 7) To Impart Intensive Training To The Students To Enable Them To Learn And Use Working Of Latest Field Equipments Machine.
  • 5. COLLAGE OF ENGINEERING Page 5 2.0 INFORMATION ABOUT COMPANY About Legrande Engineering Services Limited is a multi disciplinary engineering construction company. The company is involved in the following activities: Estate development - design, construction & management Design & construction of roads - urban and rural Design & construction of drainage works Water supply & treatments works Sewage treatment works
  • 6. COLLAGE OF ENGINEERING Page 6 Bore hole projects - supervision, monitoring and consultancy Drilling, maintenance and re-activation of bore holes Pipe laying h- AC, PVC and Ductile Design and fabrication of storage tanks Supply and installation of submersible pumps Mechanical and Electrical installation works The philosophy of Legrande Engineering Services Limited is to ensure environmentally friendly and unique solutions to all planned projects. The company identifies that success requires the development of human resources within a safe environment that encourages creativity and the enhancement of each employee's personal and professional standards. Therefore, at Legrande Engineering Services Limited, we engage extensively, state of the art computer and communications equipment, thereby enhancing project implementation and delivery. We believe that in a dynamic and ever evolving world, new methods should be acquired. Thus, by constant training of our staff, in continued professional development Programmers, we keep abreast of developments in the industry, ensuring effective and efficient project delivery standard.
  • 7. COLLAGE OF ENGINEERING Page 7 3.0 Student Profile 1. Name of the student: YUSUF 2. Father's Name: Mr. ABDULRAZAK 3. College: KADUNA POLYTECHNIC 4. Class: CIVIL ENGINEERING 5.MATRIC NUMBER.: KPT/COE/13/5797 6. Date of Birth: 18/05/1994 7. Session/Year: 2014-15 8. Address ofCommunication: LAGOS STATE 9. Contactno: 07060948126 1O. E-mail Id: Abdulyusuf959@gmail.com 11. Name of organization L.E.S.L Construction
  • 8. COLLAGE OF ENGINEERING Page 8 12. Period of Training: 27/07/2015to 31/11/2015 4.INFORMATION OF PROJECT ๏€ฑ๏€ฎ๏“๏‰๏”๏…๏€ ๏Œ๏๏ƒ๏๏”๏‰๏๏Ž๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏…๏”๏‰๏€ ๏๏“๏ ๏€ ๏Œ๏…๏‹๏‹๏‰๏€ ๏๏Š๏๏ˆ๏€ ๏Œ๏๏‡๏๏“๏€ ๏“๏”๏๏”๏…๏€  ๏€  ๏€  ๏€ฒ๏€ฎ๏๏Œ๏๏”๏€ ๏“๏‰๏š๏…๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€  ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€  ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ถ๏€ฎ๏€ด๏ˆ๏…๏ƒ๏”๏…๏’๏“๏€ ๏€ 
  • 9. COLLAGE OF ENGINEERING Page 9 ๏€ณ๏€ฎ๏Ž๏•๏๏…๏’๏“๏€ ๏๏†๏€ ๏‚๏•๏‰๏Œ๏„๏‰๏Ž๏‡๏“๏€บ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€  ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ ๏€ฑ๏€ท๏€ฐ๏€ ๏‚๏•๏‰๏Œ๏„๏‰๏Ž๏‡ ๏“๏€  4.TYPES OF BUILDING: TERECES AND SEMI-DITERCH 5.DATEOF START: JUNE-2015 6. STIPULATED DATEOFCOMPLETION: MARCH -2016 7.COMPLETION: (80% Work is Completed) 5.0 SITE LAYOUT 6.0 STEPS OF CONSTRUCTION WORK These are the steps which are mainly followed for the beginning of construction. 1) Types of building:- The types of building I the site here are semi-detach and terraces and it divided into 5 sections (A-E) 2) Site Selection: - Site for construction of building can be selected according to the Space required and whatever the area and the people demands, in accordance with the Population and bearing in mind the geographical and industrial point of view for Further development 3) Survey: - By survey we measure all the dimensions and plot the real position or place wherever we want to construct our structure.
