A TECHNICAL REPORT ON
STUDENTS INDUSTRIAL WORK EXPERIENCE SCHEME
(SIWES)
UNDERTAKEN AT
SAMRON ENGINEERING TECHNOLOGIES (SET)
20, AJEGUNLE STREET, ILUPEJU, OSHODI, LAGOS.
BY
ODUBIYI,KAZEEM AKINOLA
F/ND/15/3420006
DEPARTMENT OF ELECTRICAL/ELECTRONICS ENGINEERING
SCHOOL OF INDUSTRIA AND MANUFACTURING
YABA COLLEGE OF TECHNOLOGY.
A SIWES REPORT SUBMITTED TO THE DEPARTMENT OF
ELECTRICAL/ELECTRONICS YABA COLLEGE OF TECHNOLOGY,IN PARTIAL
FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF THE OND DEGREE
IN ELECTRICAL/ELECTRONICS ENGINEERING
FROM:
APRIL TO JULY 2017
i
ABSTRACT
The Siwes report presents the experience gathered during my three months of Industrial
training undertaken of Samron Engineering Technologies, Ilupeju, Oshodi, Lagos.
My training was on Electronics/Electrical Technician inverter section, solar installation, and
security system. I acquired practical knowledge on how to repair, replace and install electrical
systems. This report discusses the technical skills gained during the training period and
justifying the relevance of the scheme in equipping student with needed technical competence
to thrive in the real world.
ii
ACKNOWLEDGEMENT
First of all, I acknowledge the overwhelming help that God gave me through the scheme.
Without his support and miracles, I would not have been alive, let alone of having a
successful industrial training attachment.
I appreciate my parents and siblings for their constant help, and financial support.
I heartily express my appreciation to Eng. Godwin Daniel (Engineer at Samron Engineering
Technologies) for making it possible for me to do my training at Samron Engineering
Technologies.
I also appreciate Eng. Sam Omoniyi (C.E.O Samron Engineering) for sparing some of his
precious time to teach me all I could understand about inverter and solar installation. I also
thanks my colleagues, Ayinde Jubril, Taiwo Olayemi, Habib Lawal, Otukoya Ibrahim and
Amuleya Tobi, for their help towards making my three months industrial training attachment
a swell time.
Sincerely, all the people at the fabrication and installation department taught me so much that
I could not have had a successful training without them. I really appreciate their effort over
me
My appreciation goes to the Industrial Training Fund for their foresight in putting this
program in place and also to Electrical/Electronics department, Yaba College of Technology,
Yaba, Lagos for providing a platform on which I was engaged on the training.
Finally to my institution based supervisor, Eng. Ogunrewo O.F, for his support to me and my
friends and colleagues.
Thank you all, I am highly grateful.
iii
TABLE OF CONTENT
Title Page
Cover Page...........................................................................................................................i
Abstract...............................................................................................................................ii
Acknowledge......................................................................................................................iii
Table of Content..................................................................................................................iv
List of Table.........................................................................................................................v
List of Figure........................................................................................................................v
Chapter One
Introduction to Training Program....................................................................................1
1.0 Purpose of Training.........................................................................................................1
1.1 Objective of SIWES........................................................................................................1
Chapter Two
Company Profile..................................................................................................................2
2.0 Samron Engineering Technologies..................................................................................2
2.1 Brief History of SET........................................................................................................2
2.2 Vision of SET...................................................................................................................2
2.3 The Company’s Scope of Work........................................................................................2
Chapter Three
The Training Program..........................................................................................................3
3.0 Task Perform......................................................................................................................3
3.1 Work Experienced in Installation Department...................................................................4
3.10 Inverter..................................................................................................................4
3.11 Battery...................................................................................................................5
3.12 Solar Panel.............................................................................................................6
3.2 The Activities Perform in the Installation Department....................................................6-7
Chapter Four
Problem Encounter..................................................................................................................8
Chapter Five
5.0 Conclusion...........................................................................................................................9
5.1 Relevance in Experience Gained to Classroom Knowledge...........................................9
Chapter Six
Recommendation and Suggestion.........................................................................................10
Reference.................................................................................................................................10
iv
List of Figures and Tables
Table 3.0 - Showing some electric components and their functions
Figure 3.10 - Inverter
Figure 3.11 - Battery
Figure 3.11(a) - Series configuration
Figure 3.11(b) - Parallel Configuration
Figure 3.12 - Solar Panel
Figure 3.2(a) - Distribution board
Figure 3.2(bi) - Assemble of Solar Panel
Figure 3.2(bii) - Mounting of Solar
Figure 3.2(c) - Charge Controller
Figure 3.2(d) - Typical Diagram of Inverter/Solar Installation
v
CHAPTER ONE
INTRODUCTION TO TRAINING PROGRAM
1.0 PURPOSE OF TRAINING
The Students Industrial Work Experience Scheme (SIWES) was initiated in 1973 by the
Industrial Training Fund (ITF). This was to upgrade practical knowledge of students in the
