General
 For the different construction activities like
 Brick work above 5 ft
 Surface finishing works like plastering, painting, walling
etc.
 Renovation, repair and alteration works.
 Roof and slab pouring
Some temporary nature supports and structures are required
like
 Formwork (Supporting Structure)
 Scaffoldings (arrangement for working plate forms)
 Shoring (supporting method for unsafe structure)
 Underpinning (Method of strengthening an existing
structure’s footing)
Form work
 Definition
 Qualities of formwork
 Types of formwork
 Formwork detail for different structural
members
 Removal of formwork
 Maintenance of formwork
 Cost of formwork
 Advantages of steel form work
Definition
 Its is an artificial support provided below and around
the precast or cast in situ concrete work.
 Formwork is commonly made of
 Steel
 wood
 Formwork construction & casting is of prime
importance in concrete industry. It share a
significant amount of concrete cost. (20% to 25%).
 When concrete has reached a certain required
strength, the form is no longer needed & removed.
The operation of removing the form work is known
as stripping.
Qualities of formwork
 It should be according to
IS 456-2000.
 It should be practically water proof so
that it should not absorb water from
concrete.
 It should be strong.
 It can be cheaper & reusable
 It should be according to the size of
member.
Qualities of formwork
 It should be with minimum shrinkage &
swelling.
 It should be stiff enough against it’s
deflection, buckling under load.
 Its contact surface should be uniform.
 It should be light in weight
Types of formwork
 Formwork are mainly of two types
 Steel formwork
 Wooden formwork
 Steel formwork is made of
 steel sheets
 Angle Iron
 Tee Iron
 Wooden formwork consists of
 Props
 Planks battens
 Ledgers
 sheeting
Causes of failure
 Overloading of any props when
sufficient number or size of props not
provided.
 Failure of shuttering due to excessive
vibrations of needle surface vibrators.
 Failure due to improper supervision,
inadequate design/ planning of
shuttering, centering & concreting
activity.
Causes of failure
 Failure due to dislocation of props or
bracing due to careless movement of
labours having access below the
formwork of slab or beam.
 Failure due to insufficient cross
bracing. Cross bracing improve the
stiffness of props against buckling.
Formwork detail for different
structural members
 In concrete construction formwork is
commonly provided for the following
structural members.
 Foundations
 Wall
 Column
 Slabs & beams
 Stairs
Formwork for Foundations
 Wall foundations
 It consists of
 Plywood
Sheeting
 Struts
Formwork for Foundations
 Column
Foundations
 It consists of
 Side Supports
 Side Planks
 Cleats
Side Support
Side Planks
Cleats
Formwork
for Wall
 It consists of
 Timber sheeting
 Vertical posts
 Horizontal members
 Rackers
 Stakes
 Wedges
 After completing
one side of
formwork
reinforcement is
provided at the
place then the
second side
formwork is
provided.
Vertical Posts
Struts
Formwork for
Column
 It consists of the
following
 Side & End Planks
 Yoke
 Nut & Bolts
 Two end & two side
planks are joined by
the yokes and bolts.
Column
form work
Formwork for Slabs & beams
 It consists of
 Sole plates
 Wedges
 Props
 Head tree
 Planks
 Batten
 Ledgers
 Beam formwork
rests on head tree
 Slab form work rests
on battens and joists
 If prop height are
more than 8’ provide
horizontal braces.
Lintel or Beam Formwork
Formwork for Stairs
 It consists of
 Vertical & inclined
posts
 Inclined members
 Wooden Planks or
sheeting
 Stringer
 Riser Planks
Riser Planks
Removal of formwork
Time of formwork removal mainly depends on
the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as
compared to OPC (Ordinary Portland Cement)
2. Ratio of concrete mix
1. Rich ratio concrete gain strength earlier as
compared to weak ratio concrete.
3. Weather condition
1. Hydration process accelerates in hot weather
conditions as compared to cold and humid
weather conditions.
Stripping Time
Sr.
No.
Structural Member Stripping Time
1 Beam sides, walls & Columns 1-2 Days as decided by
Engineer-in-charge
2 Slab Soffits (props left under) 3 Days
3 Beams Soffits (props left under) 7 Days
4 Removal of props to slabs:
i) Spanning up to 4.5 m
ii) Spanning over 4.5 m
7 Days
14 Days
5 Removal of props to Beams & Arches:
i) Spanning up to 6 m
ii) Spanning over 6 m
14 Days
21 Days
Maintenance of formwork
 Due to continuous use wooden planks &
steel plates surfaces become uneven and
require maintenance.
 For wooden formwork use cardboard or
plastic fiber board. Bolt hole places must
also be repaired.
 For steel formwork plates must be leveled
by mallet and loose corners must be
welded.
Cost of formwork
 For normal works cost of formwork is about
30%-40% of the concrete cost.
 For special works cost of formwork is about
50%-60% of the concrete cost.
 Formwork cost is controlled by the following
factors
 Formwork Material cost
 Formwork erecting cost
 Formwork removal cost
 Formwork jointing cost (Nails and Cables)
 Labor charges.
Advantages of steel form work
 It can be used for a numbers of times.
 It is non absorbent.
 Smooth finish surface obtained.
 No shrinkage of formwork occurs.
 Easy to use.
 Its volume is less
 Its strength is more.
Formwork

