The Arrow - Advanced
kanban board
© Pop Psychology - popsych.org
2015-06-21, Tomas Rybing, Aptilo Networks
”The arrow” - Design for kanban board
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Example
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Last task for story ”A” is ready to
be deployed in production.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”A” deployed and Done!
Swim lane (=capacity) freed up
for new story.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Business decision needed, all
information on the board is
considered. Story ”B” is selected
as the most suitable to start
working on. P1 DoD is checked
so that all info are present!
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
P2 slot empty, most appropriate
from P3 is selected. P2 DoD
checked so that all required info
is present.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
If needed, a new task is created
in P3 from backlog list (DoD
checked first). This can instead
be done regularly (say weekly), to
”fill up” the priority triangle.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” analysis starts.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” analysis almost
completed, DoD criteria’s
checked before it is set to Done.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” design starts, break
down is needed (no worries
about ”too many post-its”, WIP is
controlled by swim lane).
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” design almost done,
DoD criteria’s checked before
putting to the Done section.
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” development starts,
even further break-down is
needed to allow parallelism
(remember, this is no problem)
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” development and test in
parallell (DoD check frequently to
not miss out on anything)
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
…
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
…
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
…
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
…
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
…
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
All sub-tasks for Story ”B” ready
to be deployed, DoD is checked
first!
DONE
EXPEDITE (FAST LANE)
- Cake limit
- Retros interval
- Celebration!
PRIORITY
TRIANGLE
(BACKLOG)
P3 (12)
P2 (6)
P1 (3)
ANALYSIS DESIGN DEV. TEST DEPLOY.
GOALS
Visible DoDs for each step
= System improvements
= Features
= Bugs
CLASSES OF SERVICE
ONGOING
DOING DONE DOINGDOING DOING DOING DONEDONEDONE
”The arrow” - Explained
Story ”B” done, the cycle starts
all over (but we are three tasks
closer to cake celebration! :)

More Related Content

What's hot

20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
Craeg Strong
 
Henrik Kniberg: Lean from the Trenches keynote @ AgileEE
Henrik Kniberg: Lean from the Trenches keynote @ AgileEEHenrik Kniberg: Lean from the Trenches keynote @ AgileEE
Henrik Kniberg: Lean from the Trenches keynote @ AgileEE
Agileee
 

What's hot (20)

Scrum refinement
Scrum refinementScrum refinement
Scrum refinement
 
Kanban Workshop
Kanban WorkshopKanban Workshop
Kanban Workshop
 
Kanban 101 - 3 - Kanban Essentials
Kanban 101 - 3 - Kanban EssentialsKanban 101 - 3 - Kanban Essentials
Kanban 101 - 3 - Kanban Essentials
 
Lets kanban
Lets kanbanLets kanban
Lets kanban
 
Kanban boards step by step
Kanban boards step by stepKanban boards step by step
Kanban boards step by step
 
Scrumban
ScrumbanScrumban
Scrumban
 
Scrumban
ScrumbanScrumban
Scrumban
 
Pi Planning with Easy Agile Programs for Jira
Pi Planning with Easy Agile Programs for JiraPi Planning with Easy Agile Programs for Jira
Pi Planning with Easy Agile Programs for Jira
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for Beginners
 
20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
20190923 AgileDC 2019 Conf Kanban AntiPatterns: What you don't know *can* hur...
 
Kanban board!
Kanban board!Kanban board!
Kanban board!
 
Intro to Lean Software Development
Intro to Lean Software DevelopmentIntro to Lean Software Development
Intro to Lean Software Development
 
Intro to Kanban
Intro to KanbanIntro to Kanban
Intro to Kanban
 
Scrum 101
Scrum 101 Scrum 101
Scrum 101
 
SAFe Lego Game for learning Scaled Agile Framework PI Planning
SAFe Lego Game for learning Scaled Agile Framework PI PlanningSAFe Lego Game for learning Scaled Agile Framework PI Planning
SAFe Lego Game for learning Scaled Agile Framework PI Planning
 