Universities, Polytechnics and Colleges of Technologies. It was aimed at bridging the gap
between the theoretical knowledge acquired in classes and technical knowledge in the
industries to provide students with the opportunities to apply educational knowledge in real
work situations.
Over the years, SIWES has contributed immensely in building the common pool of technical
and allied skills available to the Nigerians economy which are needed for the nations
industrial development.
Furthermore, the place and relevance of SIWES is underscored by the fact that the scheme
contributes to improving the quality of technical skills generally available in the pool from
which employers source technical manpower.
It also gives students opportunity to blend theoretical knowledge acquired in the classrooms
with practical hands, on application of knowledge require to perform work in the industry.
Also, it prepares students for employment and makes the transition from school to the world
of work easier after graduation.
I undertook my SIWES training at Samron Engineering Technologies which is located at 20,
Ajegunle, Ilupeju Oshodi, Lagos State which lasted from April 3rd to June 30th, 2017 (15
weeks).
1.1OBJECTIVE OF SIWES
The following are the some of the objectives of the SIWES
1. SIWES will provide students the opportunity to test their interest in a particular career
before permanents commitments are made.
2. SIWES will develop skills in the application of theory to practical work situations.
3. SIWES will provide students the opportunity to test their aptitude for a particular career
before permanent commitments are made.
4. SIWES students will develop skills and techniques directly applicable to their career.
5. SIWES will aid students in adjusting from college to full time employment.
6. SIWES will provide students the opportunity to develop attitudes conducive to
interpersonal relationships.
7. SIWES will increase a student’s sense of responsibility.
8. SIWES students will prepare to enter into full time employments in their area of
specialization upon graduation.
9. SIWES students will acquire good work habits
1
CHAPTER TWO
COMPANY PROFILE
2.0 SAMRON ENGINEERING TECHNOLOGIES (SET)
Samron Engineering Technologies (SET) has its headquarters located at 20, Ajegunle Street,
Ilupeju Oshodi, Lagos, with branch office located in Lagos and Ekiti state.
2.1 BRIEF HISTORY OF SET:
Samron Engineering Technologies was founded in 2002 by its current chairman/C.E.O
(Samuel Omoniyi) on June 30th, 2002. It is an indigenous electrical and electronics company,
and specialize on inverter/solar with security systems. The company was formerly known as
Samatech Engineering LTD, before it was changed to Samron Engineering Technologies in
2012. The company has a staff strength of approximately 20.
2.2 VISION OF SET:
·To provide 24/7 electricity for people and tackle the problem of electricity in the country.
·To make the inverter/solar amongst the best source of electricity in the country.
The function of the organization include:
·To provide electricity in affordable price for people.
·To reduce the challenges of electricity in the country.
·To reduce the amount people spend on fuel and PHCN bill.
·Installation and effective maintenance of inverter/solar.
·Electrical and Sound Systems installation both in conduit and surface .
·Security systems .
·Student project.
2.3 The Company's Scope of Work
In area of specialization ,Samron Engineering Technologies has the capacity of providing the
following services.
(i) service and maintenance (ii) fabrication (iii) installation
SET is made up of major department .They are
(1) sales department (2) service department (3) maintenance department
(4) installation department (5) fabrication department.
2.4 Command structure of the organisation
CHAIRMAN/CEO
GENERAL MANAGER
OPERATION MANAGER
SUPERVISOR
OPERATION ENGINEER TECHNICIAN
JUNIOR TECHNICIAN
2
CHAPTER THREE
THE TRAINING PROGRAM
3.0 THE TASK PERFORM
Then I was assigned to the electronics department, where I was taught on the identification of
various electronic components e.g resistor, capacitor, diode, integrated circuit (IC) , inductor,
regulator, MOSFET e.t.c,
I was also taught their uses which some is expressed in the table below;
Components Functions
Resistor In electronic circuit, resistor are used to reduce
current flow, adjust signal levels, to divide
voltages, bias active elements, and terminate
transmission lines among other uses.
Diode The most common function of a diode is to
allow an electric current to pass in one direction
(called the diode’s forward direction), while
blocking current in the opposite direction
(The reverse direction)
Transistor A transistor is a semi-conductor device used to
amplify or switch electronic signals and electri-
cal power.
Capacitor Its function is to store the electrical energy and
give this energy again to the circuit when
necessary.
Inductor They are used to block AC while allowing DC
to pass.
Regulator This is designed to automatically maintain
a constant voltage level.
Table 3.0: Showing some of electric components and their functions.
3
During my stay in Samron Engineering Technologies, for the first month, I was assigned to the
electronics department as a technician in the inverter section, more specifically the oscillator
section.
3.1 WORK EXPERIENCED IN INSTALLATION DEPARTMENT
For the second month of my SIWES at Samron Engineering Technologies, I was
transferred to installation department.
In installation department, I was basically involve in installation of inverter, battery, solar
panel and electrical equipment.
3.10 INVERTER: Is an electric device that changes direct current (DC) to alternating current
(AC).
The input voltage, output voltage, frequency and handling depend on the design of the
specific device. The inverter does not produce any power. The power is provided by the DC
source.
Figure 3.10 Inverter
Inverter is rated in KVA (kilovolt amps)
Input Voltage
A typical power inverter device requires a relatively stable DC power source capable of
supplying enough current for the intended power demands of the system. The input voltage
depends on the design and purpose of the inverter. Examples include;
·12 VDC, for smaller consumer and commercial inverters that typically run from a
rechargeable 12v lead-acid battery.
·24, 36 and 48 VDC, which are common standards for home energy systems.
·200 – 400, when power is from solar panels.
Output Waveform
An inverter can produce a modified sine wave, or pure sine wave depends on circuit
design.
There are two basic designs for producing household plug-in voltage from long-voltage DC
source, and then convert to AC.