More Related Content

What's hot

Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircasesKHUSHBU SHAH
 
Scaffolding & underpinning
Scaffolding & underpinningScaffolding & underpinning
Scaffolding & underpinningJitesh Dhule
 
Bricks bats and closers
Bricks bats and closersBricks bats and closers
Bricks bats and closersSahil Pahal
 
STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.Mehul Gohil
 
Types of bonds in brick masonry
Types of bonds in brick masonryTypes of bonds in brick masonry
Types of bonds in brick masonryMaliha Mehr
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructiontivar rose
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONRavindra Patnayaka
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building ConstructionEr.Karan Chauhan
 
Steel grillage fondation
Steel grillage fondation Steel grillage fondation
Steel grillage fondation komal prasad
 

What's hot (20)

Brickwork bond ppt
Brickwork bond pptBrickwork bond ppt
Brickwork bond ppt
 
Formwork
FormworkFormwork
Formwork
 
Chapter 7 stairs & staircases
Chapter 7 stairs & staircasesChapter 7 stairs & staircases
Chapter 7 stairs & staircases
 
Scaffolding & underpinning
Scaffolding & underpinningScaffolding & underpinning
Scaffolding & underpinning
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Brick masonary
Brick masonaryBrick masonary
Brick masonary
 
Bricks bats and closers
Bricks bats and closersBricks bats and closers
Bricks bats and closers
 
Construction material paint
Construction material paintConstruction material paint
Construction material paint
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.STEEL STRUCTURE CONSTRUCTION.
STEEL STRUCTURE CONSTRUCTION.
 
Types of bonds in brick masonry
Types of bonds in brick masonryTypes of bonds in brick masonry
Types of bonds in brick masonry
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
blockwork
 blockwork blockwork
blockwork
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
Steel grillage fondation
Steel grillage fondation Steel grillage fondation
Steel grillage fondation
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 

Similar to Formwork

8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdfFaizanSolanki
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldingsHamdija Velagic
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningkuldeep361335
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shutteringKishor Ade
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''Nabeel Rajpoot
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 

Similar to Formwork (20)

8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldings
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 
formwork.pdf
formwork.pdfformwork.pdf
formwork.pdf
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
FormWork
FormWork FormWork
FormWork
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Formwork
FormworkFormwork
Formwork
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 

More from Jitesh Dhule

More from Jitesh Dhule (9)

Stone masonry
Stone masonryStone masonry
Stone masonry
 
Safety in construction
Safety in constructionSafety in construction
Safety in construction
 
Foundation
FoundationFoundation
Foundation
 
Staircase
StaircaseStaircase
Staircase
 
Masonry special features
Masonry special featuresMasonry special features
Masonry special features
 
Flooring
FlooringFlooring
Flooring
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Bricks
BricksBricks
Bricks
 