  • 10. COLLAGE OF ENGINEERING Page 10 4) Site Investigation: -By this we investigate about the type of the soil, bearing capacity Of the soil, nature of the bed, the topographical feature of the area, which in turn helps the structural engineer to design the foundation suitable for structure. 5) Architectural Drawings: - Architectural drawings are the heart to the project, which Is the master document or the copy with which we have to stick completely and do Accordingly; these drawings have all the plans and construction details about the Particular project. 6) Structure Design: - Structural plan is the drawing that shows the reinforcement details which gives stability to the structures. It suggests the type of foundation, columns, beams and slabs etc. which are needed for the construction and also provides the amount of steel and reinforcement arrangement and its size. 7) Construction: - After all these steps, Construction of the proposed project starts. The construction is done at the site in which different section is divided like Civil, Electrical and Mechanical work. 7.0 Methodology of Work a) Site Clearance: - The very first step is site clearance which involves removal of grass /stump /trees and vegetation along with any other objections which might be there in the site location. b) Positioning of Central coordinate and layout: - The centre point was marked with The help of a TOTAL STATION thread and plumb bob as per the grid drawing. With Respect to this centre point, all the other points of columns were to be decided so its exact Position is very critical. c) Excavation: - Excavation was carried out both manually as well as mechanically. Adequate precautions are taken to see that the excavation operations do not damage the adjoining structures. Excavation is carried out providing adequate side slopes and Dressing of excavation bottom. The soil present beneath the surface was too clayey so it was dumped and was not used for back filling. The filling is done in layer not exceeding 20 cm layer and then itโ€™s compacted. Depth of excavation was 2.0 meter from Ground Level. There are some points which should be kept in mind at the time of excavation:- 1. Upon identifying warning tape of any service, mechanical excavation shall be stopped and manual excavation shall be done. 2. In areas where the trench is close to the buildings, depending on the type of Foundation of the building, shoring shall be done by planking, strutting or trench Sheets. 3. In other areas it will be stepped open excavation with battered slopes. 4. Dewatering system shall continue to run until backfilling is completed up to the level of the natural water table. 5. Bottom of the trench shall be cleaned, free of loose material; rock projections and the surface will be levelled and moistened uniformly before commencing compaction. Levelled bottom surface shall be compacted as per the specification. d) Blinding: - After the process of excavation, placing of plain cement concrete (blinding) is done. A layer of 100mm with projection was made in such a manner that it
  • 11. COLLAGE OF ENGINEERING Page 11 was not mixed with the soil. It provides a solid base for the raft foundation and a mix of 1:4:8 that is, 1 bag of cement to 4 parts of sand and 8 parts of coarse aggregates by weight were used in it. Plain concrete is vibrated to achieve full compaction. Concrete placed below ground should be protected from falling earth during and after placing. When joint in a layer of concrete are unavoidable, and end is sloped at an angle of 30 and junctions of different layers break joint in laying upper layer of concrete. The lower surface is made rough and clean watered before upper layer is laid. e) Raft Foundation: - Raft foundations are used to distribute the load from a Structure over a large area. Normally raft foundation is used Arrangement of reinforcement bars.
  • 12. COLLAGE OF ENGINEERING Page 12 f) Raft Foundation Formwork:- This is a structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support unit is able to support itself. *Bars used--- 12mm for the Beams 10mm for Rings/stirrups g) Casting Of Raft Foundation Beam Mix Ratio 1:4:8
  • 13. COLLAGE OF ENGINEERING Page 13 h) Filling Of The Raft Foundation i) Compaction:- This the process of applying energy to loose soil to consolidate it and remove any any voids, thereby increasing the density and consequently its load-bearing capacity. Benefit of Compaction *Increase Load-bearing capacity *Prevents soil settlement (Better Stability) *Reduce water seepage *Reduce shrinkage and others j)Blinding:- After the process of filling, laying of plain cement concrete that is blinding is done. A layer of 100mm with projection was made in such a manner that it was not mixed with the soil. It provides a solid base for the raft foundation slab and a mix of 1:4:8 that is, 1 bag of cement to 4 parts of sand and 8 parts of coarse aggregates by weight were used in it. Plain concrete is vibrated to achieve full compaction. Concrete placed below ground should be protected from falling earth during and after placing. When joint in a layer of concrete are unavoidable, and end is sloped at an angle of 30 and junctions of different layers break joint in laying upper layer of concrete. The lower surface is made rough and clean watered before upper layer is laid .