The second method converts DC to AC at battery level and uses a line frequency
transformation to create the output voltage
4
Output Frequency
The AC output frequency of a power inverter device is usually the same as standard power line
frequency, 50 or 60 hertz. If the output of the device or circuit is to be further conditioned (for
example, stepped up) then the frequency may be much higher for good transformation efficiency.
Output Voltage
The AC output voltage of a power inverter is often regulated to be the same as the grid line
voltage, typically 120 or 240 VDC at the distribution level, even when there are changes in the
load that the inverter is driving. This allows the inverter to power numerous devices designed for
standard line power. Some inverters also allow selectable or continuously variable output
voltages.
Output Power
Inverter will often have an overall power rating expressed in Watts or Kilowatts. This describes
the power that will be available to the device the inverter is driving and indirectly, the power that
will be needed from the DC source. Smaller popular consumer and commercial devices designed
to mimic line power typically range from 150 to 300 watts.
3.11 BATTERY
The runtime of an inverter is depended on the battery power and the amount of power
being drawn from the inverter at a given time. As the amount of equipment using the inverter
increases, the runtime decreases. In order to prolong the runtime of an inverter, additional
batteries can be added to the inverter.
When attempting to add more batteries to an inverter, there are two basic options for
installation.
Figure 3.11 Battery
1. Series Configuration
In a series configuration, voltage increase. This type of connection can only used for more
than 124 power inverter system. In a series configuration, if a single battery died, the other
battery will not be able to power the load.
Figure 3.11(a) Series Configuration
5
1. Parallel Configuration
In a parallel connection, the capacity increases and prolong the runtime of the inverter. This
increase the overall ampere hour (Ah) rating of the battery set.
If a single battery is discharged through the other batteries will then discharged through it.
This can lead to rapid discharge of the entire pack, or even an over current and possible
power. To avoid this, large paralleled batteries may be connected via diodes or intelligent
monitoring with automatic switching to isolate an under voltage batteries from others
Figure 3.11(b) Parallel Configuration
3.12 SOLAR PANEL
Solar panel absorbs the sunlight as a source of energy to generate electricity or heat
A photovoltaic (PV) module is a packaged connect assembly of typically 6 x 10
photovoltaic solar cells.
Figure 3.12 Solar Panel
Photovoltaic module constitute the photovoltaic array of a photovoltaic system that
generates and supplies solar electricity in commercial and residential application. Each module is
rated by its DC output power under Standard Test Conditioned (STC) and typically ranged from
100 to 365 watts (W). The efficiency of a module determines the area of a module given the
same rated output of a 16% efficient, 250 watts module. There are a few commercial available
solar module that exceed efficiency of 22% and reportedly also exceeding 24%
3.2 THE ACTIVITIES PERFORM IN INSTALLATION DEPARTMENT
3.5KVA/48V Inverter with Solar Panel Installation for domestic use
Parameter:
5KVA Inverter
4x12V/200Ah Batteries
8x100W Solar Panels
48V, 100A Charge Controller
Solar and battery rack
6
PROCEDURE:
üFirstly, the load was first isolated from the distribution board (DB) i.e the separation of loads
that will work with inverter from other load in the house.
Figure 3.2 (a) Distribution board
üThe batteries was connected together in series configuration to produce 48V output.
üThe inverter was connected to the batteries and it powered ON for testing and OFF
immediately.
üThe solar panel was mounted on the roof using solar rack and it was connected in series and
parallel configuration.
Figure 3.2 (bi) Assemble of solar panel Figure 3.2 (bii) Mounting of solar
üThe output from the solar panel was connected directly to the charge controller.
Figure 3.2 (c) Charge Controller
üThe output of the charge controller was connected to the batteries in order to charge the
batteries with the required voltage.
üAll the connection was properly checked and tested using multi-meter.
Figure 3.2 (d)Typical diagram of Inverter/Solar Installation
üThe system was powered ON
7
CHAPTER FOUR
4.0 PROBLEM ENCOUNTERED
Challenges that I was confronted with at Samron Engineering Technologies was centred
mainly on soldering. When I was in electronic section, it was very difficult for me to use
soldering iron to sold on vero board using soldering led. I got myself injured severally when
handling soldering iron, due to the high number of people which is inverse to the space available
in the workshop.
There was also a time when I was transferred to installation department, where I found
fixing trunk difficult. It was many time I did hit myself with hammer and spoil many trunks
before I mastered it. Also my first day on sight where I found it difficult to climb roof.
8
CHAPTER FIVE
5.0CONCLUSION
My three months industrial attachment as an engineer at samron engineering technologies
was huge success and a great time of acquisition of knowledge and skilld. Through my
training i was able to appreciate my choosen course of study even more because i had the
opportunity to blend the theoretical knowledge acquired from school with the practical hands
on application of knowledge gained here to perform very important tasks that contributed in
a way to my productivity in the company .It also gave the opportunity to have a fact of what
it would be like after graduation when i start working.
5.1RELEVANCE OF EXPERIENCE GAINED TO CLASSROOM KNOWLEDGE
The relevance of the experience gained can be linked to following courses;
EEC 129 Electrical installation
EEC115 Electrical science 1
EEC126 Instrumentation 1
EEC124 Electronics
EEC123 Electrical machine 1
EEC122 Electrical power 1
9
CHAPTER SIX
6.0 RECOMMENDATION AND SUGGESTION
I use this means to make the following recommendation and suggestion
ü.Allowance should be paid to student during the programme just like NYSC and not after.
This would help them a great deal to handle some financial problems during their training
course.
ü. I suggest ITF should liaise with some companies where they will take up students for
industrial training .this will help student who find it difficult to find attachments or who
end up in companies where they do nothing.
REFERENCE
“Guide to successful participation in SIWES” by engnr. Olusegun AT mafe,2009.
10