Arches
ArchesArches
Arches
 

Recently uploaded

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

Formwork

  • 2. General  For the different construction activities like  Brick work above 5 ft  Surface finishing works like plastering, painting, walling etc.  Renovation, repair and alteration works.  Roof and slab pouring Some temporary nature supports and structures are required like  Formwork (Supporting Structure)  Scaffoldings (arrangement for working plate forms)  Shoring (supporting method for unsafe structure)  Underpinning (Method of strengthening an existing structure’s footing)
  • 3. Form work  Definition  Qualities of formwork  Types of formwork  Formwork detail for different structural members  Removal of formwork  Maintenance of formwork  Cost of formwork  Advantages of steel form work
  • 4. Definition  Its is an artificial support provided below and around the precast or cast in situ concrete work.  Formwork is commonly made of  Steel  wood  Formwork construction & casting is of prime importance in concrete industry. It share a significant amount of concrete cost. (20% to 25%).  When concrete has reached a certain required strength, the form is no longer needed & removed. The operation of removing the form work is known as stripping.
  • 5. Qualities of formwork  It should be according to IS 456-2000.  It should be practically water proof so that it should not absorb water from concrete.  It should be strong.  It can be cheaper & reusable  It should be according to the size of member.
  • 6. Qualities of formwork  It should be with minimum shrinkage & swelling.  It should be stiff enough against it’s deflection, buckling under load.  Its contact surface should be uniform.  It should be light in weight
  • 7. Types of formwork  Formwork are mainly of two types  Steel formwork  Wooden formwork  Steel formwork is made of  steel sheets  Angle Iron  Tee Iron  Wooden formwork consists of  Props  Planks battens  Ledgers  sheeting
  • 8. Causes of failure  Overloading of any props when sufficient number or size of props not provided.  Failure of shuttering due to excessive vibrations of needle surface vibrators.  Failure due to improper supervision, inadequate design/ planning of shuttering, centering & concreting activity.
  • 9. Causes of failure  Failure due to dislocation of props or bracing due to careless movement of labours having access below the formwork of slab or beam.  Failure due to insufficient cross bracing. Cross bracing improve the stiffness of props against buckling.
  • 10. Formwork detail for different structural members  In concrete construction formwork is commonly provided for the following structural members.  Foundations  Wall  Column  Slabs & beams  Stairs
  • 11. Formwork for Foundations  Wall foundations  It consists of  Plywood Sheeting  Struts
  • 12. Formwork for Foundations  Column Foundations  It consists of  Side Supports  Side Planks  Cleats Side Support Side Planks Cleats
  • 13. Formwork for Wall  It consists of  Timber sheeting  Vertical posts  Horizontal members  Rackers  Stakes  Wedges  After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided. Vertical Posts Struts
  • 14. Formwork for Column  It consists of the following  Side & End Planks  Yoke  Nut & Bolts  Two end & two side planks are joined by the yokes and bolts.
  • 16.
  • 17. Formwork for Slabs & beams  It consists of  Sole plates  Wedges  Props  Head tree  Planks  Batten  Ledgers  Beam formwork rests on head tree  Slab form work rests on battens and joists  If prop height are more than 8’ provide horizontal braces.
  • 18. Lintel or Beam Formwork
  • 19. Formwork for Stairs  It consists of  Vertical & inclined posts  Inclined members  Wooden Planks or sheeting  Stringer  Riser Planks Riser Planks
  • 20.
  • 21. Removal of formwork Time of formwork removal mainly depends on the following factors 1. Type of Cement 1. Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2. Ratio of concrete mix 1. Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 22. Stripping Time Sr. No. Structural Member Stripping Time 1 Beam sides, walls & Columns 1-2 Days as decided by Engineer-in-charge 2 Slab Soffits (props left under) 3 Days 3 Beams Soffits (props left under) 7 Days 4 Removal of props to slabs: i) Spanning up to 4.5 m ii) Spanning over 4.5 m 7 Days 14 Days 5 Removal of props to Beams & Arches: i) Spanning up to 6 m ii) Spanning over 6 m 14 Days 21 Days
  • 23. Maintenance of formwork  Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance.  For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired.  For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 24. Cost of formwork  For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors  Formwork Material cost  Formwork erecting cost  Formwork removal cost  Formwork jointing cost (Nails and Cables)  Labor charges.
  • 25. Advantages of steel form work  It can be used for a numbers of times.  It is non absorbent.  Smooth finish surface obtained.  No shrinkage of formwork occurs.  Easy to use.  Its volume is less  Its strength is more.