  • 14. COLLAGE OF ENGINEERING Page 14 k)Ground Floor Slab Reinforcement :- This the arrangement of steel bars that reinforces the columns and it transfer load to the foundation. Process Using of 12mm steel bars as top bars and retune bars. And use of binding wire to tie them together. Mechanical and Electrical pipes Casting of the Slab
  • 15. COLLAGE OF ENGINEERING Page 15 l) Column: - A column is an important component of RCC structure. It is a vertical Member which is used to transfer the load of super structure such as super structure, floor, balconies, slab etc. The method of construction of column is follow:- I. Placing vertical steel of columns: - As according to structural drawing (column Schedule) vertical bars were placed through top reinforcement of raft on the Position marked earlier (6.5) above the bottom reinforcement of raft. II. Layout of columns: - After casting of raft again the layout of column is done in order to check the actual position of vertical bars of columns. The layout is also helpful to place the shuttering on actual position, so that the column should be in proper position according to drawing (Column layout drawing). III. Bar binding and column starter: - Shear reinforcement was tied as according to structural drawing (column schedule) up to the height determined from framing plan. At bottom instead of making column starter a T shaped bar was weld with vertical steel on the layout of column so the shuttering can be fixed on desired accurate position. IV. Kickers:- This are the low plinth at the base of a column that alow the formwork to be fix easily Formwork and a casted Kicker
  • 16. COLLAGE OF ENGINEERING Page 16 Formwork:- This is a structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support unit is able to support itself. Plumb and Line were used to check the alignments Casting of the column j) Beams and Slab: - A structural member which supports lateral load and Resist bending is known as beam. Slabs are plane structural member whose thickness is quite small as compared to its other dimension. Slab support mainly transverse loads and transfer them to end supports by bending action in one or more directions. The steps which are followed for the construction of column are written as below:- I. Fixing Beam bottom and slab formwork: - Beam bottoms are fixed along with the vertical reinforcement of columns using a specially made arrangement called โ€œBEAM SUPPORTERโ€. Then sides of beams are fixed and then main slabโ€™s shuttering is laid according to architectural drawing (framing plan). The gaps are filled and uniform horizontal platform is made to support the slab. Generally, beam bottom and slabโ€™s shuttering is made of plywood (marine board) and rests on vertical steel pipe arrangement called โ€œprobesโ€. Note: All the sunken portions and sections according to co-ordinate framing plan should be taken into consideration while fixing the beam bottoms and slabโ€™s shuttering. II. Placing of reinforcement of beams and slab: - First of all reinforcement of primary Beams is laid and then secondary beams on a certain height above the shuttering according to structural drawing (beam detail). After all beams are tied and are placed on
  • 17. COLLAGE OF ENGINEERING Page 17 their respective position slab reinforcement is laid according to structural drawing (slab reinforcement detail) and bar bending schedule. Cover blocks are placed in between shuttering and slabs reinforcement. Note: All the section should read carefully and dowel required for any section or staircase should be placed before casting. III. Leveling of slab: - To check exact level of slab (both bottom and top) a certain level is marked above the finished floor level on columns bars as convenient. A thread is tied throughout that mark on the column bars at the marked level and level of slab (bottom and top) is measured by measuring the perpendicular length from thread level to the top level of slab by the help of measuring tape or a graduated bar. g) Construction of Stair Properties of a flight Stair: This is a series of steps that link from one level to anoder. Staircase: - A flight steps include landings rails stringers posts newel posts and balustrade. Form Work
  • 18. COLLAGE OF ENGINEERING Page 18 Bar binding and Bending 8.0 Establishment at Site Establishment refers to recruitment of permanent or temporary work force in the department of engineer, office staff, skilled and unskilled for carrying out works. Construction industry can only function steadily and satisfactory if there is a good rapport and co-operative relationship between the construction workers and their employers. Permanent establishment Permanent establishment constitutes employee working against the sanctioned permanent posts in the department, drawing the regular pay bill without any time limit. The permanent establishment include:- Assistant General Manager Accountant Project Manager Site Engineers Store keeper . Lab technologist Temporary Establishment Temporary establishment are the employees recruited directly for the actual execution of a specific work and whose pay is directly charged to the work for which they are employed. The temporary establishment include:- Supervisor Bar benders Electricians Labourers . Plumber