More Related Content

What's hot

SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLASIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLAG_ade
 
Siwes report original
Siwes report originalSiwes report original
Siwes report originalBrightnyt Pun
 
Sample of SIWES REPORT
Sample of SIWES REPORTSample of SIWES REPORT
Sample of SIWES REPORTMargaret Itam
 
AbleMoJah's IT Report
AbleMoJah's IT ReportAbleMoJah's IT Report
AbleMoJah's IT ReportAble MoJah
 
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEA PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEIbrahim Yusuf Salihu
 
Computer Basics - A SIWES Report.
Computer Basics - A SIWES Report.Computer Basics - A SIWES Report.
Computer Basics - A SIWES Report.Abah Joseph Israel
 
Indusrial trainning Report presentation
Indusrial trainning Report presentationIndusrial trainning Report presentation
Indusrial trainning Report presentationAbdulafeez Fasasi
 
Aroso Emmanuel A. - IT Technical Report.pdf
Aroso Emmanuel A. - IT Technical Report.pdfAroso Emmanuel A. - IT Technical Report.pdf
Aroso Emmanuel A. - IT Technical Report.pdfYolanda Ivey
 
IT Defence Preparation
IT Defence PreparationIT Defence Preparation
IT Defence PreparationHerbey Herdarm
 
SIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNSIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNEjiro Ndifereke
 
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNSIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNEjiro Ndifereke
 

What's hot (20)

SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLASIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
 
Siwes report original
Siwes report originalSiwes report original
Siwes report original
 
It report
It reportIt report
It report
 
Technical Report
Technical ReportTechnical Report
Technical Report
 
Sample of SIWES REPORT
Sample of SIWES REPORTSample of SIWES REPORT
Sample of SIWES REPORT
 
AbleMoJah's IT Report
AbleMoJah's IT ReportAbleMoJah's IT Report
AbleMoJah's IT Report
 
CHAPTER ONE1 (Repaired)
CHAPTER ONE1 (Repaired)CHAPTER ONE1 (Repaired)
CHAPTER ONE1 (Repaired)
 
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEMEA PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
A PRESENTATION ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME
 
Computer Basics - A SIWES Report.
Computer Basics - A SIWES Report.Computer Basics - A SIWES Report.
Computer Basics - A SIWES Report.
 
Indusrial trainning Report presentation
Indusrial trainning Report presentationIndusrial trainning Report presentation
Indusrial trainning Report presentation
 
Aroso Emmanuel A. - IT Technical Report.pdf
Aroso Emmanuel A. - IT Technical Report.pdfAroso Emmanuel A. - IT Technical Report.pdf
Aroso Emmanuel A. - IT Technical Report.pdf
 
IT Defence Preparation
IT Defence PreparationIT Defence Preparation
IT Defence Preparation
 
MY SIWES REPORT
MY SIWES REPORTMY SIWES REPORT
MY SIWES REPORT
 
I.T. Report
I.T. ReportI.T. Report
I.T. Report
 
Siwes report
Siwes reportSiwes report
Siwes report
 
SIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGNSIWES I.T REPORT ON WEB DESIGN
SIWES I.T REPORT ON WEB DESIGN
 
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGNSIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
SIWES REPORT ON NETWORKING AND BASIC WEB DESIGN
 
Siwes report
Siwes reportSiwes report
Siwes report
 
SIWES PRESENTATION
SIWES PRESENTATIONSIWES PRESENTATION
SIWES PRESENTATION
 
Siwes Pesentation
Siwes PesentationSiwes Pesentation
Siwes Pesentation
 

Similar to Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YABATECH

COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptx
COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptxCOMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptx
COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptxaguc419
 
Ajayi samson aduragbemi siwes report
Ajayi samson aduragbemi siwes reportAjayi samson aduragbemi siwes report
Ajayi samson aduragbemi siwes reportSamsonAjayi4
 
Industrial Installation Skills Acquired and Job Performance of Graduates of E...
Industrial Installation Skills Acquired and Job Performance of Graduates of E...Industrial Installation Skills Acquired and Job Performance of Graduates of E...
Industrial Installation Skills Acquired and Job Performance of Graduates of E...theijes
 
