S-50 AMMONIA SYNTHESIS CONVERTER (R-3502)
Supplier: M/s MANGIAROTTI SpA
Transporter (Kandla port to NFL Vijaipur) : M/s Reshamsingh & Co Pvt Ltd., Mumbai
Operating conditions
Inlet Gas
Temperature oC 372
Pressure Kg/cm2 183.2
Total flow Nm3/hr 615,133
Composition
H2 Vol% 50.50
N2 Vol% 16.84
Inerts, CH4 + Ar Vol% 13.50
NH3 Vol% 19.16
Outlet Gas
Temperature oC 417
Pressure Kg/cm2 182.7
Total flow Nm3/hr 596,242
Composition
H2 Vol% 47.35
N2 Vol% 15.78
Inerts, CH4 + Ar Vol% 13.93
NH3 Vol% 22.94
Catalyst
Type KM1
Size mm 1.5-3
Diameters, OD (effective)/ ID mm 2,896 / 760
Height (excl./incl. bottom cone m 20,100 / 21,200
Volume m3 125,4
Mechanical Data (Pressure Vessel)
Type Vessel with top manhole
Inner diameter mm 3,000
Inner length (T-T) mm 20,250
Normal operating pressure Kg/cm2 g 183.1
Design pressure Kg/cm2 g 245
Hydrogen partial pressure, design Kg/cm2 130
Temperature of Operating Design
Cover and cylinder part oC 372 430
Spherical bottom oC 372 430
Bottom forging oC 419 450
Bottom flange oC 419 450
Nozzle sizes
Main inlet inch 16
outlet inch 16
Installation of S-50 ammonia synthesis
converter along with waste heat boiler in
downstream of existing S-200 ammonia
synthesis converter is one of the major
scheme of Capacity Enhancement Project of
Ammonia-II plant.
Pre shutdown activity
The anchor bolts were position with the help of template during casting of top portion of
foundation of S-50 ammonia synthesis converter and the same was grouted with Shrinkom-
20 after completion of civil work and removal of template. Top surface of foundation was
prepared for placement of equipment.
First of all skirt were placed on foundation and leveled at elevation of 106.200 mtr. with the
help of MS plats and gaps between base plate of skirt and civil foundation was filled by
Shrinkom-20.
After placement of skirt, S-50 ammonia synthesis converter was placed and leveled /
centered on skirt with the help of Demag CC2800-1and CC2000 crane on 12.08.2011.
Erection plan submitted by M/s Sarens Heavy Lift India Pvt. Ltd., party engaged by piping &
equipment erection contractor (M/s Satnam Global Infraprojects Ltd., Delhi) for heavy
equipment erection alongwith cranes is enclosed.
After opening of top cover and outer screen panel covers, joint inspection was done by NFL /
HTAS to check any damage during transportation / erection and found Ok. Lot of rust as
scale was found on inside surface of reactor which was vacuum cleaned before catalyst
loading.
Catalyst was charged with the help of shower head from 31.01.2012 to 06.02.2012 by M/s
Amol Construction in presence of HTAS representative Mr. AsadRadfar. The approximate
density of catalyst achieved was 2.95 Kg/litre. During charging of catalyst, support
provided for centre screen and outer screen panels were removed which was provided by
the supplier to avoid any damage while transit.
After catalyst loading, outer screen panel cover boxed up and tack weld as instructed by
HTAS. Gland packing of stuffing box (centre screen and outer screen panel cover flange)
checked and found OK. Top cover and bottom cover were boxed up with the help of bolt
tightening device and lip seal welded with Inconel filler wire.
Insulation job of S-50 Ammonia synthesis converter (160.0 mm thick) and connecting pipe
line job done by M/s Kaefer Punj Lloyd Limited.
Shutdown Activity:
All the prefabricated pipelines were hydrotest at 367.5 Kg/cm2 before hookup with existing
header and S-50 converter. RT of the all weld joint done on half weld and UT at full weld joint
of pipe line. Stress reliving of alloy steel pipe weld joint (2.25Cr 1Mo steel) was done as per
ASME section and Hardness was achieved below 220 HB. Instrumentation, Electrical and
Structure job were taken care by respective department.
*****************************************************************

More Related Content

What's hot

What's hot (20)

Ammonia synthesis converter
Ammonia synthesis converterAmmonia synthesis converter
Ammonia synthesis converter
 
Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers -
 
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdfA case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
 
Theory and Operation VSG-A101 Ammonia Synthesis Catalyst
Theory and Operation VSG-A101 Ammonia Synthesis CatalystTheory and Operation VSG-A101 Ammonia Synthesis Catalyst
Theory and Operation VSG-A101 Ammonia Synthesis Catalyst
 
Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst Loading
 
Theory and Practice of Steam Reforming
Theory and Practice of Steam ReformingTheory and Practice of Steam Reforming
Theory and Practice of Steam Reforming
 
Steam Reforming - Carbon Formation
Steam Reforming - Carbon FormationSteam Reforming - Carbon Formation
Steam Reforming - Carbon Formation
 