Kanban 101
Kanban 101Kanban 101
Kanban 101
 
Henrik Kniberg: Lean from the Trenches keynote @ AgileEE
Henrik Kniberg: Lean from the Trenches keynote @ AgileEEHenrik Kniberg: Lean from the Trenches keynote @ AgileEE
Henrik Kniberg: Lean from the Trenches keynote @ AgileEE
 
Agile Kanban
Agile KanbanAgile Kanban
Agile Kanban
 
Pass the pennies - Lean game simulation
Pass the pennies - Lean game simulationPass the pennies - Lean game simulation
Pass the pennies - Lean game simulation
 
Kanban for Portfolio Management
Kanban for Portfolio ManagementKanban for Portfolio Management
Kanban for Portfolio Management
 

Viewers also liked

How to improve flow efficiency, remove the red bricks Agile2014
How to improve flow efficiency, remove the red bricks Agile2014How to improve flow efficiency, remove the red bricks Agile2014
How to improve flow efficiency, remove the red bricks Agile2014
Håkan Forss
 
Projekt en agil bromsmedicin - Andreas Larsson
Projekt en agil bromsmedicin - Andreas LarssonProjekt en agil bromsmedicin - Andreas Larsson
Projekt en agil bromsmedicin - Andreas Larsson
manssandstrom
 
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas BjorkholmAgile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
manssandstrom
 
Priorizacion de historias de usuario - caso practico
Priorizacion de historias de usuario - caso practicoPriorizacion de historias de usuario - caso practico
Priorizacion de historias de usuario - caso practico
Carlos Urshela
 

Viewers also liked (20)

The Volcano - Enterprise kanban board
The Volcano - Enterprise kanban boardThe Volcano - Enterprise kanban board
The Volcano - Enterprise kanban board
 
The Busy Bee Paradox Agile Tour Lille 2014
The Busy Bee Paradox Agile Tour Lille 2014The Busy Bee Paradox Agile Tour Lille 2014
The Busy Bee Paradox Agile Tour Lille 2014
 
Lean Tribe 30
Lean Tribe 30Lean Tribe 30
Lean Tribe 30
 
Kanban introduction
Kanban introductionKanban introduction
Kanban introduction
 
Advanced Kanban Boards
Advanced Kanban BoardsAdvanced Kanban Boards
Advanced Kanban Boards
 
Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps
 
Are you too busy to improve #lkse 2014-05-30
Are you too busy to improve #lkse 2014-05-30Are you too busy to improve #lkse 2014-05-30
Are you too busy to improve #lkse 2014-05-30
 
Experimentation is King Lean Kanban Central Europe 2015
Experimentation is King Lean Kanban Central Europe  2015Experimentation is King Lean Kanban Central Europe  2015
Experimentation is King Lean Kanban Central Europe 2015
 
KATA - Habits for lean learning Agile Australia 2016
KATA - Habits for lean learning Agile Australia 2016KATA - Habits for lean learning Agile Australia 2016
KATA - Habits for lean learning Agile Australia 2016
 
Make the invisible visible - Visual management in agile product development
Make the invisible visible - Visual management in agile product developmentMake the invisible visible - Visual management in agile product development
Make the invisible visible - Visual management in agile product development
 
How to improve flow efficiency, remove the red bricks Agile2014
How to improve flow efficiency, remove the red bricks Agile2014How to improve flow efficiency, remove the red bricks Agile2014
How to improve flow efficiency, remove the red bricks Agile2014
 
IEBS - Técnicas de priorización - Caso práctico
IEBS - Técnicas de priorización - Caso prácticoIEBS - Técnicas de priorización - Caso práctico
IEBS - Técnicas de priorización - Caso práctico
 
Projekt en agil bromsmedicin - Andreas Larsson
Projekt en agil bromsmedicin - Andreas LarssonProjekt en agil bromsmedicin - Andreas Larsson
Projekt en agil bromsmedicin - Andreas Larsson
 
Agila chefer - What's in it for me
Agila chefer - What's in it for meAgila chefer - What's in it for me
Agila chefer - What's in it for me
 