  • 19. COLLAGE OF ENGINEERING Page 19 9.0 Information about Material The various materials used for construction and supporting the building are termed as Building Materials. The different building materials include cement, coarse aggregate (gravel) fine aggregate (sand) and high yield bars are to be tested before using them in building construction. The materials which are used at site as below:- a) Cement: - Cement is a binding material that has cohesive and adhesive property in the presence of water. The brands of cement used are Elephant (Portland cement) and Dangote 42.5 grade Portland cement. b) Brick: - An artificial masonry unit in the form of rectangular block of prepared is Called a brick. The main constituents of brick are 9โ€ and 6โ€ 225x225x450 and 150x225x450 c) Sand: - Sand is a filling material which is used in concrete, mortar and plastering. Sand is basically consisting of small grains of silica which is formed by the decomposition of sandstones due to various effects of weather. The coarse gain is sharp, angular and certainly free from salt etc which is employed in concreting. d) Aggregate: Is the inert material which forms the bulk of cement concrete. The aggregate are bound together by mean of cement. The size of aggregate which is used at the site is 10mm and 20mm. e) Admixture: - Admixture is the materials which are used to improve the quality of Concrete. The admixture which is used at the casting of column is coming from Dr. Fix Limited company. The capacity of one drum is 20litres. This admixture is helps to increase the setting time and maintains the strength of concrete. F) Miscellaneous: - Miscellaneous materials are those which are also important except basic materials. There are numbers of materials which are used for construction at site which are:- 1) Plastic pipes 2) G.I. pipes 3) Electric Wires 4) Fiber Sheets 5) Bitumen 6) Water proofing 7) Termite proofing 8) Fire resistance 9) Paint and Varnish 10) Glass 11) Wooden Doors 12) Chips 13) Marble 14) POP
  • 20. COLLAGE OF ENGINEERING Page 20 10.0 Information about Test There are number of tests which are performed at the site on different material. The tests which we have performed at the site are below:- a) Compressive Test: - The compressive strength of a cube is an indication of the strength of concrete. With the help of this we can check the characteristics strength of concrete. The size of cube is taken as 15cm3. At least three specimen should be made for testing which is to be performed at 7, 21, 28 days. Observation and calculations:- Proportion of concrete = M25 Cross-section Area = 15x15=225 cm3 Breaking Load = 770 KN Compressive strength after 28 days = 34.2 KN/mm2 Result:- Compressive Strength of concrete sample after 28 days is 34.2N/mm2 . Whereas Strength requirement is 25 N/mm2 , hence tested sample is safe. b) Silt Content: - Silt is a material of particle sizes between 0.002mm to 0.06mm. It is Usually found in sands obtained from natural sources such as river bed. If it is present in excess quantity then is preventing a bond between cement and aggregate. Silt value is to be increase more than 6% by volume. This test is to be easily performed in beaker of size 250ml. C) Weight of Steel: - This is a field test which is performed on steel to check wt. meter length because there are number of impurities will be added in the materials due to Temperature variations so that its wt. will vary from the standard value. There is a Chance of corrosion and rusting over steel bar Observation and Calculation:- Height of sample = 150ml Height of silt after 3 hours = 6ml Percentage of Silt = 4% Result:- Its value does not increase more than 6% by volume. 1 10mm 620gm 620gm 2 12mm 890gm 890gm 3 16mm 1580gm 1550gm
  • 21. COLLAGE OF ENGINEERING Page 21 11.0 Information about Equipmen 1) Tilted Drum Mixer: A concrete mixer (also commonly called a cement mixer) is a device that homogeneously combines cement, aggregate such as sand or gravel, and water to form concrete. For smaller volume works portable concrete mixers are often used so that the concrete can be made at the construction site, giving the workers ample time to use the concrete before it hardens. The entire drum rotates around its axis as metals are loaded through a charge chute at one end of the drum and exit through a discharge chute at the opposite end of the drum. Mixing blades are mounted on the inside surface of the drum and as the drum rotates the blades mix by lifting and dropping the materials during each rotation. Once the materials are sufficiently mixed the rotation of the drum is reversed and the blade arrangement pushes the concrete through to the discharge end of the mixer. 2) Needle Vibrator: The Needle Vibrator, also known as immersion or poker vibrator have a power unit and long flexible tube at the end of which a vibrating head is attached. Wherever compaction is to be done, the vibrating head is inserted in the concrete. Concrete vibrators consolidate freshly poured concrete so that trapped air and excess water are released and the concrete settles firmly in place in the formwork. Improper consolidation of concrete can cause product defects, compromise the concrete strength, and produce surface blemishes such as bug holes and honeycombing. An internal Concrete vibrator is a steel cylinder about the size of the handle of a baseball bat, with a Hose or electrical cord attached to one end. The vibrator head is immersed in the wet Concrete.