A presentation on reformer new
A presentation on reformer newA presentation on reformer new
A presentation on reformer new
 
Introduction To Syngas Plant Flowsheet Options
Introduction To Syngas Plant Flowsheet OptionsIntroduction To Syngas Plant Flowsheet Options
Introduction To Syngas Plant Flowsheet Options
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
 
Principles of Pre-reforming Technology
Principles of Pre-reforming TechnologyPrinciples of Pre-reforming Technology
Principles of Pre-reforming Technology
 
Secondary Reforming Flowsheets
Secondary Reforming FlowsheetsSecondary Reforming Flowsheets
Secondary Reforming Flowsheets
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
Steam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewSteam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive Review
 
Reduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming CatalystReduction and Start-Up of Steam Reforming Catalyst
Reduction and Start-Up of Steam Reforming Catalyst
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical Supplement
 
Naphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 CrackingNaphtha Steam Reforming Catalyst Reduction by NH3 Cracking
Naphtha Steam Reforming Catalyst Reduction by NH3 Cracking
 
Gas Heated Reforming - An Overview
Gas Heated Reforming - An OverviewGas Heated Reforming - An Overview
Gas Heated Reforming - An Overview
 
Benfield system
Benfield systemBenfield system
Benfield system
 
Ammonia Plant - Secondary Reforming
Ammonia Plant - Secondary ReformingAmmonia Plant - Secondary Reforming
Ammonia Plant - Secondary Reforming
 

Similar to S 50 ammonia convertor

Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
Vijay Raj
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
Minh Bui Si
 
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's StatusFirst Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
R SIVAKUMAR
 

Similar to S 50 ammonia convertor (20)

Performance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic JackPerformance Evaluation for Production of 5000kgHydraulic Jack
Performance Evaluation for Production of 5000kgHydraulic Jack
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
Process Design for Natural Gas Transmission
Process Design for Natural Gas TransmissionProcess Design for Natural Gas Transmission
Process Design for Natural Gas Transmission
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Ethylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaEthylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper china
 
Erection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressurepartsErection guidelinesfor500mw boilerpressureparts
Erection guidelinesfor500mw boilerpressureparts
 
35.pdf
35.pdf35.pdf
35.pdf
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's StatusFirst Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
 
AIR BRAKE SYSTEM
AIR BRAKE SYSTEMAIR BRAKE SYSTEM
AIR BRAKE SYSTEM
 
AIR BRAKE SYSTEM
AIR BRAKE SYSTEMAIR BRAKE SYSTEM
AIR BRAKE SYSTEM
 
Design and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure AccumulatorDesign and Stress Analysis of High Pressure Accumulator
Design and Stress Analysis of High Pressure Accumulator
 
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...IRJET- 	 A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
IRJET- A Case Study: In-Situ Weld Repair of Steel Casting of Grade C12A AST...
 
Ijmet 10 02_002
Ijmet 10 02_002Ijmet 10 02_002
Ijmet 10 02_002
 
Training PPT
Training PPTTraining PPT
Training PPT
 
Thermal analysis of piston
Thermal analysis of pistonThermal analysis of piston
Thermal analysis of piston
 
Standard erection manual (pressure parts)
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
 
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
 

More from Prem Baboo

High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)
Prem Baboo
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plants
Prem Baboo
 

More from Prem Baboo (20)

The explosion hazard in urea process (1)
The explosion hazard in urea process (1)The explosion hazard in urea process (1)
The explosion hazard in urea process (1)
 
Urea process flow diagram
Urea process flow diagramUrea process flow diagram
Urea process flow diagram
 
Materialtechnologyforfertilizersindustries
MaterialtechnologyforfertilizersindustriesMaterialtechnologyforfertilizersindustries
Materialtechnologyforfertilizersindustries
 
Neemcoatedureaaphilosophyforenvironment
NeemcoatedureaaphilosophyforenvironmentNeemcoatedureaaphilosophyforenvironment
Neemcoatedureaaphilosophyforenvironment
 
Nano ureathephilosophyoffuture
Nano ureathephilosophyoffutureNano ureathephilosophyoffuture
Nano ureathephilosophyoffuture
 
Super conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency traysSuper conversion in urea reactors with super cup high efficiency trays
Super conversion in urea reactors with super cup high efficiency trays
 
Ammonia plant material balance
Ammonia plant material balanceAmmonia plant material balance
Ammonia plant material balance
 
Sswi april may-2021_lowres
Sswi april may-2021_lowresSswi april may-2021_lowres
Sswi april may-2021_lowres
 
Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1Sweet and sour experience of commissioning 1
Sweet and sour experience of commissioning 1
 
How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...How to improve safety and reliability of the high pressure section of urea pl...
How to improve safety and reliability of the high pressure section of urea pl...
 