Typical FAIR Act Inventory Approval Process
Typical FAIR Act Inventory Approval ProcessTypical FAIR Act Inventory Approval Process
Typical FAIR Act Inventory Approval Process
 
Caso práctico técnicas de priorización - joaquín santodomingo
Caso práctico   técnicas de priorización - joaquín santodomingoCaso práctico   técnicas de priorización - joaquín santodomingo
Caso práctico técnicas de priorización - joaquín santodomingo
 
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas BjorkholmAgile och Kanban på driftavdelningen - Tomas Bjorkholm
Agile och Kanban på driftavdelningen - Tomas Bjorkholm
 
OOP 2012 - Kanban at Scale and why traditional approaches set you up for failure
OOP 2012 - Kanban at Scale and why traditional approaches set you up for failureOOP 2012 - Kanban at Scale and why traditional approaches set you up for failure
OOP 2012 - Kanban at Scale and why traditional approaches set you up for failure
 
Priorizacion de historias de usuario - caso practico
Priorizacion de historias de usuario - caso practicoPriorizacion de historias de usuario - caso practico
Priorizacion de historias de usuario - caso practico
 
Estimation Agile Projects
Estimation Agile ProjectsEstimation Agile Projects
Estimation Agile Projects
 

Similar to The Arrow - Advanced Kanban board

MLconf NYC Shan Shan Huang
MLconf NYC Shan Shan HuangMLconf NYC Shan Shan Huang
MLconf NYC Shan Shan Huang
MLconf
 

Similar to The Arrow - Advanced Kanban board (20)

MLconf NYC Shan Shan Huang
MLconf NYC Shan Shan HuangMLconf NYC Shan Shan Huang
MLconf NYC Shan Shan Huang
 
Risking Everything with Akka Streams
Risking Everything with Akka StreamsRisking Everything with Akka Streams
Risking Everything with Akka Streams
 
Microsoft NERD Talk - R and Tableau - 2-4-2013
Microsoft NERD Talk - R and Tableau - 2-4-2013Microsoft NERD Talk - R and Tableau - 2-4-2013
Microsoft NERD Talk - R and Tableau - 2-4-2013
 
Guidelines to clean coding
Guidelines to clean codingGuidelines to clean coding
Guidelines to clean coding
 
2 Years of Real World FP at REA
2 Years of Real World FP at REA2 Years of Real World FP at REA
2 Years of Real World FP at REA
 
Living with a Cephalopod: Daily Care & Feeding of Ceph Storage
Living with a Cephalopod: Daily Care & Feeding of Ceph StorageLiving with a Cephalopod: Daily Care & Feeding of Ceph Storage
Living with a Cephalopod: Daily Care & Feeding of Ceph Storage
 
Ceph Day SF 2015 - SysAdmin's Toolbox: Tools for Running Ceph in Production
Ceph Day SF 2015 - SysAdmin's Toolbox: Tools for Running Ceph in Production Ceph Day SF 2015 - SysAdmin's Toolbox: Tools for Running Ceph in Production
Ceph Day SF 2015 - SysAdmin's Toolbox: Tools for Running Ceph in Production
 
Defensive programming in Javascript and Node.js
Defensive programming in Javascript and Node.jsDefensive programming in Javascript and Node.js
Defensive programming in Javascript and Node.js
 
Hands on data science with r.pptx
Hands  on data science with r.pptxHands  on data science with r.pptx
Hands on data science with r.pptx
 
Elixir - GDG - Nantes
Elixir - GDG - NantesElixir - GDG - Nantes
Elixir - GDG - Nantes
 
Golang Performance : microbenchmarks, profilers, and a war story
Golang Performance : microbenchmarks, profilers, and a war storyGolang Performance : microbenchmarks, profilers, and a war story
Golang Performance : microbenchmarks, profilers, and a war story
 
Data Exploration with Apache Drill: Day 1
Data Exploration with Apache Drill:  Day 1Data Exploration with Apache Drill:  Day 1
Data Exploration with Apache Drill: Day 1
 