  • 22. COLLAGE OF ENGINEERING Page 22 3. JCB Excavator: Excavators are heavy construction equipment consisting of a boom, stick, bucket and cab on a rotating platform (known as the "house"). The house sits atop an undercarriage with tracks or wheels. A cable-operated excavator uses winches and steel ropes to accomplish the movements. They are a natural progression from the steam shovels and often called power shovels. 4.Rammers are used for compacting small areas by providing impact load to the soil. This equipment is light and can be hand or machine operated. The base size of rammers can be 15cm x 15cm or 20cm x 20cm or more.
  • 23. COLLAGE OF ENGINEERING Page 23 5. Vibrating smooth wheeled rollers In case of vibrating smooth wheeled rollers, the drums are made to vibrate by employing rotating or reciprocating mass. These rollers helpful from several considerations like:- (i) Higher compaction level can be achieved with maximum work (ii) Compaction can be done up to greater depths
  • 24. COLLAGE OF ENGINEERING Page 24 12.0 Safety Measure and Campaign a) In Civil engineering construction project, accidents cannot be avoided. An event can happen any time and unexpectedly during construction. About 80 percent of accidents are mainly caused due to unsafe practices and shear negligence of the workers. Safety measures are required to be built properly to motivate and encourage the workers to work at the given site or industry without any fear, tension or worry in mind about his security of life. Good safety measures are essential to increase the output of work by generating safety free environmental sense of contentment among the workers. Safety measure can be efficiently handled by properly educating and training workers about the safe rules and their importance. It is the foremost duty of construction management to appoint separate safety engineer to undertake safety measure and to prevent the occurrence of accidents. The causes of accidents should be properly investigated and suitable measures should be adopted to control these accidents. Thus, safety measures prevent: 1. Reduced workersโ€™ compensation claims 2. Reduced expenses related to injuries and illnesses 3. Reduced absenteeism and Lower employee complaints 4. Loss of Life and Increased productivity 5. Improved employee morale and satisfaction 6. Reduction of hidden cost and reduced insurance cost b) Personal Safety Wear protective equipment. Always wear safety helmet, safety vast and safety foot wear at construction site. Do not drink or take drugs while working. Pay attention to personal hygiene. Do not play in the workplace. Report to your supervisor immediately if you notice any unsafe condition c) Public Safety Pay attention to public safety . Members of the public are often unaware of or do not understand the work carried out on construction sites and the hazards involved. Take great care to prevent the fall of materials from height. Do not stack materials on floor edges or on scaffolds. d) Safety Campaign An organized movement launched by an enterprise or construction firm to advocate the safety rules and regulations among its workers to reduce the number of accidents is termed as safety campaign. The following points should be kept in mind for launching safety campaign. 1. The safety campaign must be placed under the charge of a very competent, experienced and able manager, who may be termed as safety Director. 2. The worker should be frequently addressed in a small group in their language or
  • 25. COLLAGE OF ENGINEERING Page 25 easy accessible language to explain about safety rules. 3. Doโ€™s and Donโ€™ts during construction work should be displayed in bold letter along with diagram on chart paper 4. Advertisement films, Documentaries and CD should be shown to the workers on off days, explaining about the need for safety measures. 5. Safety Slogans and safety Quotations should be made an integral part of safety campaign to educate the illiterate and poor workers. 6. Training in first-aid should be provided to workers and supervisors for trating minor cuts and injuries. 7. Safety journals should be brought about by the concerned management and distributed free of cost to the workers. 13.0 Inspection and Quality Control a) Inspection is the process of carrying out vigilant checks during the construction of