Industrial_Training_Report_docx.docx
Industrial_Training_Report_docx.docxIndustrial_Training_Report_docx.docx
Industrial_Training_Report_docx.docxKomeshKumar2
 
Vincent chibueze c. full it report
Vincent chibueze c. full it reportVincent chibueze c. full it report
Vincent chibueze c. full it reportChibueze C. Vincent
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training ReportDavid James
 
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...Michael Agwulonu
 
Lukman Ahmad Ingbeshi Students work experience .pptx
Lukman Ahmad Ingbeshi Students work experience .pptxLukman Ahmad Ingbeshi Students work experience .pptx
Lukman Ahmad Ingbeshi Students work experience .pptxAhmadLukman19
 
MY PRESENTATION for my siwes defese.pptx
MY PRESENTATION for my siwes defese.pptxMY PRESENTATION for my siwes defese.pptx
MY PRESENTATION for my siwes defese.pptxAhmadLukman19
 
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...Journal of Agriculture and Crops
 
Swep report
Swep reportSwep report
Swep reportoz4don
 
Electrical & electronics engineering
Electrical & electronics engineeringElectrical & electronics engineering
Electrical & electronics engineeringVivek Kumar Sinha
 
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...Faith Brown
 
Computer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportComputer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportPaullaster Okoth
 

Similar to Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YABATECH (20)

COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptx
COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptxCOMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptx
COMPUTER ENGINEERING DIVINE UCHENNA WOGA.pptx
 
Ajayi samson aduragbemi siwes report
Ajayi samson aduragbemi siwes reportAjayi samson aduragbemi siwes report
Ajayi samson aduragbemi siwes report
 
Siwes report on networking by abdullahi yahaya
Siwes report on networking by abdullahi yahayaSiwes report on networking by abdullahi yahaya
Siwes report on networking by abdullahi yahaya
 
Industrial Installation Skills Acquired and Job Performance of Graduates of E...
Industrial Installation Skills Acquired and Job Performance of Graduates of E...Industrial Installation Skills Acquired and Job Performance of Graduates of E...
Industrial Installation Skills Acquired and Job Performance of Graduates of E...
 
Industrial_Training_Report_docx.docx
Industrial_Training_Report_docx.docxIndustrial_Training_Report_docx.docx
Industrial_Training_Report_docx.docx
 
SIWES REPORT SAMPLE
SIWES REPORT SAMPLESIWES REPORT SAMPLE
SIWES REPORT SAMPLE
 
Report docx
Report docxReport docx
Report docx
 
Asyraf
AsyrafAsyraf
Asyraf
 
Vincent chibueze c. full it report
Vincent chibueze c. full it reportVincent chibueze c. full it report
Vincent chibueze c. full it report
 
Industrial training Report
Industrial training ReportIndustrial training Report
Industrial training Report
 
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...
A Technical Report on Student Work Experience Programme 2 (SWEP 2) Undertaken...
 
Lukman Ahmad Ingbeshi Students work experience .pptx
Lukman Ahmad Ingbeshi Students work experience .pptxLukman Ahmad Ingbeshi Students work experience .pptx
Lukman Ahmad Ingbeshi Students work experience .pptx
 
MY PRESENTATION for my siwes defese.pptx
MY PRESENTATION for my siwes defese.pptxMY PRESENTATION for my siwes defese.pptx
MY PRESENTATION for my siwes defese.pptx
 
2nd ICESD 2016 Conference Paper 8
2nd ICESD 2016 Conference Paper 82nd ICESD 2016 Conference Paper 8
2nd ICESD 2016 Conference Paper 8
 
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...
Appraisal of Students Industrial Work Experience Scheme (SIWES) in NCAM, Agri...
 
Swep report
Swep reportSwep report
Swep report
 
Electrical & electronics engineering
Electrical & electronics engineeringElectrical & electronics engineering
Electrical & electronics engineering
 
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...
Availability And Adequacy Of Workshop Facilities For Skill Acquisition Among ...
 
Computer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment reportComputer science/ IT Fianl attachment report
Computer science/ IT Fianl attachment report
 
johnson pdf (3)_2N
johnson pdf (3)_2Njohnson pdf (3)_2N
johnson pdf (3)_2N
 

Recently uploaded

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 

Recently uploaded (20)

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 

Siwes Report by odubiyi kazeem akionola (ENGKEEN),electrical enginieering,YABATECH