Experience of material in fertilizers industries
Experience of material in fertilizers industriesExperience of material in fertilizers industries
Experience of material in fertilizers industries
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology book
 
High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)High pressure vessel_leakage_in_urea_plants (1)
High pressure vessel_leakage_in_urea_plants (1)
 
High pressure vessel leakage in urea plants
High pressure vessel leakage in urea plantsHigh pressure vessel leakage in urea plants
High pressure vessel leakage in urea plants
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
P & i diagram and tagging philosphy for
P & i diagram and tagging philosphy forP & i diagram and tagging philosphy for
P & i diagram and tagging philosphy for
 
Ureaplantenergysavingbyselectionoflinermaterialandinernals
UreaplantenergysavingbyselectionoflinermaterialandinernalsUreaplantenergysavingbyselectionoflinermaterialandinernals
Ureaplantenergysavingbyselectionoflinermaterialandinernals
 
5000 tpd urea mega plants design
5000 tpd urea  mega plants design5000 tpd urea  mega plants design
5000 tpd urea mega plants design
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

S 50 ammonia convertor

  • 1. INSTALLATION OF S-50 AMMONIA CONVERTOR Prem Baboo Sr.Manager (Prod) National fertilizers Ltd. India S-50 AMMONIA SYNTHESIS CONVERTER (R-3502) Supplier: M/s MANGIAROTTI SpA Transporter (Kandla port to NFL Vijaipur) : M/s Reshamsingh & Co Pvt Ltd., Mumbai
  • 2. Operating conditions Inlet Gas Temperature oC 372 Pressure Kg/cm2 183.2 Total flow Nm3/hr 615,133 Composition H2 Vol% 50.50 N2 Vol% 16.84 Inerts, CH4 + Ar Vol% 13.50 NH3 Vol% 19.16 Outlet Gas Temperature oC 417 Pressure Kg/cm2 182.7 Total flow Nm3/hr 596,242 Composition H2 Vol% 47.35 N2 Vol% 15.78 Inerts, CH4 + Ar Vol% 13.93 NH3 Vol% 22.94 Catalyst Type KM1 Size mm 1.5-3 Diameters, OD (effective)/ ID mm 2,896 / 760 Height (excl./incl. bottom cone m 20,100 / 21,200 Volume m3 125,4 Mechanical Data (Pressure Vessel) Type Vessel with top manhole Inner diameter mm 3,000 Inner length (T-T) mm 20,250 Normal operating pressure Kg/cm2 g 183.1 Design pressure Kg/cm2 g 245 Hydrogen partial pressure, design Kg/cm2 130 Temperature of Operating Design Cover and cylinder part oC 372 430 Spherical bottom oC 372 430 Bottom forging oC 419 450 Bottom flange oC 419 450 Nozzle sizes Main inlet inch 16 outlet inch 16 Installation of S-50 ammonia synthesis converter along with waste heat boiler in downstream of existing S-200 ammonia synthesis converter is one of the major scheme of Capacity Enhancement Project of Ammonia-II plant. Pre shutdown activity
  • 3. The anchor bolts were position with the help of template during casting of top portion of foundation of S-50 ammonia synthesis converter and the same was grouted with Shrinkom- 20 after completion of civil work and removal of template. Top surface of foundation was prepared for placement of equipment. First of all skirt were placed on foundation and leveled at elevation of 106.200 mtr. with the help of MS plats and gaps between base plate of skirt and civil foundation was filled by Shrinkom-20. After placement of skirt, S-50 ammonia synthesis converter was placed and leveled / centered on skirt with the help of Demag CC2800-1and CC2000 crane on 12.08.2011. Erection plan submitted by M/s Sarens Heavy Lift India Pvt. Ltd., party engaged by piping & equipment erection contractor (M/s Satnam Global Infraprojects Ltd., Delhi) for heavy equipment erection alongwith cranes is enclosed. After opening of top cover and outer screen panel covers, joint inspection was done by NFL / HTAS to check any damage during transportation / erection and found Ok. Lot of rust as
  • 4. scale was found on inside surface of reactor which was vacuum cleaned before catalyst loading. Catalyst was charged with the help of shower head from 31.01.2012 to 06.02.2012 by M/s Amol Construction in presence of HTAS representative Mr. AsadRadfar. The approximate density of catalyst achieved was 2.95 Kg/litre. During charging of catalyst, support provided for centre screen and outer screen panels were removed which was provided by the supplier to avoid any damage while transit. After catalyst loading, outer screen panel cover boxed up and tack weld as instructed by HTAS. Gland packing of stuffing box (centre screen and outer screen panel cover flange) checked and found OK. Top cover and bottom cover were boxed up with the help of bolt tightening device and lip seal welded with Inconel filler wire. Insulation job of S-50 Ammonia synthesis converter (160.0 mm thick) and connecting pipe line job done by M/s Kaefer Punj Lloyd Limited. Shutdown Activity: All the prefabricated pipelines were hydrotest at 367.5 Kg/cm2 before hookup with existing header and S-50 converter. RT of the all weld joint done on half weld and UT at full weld joint of pipe line. Stress reliving of alloy steel pipe weld joint (2.25Cr 1Mo steel) was done as per ASME section and Hardness was achieved below 220 HB. Instrumentation, Electrical and Structure job were taken care by respective department.
  • 5.