  • 26. COLLAGE OF ENGINEERING Page 26 project against any serious defect or lack of progress. Inspection of work is carried from beginning of work up to the completion of project at various stages or levels by competent authority. Quality control is the comparison of materials, construction techniques and finishing products etc. with the laid down standards. The quality control and inspection should ensure that the quality of work is the accordance with the prescribed specification. i) Stages of construction: a) Layout stage: It is the first stage of work to be inspected when the layout of building is carried out. The layout should be properly checked for right angles and dimensions must be measured as per plan. b) Earthwork completion stage: At this stage, quality inspectors check the adequate depth and width of excavation trench to ensure desired the depth of foundation. c) Foundation laying stage: At this stage, the quality engineer mainly inspects the material reached at the site, such as quality of cement, sand, bricks and aggregate to be used in foundations. The materials must be of the same quality as has been inspected at the supplierโ€™s premises. In general, a contractor always tries to use over burnt or jhama bricks for the foundation for the foundation work which should be objected. d) D.P.C. laying stage: It is the one of the critical stage, which must be inspected by the quality engineer. It is the completion of foundation stage, when damp proofing course is laid at the top of foundation layer to protect the building from moisture. At this stage, once again layout of building should be exactly checked as per the building plan to ensure proper internal dimensions of rooms and its component. e) Formwork erecting stage: Erecting formwork is one of the major stage of the construction work, which must be given due attention by the quality inspectors. The shape, strength and finishing surfaces of concrete in beams, column and slabs mainly depend upon type of form work. For large project, only steel form work should be used. For concrete construction forms or shuttering in the forms of wooden planks or steel plates are used for keeping the green concrete in position till it hardens. This helps in giving the desired shapes to different components of the structure ii)Removal of formwork For columns = 24 to 48 hours For slab up to 4.5 m span = 7 days For slab more than 4.5m span = 14 days For beams up to 6m span = 14 days For beams above 6m span = 21 days iii) The good formwork should satisfy the following requirements:- 1. The material of the formwork should be practically water proof so that it canโ€™t absorb water from concrete. 2. It should be strong enough to withstand the pressure or the load of the fresh concrete, live load of the worker coming on it. 3. The formwork should be so made that it can be removed easily without causing the least injury to the surface of nearly constructed concrete members. 4. The inside surface of formwork should be smooth so as to give good appearance
  • 27. COLLAGE OF ENGINEERING Page 27 to the resulting newly constructed concrete members. f) Reinforcement laying stage: The strength of the structure member like beams, column and slab depends upon the reinforcement provided. So, when the reinforcement stage is laid over the formwork erected, it is right time for quality engineers to inspect the work for identification of any defect with respect to inadequate reinforcement 14.0 Site Drawings a) Column Drawing 15.0verall Benefits of Training a) Internship is a class healed at site to provide an enhanced understanding of the outside working environment before the student graduate. Student like civil and urban engineering and other fields also take this practice. The main aim of this Practice (internship) is that to teach students communication with different
  • 28. COLLAGE OF ENGINEERING Page 28 Workers or employees, to improve practical skill what they learned at class, up grading the theoretical knowledge in addition to the class, improve their leadership skill, team playing skill and etc. I have acquired much knowledge in different tasks as explained below in different section. That different knowledge gets me a good performance in the internship period and I gain an experience that helps me after the graduation in the upcoming working era of mine. b) Improving practical skill i) The aim of the internship is to address more practical knowledge for student. So, I found a practical knowledge at the site as much possible within the four month. The knowledge we have learn in the class is helpful to get those practical or real work in the site and totally different from the actual knowledge gained from the class. Thus I found some knowledge in the site which helps me to work with the site environment or site peoples. ii) Some of the practical knowledge I gain from the internship class was: Construction of formwork and false work for some reinforced concrete structure. In any construction work the first stage before casting of concrete is designing and