  • 1. A TECHNICAL REPORT ON STUDENTS INDUSTRIAL WORK EXPERIENCE SCHEME (SIWES) UNDERTAKEN AT SAMRON ENGINEERING TECHNOLOGIES (SET) 20, AJEGUNLE STREET, ILUPEJU, OSHODI, LAGOS. BY ODUBIYI,KAZEEM AKINOLA F/ND/15/3420006 DEPARTMENT OF ELECTRICAL/ELECTRONICS ENGINEERING SCHOOL OF INDUSTRIA AND MANUFACTURING YABA COLLEGE OF TECHNOLOGY. A SIWES REPORT SUBMITTED TO THE DEPARTMENT OF ELECTRICAL/ELECTRONICS YABA COLLEGE OF TECHNOLOGY,IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF THE OND DEGREE IN ELECTRICAL/ELECTRONICS ENGINEERING FROM: APRIL TO JULY 2017 i
  • 2. ABSTRACT The Siwes report presents the experience gathered during my three months of Industrial training undertaken of Samron Engineering Technologies, Ilupeju, Oshodi, Lagos. My training was on Electronics/Electrical Technician inverter section, solar installation, and security system. I acquired practical knowledge on how to repair, replace and install electrical systems. This report discusses the technical skills gained during the training period and justifying the relevance of the scheme in equipping student with needed technical competence to thrive in the real world. ii
  • 3. ACKNOWLEDGEMENT First of all, I acknowledge the overwhelming help that God gave me through the scheme. Without his support and miracles, I would not have been alive, let alone of having a successful industrial training attachment. I appreciate my parents and siblings for their constant help, and financial support. I heartily express my appreciation to Eng. Godwin Daniel (Engineer at Samron Engineering Technologies) for making it possible for me to do my training at Samron Engineering Technologies. I also appreciate Eng. Sam Omoniyi (C.E.O Samron Engineering) for sparing some of his precious time to teach me all I could understand about inverter and solar installation. I also thanks my colleagues, Ayinde Jubril, Taiwo Olayemi, Habib Lawal, Otukoya Ibrahim and Amuleya Tobi, for their help towards making my three months industrial training attachment a swell time. Sincerely, all the people at the fabrication and installation department taught me so much that I could not have had a successful training without them. I really appreciate their effort over me My appreciation goes to the Industrial Training Fund for their foresight in putting this program in place and also to Electrical/Electronics department, Yaba College of Technology, Yaba, Lagos for providing a platform on which I was engaged on the training. Finally to my institution based supervisor, Eng. Ogunrewo O.F, for his support to me and my friends and colleagues. Thank you all, I am highly grateful. iii
  • 4. TABLE OF CONTENT Title Page Cover Page...........................................................................................................................i Abstract...............................................................................................................................ii Acknowledge......................................................................................................................iii Table of Content..................................................................................................................iv List of Table.........................................................................................................................v List of Figure........................................................................................................................v Chapter One Introduction to Training Program....................................................................................1 1.0 Purpose of Training.........................................................................................................1 1.1 Objective of SIWES........................................................................................................1 Chapter Two Company Profile..................................................................................................................2 2.0 Samron Engineering Technologies..................................................................................2 2.1 Brief History of SET........................................................................................................2 2.2 Vision of SET...................................................................................................................2 2.3 The Company’s Scope of Work........................................................................................2 Chapter Three The Training Program..........................................................................................................3 3.0 Task Perform......................................................................................................................3 3.1 Work Experienced in Installation Department...................................................................4 3.10 Inverter..................................................................................................................4 3.11 Battery...................................................................................................................5 3.12 Solar Panel.............................................................................................................6 3.2 The Activities Perform in the Installation Department....................................................6-7 Chapter Four Problem Encounter..................................................................................................................8 Chapter Five 5.0 Conclusion...........................................................................................................................9 5.1 Relevance in Experience Gained to Classroom Knowledge...........................................9 Chapter Six Recommendation and Suggestion.........................................................................................10 Reference.................................................................................................................................10 iv
  • 5. List of Figures and Tables Table 3.0 - Showing some electric components and their functions Figure 3.10 - Inverter Figure 3.11 - Battery Figure 3.11(a) - Series configuration Figure 3.11(b) - Parallel Configuration Figure 3.12 - Solar Panel Figure 3.2(a) - Distribution board Figure 3.2(bi) - Assemble of Solar Panel Figure 3.2(bii) - Mounting of Solar Figure 3.2(c) - Charge Controller Figure 3.2(d) - Typical Diagram of Inverter/Solar Installation v