2022 - Delivering Powerful Technical Presentations.pdf
2022 - Delivering Powerful Technical Presentations.pdf2022 - Delivering Powerful Technical Presentations.pdf
2022 - Delivering Powerful Technical Presentations.pdf
 
The never changing face of immutability
The never changing face of immutabilityThe never changing face of immutability
The never changing face of immutability
 
Manage a Complex Test Effort with Lean and Kanban
Manage a Complex Test Effort with Lean and KanbanManage a Complex Test Effort with Lean and Kanban
Manage a Complex Test Effort with Lean and Kanban
 
Parallel R and Hadoop
Parallel R and HadoopParallel R and Hadoop
Parallel R and Hadoop
 
DevOps Training - Ho Chi Minh City
DevOps Training - Ho Chi Minh CityDevOps Training - Ho Chi Minh City
DevOps Training - Ho Chi Minh City
 
design-compiler.pdf
design-compiler.pdfdesign-compiler.pdf
design-compiler.pdf
 
Gsas intro rvd (1)
Gsas intro rvd (1)Gsas intro rvd (1)
Gsas intro rvd (1)
 
Command Line Applications with Ruby
Command Line Applications with RubyCommand Line Applications with Ruby
Command Line Applications with Ruby
 

Recently uploaded

%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
masabamasaba
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
VictoriaMetrics
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
masabamasaba
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 

Recently uploaded (20)

WSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaS
 
tonesoftg
tonesoftgtonesoftg
tonesoftg
 
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
 
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
 
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand
 
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
%+27788225528 love spells in Colorado Springs Psychic Readings, Attraction sp...
 
WSO2CON 2024 - WSO2's Digital Transformation Journey with Choreo: A Platforml...
WSO2CON 2024 - WSO2's Digital Transformation Journey with Choreo: A Platforml...WSO2CON 2024 - WSO2's Digital Transformation Journey with Choreo: A Platforml...
WSO2CON 2024 - WSO2's Digital Transformation Journey with Choreo: A Platforml...
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK Software
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
 
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
 

The Arrow - Advanced Kanban board

  • 1. The Arrow - Advanced kanban board © Pop Psychology - popsych.org 2015-06-21, Tomas Rybing, Aptilo Networks
  • 2. ”The arrow” - Design for kanban board DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE
  • 3. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Example
  • 4. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Last task for story ”A” is ready to be deployed in production.
  • 5. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”A” deployed and Done! Swim lane (=capacity) freed up for new story.
  • 6. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Business decision needed, all information on the board is considered. Story ”B” is selected as the most suitable to start working on. P1 DoD is checked so that all info are present!
  • 7. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained P2 slot empty, most appropriate from P3 is selected. P2 DoD checked so that all required info is present.
  • 8. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained If needed, a new task is created in P3 from backlog list (DoD checked first). This can instead be done regularly (say weekly), to ”fill up” the priority triangle.
  • 9. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” analysis starts.
  • 10. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” analysis almost completed, DoD criteria’s checked before it is set to Done.
  • 11. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” design starts, break down is needed (no worries about ”too many post-its”, WIP is controlled by swim lane).
  • 12. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” design almost done, DoD criteria’s checked before putting to the Done section.
  • 13. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” development starts, even further break-down is needed to allow parallelism (remember, this is no problem)
  • 14. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” development and test in parallell (DoD check frequently to not miss out on anything)
  • 15. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained …
  • 16. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained …
  • 17. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained …
  • 18. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained …
  • 19. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained …
  • 20. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained All sub-tasks for Story ”B” ready to be deployed, DoD is checked first!
  • 21. DONE EXPEDITE (FAST LANE) - Cake limit - Retros interval - Celebration! PRIORITY TRIANGLE (BACKLOG) P3 (12) P2 (6) P1 (3) ANALYSIS DESIGN DEV. TEST DEPLOY. GOALS Visible DoDs for each step = System improvements = Features = Bugs CLASSES OF SERVICE ONGOING DOING DONE DOINGDOING DOING DOING DONEDONEDONE ”The arrow” - Explained Story ”B” done, the cycle starts all over (but we are three tasks closer to cake celebration! :)