constructing of form work. As I explained in the work procedure the formwork and false work must be stiff and must resist the fresh concrete till the concrete gain its strength. Thus the construction stage of form work was new to me since Iโ€˜m new for the practical world now I gain practical knowledge about how it is worked and erected. Bar bending, positioning, splicing and tying, according the specified drawing. After the formwork and false work is ready the bar bending, positioning and tying work goes next. This work is done based on the working drawing provided in the working drawings (structural drawing) by the design team of that specified structure. In most case it was new for me to see such work since it is a practical work only performed at the site. Surveying on building construction. We conduct the surveying class in the field for its lab session of the course in the normal class. But we donโ€˜t know about how it is going to be in building construction in particular and in which particular stage of the construction work it used either the super structure or sub structure. Concrete is a vital material in any construction of reinforced concrete and is the main constituent or ingredient of any reinforced concrete structure. Thus it is mandatory to know this material in practice including how it is treated, placed (poured), mixed and the equipment used for those work. I got the practical knowledge in terms of those listed aspects of concrete. Different construction equipment (machines) and their use in construction site. Many of great structures before are a product of numerous human power and countless days inspired by great powers. Machines are capable of handling tough work which may be beyond the scope of human labour to be performed. They can be expected to work with fair degree of effectiveness even under adverse weather, climate or topographical conditions. I generally know how equipmentโ€˜s are used in the site including their specific purpose. c) Upgrading the theoretical knowledge i) The internship class is not only depending on the practical aspect but it also help students to upgrade or increase knowledge on already that they have. I try to
  • 29. COLLAGE OF ENGINEERING Page 29 integrate the practical knowledge with that of the theory learned in the class in different place in order to get more knowledge than the theory we learned on the class. I got the internship class very interesting in terms of upgrading a theoretical knowledge and I learned from the site some theories that we havenโ€˜t learn in the class room by searching different related literature. Some of this is: Quantity surveying Structural design of shear wall and its advantage Construction equipment Report writing ii) I learned those things in exclusive cause it is hard to read and understand everything from books and asking some peoples at site to those things ashamed me. Generally I change myself alit bit after the internship period in my knowledge than before I took it. d)Upgrading interpersonal communication skill i) Communication is sharing or exchanging information or ideas with others in order to get some messages and knowledge. The communications systems within the building design and construction enterprise has taken on a large role in the achievement of profitability and efficiency. A basic understanding of communication systems is beneficial to all building professionals and trades, as they all play a part in the success of the construction. Construction is one of the places that ask a good communication skill either managing every trade of work or asking what is gowning on over there. So, communication is an important way of learning, which can be defined formally as the act, process, or experience of gaining knowledge or skills and sharing what we know. Cool communication is important in the real constructions world and it can appear in different forms as speaking, writing, and listening. In the site the most things I gain is due to communication with other workers like engineers, skilled and non-skilled workers, Forman etc. in some place/case it is very difficult to talk workers and ask them what we want because of that they underestimate us and sometimes they are not eager to tell. e) Improving team playing skill i) Team playing skill for construction work Team works, especially for engineers, involve in every piece of task and achieving good team playing skill is essential for Effective completion of tasks and Increasing productivity. This skill already exists in my personality in the campus due to different assignment and project works that I work together with student. But this skill is more than this in the construction site. In the construction site the work is already a team work and it needs more closeness of workers to solve problems arise in different aspects, misunderstanding in the drawing or working methodology and consult every work. We the student at the site also works together as a team to get more understanding and share ideas. More or less I improve my team work status by working together with different professionals, student and workers as a whole in the civil engineering works and consulting. f) Improving leadership skill i) Leadership is the process of influencing individuals or groups to accomplish an organizational goal or mission. I have seen how each worker is controlled and