  • 6. CHAPTER ONE INTRODUCTION TO TRAINING PROGRAM 1.0 PURPOSE OF TRAINING The Students Industrial Work Experience Scheme (SIWES) was initiated in 1973 by the Industrial Training Fund (ITF). This was to upgrade practical knowledge of students in the Universities, Polytechnics and Colleges of Technologies. It was aimed at bridging the gap between the theoretical knowledge acquired in classes and technical knowledge in the industries to provide students with the opportunities to apply educational knowledge in real work situations. Over the years, SIWES has contributed immensely in building the common pool of technical and allied skills available to the Nigerians economy which are needed for the nations industrial development. Furthermore, the place and relevance of SIWES is underscored by the fact that the scheme contributes to improving the quality of technical skills generally available in the pool from which employers source technical manpower. It also gives students opportunity to blend theoretical knowledge acquired in the classrooms with practical hands, on application of knowledge require to perform work in the industry. Also, it prepares students for employment and makes the transition from school to the world of work easier after graduation. I undertook my SIWES training at Samron Engineering Technologies which is located at 20, Ajegunle, Ilupeju Oshodi, Lagos State which lasted from April 3rd to June 30th, 2017 (15 weeks). 1.1OBJECTIVE OF SIWES The following are the some of the objectives of the SIWES 1. SIWES will provide students the opportunity to test their interest in a particular career before permanents commitments are made. 2. SIWES will develop skills in the application of theory to practical work situations. 3. SIWES will provide students the opportunity to test their aptitude for a particular career before permanent commitments are made. 4. SIWES students will develop skills and techniques directly applicable to their career. 5. SIWES will aid students in adjusting from college to full time employment. 6. SIWES will provide students the opportunity to develop attitudes conducive to interpersonal relationships. 7. SIWES will increase a student’s sense of responsibility. 8. SIWES students will prepare to enter into full time employments in their area of specialization upon graduation. 9. SIWES students will acquire good work habits 1
  • 7. CHAPTER TWO COMPANY PROFILE 2.0 SAMRON ENGINEERING TECHNOLOGIES (SET) Samron Engineering Technologies (SET) has its headquarters located at 20, Ajegunle Street, Ilupeju Oshodi, Lagos, with branch office located in Lagos and Ekiti state. 2.1 BRIEF HISTORY OF SET: Samron Engineering Technologies was founded in 2002 by its current chairman/C.E.O (Samuel Omoniyi) on June 30th, 2002. It is an indigenous electrical and electronics company, and specialize on inverter/solar with security systems. The company was formerly known as Samatech Engineering LTD, before it was changed to Samron Engineering Technologies in 2012. The company has a staff strength of approximately 20. 2.2 VISION OF SET: ·To provide 24/7 electricity for people and tackle the problem of electricity in the country. ·To make the inverter/solar amongst the best source of electricity in the country. The function of the organization include: ·To provide electricity in affordable price for people. ·To reduce the challenges of electricity in the country. ·To reduce the amount people spend on fuel and PHCN bill. ·Installation and effective maintenance of inverter/solar. ·Electrical and Sound Systems installation both in conduit and surface . ·Security systems . ·Student project. 2.3 The Company's Scope of Work In area of specialization ,Samron Engineering Technologies has the capacity of providing the following services. (i) service and maintenance (ii) fabrication (iii) installation SET is made up of major department .They are (1) sales department (2) service department (3) maintenance department (4) installation department (5) fabrication department. 2.4 Command structure of the organisation CHAIRMAN/CEO GENERAL MANAGER OPERATION MANAGER SUPERVISOR OPERATION ENGINEER TECHNICIAN JUNIOR TECHNICIAN 2
  • 8. CHAPTER THREE THE TRAINING PROGRAM 3.0 THE TASK PERFORM Then I was assigned to the electronics department, where I was taught on the identification of various electronic components e.g resistor, capacitor, diode, integrated circuit (IC) , inductor, regulator, MOSFET e.t.c, I was also taught their uses which some is expressed in the table below; Components Functions Resistor In electronic circuit, resistor are used to reduce current flow, adjust signal levels, to divide voltages, bias active elements, and terminate transmission lines among other uses. Diode The most common function of a diode is to allow an electric current to pass in one direction (called the diode’s forward direction), while blocking current in the opposite direction (The reverse direction) Transistor A transistor is a semi-conductor device used to amplify or switch electronic signals and electri- cal power. Capacitor Its function is to store the electrical energy and give this energy again to the circuit when necessary. Inductor They are used to block AC while allowing DC to pass. Regulator This is designed to automatically maintain a constant voltage level. Table 3.0: Showing some of electric components and their functions. 3
  • 9. During my stay in Samron Engineering Technologies, for the first month, I was assigned to the electronics department as a technician in the inverter section, more specifically the oscillator section. 3.1 WORK EXPERIENCED IN INSTALLATION DEPARTMENT For the second month of my SIWES at Samron Engineering Technologies, I was transferred to installation department. In installation department, I was basically involve in installation of inverter, battery, solar panel and electrical equipment. 3.10 INVERTER: Is an electric device that changes direct current (DC) to alternating current (AC). The input voltage, output voltage, frequency and handling depend on the design of the specific device. The inverter does not produce any power. The power is provided by the DC source. Figure 3.10 Inverter Inverter is rated in KVA (kilovolt amps) Input Voltage A typical power inverter device requires a relatively stable DC power source capable of supplying enough current for the intended power demands of the system. The input voltage depends on the design and purpose of the inverter. Examples include; ·12 VDC, for smaller consumer and commercial inverters that typically run from a rechargeable 12v lead-acid battery. ·24, 36 and 48 VDC, which are common standards for home energy systems. ·200 – 400, when power is from solar panels. Output Waveform An inverter can produce a modified sine wave, or pure sine wave depends on circuit design. There are two basic designs for producing household plug-in voltage from long-voltage DC source, and then convert to AC. The second method converts DC to AC at battery level and uses a line frequency transformation to create the output voltage 4