  • 30. COLLAGE OF ENGINEERING Page 30 organized to perform its day to day activities. Among all other managements i have seen that human resource management is the most important one. i have actually observed the method of controlling the working time and amount of work done by each worker so that the work proceeds according to the work plan (schedule).Leadership is a skill to guide, control and monitor peoples. For effective leadership i understood that personal values like confidence, effective communication and devotion are very important. bm) In order to be good Leadership the following criteria should be fulfilled. bn) Those are:- Be technically proficient (skilled with different knowledgeโ€˜s). Seek responsibility and take responsibility for your actions. Make sound and timely decisions. Know your people and look out for their well-being. Keep your workers informed. Develop a sense of responsibility in your workers. Ensure that tasks are understood, supervised, and accomplished. Use the full capabilities of your organization. Listening to others. Being organized. Able to communicate clearly and efficiently. ii) In the site it was impossible to us to lead anything because we go to the site to learn about the site work and we donโ€˜t have enough ability to handle such works in such short time but we have learned how to become a good leader and the main signal of a good leader. iii) Finally what I take hold of is Becoming a leader isnโ€˜t easy because it takes a conscious commitment and consistent effort to develop oneโ€˜s leadership skills g)Work ethics and related issues i) The concept of work ethics may be summarized as the overall quality in oneโ€˜s behavior towards appreciating the process of work flow and performing rather well on the job so that this work flow will not be jeopardized in the long run. During my internship program, I could say that I have managed to do my side of the job description with a high spirit and enthusiasm so that there was a smooth flow of activities both in the office and on construction site. Work ethics involve such characteristics as honesty, responsibility, reliability, accountability and etc. ii) Punctuality is one of the major issues that could be raised when talking about work ethics and on my side I tried meet this criteria by attending to my working station in time so that there will not be any delay on the activities planned for that day. The behavior that one shows towards his peers and colleagues is also one manifestation of the concept of work ethics. Personally, I always respected and gave priority the employers of the company. Elements of work ethics that worth mentioning are:- punctuality, honesty, reliability, office discipline, corporation and responsibility. ii) We as a student should follow the rules and regulations set by the company and avoid complaining any work load, activity or assignment that may arise on the site or office. It is a pleasure of supervisors if we have a good work ethics and we are
  • 31. COLLAGE OF ENGINEERING Page 31 responsible for any given tasks. Since the aim of internship is to let students know the outside environment pertinent to their field, which includes of such the above dealt qualities, I was with the great interest that I tried to meet my responsibilities and work ethics that I suppose to be fulfil by my side. 16.0 Conclusion 1) The entire period of Industrial Training has given me good & important practical exposure of construction work. At the end of the Industrial Training under LEGRANDE ENINEERING SERVICES Limited, LAGOS STATE, I feel myself better equipped and ready to face the field problems related to Civil Engineering works. In these four& half months, I have learnt how to deal with Authorities and workers under supervision and I have become familiar with the fact that the field work is much difficult from theoretical knowledge. But until you donโ€™t have the theoretical knowledge, the practical work is very difficult to carry-out and understand. 2) Working with experienced engineers has enhanced my technical skills to a great extent for which I am grateful to them. Their professional approach towards work is appreciable. 3) The training has provided me with much needed field exposure to shape up my thinking in a better way as a professional making me a lot more capable to face the challenges of life. 17.0 References and Bibliography ๏‚ท .Drawings shown above are made on AUTO CAD ๏‚ท . Images shown in the report are self-clicked images at various locations ๏‚ท .Calculation mentioned above are carried out in the daily dairy ๏‚ท . Civil Construction Books ๏‚ท .Drawings provided at the site ๏‚ท .COMPANY WEBSITE-(lesl.awardspace.com)