  • 10. Output Frequency The AC output frequency of a power inverter device is usually the same as standard power line frequency, 50 or 60 hertz. If the output of the device or circuit is to be further conditioned (for example, stepped up) then the frequency may be much higher for good transformation efficiency. Output Voltage The AC output voltage of a power inverter is often regulated to be the same as the grid line voltage, typically 120 or 240 VDC at the distribution level, even when there are changes in the load that the inverter is driving. This allows the inverter to power numerous devices designed for standard line power. Some inverters also allow selectable or continuously variable output voltages. Output Power Inverter will often have an overall power rating expressed in Watts or Kilowatts. This describes the power that will be available to the device the inverter is driving and indirectly, the power that will be needed from the DC source. Smaller popular consumer and commercial devices designed to mimic line power typically range from 150 to 300 watts. 3.11 BATTERY The runtime of an inverter is depended on the battery power and the amount of power being drawn from the inverter at a given time. As the amount of equipment using the inverter increases, the runtime decreases. In order to prolong the runtime of an inverter, additional batteries can be added to the inverter. When attempting to add more batteries to an inverter, there are two basic options for installation. Figure 3.11 Battery 1. Series Configuration In a series configuration, voltage increase. This type of connection can only used for more than 124 power inverter system. In a series configuration, if a single battery died, the other battery will not be able to power the load. Figure 3.11(a) Series Configuration 5
  • 11. 1. Parallel Configuration In a parallel connection, the capacity increases and prolong the runtime of the inverter. This increase the overall ampere hour (Ah) rating of the battery set. If a single battery is discharged through the other batteries will then discharged through it. This can lead to rapid discharge of the entire pack, or even an over current and possible power. To avoid this, large paralleled batteries may be connected via diodes or intelligent monitoring with automatic switching to isolate an under voltage batteries from others Figure 3.11(b) Parallel Configuration 3.12 SOLAR PANEL Solar panel absorbs the sunlight as a source of energy to generate electricity or heat A photovoltaic (PV) module is a packaged connect assembly of typically 6 x 10 photovoltaic solar cells. Figure 3.12 Solar Panel Photovoltaic module constitute the photovoltaic array of a photovoltaic system that generates and supplies solar electricity in commercial and residential application. Each module is rated by its DC output power under Standard Test Conditioned (STC) and typically ranged from 100 to 365 watts (W). The efficiency of a module determines the area of a module given the same rated output of a 16% efficient, 250 watts module. There are a few commercial available solar module that exceed efficiency of 22% and reportedly also exceeding 24% 3.2 THE ACTIVITIES PERFORM IN INSTALLATION DEPARTMENT 3.5KVA/48V Inverter with Solar Panel Installation for domestic use Parameter: 5KVA Inverter 4x12V/200Ah Batteries 8x100W Solar Panels 48V, 100A Charge Controller Solar and battery rack 6
  • 12. PROCEDURE: üFirstly, the load was first isolated from the distribution board (DB) i.e the separation of loads that will work with inverter from other load in the house. Figure 3.2 (a) Distribution board üThe batteries was connected together in series configuration to produce 48V output. üThe inverter was connected to the batteries and it powered ON for testing and OFF immediately. üThe solar panel was mounted on the roof using solar rack and it was connected in series and parallel configuration. Figure 3.2 (bi) Assemble of solar panel Figure 3.2 (bii) Mounting of solar üThe output from the solar panel was connected directly to the charge controller. Figure 3.2 (c) Charge Controller üThe output of the charge controller was connected to the batteries in order to charge the batteries with the required voltage. üAll the connection was properly checked and tested using multi-meter. Figure 3.2 (d)Typical diagram of Inverter/Solar Installation üThe system was powered ON 7
  • 13. CHAPTER FOUR 4.0 PROBLEM ENCOUNTERED Challenges that I was confronted with at Samron Engineering Technologies was centred mainly on soldering. When I was in electronic section, it was very difficult for me to use soldering iron to sold on vero board using soldering led. I got myself injured severally when handling soldering iron, due to the high number of people which is inverse to the space available in the workshop. There was also a time when I was transferred to installation department, where I found fixing trunk difficult. It was many time I did hit myself with hammer and spoil many trunks before I mastered it. Also my first day on sight where I found it difficult to climb roof. 8
  • 14. CHAPTER FIVE 5.0CONCLUSION My three months industrial attachment as an engineer at samron engineering technologies was huge success and a great time of acquisition of knowledge and skilld. Through my training i was able to appreciate my choosen course of study even more because i had the opportunity to blend the theoretical knowledge acquired from school with the practical hands on application of knowledge gained here to perform very important tasks that contributed in a way to my productivity in the company .It also gave the opportunity to have a fact of what it would be like after graduation when i start working. 5.1RELEVANCE OF EXPERIENCE GAINED TO CLASSROOM KNOWLEDGE The relevance of the experience gained can be linked to following courses; EEC 129 Electrical installation EEC115 Electrical science 1 EEC126 Instrumentation 1 EEC124 Electronics EEC123 Electrical machine 1 EEC122 Electrical power 1 9
  • 15. CHAPTER SIX 6.0 RECOMMENDATION AND SUGGESTION I use this means to make the following recommendation and suggestion ü.Allowance should be paid to student during the programme just like NYSC and not after. This would help them a great deal to handle some financial problems during their training course. ü. I suggest ITF should liaise with some companies where they will take up students for industrial training .this will help student who find it difficult to find attachments or who end up in companies where they do nothing. REFERENCE “Guide to successful participation in SIWES” by engnr. Olusegun AT mafe,2009. 10